CN208055980U - A kind of permeable erosion control wall construction of hydraulic engineering - Google Patents

A kind of permeable erosion control wall construction of hydraulic engineering Download PDF

Info

Publication number
CN208055980U
CN208055980U CN201820378594.3U CN201820378594U CN208055980U CN 208055980 U CN208055980 U CN 208055980U CN 201820378594 U CN201820378594 U CN 201820378594U CN 208055980 U CN208055980 U CN 208055980U
Authority
CN
China
Prior art keywords
bored concrete
concrete pile
horizontal protective
guan liang
river
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820378594.3U
Other languages
Chinese (zh)
Inventor
崔福占
郝振华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Research Institute of Investigation and Design of Water Conservancy and Hydropower
Original Assignee
Hebei Research Institute of Investigation and Design of Water Conservancy and Hydropower
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Research Institute of Investigation and Design of Water Conservancy and Hydropower filed Critical Hebei Research Institute of Investigation and Design of Water Conservancy and Hydropower
Priority to CN201820378594.3U priority Critical patent/CN208055980U/en
Application granted granted Critical
Publication of CN208055980U publication Critical patent/CN208055980U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of permeable erosion control wall constructions of hydraulic engineering, including:It is set to the multiple bored concrete piles for wearing river building downstream side;Bored concrete pile is reinforced concrete structure, and clear distance is not more than 0.5m between the stake of bored concrete pile;The Guan Liang being set at the top of bored concrete pile;The Guan Liang is reinforced concrete structure, and multiple bored concrete piles are connected as entirety by the Guan Liang;It is set to the horizontal protective in bored concrete pile downstream side;The horizontal protective is lattice guest's gabion;The bored concrete pile stretches into river headcut scour line hereinafter, the Guan Liang and horizontal protective are embedded in river general scour line or less;The horizontal protective is close to Guan Liang.This patent is vertical protection plus horizontal protective pattern, and vertical protection mainly plays earth-retaining, is water-permeable passage between the stake of bored concrete pile, can effectively reduce the water pressure after anti-scour wall, mitigates wall load;Horizontal protective is laid with close to Guan Liang level, and using flexible structure, when headcut scour occurs for downstream, horizontal protective slump prevents wall is direct from crossing water.

Description

A kind of permeable erosion control wall construction of hydraulic engineering
Technical field
The utility model is related to water conservancy and hydropower protection works technical fields, are prevented with permeable more particularly to a kind of hydraulic engineering Rush wall construction.
Background technology
It is needed for engineering construction, having many on river wears river building.Such as Route, it is disposed with more Seat wears the inverted-siphon of rivers and canals road, and inverted-siphon tube top is embedded in the 300 years erosion lines in river or less.In recent years, northern area is constantly in Drought state, most of river are in dry state, create convenience to river sand mining, illegal sand mining phenomenon is universal Occur.Sand is adopted since river is unordered on a large scale, the deep larger sandstone hole in many holes is formed, changes original riverbed shape in river State destroys the equilibrium state of natural river course.Unordered sand of adopting leads to the whole incision in long range riverbed, simultaneously because downstream is washed away Basic point reduction causes section to increase than drop, and river generates headcut scour.When existing in section, when wearing river building, headcut scour is sent out It opens up and wears river building, building is caused to face sky, jeopardize the safety of building.
In conclusion problem of the existing technology is:Safeguard structure is mostly bank slope protection, is not bordered on the river, and river is not suitable for Wear the protection of river building in bottom.
Utility model content
The technical problems to be solved in the utility model is:A kind of hydraulic engineering permeable erosion control wall construction, the water conservancy are provided The safeguard structure that engineering is combined with permeable erosion control wall construction using vertical protection plus horizontal protective, can effectively prevent punching of tracing to the source It brushes to river building development is worn, to protect the safety of building.
The utility model is adopted the technical scheme that solve technical problem present in known technology:
A kind of permeable erosion control wall construction of hydraulic engineering, includes at least:
It is set to the multiple bored concrete piles (5) for wearing river building (4) downstream side;The bored concrete pile (5) is armored concrete knot Structure, clear distance is not more than 0.5m between the stake of the bored concrete pile (5);
The Guan Liang (6) being set at the top of bored concrete pile (5);The Guan Liang (6) is reinforced concrete structure, the Guan Liang (6) Multiple bored concrete piles (5) are connected as entirety;
It is set to the horizontal protective (7) in bored concrete pile (5) downstream side;The horizontal protective (7) is lattice guest's gabion;
The bored concrete pile (5) stretches into river headcut scour line (3) hereinafter, the Guan Liang (6) and horizontal protective (7) are embedded in River general scour line (2) is below;The horizontal protective (7) is close to Guan Liang (6).
Further:The width and height of the Guan Liang (6) are all higher than the diameter of bored concrete pile (5).
Further:The horizontal protective (7) has geotextiles (8).
Further:For the bored concrete pile (5) away from river building (4) edge 15m is worn, the stake of the bored concrete pile (5) is a length of The stake diameter of 15.5m, the bored concrete pile (5) are 1.2m.
The utility model has the advantages and positive effects of:
By using above-mentioned technical proposal, the utility model is vertical protection plus horizontal protective pattern, and vertical protection is main Play earth-retaining, is water-permeable passage between the stake of bored concrete pile, can effectively reduce the water pressure after anti-scour wall, mitigate wall load; Horizontal protective is laid with close to Guan Liang level, and using flexible structure, when headcut scour occurs for downstream, horizontal protective slump prevents Wall directly crosses water, increases the service life of wall, has good permeable effect after the geotextiles slump being arranged under horizontal protective Fruit, and can effectively prevent native loss after wall, the safeguard structure can effectively prevent headcut scour to wearing river building development, To protect the safety of building.
Description of the drawings
Fig. 1 is the structure chart of the preferred embodiment in the utility model;
Wherein:1, river bed;2, general scour line;3, headcut scour line;4, river building is worn;5, bored concrete pile;6, Guan Liang;7, Horizontal protective;8, geotextiles.
Specific implementation mode
For that can further appreciate that the utility model content, feature and effect of the utility model, the following examples are hereby given, and It is described in detail with the accompanying drawings as follows:
Referring to Fig. 1, a kind of permeable erosion control wall construction of hydraulic engineering, including:
It is set to the bored concrete pile 5 for wearing 4 downstream side of river building;For the bored concrete pile 5 away from 4 edge 15m of river building is worn, stake is long 15.5m, stake diameter 1.2m, clear distance is 0.5m between stake;The bored concrete pile (5) be reinforced concrete structure, concrete strength C30, The longitudinal reinforcement that configuration is 26 a diameter of 28, reinforcing bar use HRB400;
It is set to the Guan Liang 6 at 5 top of bored concrete pile;The Guan Liang 6 is reinforced concrete structure, and concrete strength is C30F150, Guan Liang wide 1.8m, high 1.5m;
It is set to the horizontal protective 7 in bored concrete pile downstream side;The horizontal protective 7 is close to Guan Liang 6;The horizontal protective 7 is The thickness of lattice guest's gabion, horizontal protective 7 is 1.0m, length 20m;
The geotextiles 8 being set under horizontal protective 7;The geotextiles 8 are 300g/m2Geotextiles;
The bored concrete pile 5 stretches into river headcut scour line 3 hereinafter, to ensure wall stability;The Guan Liang 6 and horizontal protective 7 are embedded in river general scour line 2 hereinafter, ensureing that safeguard structure does not block water, and do not influence river course flood.
By using above-mentioned technical proposal, this preferred embodiment is vertical protection plus horizontal protective pattern, vertical protection master Play earth-retaining, is water-permeable passage between the stake of bored concrete pile, can effectively reduce the water pressure after anti-scour wall, it is negative to mitigate wall Lotus.Wear river building in protection river bed 1;Horizontal protective is laid with close to Guan Liang level, using flexible structure, when headcut scour occurs for downstream When, horizontal protective slump prevents wall is direct from crossing water, increases the service life of wall, the geotextiles being arranged under horizontal protective are collapsed Falling behind has good permeable effect, and can effectively prevent native loss after wall, which can effectively prevent to trace to the source It washes away to river building development is worn, to protect the safety of building.
The embodiments of the present invention are described in detail above, but the content is only the preferable of the utility model Embodiment should not be considered as limiting the scope of the present invention.It is made according to the scope of application of this utility model equal Deng variation and improvement etc., should all still belong within the patent covering scope of the utility model.

Claims (4)

1. a kind of permeable erosion control wall construction of hydraulic engineering, it is characterised in that:It includes at least:
It is set to the multiple bored concrete piles (5) for wearing river building (4) downstream side;The bored concrete pile (5) is reinforced concrete structure, institute Clear distance is not more than 0.5m between stating the stake of bored concrete pile (5);
The Guan Liang (6) being set at the top of bored concrete pile (5);The Guan Liang (6) is reinforced concrete structure, and the Guan Liang (6) will be more A bored concrete pile (5) is connected as entirety;
It is set to the horizontal protective (7) in bored concrete pile (5) downstream side;The horizontal protective (7) is lattice guest's gabion;
The bored concrete pile (5) stretches into river headcut scour line (3) hereinafter, the Guan Liang (6) and horizontal protective (7) are embedded in river General scour line (2) is below;The horizontal protective (7) is close to Guan Liang (6).
2. the permeable erosion control wall construction of hydraulic engineering according to claim 1, it is characterised in that:The width of the Guan Liang (6) The diameter of bored concrete pile (5) is all higher than with height.
3. the permeable erosion control wall construction of hydraulic engineering according to claim 2, it is characterised in that:The horizontal protective (7) Have geotextiles (8).
4. the permeable erosion control wall construction of hydraulic engineering according to claim 3, it is characterised in that:The bored concrete pile (5) away from River building (4) edge 15m is worn, the stake diameter of a length of 15.5m of stake of the bored concrete pile (5), the bored concrete pile (5) are 1.2m.
CN201820378594.3U 2018-03-20 2018-03-20 A kind of permeable erosion control wall construction of hydraulic engineering Expired - Fee Related CN208055980U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820378594.3U CN208055980U (en) 2018-03-20 2018-03-20 A kind of permeable erosion control wall construction of hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820378594.3U CN208055980U (en) 2018-03-20 2018-03-20 A kind of permeable erosion control wall construction of hydraulic engineering

Publications (1)

Publication Number Publication Date
CN208055980U true CN208055980U (en) 2018-11-06

Family

ID=63989378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820378594.3U Expired - Fee Related CN208055980U (en) 2018-03-20 2018-03-20 A kind of permeable erosion control wall construction of hydraulic engineering

Country Status (1)

Country Link
CN (1) CN208055980U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114056506A (en) * 2021-12-22 2022-02-18 中交第一航务工程局有限公司 Anti-scouring structure and method for ship bottom

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114056506A (en) * 2021-12-22 2022-02-18 中交第一航务工程局有限公司 Anti-scouring structure and method for ship bottom

Similar Documents

Publication Publication Date Title
CN202298556U (en) Novel prevention structure for landslide converting-type debris flow
CN106759066A (en) A kind of method of mountain area side slope water conservancy diversion energy dissipating prevention and control geological disaster
CN106192871A (en) Protection arrangement for debris flow gully
CN104695386A (en) Blocking and discharge structure and method for ditch water treatment
CN203755243U (en) Protection structure of bridgehead conical slopes
CN103603666B (en) Tailing pond sand excavation method
CN208055980U (en) A kind of permeable erosion control wall construction of hydraulic engineering
CN107059891B (en) Plant pile group type mud-rock flow is blocked structure
CN201165666Y (en) Flexible netted check dam
CN105064291A (en) Step sand-blocking dam ecosystem for reservoir desilting and sand prevention
CN205604186U (en) Clay core morals and manners material dam
KR101170789B1 (en) Complex debris barrier of eco-friendly
CN109868785A (en) A kind of mixing dam body permeable ecology makes beach engineering
CN104264626A (en) Structure for controlling and guiding river regime and stabilizing river mainstream
CN204551386U (en) For the gear row structure of ditch water treatment
CN101691744B (en) Overflow pre-settling construction method for concrete face rock-fill dam
CN205012282U (en) Novel ecology landscape bank protection system
CN204690683U (en) A kind of ecology type of choking water protects beach structure
CN208762946U (en) A kind of safeguard structure of inverted siphon
CN203878542U (en) W-shaped ecological gabion submerged dam
CN206768738U (en) A kind of suspension type anti-scour wall protective slope structure
CN112900369A (en) Tailing storehouse row oozes reinforced structure
CN104452789A (en) Homogeneous clay ash dam draining and seeping system
CN204097961U (en) The structure of river gesture and poised stream main flow is led in a kind of control
CN104947630A (en) Over-current slag collecting weir for water conservancy and hydropower engineering and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant