CN109356093A - A kind of upright shore protection three-dimensional modularized ecology modernization system of hard and its technique - Google Patents

A kind of upright shore protection three-dimensional modularized ecology modernization system of hard and its technique Download PDF

Info

Publication number
CN109356093A
CN109356093A CN201811306927.2A CN201811306927A CN109356093A CN 109356093 A CN109356093 A CN 109356093A CN 201811306927 A CN201811306927 A CN 201811306927A CN 109356093 A CN109356093 A CN 109356093A
Authority
CN
China
Prior art keywords
area
filler
shore protection
water
plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811306927.2A
Other languages
Chinese (zh)
Inventor
沈晓笑
邵雅璐
赵子龙
吴问波
吴七斤
邱娅柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201811306927.2A priority Critical patent/CN109356093A/en
Publication of CN109356093A publication Critical patent/CN109356093A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • C02F3/322Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae use of algae
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/105Phosphorus compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/16Nitrogen compounds, e.g. ammonia
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/007Contaminated open waterways, rivers, lakes or ponds
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Botany (AREA)
  • Biotechnology (AREA)
  • General Engineering & Computer Science (AREA)
  • Organic Chemistry (AREA)
  • Hydrology & Water Resources (AREA)
  • Microbiology (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Environmental Sciences (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)
  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)

Abstract

The invention discloses a kind of upright shore protection three-dimensional modularized ecology modernization system of hard and its techniques, are sequentially arranged intensive treatment area, emergent aquactic plant purifying area and submerged plant purifying area, bottom close to staying water side in upright shore protection and connect with river bed;The height in each area is respectively flood level, ordinary water level and low water level;Width is respectively 0.5 ~ 0.8 times, 0.8 ~ 1.2 times, 1.1 ~ 1.3 times of ordinary water level;Each area's underfill filler plants emergent aquactic plant and submerged plant on filler.When staying water is close to bank, successively solved the problems, such as abutment scour by the buffering for the plant planted by each region in different level position;Rainwash pollution successively cuts down nitrogen, phosphorus by each region significantly.It is good with effects of purification quality, shore protection stability is strong, ecological environment is good, process operation is easy to operate, at the same purify rainwash pollution the advantages of.

Description

A kind of upright shore protection three-dimensional modularized ecology modernization system of hard and its technique
Technical field
The invention belongs to water environment protection and repair field, and in particular to a kind of upright shore protection three-dimensional modularized ecology of hard Change modernization system and its technique.
Background technique
River and lake are important components in the ecosystem.Bank-protection works connects terriecosystems in the ecosystem With aquatic ecosystem important link, there are unique hydraulics and ecological characteristics.Current most of River Bank-Lines are straight, hard Matter (concrete lining), plant are rare, these significantly reduce function of the shore protection as pollution of river reduction and ecoscape. The shore protection ecosystem is faced with two aspect outstanding problems: on the one hand, the particulate matter of suspension and precipitating species except river, aggravation Shore protection is washed away and is corroded.Still further aspect, the water-level fluctuation in river itself, change of water quality rush the shore protection ecosystem It hits.Therefore, in order to construct the healthy shore protection ecosystem, it would be highly desirable to construct good purification, the ecosystem are stable, wash away influence it is small Three-dimensional modularized shore protection.
A kind of Chinese patent application file " purified water type ecological revetment cross flow system " of application number 201511019060.9, relates to And a kind of purified water type ecological revetment cross flow system, the ecological revetment cross flow system include setting gradually along slope surface to water surface direction Diversion traverse furrow, deceleration weir, reaction tank, gabion shore protection, the side of the reaction tank is equipped with separation layer, the reaction tank from upper and Under set gradually plantation layer, absorption-nitrification layer, metalling and anaerobism-denitrification layer, be equipped in the metalling along water surface side To the discharger tilted down.But the undeclared variation to water level of this method adapts to, the influence to silt underwashing.
A kind of Chinese patent application file bank protection method of wave " purified water type river disappear " of application number 201511020686.1, It is related to a kind of purified water type river to disappear the bank protection method of wave, the bank protection method includes the steps of determining that the specification of shore protection module, Shore protection module is prepared, shore protection module, building shore protection ecology are installed.By the way that the unrestrained shore protection module that disappears is arranged near the waterfront in river, Slowed down by the module to the delay of water flow, new flow boundary condition is built, thus the work for reaching conduct water flow, protecting bunding With.Meanwhile disappear between unrestrained module and bunding formed a hydrostatic microenvironment, can planting aquatic plants, inhabited for aquatic animal, To form the aquatic animals and plants ecosystem, pollution of the bank slope point non point source of pollution to water quality is purified.But this method does not have embodiment pair Influence in the removal of nitrogen and phosphorus pollution object, to SEA LEVEL VARIATION.
The Chinese patent application file of application number 201610006876.6 " improves black smelly river using micro- aeration and submerged plant The system and method for road water quality ", provide system and the side for improving black-odor riverway water quality using the micro- aeration of bottom and submerged plant Method.Sediment contamination release is controlled, submerged plant growth is assisted, cuts down ammonia nitrogen;Simultaneously according to the Seasonal dynamics change of plant, her is utilized Evergreen type submerged vegetation is established in happy algae-eel grass combination, and planting companion species is hornwort, Haloragidaceae Myriophyllum spicatum, hydrilla verticillata, is established Stable submerged vegetation achievees the purpose that river training water quality.The introducing of submerged plant overcomes black smelly river using liftable floating bed The low problem of road water correction engineering initial stage transparency.But this method, which does not have embodiment to change river water level, to be influenced, river punching The reply of brush.And the reduction to nitrogen and phosphorus pollution object.
The Chinese patent application file " a kind of ecological revetment and its construction method " of application number 201610008443.4, the party Method is related to the method for city river hard vertical bank ecology, landscape and purification of water quality.Material required for this method includes Metal wire casing, corncob, rubble, fixed frame and wetland plant.It is first depending on the Riparian Zone depth of water, customizes metal wire casing and angle bar Fixed frame;Fixed frame is fixed on hard vertical quaywall body by interval 1m distance with expansion bolt, it then will be golden with fastener Belong to and being hung on wall under net cage;The corncob purchased is filled into metal wire casing again, packed height 70cm is to apart from metal mesh At the 30cm of box top, the rubble with a thickness of 30cm is refilled;Finally the wetland plant of seed selection is planted in metal wire casing surface layer.But This method is not directed to remove nitrogen and phosphorus pollutants, the adaptation of SEA LEVEL VARIATION.
A kind of Chinese patent application file " drift for integrating the wave that disappears, offshore cultivation of application number 201610121433.1 Surface unit ", belong to coastal engineering structures field of comprehensive utilization.It includes that the unrestrained unit that disappears for having both net cage function, floating are anti- Wave case and anchor structure, it is characterised in that: the unrestrained unit that disappears is made of foundation block, artificial rigid vegetation and the cage type unrestrained cylinder that disappears, It is mounted on anti-wave case by foundation block and is mutually spliced to form overall structure;Whole device floats across the sea, using anchor Chain is fixed on seabed.But this method does not relate to the removal to nitrogen and phosphorus pollution object.
Application number 201610205869.9 Chinese patent application file " it is a kind of applied to black and odorous water administer water quality change Kind and ecological restoring method ", water level is set in river to be processed and automatically controls filtering dam, by river be divided into upper river and Downstream river course constructs ecological packed bed and landscape water channel near upper river and downstream river course;Portion in the upper river Enter dirty river after dividing water to automatically control the processing of filtering dam by water level, another part water passes sequentially through ecology after being pumped out and fills out It is imported in lower fluid stream channel after expecting bed and the processing of landscape water channel.But this method is not directed to the effect of shore protection, constructs the good life of shore protection State system.
A kind of Chinese patent application file " ecological revetment with pollution amelioration function of application number 201610208950.2 Structure ", a kind of ecological bank protection structure with pollution amelioration function is provided, from top to bottom successively includes bank slope soil horizon, soil With biological carbon fine particle layer mixed layer, biological carbon coarse-particle bed and metalling, by stalk or straw high warm under anoxic conditions Solution is prepared into biological carbon particle, smashes after acid-wash activation and grinds the biological carbon fine grained for being 0.5-0.8cm for diameter, will High temperature pyrolysis is prepared into biological carbon particle to corncob under anoxic conditions, smashes that grind as diameter be 1.5- after acid-wash activation The biological carbon coarse granule of 2.0cm.But this method does not have the variation for embodying horizontal direction shore protection control measures, has a single function.
A kind of Chinese patent application file " ecotypic damaged shore protection reparation structure " of application number 201610232108.2, Including pile foundation concrete structure, place platform, prefabricated cylinder and prefabricated wedge block.Several prefabricated cylinders, which are vertically arranged, to be installed on Platform is placed, seamless connection, and the prefabricated cylinder of each adjacent two are realized in cast-in-place concrete between the prefabricated cylinder of each adjacent two Between bottom be fixed with prefabricated wedge block;Place the lower junction that platform is arranged in side pile foundation concrete structure near water and former shore protection On structure;The inserting piling square pile of side near water of former shore protection substructure, and casting concrete forms pile foundation concrete structure.But this method The reparation of shore protection is only illustrated, does not have the ecological functions to shore protection, especially nitrogen, phosphorus reduction to make design.
A kind of Chinese patent application file " composite ecological bank-protection works material " of application number 201610354231.1, packet Bank-protection works material ontology is included, the bank-protection works material ontology is made of three-decker from top to bottom, wherein upper layer and lower layer For Multi-layer composite Fiber Materials layer, and the middle layer that thickening is widened on periphery is then concrete segment layer, and above-mentioned three-decker is adopted It is connected with the fixed corbeling of cylinder, the void layer between three-decker is then filled using handstone and mudstone, described Concrete segment layer periphery be equipped with zigzag structure.But this method is not directed to the removal to nitrogen, phosphorus, the influence to washing away.
A kind of Chinese patent application file " ecotype assembled revetment combined structure " of application number 201610459369.8, Including barricade, bottom plate, landscape platform, clinohedral;Clinohedral is made by pervious concrete, including fish habitat clinohedral, plant life Clinohedral, fish habitat clinohedral are equipped with the first fish habitat hole, the bionical grass of fiber;Plant the landscape platform on raw clinohedral top Equipped with raw hole is planted, plants raw hole and penetrate through from landscape platform to raw clinohedral bottom is planted, plant in raw hole and be filled with haydite bag, haydite bag top Planting aquatic plants;Barricade includes fish habitat barricade, plants raw barricade, and fish habitat clinohedral is set to fish habitat barricade On, it plants raw clinohedral and is set on the raw barricade of plant;It plants raw barricade and is equipped with intercommunicating pore;Fish habitat barricade is equipped with the second fish Hole is inhabited, fish habitat barricade is run through in the second fish habitat hole, and penetrates through with the first fish habitat hole, and fish habitat barricade is planted Raw barricade splicing connection.Through the invention, there are the comprehensive functions such as dirty filter, plant life, landscape, shore protection and ecology.But this method pair It is not directed in the removal of nitrogen phosphorus, investment is big, operating cost is high.
Chinese patent application file " a kind of Ecotype Concrete sheet pile and its construction party of application number 201610546807.4 Method ", provide a kind of Ecotype Concrete sheet pile, the sheet pile includes an ecological revetment component, a lateral web and vertical In the vertical edge of a wing of web two sides;Longitudinally through tenon and longitudinally through groove are respectively equipped on the outside of the edge of a wing two, The sheet pile lower end of the groove side is equipped with intilted angle;A Grouting Pipe, web backup plate pile crown are buried in the tenon End sets one and hangs a circular hole;The web surface is equipped with two rows of slots by two edges, is equipped with and the length at web bottom surface Square hole at cross rectangle counterbore;The slot and rectangle counterbore for protruding into web by bolt are by the ecology Shore protection component is mounted below web.But structure is complicated for this method, is not directed to the building of the shore protection ecosystem.
The Chinese patent application file " a kind of bank protection structure and construction method " of application number 201610653657.7, discloses A kind of bank protection structure and construction method, are vertically installed with sheet pile wall in the side near water of existing old shore protection, connect on the top of sheet pile wall It is connected to prefabricated shore protection, prefabricated shore protection is arranged at intervals with multiple on sheet pile wall, and the width of single prefabricated shore protection is 30-50cm, phase Adjacent prefabricated shore protection interval 2-5m;Prefabricated shore protection one end and the top of sheet pile wall connect, and the other end is fixedly connected with old shore protection, prefabricated Shore protection is integral inclined to be resisted against on old shore protection;The side near water of prefabricated shore protection and old shore protection junction is provided with anti-collision rubber circle;Always The top of shore protection is provided with riding track.The bank protection structure and method can reduce the construction depth of front-seat vertical bank revetment, rationally play Old shore protection effect reduces vertical bank revetment depth, thus saving construction cost.But this method investment is big, structure is complicated, and illustrates to water body The removal of middle nitrogen phosphorus.
Summary of the invention
, hardening upright for channel revetment washes away the distinct issues such as serious, and the object of the present invention is to provide one kind The upright shore protection three-dimensional modularized ecology modernization system of hard and technique, initially set up intensive treatment area, emergent aquactic plant purifying area, Submerged plant purifying area, and adjustable purification system is established according to SEA LEVEL VARIATION and variation water quality, cut down nitrogen, phosphorus etc. Pollutant fully ensures that purification of water quality and the transformation of shore protection ecology.By subregion, solid, modular characteristics have been fully demonstrated, have been had Have that effects of purification quality is good, shore protection stability is strong, ecological environment is good, process operation advantage easy to operate.
Technical solution
The purpose of the present invention is achieved through the following technical solutions:
A kind of upright shore protection three-dimensional modularized ecology modernization system of hard, is in upright shore protection close to staying water one Side is sequentially arranged intensive treatment area, emergent aquactic plant purifying area and submerged plant purifying area, bottom respectively and connects with river bed;Strengthen The height for the treatment of region, emergent aquactic plant purifying area and submerged plant purifying area is respectively flood level (HFlood level), ordinary water level (HOrdinary water level) and Low water level (HLow water level).The width in intensive treatment area, emergent aquactic plant purifying area and submerged plant purifying area is respectively ordinary water level (HOrdinary water level) 0.5~0.8 times, 0.8~1.2 times, 1.1~1.3 times.When water-level fluctuation is big, width takes large values, and water-level fluctuation is small When, width gets the small value.
Wherein intensive treatment area includes floating body, emergent aquactic plant, 1# snorkel, buoy, bullet rope, geotextiles, composite filling, 1# Filler, 2# filler, bottom geotextiles;Composite filling, 1# filler, 2# filler are sequentially arranged in from top to bottom in geotextiles package, Emergent aquactic plant is planted in composite filling, and buoy is connected with bullet rope, and the bullet rope other end is fixed on filler.Floating body uses HDPE material Matter;1# snorkel use HDPE material, through filler and stretch out floating body outside, 30~60cm of diameter, be highly higher by flood level 30~ 50cm.Composite filling, 150~180mm of mounting distance;1# filler is quartz sand filter media, 2~4mm of partial size;2# filler is shell filter Material.
The filler of emergent aquactic plant purifying area is filled in the space that upright timber (3-2) surrounds, heights of roofs on upright timber It is equal with ordinary water level.It is 3# filler at the middle and upper levels, is shell filtrate;Bottom is 4# filler, zeolite, partial size 4-8mm;Emergent aquactic plant Purifying area is planted on 3# filler.2# snorkel penetrates through filler, and using HDPE material, 30~60cm of diameter is highly higher by ordinary water 20~40cm of position.
Submerged plant purifying area includes submerged plant, 5# filler, timber revetment.Timber revetment is equal with low water level.5# is filled out Material is magnetic iron ore filtrate Fe2O370%, timber revetment length 5m~8m, diameter about 20~25cm.
A kind of operation process of the upright shore protection three-dimensional modularized ecology modernization system of hard,
In the horizontal direction, when staying water is close to bank, successively by different level position submerged plant purifying area, Emergent aquactic plant purifying area, intensive treatment area, by what is planted in water plant purification area, emergent aquactic plant purifying area, intensive treatment area The buffering of submerged plant, emergent aquactic plant, solves the problems, such as abutment scour.
Intensive treatment area, emergent aquactic plant purifying area, submerged plant purifying area are successively passed through in rainwash pollution, cut down significantly Nitrogen, phosphorus.
When water level changes between flood level and ordinary water level, the lifting of floating body will drive emergent aquactic plant, buoy and bullet rope Oscilaltion strengthens filler to the treatment effect of water body.
Compared with the prior art, the present invention has the advantages that
(1) present invention is stable with the shore protection ecosystem, improves nitrogen and phosphorus pollution object cuts down, and adapts to water level and change of water quality, subtracts Few abutment scour is core, devises three intensive treatment area, emergent aquactic plant purifying area, submerged plant purifying area purification parts.
(2) construction investment is few and easy to implement.Based on reuse in situ and processing, land occupation and construction investment are reduced, is passed through Subregion, three-dimensional transformation construct modular mode, and outstanding advantages effects of purification quality of the present invention is good, shore protection stability is strong, ecological ring Border is good, and process operation is easy to operate.
(3) flexible operation, high treating effect.By ecology revetment modification, pollutant fluxes situation: SS removal rate 40~ 55%, COD removal rate 30~45%, ammonia nitrogen removal frank 25~40%, total tp removal rate 35~50%.
Detailed description of the invention
Fig. 1 is a kind of upright shore protection three-dimensional modularized ecology remodeling method schematic diagram of hard;
Fig. 2 is a kind of upright shore protection three-dimensional modularized ecology remodeling method connection figure of hard;
Fig. 3 is a kind of upright shore protection three-dimensional modularized ecology remodeling method sectional view of hard;
In figure: upright shore protection -1, intensive treatment area -2, emergent aquactic plant purifying area -3, submerged plant purifying area -4, to be processed Water body -5, floating body -2-1, emergent aquactic plant -2-2,1# snorkel -2-3, buoy -2-4, bullet rope -2-5, geotextiles -2-6, combination are filled out Material -2-7,1# filler -2-8,2# filler -2-9, bottom geotextiles -2-10, emergent aquactic plant -3-1, upright timber -3-2,3# are filled out Material -3-3,4# filler -3-4,2# snorkel -3-5, submerged plant -4-1,5# filler -4-2, timber revetment -4-3.
Specific embodiment
Technical solution of the present invention is further described by following specific embodiment.
Embodiment 1
Certain section of channel revetment length about 2.3km, river width 26m, flood level 2.5m, ordinary water level 1.5m, low water level 0.5m, uprightly Shore protection (1) is upright Reinforced Concrete Structure, is higher than flood level 0.5m.
A kind of upright shore protection three-dimensional modularized ecology modernization system of hard, in upright shore protection 1 close to staying water 5 one Side is sequentially arranged intensive treatment area 2, emergent aquactic plant purifying area 3 and submerged plant purifying area 4 respectively;Intensive treatment area 2, very water are planted The height of object purifying area 3 and submerged plant purifying area 4 is respectively flood level (HFlood level), ordinary water level (HOrdinary water level) and low water level (HLow water level).The width in intensive treatment area 2, emergent aquactic plant purifying area 3 and submerged plant purifying area 4 is respectively ordinary water level (HOrdinary water level) 0.5~0.8 times, 0.8~1.2 times, 1.1~1.3 times.When water-level fluctuation is big, width takes large values, water-level fluctuation hour, width Get the small value.
Wherein intensive treatment area 2 includes floating body 2-1, emergent aquactic plant 2-2,1# snorkel 2-3, buoy 2-4, bullet rope 2-5, soil Work cloth 2-6, composite filling 2-7,1# filler 2-8,2# filler 2-9, bottom geotextiles 2-10;Composite filling 2-7,1# filler 2-8, 2# filler 2-9 be sequentially arranged in from top to bottom geotextiles package in, emergent aquactic plant is planted in composite filling 2-7, buoy 2-4 with Bullet rope 2-5 is connected, and the bullet rope other end is fixed on filler.When water level changes between flood level and ordinary water level, floating body 2-1's Lifting will drive emergent aquactic plant 2-2, buoy 2-4 and bullet rope 2-5 oscilaltion, strengthen filler to the treatment effect of water body.
Floating body 2-1 uses HDPE material, 5~8kg/m of buoyancy2, emergent aquactic plant 2-2 kind plant reed, canna, planting density Not less than 20 plants/m2, 1# snorkel 2-3 uses HDPE material, outside filler and stretching floating body, 30~60cm of diameter, and height It is higher by 30~50cm of flood level.Geotextiles 2-6 specification is not less than 200g/m2, 320~360m of composite filling 2-7 specific surface area2/ m3, 2.5~2.9kg/m of Unit Weight3, 150~180mm of mounting distance.1# filler 2-8 quartz sand filter media, mud containing rate should not exceed 1%, 2~4mm of partial size, density are less than 2g/cm3.2# filler 2-9 shell filtrate, specific gravity are not less than 0.85g/cm3.Bottom geotextiles 2-10, specification are not less than 200g/m2
Emergent aquactic plant purifying area 3 includes emergent aquactic plant 3-1, upright timber 3-2,3# filler 3-3,4# filler 3-4,2# ventilation Pipe 3-5, filler are filled in the space that upright timber 3-2 is surrounded;Emergent aquactic plant purifying area 3 includes that emergent aquactic plant 3-1 kind plants Huang Calamus, iris, planting density are not less than 20 plants/m2.Upright timber 3-2 length 5m~8m, diameter about 20~25cm.3# filler 3- 3 be shell filtrate, and specific gravity is not less than 0.85g/cm3, 4# filler 3-4 sized zeolite particles 4-8mm, Al2O3Content is not less than 5%, density 1.8g/cm3, nonuniformity coefficient≤1.8.2# snorkel 3-5 penetrates through filler, and using HDPE material, 30~60cm of diameter, height is high 20~40cm of ordinary water level out.
Submerged plant purifying area 4 includes submerged plant 4-1,5# filler 4-2, timber revetment 4-3.It is pushed up on upright timber 3-2 Height is equal with ordinary water level.Timber revetment 4-3 is equal with low water level.Submerged plant 4-1 such as hornwort, waterweed, planting density 100 buds/m2, 5# filler 4-2 magnetic iron ore filtrate Fe2O370%, heap density 2.95g/cm3, nonuniformity coefficient≤1.8, timber revetment 4-3 length 5m~8m, diameter about 20~25cm.
In the horizontal direction, staying water is close to bank, successively purifies by submerged plant purifying area 4, emergent aquactic plant Area 3, intensive treatment area 2 solve the problems, such as abutment scour by the building of three-dimensional module.Rainwash pollution is successively passed through Intensive treatment area 2, emergent aquactic plant purifying area 3, submerged plant purifying area 4, significantly reduction nitrogen, phosphorus.
Pollutant fluxes are shown in Table 1 after the upright shore protection three-dimensional modularized ecology transformation of hard.
1 embodiment 1 of table administers front and back water quality situation
Index SS(mg/L) COD(mg/L) NH3-N(mg/L) TP(mg/L)
Before processing 158 82.0 6.6 1.5
After processing 110.6 57.4 4.95 0.975
Removal rate 30% 30% 25% 35%
As shown in Table 1, SS removal rate 40%, COD removal rate 30%, ammonia nitrogen removal frank 25%, total tp removal rate 35%.
Embodiment 2
Other are the same as embodiment 1.
The width in intensive treatment area 2, emergent aquactic plant purifying area 3 and submerged plant purifying area 4 is respectively ordinary water level (HOrdinary water level= 0.7 times (1.05m), 1.0 times (1.5m), 1.2 times (1.8m) 1.5m).
Pollutant fluxes are shown in Table 2 after the upright shore protection three-dimensional modularized ecology transformation of hard.
2 embodiment 2 of table administers front and back water quality situation
Index SS(mg/L) COD(mg/L) NH3-N(mg/L) TP(mg/L)
Before processing 158 82.0 6.6 1.5
After processing 75.84 50.84 4.42 0.885
Removal rate 52% 38.0% 33.0% 41.0%
As shown in Table 2, SS removal rate 52%, COD removal rate 38%, ammonia nitrogen removal frank 33%, total tp removal rate 41%.
Embodiment 3
Other are the same as embodiment 1.
The width in intensive treatment area 2, emergent aquactic plant purifying area 3 and submerged plant purifying area 4 is respectively ordinary water level (HOrdinary water level= 0.8 times (1.2m), 1.2 times (1.8m), 1.3 times (1.95m) 1.5m).
Pollutant fluxes are shown in Table 3 after the upright shore protection three-dimensional modularized ecology transformation of hard.
3 embodiment 3 of table administers front and back water quality situation
Index SS(mg/L) COD(mg/L) NH3-N(mg/L) TP(mg/L)
Before processing 158 82.0 6.6 1.5
After processing 71.1 45.1 3.96 0.75
Removal rate 55% 45% 40% 50%
As shown in Table 3, SS removal rate 55%, COD removal rate 45%, ammonia nitrogen removal frank 40%, total tp removal rate 50%.

Claims (7)

1. a kind of upright shore protection three-dimensional modularized ecology modernization system of hard, which is characterized in that be included in upright shore protection (1) and lean on Intensive treatment area (2), emergent aquactic plant purifying area (3) and the submerged plant purifying area that nearly staying water (5) side is sequentially arranged (4), bottom connects with river bed;
The height in intensive treatment area (2), emergent aquactic plant purifying area (3) and submerged plant purifying area (4) is respectively flood level, ordinary water Position and low water level;Width is respectively 0.5~0.8 times, 0.8~1.2 times, 1.1~1.3 times of ordinary water level;
Intensive treatment area (2), emergent aquactic plant purifying area (3) and submerged plant purifying area (4) fill filler, and water is endured in plantation on filler Plant and submerged plant.
2. the upright shore protection three-dimensional modularized ecology modernization system of a kind of hard described in claim 1, which is characterized in that strengthen When the width water-level fluctuation for the treatment of region (2), emergent aquactic plant purifying area (3) and submerged plant purifying area (4) is big, width is taken greatly Value, water-level fluctuation hour, width gets the small value.
3. the upright shore protection three-dimensional modularized ecology modernization system of a kind of hard described in claim 1, which is characterized in that wherein Intensive treatment area (2) includes floating body (2-1), geotextiles is arranged below floating body, the filler is composite filling, 1# filler, 2# The combination of filler, three kinds of fillers are sequentially arranged in from top to bottom in geotextiles package;Snorkel is through filler and stretches out outside floating body.
4. the upright shore protection three-dimensional modularized ecology modernization system of a kind of hard as claimed in claim 3, which is characterized in that combination Filler, 150~180mm of mounting distance;1# filler is quartz sand filter media;2# filler is shell filtrate.
5. the upright shore protection three-dimensional modularized ecology modernization system of a kind of hard described in claim 1, which is characterized in that very water The filler in plant purification area (3), upper layer are shell filtrate;Bottom is zeolite, and snorkel is through filler and stretches out outside floating body.
6. the upright shore protection three-dimensional modularized ecology modernization system of a kind of hard described in claim 1, which is characterized in that heavy water The filler in plant purification area (4) is magnetic iron ore.
7. a kind of technique of the upright shore protection three-dimensional modularized ecology modernization system of hard described in claim 1, feature exist In, in the horizontal direction, when staying water is close to bank, successively by different level position submerged plant purifying area (4), very Water plant purification area (3), intensive treatment area (2), by water plant purification area (4), emergent aquactic plant purifying area (3), intensive treatment The buffering of the submerged plant, emergent aquactic plant planted in area (2);Rainwash pollution is successively planted by intensive treatment area (2), very water Object purifying area (3), submerged plant purifying area (4).
CN201811306927.2A 2018-11-05 2018-11-05 A kind of upright shore protection three-dimensional modularized ecology modernization system of hard and its technique Pending CN109356093A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811306927.2A CN109356093A (en) 2018-11-05 2018-11-05 A kind of upright shore protection three-dimensional modularized ecology modernization system of hard and its technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811306927.2A CN109356093A (en) 2018-11-05 2018-11-05 A kind of upright shore protection three-dimensional modularized ecology modernization system of hard and its technique

Publications (1)

Publication Number Publication Date
CN109356093A true CN109356093A (en) 2019-02-19

Family

ID=65344209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811306927.2A Pending CN109356093A (en) 2018-11-05 2018-11-05 A kind of upright shore protection three-dimensional modularized ecology modernization system of hard and its technique

Country Status (1)

Country Link
CN (1) CN109356093A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644430A (en) * 2019-07-30 2020-01-03 北京东方园林环境股份有限公司 Composite ecological revetment structure and construction method thereof
CN117164100A (en) * 2023-11-02 2023-12-05 日照城投环境科技集团有限公司 Water treatment system and water treatment method for river entering sea
CN117164167A (en) * 2023-10-13 2023-12-05 江苏龙腾工程设计股份有限公司 Fishery photovoltaic complementary ecological filtration dam system for aquaculture tail water

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100818758B1 (en) * 2007-12-11 2008-04-03 주식회사 오이디 Structure for establish mat of river slope
CN103936163A (en) * 2014-04-25 2014-07-23 中国矿业大学 Method for water resource cascade adjustment control and water quality ecological purification in high groundwater level coal-mining subsidence area
CN105544461A (en) * 2015-12-30 2016-05-04 北京东方园林生态股份有限公司 Water purification type ecological bank protection overflow system
CN205295095U (en) * 2016-01-08 2016-06-08 沈晓笑 System for black smelly water that remains in a standstill is administered
CN107487846A (en) * 2017-08-31 2017-12-19 河海大学 A kind of ecological hard shore protection for being applied to become water level
CN207176613U (en) * 2017-08-24 2018-04-03 云南长江绿海环境工程股份有限公司 A kind of ecological sloot
CN107935185A (en) * 2017-11-20 2018-04-20 河海大学 A kind of step artificial wet land system for being used to improve water quality

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100818758B1 (en) * 2007-12-11 2008-04-03 주식회사 오이디 Structure for establish mat of river slope
CN103936163A (en) * 2014-04-25 2014-07-23 中国矿业大学 Method for water resource cascade adjustment control and water quality ecological purification in high groundwater level coal-mining subsidence area
CN105544461A (en) * 2015-12-30 2016-05-04 北京东方园林生态股份有限公司 Water purification type ecological bank protection overflow system
CN205295095U (en) * 2016-01-08 2016-06-08 沈晓笑 System for black smelly water that remains in a standstill is administered
CN207176613U (en) * 2017-08-24 2018-04-03 云南长江绿海环境工程股份有限公司 A kind of ecological sloot
CN107487846A (en) * 2017-08-31 2017-12-19 河海大学 A kind of ecological hard shore protection for being applied to become water level
CN107935185A (en) * 2017-11-20 2018-04-20 河海大学 A kind of step artificial wet land system for being used to improve water quality

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李孟等: "《给水处理原理》", 31 December 2013 *
杜云岭: "《河道修防工》", 30 April 2012, 黄河水利出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644430A (en) * 2019-07-30 2020-01-03 北京东方园林环境股份有限公司 Composite ecological revetment structure and construction method thereof
CN117164167A (en) * 2023-10-13 2023-12-05 江苏龙腾工程设计股份有限公司 Fishery photovoltaic complementary ecological filtration dam system for aquaculture tail water
CN117164167B (en) * 2023-10-13 2024-03-29 江苏龙腾工程设计股份有限公司 Fishery photovoltaic complementary ecological filtration dam system for aquaculture tail water
CN117164100A (en) * 2023-11-02 2023-12-05 日照城投环境科技集团有限公司 Water treatment system and water treatment method for river entering sea
CN117164100B (en) * 2023-11-02 2024-01-26 日照城投环境科技集团有限公司 Water treatment system and water treatment method for river entering sea

Similar Documents

Publication Publication Date Title
CN207671771U (en) A kind of sewage treatment plant tail water separated practices exhaust system
KR101360271B1 (en) Sustainable structured biotop system using wetland, pond and settling pond structure adopting multi-cells and multi-lanes
CN211368589U (en) Compound ecological revetment structure
CN106430608A (en) In-situ biological-ecological recovery integrated system for urban river water body
CN102733349A (en) Method for de-silting lake and constructing lake center island
CN211080099U (en) Ecological river bank protection
CN102219305A (en) Vertical revetment river lake water wet land system and construction method thereof
CN207512028U (en) A kind of water quality of river in-situ purification system
CN109356093A (en) A kind of upright shore protection three-dimensional modularized ecology modernization system of hard and its technique
CN106522160A (en) Construction method of revetment type ecological landscape
CN109399800B (en) River and lake runoff pollution cascade control system
CN109607802A (en) A kind of shallow water river channel/small watershed ecological harnessing system
CN106517639A (en) Construction method of lake water purification system
CN212375123U (en) Ecological water filtering dam for river channel treatment
CN104261627B (en) A kind of groundwater pollution control of eutrophication water
CN212533945U (en) River edge beach fish habitat structure
CN105672447B (en) For handling Multi-level deflector formula Rain Garden system and its application of early-stage rainwater
CN107352753B (en) Bionic multi-combination ecological water purification weir
CN211898143U (en) Device for enhancing river channel undercurrent exchange
CN105297676A (en) River ecological bank protection system formed by triangular pyramidal wood pile stone cage frames and construction method
CN211338977U (en) Ecological cycle purifying and filtering system for river channel treatment
CN210491975U (en) Ecological revetment with greening device
CN211090825U (en) Emergent aquatic plant decontaminating planting and fixing device
CN206570163U (en) A kind of waterfront band water body purification system
CN111925052A (en) Compound city river course municipal administration mouth of arranging preprocessing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190219