CN210827307U - Ecological bank protection of garden design - Google Patents
Ecological bank protection of garden design Download PDFInfo
- Publication number
- CN210827307U CN210827307U CN201921133092.5U CN201921133092U CN210827307U CN 210827307 U CN210827307 U CN 210827307U CN 201921133092 U CN201921133092 U CN 201921133092U CN 210827307 U CN210827307 U CN 210827307U
- Authority
- CN
- China
- Prior art keywords
- support rod
- wood piles
- rod
- bank
- wood
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses an ecological bank protection of garden design, including setting up in the first cradling piece of nearly bank position department to and set up in the second cradling piece that one side of riverbank was kept away from to first cradling piece, form 60cm ~80cm wide clearance between first cradling piece and the second cradling piece, inserted many first pegs at this clearance department, and many second pegs, first peg laminating first cradling piece, and contact between the adjacent first pegs, the second peg laminating the second cradling piece, and laminate between the adjacent second pegs, in clearance department, be located and fill between first peg and the second peg and have the stone layer, laid silt layer above the stone layer; this product can increase the sight, increases the river bank firmness, can also provide better safeguard effect simultaneously.
Description
Technical Field
The utility model relates to an ecological bank protection of garden design.
Background
The ecological slope protection is a slope protection technology for supporting a slope or a side slope by basic knowledge of subjects such as comprehensive engineering mechanics, soil science, ecology, botany and the like to form a comprehensive slope protection system consisting of plants or engineering and plants. After the excavation side slope is formed, the surface layer of the side slope is protected and reinforced by planting plants and utilizing the interaction (root anchoring effect) of the plants, rocks and soil bodies, so that the requirement on the stability of the surface layer of the side slope can be met, the slope protection mode of the damaged natural ecological environment can be recovered, and the method is an effective slope protection and slope fixing means.
The ecological revetment in the prior art mainly aims at large-scale ecosystem, such as large-scale rivers, depression etc. gardens belong to miniature ecosystem, therefore this type of large-scale ecological revetment can not promote, gardens belong to ornamental structure.
Therefore, the garden design ecological slope protection capable of increasing ornamental value, increasing the firmness of the river bank and simultaneously providing better protection effect is designed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a can increase the sight, increase the river bank firmness, can also provide better safeguard effect's the ecological bank protection of garden design simultaneously.
The utility model discloses a realize through following technical scheme:
a garden design ecological slope protection comprises a first support rod arranged at a position close to a bank and a second support rod arranged at one side of the first support rod far away from the bank, wherein a gap with the width of 60 cm-80 cm is formed between the first support rod and the second support rod, a plurality of first wood piles and a plurality of second wood piles are inserted into the gap, the first wood piles are attached to the first support rod, adjacent first wood piles are contacted, the second wood piles are attached to the second support rod and are attached to adjacent second wood piles, a stone layer is filled between the first wood piles and the second wood piles at the gap, a sludge layer is laid above the stone layer, holes are drilled on the side surfaces of the first wood piles, transversely penetrate through the first wood piles, reinforcing rods are assembled through the holes and are wood rods, the left ends of the reinforcing rods penetrate through the first wood piles and then are inserted into the bank, the right end of the reinforcing rod is located at the gap, the reinforcing rod is located above the silt layer, the upper end face of the first timber pile is flush with the surface of the river bank, the upper end of the second timber pile protrudes to the surface of the river bank by 60-120 cm, the lower ends of the first timber pile and the second timber pile are both processed to form spine portions, a connecting rod is welded on the right side of the first support rod, a nut is assembled after the connecting rod penetrates through the second support rod towards the right side, a plurality of rotary seats are welded on the side face, away from the first support rod, of the second support rod, sleeve rods are matched with the rotary seats, pin shafts are matched between the sleeve rods and the rotary seats, auxiliary support rods are inserted into the sleeve rods, the right end of the reinforcing rod is processed to form a large end portion, and the diameter of the large end portion is larger than the aperture of the holes.
Preferably, a screw is screwed into the top of the first timber pile, the upper end of the screw is provided with a cap, an annular wire binding groove is processed on the outer wall of the cap, a polygonal stressed part is processed on the outer wall of the cap, a steel cable is bound through the wire binding groove, an anchor rod is bound on one end of the steel cable far away from the cap, the lower end of the anchor rod is driven into a river bank, and a stressed block is processed on the upper end of the anchor rod; the main effect of above-mentioned structure lies in, at the shaping initial stage of this product, and the firmness between first stake and the ground probably exists inadequately, when the earth of river bank takes place to collapse, probably causes the slope of first stake, therefore we have designed the cable wire, and the one end of cable wire is passed through between screw and the first stake fixedly, and the other end of cable wire passes through between stock and the ground fixedly, and the interval of cable wire between stock and screw is greater than 120 cm.
Preferably, the first support rod and the second support rod are both hollow stainless steel rods, and the wall thickness is 2 mm-6 mm.
Preferably, a plurality of annular growth grooves are provided at the outer wall of the large end portion, the growth grooves being provided to facilitate growth of moss or other aquatic plants.
The utility model has the advantages that:
1) a space for fish, shrimp, crab and other organisms to grow is formed between the first timber pile and the second timber pile, and the presence of aquatic animals in gardens can increase ornamental value.
2) The stone layer filled between the first timber pile and the second timber pile can play a shaping effect, so that the distance between the first timber pile and the second timber pile is fixed, the first timber pile and the second timber pile are ensured to have the most space for aquatic animal activities, and aquatic plant growth is provided;
3) common aquatic plants such as water lily, bowl lotus and the like can be planted through the sludge layer, so that the beautifying effect is achieved;
4) the first wood piles are flush with the surface of the river bank, so that people can closely observe aquatic plants and animals positioned on the first wood piles and the second wood piles, the height of the second wood piles is higher than that of the river bank, the guardrail function is achieved, people are prevented from falling into the river, and meanwhile, the space between the first wood piles and the second wood piles can be prevented from closely contacting the second wood piles;
5) the design of the reinforcing rod can ensure that the connection between the first timber pile and the river bank is firmer;
6) the first timber pile is designed to achieve the effect of soil stabilization, and soil loss after soil on the river bank is loosened is avoided.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a top view of the present invention;
fig. 2 is a schematic view of the installation of the present invention;
FIG. 3 is a front view of a stiffening rod;
fig. 4 is a schematic view of the assembly of the steel cord.
Detailed Description
All of the features disclosed in this specification, or all of the steps in any method or process so disclosed, may be combined in any combination, except combinations of features and/or steps that are mutually exclusive.
Any feature disclosed in this specification (including any accompanying claims, abstract and drawings), may be replaced by alternative features serving equivalent or similar purposes, unless expressly stated otherwise. That is, unless expressly stated otherwise, each feature is only an example of a generic series of equivalent or similar features.
In the description of the present invention, it is to be understood that the terms "one end", "the other end", "the outside", "upper", "inside", "horizontal", "coaxial", "central", "end", "length", "outer end", etc. indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, in the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise explicitly specified or limited, the terms "set", "coupled", "connected", "penetrating", "plugging", and the like are to be understood in a broad sense, and may be, for example, fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
As shown in fig. 1, 2, 3 and 4, the garden design ecological slope protection comprises a first support rod 1 arranged at a position close to the bank and a second support rod 2 arranged at a side of the first support rod 1 far from the bank, a gap 3 with a width of 60 cm-80 cm is formed between the first support rod 1 and the second support rod 2, a plurality of first wood piles 4 and a plurality of second wood piles 5 are inserted into the gap 3, the first wood piles 4 are attached to the first support rod 1 and are contacted with each other between adjacent first wood piles 4, the second wood piles 5 are attached to the second support rod 2 and are attached to each other between adjacent second wood piles 5, a stone layer 6 is filled between the first wood piles 4 and the second wood piles 5 at the gap 3, a sludge layer 7 is laid above the stone layer 6, a hole 411 is drilled at the side surface of the first wood pile 4, and transversely penetrates through the first wood piles 4, a reinforcing rod 9 is assembled through the hole 411, the reinforcing rod 9 is a wood rod, the left end of the reinforcing rod 9 penetrates through the first wood pile 4 and then is inserted into the bank, the right end of the reinforcing rod 9 is positioned at a gap, the reinforcing rod 9 is positioned above the sludge layer 7, the upper end surface of the first wood pile 4 is flush with the surface of the bank, the upper end of the second wood pile 5 protrudes to the surface of the bank by 70cm, the lower ends of the first wood pile 4 and the second wood pile 5 are both processed into a sharp-pointed part 10, a connecting rod 121 is welded on the right side of the first support rod 1, a nut 131 is assembled after the connecting rod 121 penetrates through the second support rod 2 on the right side, a plurality of rotating seats 141 are welded on the side surface of the second support rod 2 far away from the first support rod 1, a sleeve rod 151 is matched through the rotating seats 141, a pin 161 is matched between the sleeve rod 151 and the rotating seats 141, an auxiliary support rod 171 is inserted into the sleeve rod 151, the right end of the reinforcing bar 9 is formed with a large end portion 999, and the diameter of the large end portion 999 is larger than the diameter of the hole 411.
In a preferred embodiment of the present invention, a screw 11 is screwed into the top of the first timber pile 4, a cap 12 is provided at the upper end of the screw 11, an annular wire binding groove 13 is processed at the outer wall of the cap 12, a polygonal stressed portion 14 is processed at the outer wall of the cap 12, a steel cable 15 is bound through the wire binding groove 13, an anchor rod 16 is bound at the end of the steel cable 15 far away from the cap 12, the lower end of the anchor rod 16 is driven into the river bank, and a stressed block 17 is processed at the upper end of the anchor rod 16; the main effect of above-mentioned structure lies in, at the shaping initial stage of this product, and the firmness between first stake and the ground probably exists inadequately, when the earth of river bank takes place to collapse, probably causes the slope of first stake, therefore we have designed the cable wire, and the one end of cable wire is passed through between screw and the first stake fixedly, and the other end of cable wire passes through between stock and the ground fixedly, and the interval of cable wire between stock and screw is greater than 120 cm.
The utility model discloses in the embodiment of a preferred, first cradling piece 1 and second cradling piece 2 are hollow stainless steel pole, and the wall thickness is 4 mm.
In a preferred embodiment of the present invention, a plurality of annular growth grooves 998 are formed in the outer wall of the large end portion 999, and the growth grooves 998 are provided to facilitate the growth of moss or other aquatic plants.
The utility model has the advantages that:
1) a space for fish, shrimp, crab and other organisms to grow is formed between the first timber pile and the second timber pile, and the presence of aquatic animals in gardens can increase ornamental value.
2) The stone layer filled between the first timber pile and the second timber pile can play a shaping effect, so that the distance between the first timber pile and the second timber pile is fixed, the first timber pile and the second timber pile are ensured to have the most space for aquatic animal activities, and aquatic plant growth is provided;
3) common aquatic plants such as water lily, bowl lotus and the like can be planted through the sludge layer, so that the beautifying effect is achieved;
4) the first wood piles are flush with the surface of the river bank, so that people can closely observe aquatic plants and animals positioned on the first wood piles and the second wood piles, the height of the second wood piles is higher than that of the river bank, the guardrail function is achieved, people are prevented from falling into the river, and meanwhile, the space between the first wood piles and the second wood piles can be prevented from closely contacting the second wood piles;
5) the design of the reinforcing rod can ensure that the connection between the first timber pile and the river bank is firmer;
6) the first timber pile is designed to achieve the effect of soil stabilization, and soil loss after soil on the river bank is loosened is avoided.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that are not thought of through the creative work should be covered within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope defined by the claims.
Claims (4)
1. The utility model provides an ecological bank protection of garden design which characterized in that: the river bank reinforcing device comprises a first support rod arranged at a position close to a bank and a second support rod arranged at one side of the first support rod far away from the bank, wherein a gap with the width of 60-80 cm is formed between the first support rod and the second support rod, a plurality of first wood piles and a plurality of second wood piles are inserted into the gap, the first wood piles are attached to the first support rod, adjacent first wood piles are in contact, the second wood piles are attached to the second support rod, adjacent second wood piles are attached to each other, a stone layer is filled between the first wood piles and the second wood piles at the gap, a mud layer is laid above the stone layer, holes are drilled in the side surfaces of the first wood piles, transversely penetrate through the first wood piles, reinforcing rods are assembled through the holes and are wood rods, the left ends of the reinforcing rods penetrate through the first wood piles and then are inserted into the bank, the right end of the reinforcing rod is located at the gap, the reinforcing rod is located above the silt layer, the upper end face of the first timber pile is flush with the surface of the river bank, the upper end of the second timber pile protrudes to the surface of the river bank by 60-120 cm, the lower ends of the first timber pile and the second timber pile are both processed to form spine portions, a connecting rod is welded on the right side of the first support rod, a nut is assembled after the connecting rod penetrates through the second support rod towards the right side, a plurality of rotary seats are welded on the side face, away from the first support rod, of the second support rod, sleeve rods are matched with the rotary seats, pin shafts are matched between the sleeve rods and the rotary seats, auxiliary support rods are inserted into the sleeve rods, the right end of the reinforcing rod is processed to form a large end portion, and the diameter of the large end portion is larger than the aperture of the holes.
2. The ecological bank protection of garden design of claim 1, characterized in that: a screw is screwed into the top of the first timber pile, a cap is arranged at the upper end of the screw, an annular wire binding groove is processed at the outer wall of the cap, a polygonal stressed part is processed at the outer wall of the cap, a steel cable is bound through the wire binding groove, an anchor rod is bound at the end of the steel cable far away from the cap, the lower end of the anchor rod is driven into a river bank, and a stressed block is processed at the upper end of the anchor rod.
3. The ecological bank protection of garden design of claim 1, characterized in that: the first support rod and the second support rod are both hollow stainless steel rods, and the wall thickness is 2 mm-6 mm.
4. The ecological bank protection of garden design of claim 1, characterized in that: a plurality of annular growth grooves are provided at an outer wall of the large end portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921133092.5U CN210827307U (en) | 2019-07-18 | 2019-07-18 | Ecological bank protection of garden design |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921133092.5U CN210827307U (en) | 2019-07-18 | 2019-07-18 | Ecological bank protection of garden design |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210827307U true CN210827307U (en) | 2020-06-23 |
Family
ID=71261357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921133092.5U Expired - Fee Related CN210827307U (en) | 2019-07-18 | 2019-07-18 | Ecological bank protection of garden design |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210827307U (en) |
-
2019
- 2019-07-18 CN CN201921133092.5U patent/CN210827307U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210827307U (en) | Ecological bank protection of garden design | |
CN104213537A (en) | Combined design of substrate applicable to slope ecological transformation and construction method of substrate | |
Polster | Soil bioengineering techniques for riparian restoration | |
KR20090069865A (en) | Construction method of wellbeing slope use props | |
CN207829007U (en) | A kind of rock side slope ecological slope protection structure | |
Harding et al. | A prehistoric salt production site at Baile Figa, Romania | |
CN204540076U (en) | A kind of energy-conservation cliff greening system | |
CN204518865U (en) | Durable firm ecological fish water hole | |
CN211571752U (en) | Landscape garden design ecological slope protection | |
KR101363313B1 (en) | A Stone Mat for structuring a vegetable rapids applied to civil, road, park, water resorces, port, water works and river field | |
CN211898175U (en) | Ecological protection structure of river course bank slope | |
KR100989662B1 (en) | stone structure and this construction technique for bank protection | |
CN209975476U (en) | Slope protection net for water conservancy | |
CN113338312A (en) | Ecological bank protection structure of coconut palm soil bag | |
CN210054306U (en) | Culture pond | |
CN211498717U (en) | A campshed supporting construction for reducing ecological revetment of soil erosion and water loss | |
CN205213553U (en) | Slope greening structure | |
CN202652834U (en) | Novel weeding earth boring machine | |
KR200307169Y1 (en) | Fence for slant ground | |
Patten | Excavations at Eye Quarry. The Southern Extension. Phases 1, 2 & 3 | |
KR101652211B1 (en) | Tetrapod type steel reef | |
CN208242165U (en) | A kind of feldspathic sandstone tree planting shovel head | |
US20240032487A1 (en) | Stake stabilization member and erosion control system using same | |
CN220565243U (en) | Slope reinforcement greening device is restoreed in mine | |
CN210491621U (en) | Digging device for landscaping |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200623 Termination date: 20210718 |
|
CF01 | Termination of patent right due to non-payment of annual fee |