CN101691744B - Overflow pre-settling construction method for concrete face rock-fill dam - Google Patents
Overflow pre-settling construction method for concrete face rock-fill dam Download PDFInfo
- Publication number
- CN101691744B CN101691744B CN2009102723038A CN200910272303A CN101691744B CN 101691744 B CN101691744 B CN 101691744B CN 2009102723038 A CN2009102723038 A CN 2009102723038A CN 200910272303 A CN200910272303 A CN 200910272303A CN 101691744 B CN101691744 B CN 101691744B
- Authority
- CN
- China
- Prior art keywords
- rock
- fill dam
- dam body
- settling
- dam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The invention discloses an overflow pre-settling construction method for a concrete face rock-fill dam, which comprises the following steps: placing empty reinforcement gabions in order and welding the gabions to form a whole, and then filling stones into the gabions; piling up the reinforcement gabions along the downstream side slope of the rock-fill dam body, and connecting the reinforcement gabions by reinforcements to form a whole; and anchoring the reinforcement gabions and mountains at two shores together by using screw thread reinforcements as anchor rods, and finishing overflow pre-settling after the water flows through the dam. In the overflow pre-settling construction method for the concrete face rock-fill dam, the downstream side slope of the rock-fill dam body can stand the erosion of multiple flash floods after adopting the reinforcement gabion protection construction; at the flash flood of a flood season, the dam surface of the rock-fill dam body produces settlement due to overflowing, so the compactness of the rock-fill dam body is passively improved, the settling deformation of the rock-fill dam body is accelerated, the overflowing is equivalent to releasing the settlement of the rock-fill dam body, and the method is favorable for settling deformation control and stable safety of the rock-fill dam body.
Description
Technical field
The invention belongs to the CFRD construction field.
Technical background
In CFRD construction construction,, usually have to organize enrockment dam body filling construction at plum rain season owing to reasons such as durations.Because mountain stream rises to fall suddenly suddenly, Freshets roar down from the mountains comes soon, goes also soon; Hard to guard against, whenever this rising suddenly that runs into the mountain area set flood when breaking out suddenly, because the Diversion Tunnel flood carrying capacity is limited; Gently then the enrockment dam body is destroyed by rush of water, and weight person's construction equipment even personnel possibly produce injures and deaths.
Summary of the invention
The objective of the invention is to provide a kind of middle-size and small-size overflow pre-settling construction method for concrete face rock-fill dam.
The objective of the invention is to realize like this: a kind of overflow pre-settling construction method for concrete face rock-fill dam,
A. empty reinforced gabion is put neatly and after integrally welded, in gabion, is loaded stone;
B. reinforced gabion is piled up along enrockment dam body downstream side slope one word, links into an integrated entity with reinforcing bar each other;
C. do anchor pole with indented bars, with reinforced gabion and two sides massif anchor together, treat that water flows through the dam after, accomplished the water preliminary sedimentation and fell.
Reinforced gabion is built by laying bricks or stones along the enrockment dam body and highly is no more than upper reaches dam facing reclamation level.
Reinforced gabion length * wide 300 * the 200cm that is not less than.
Overflow pre-settling construction method for concrete face rock-fill dam provided by the invention, domatic to enrockment dam body downstream side, after taking the reinforced gabion construction of prevention work, can stand the test that repeatedly Freshets roar down from the mountains washes away; When flood season, Freshets roar down from the mountains; Enrockment dam body dam facing is because of crossing the water generates sedimentation, and the passive compactness that improves the enrockment dam body has been quickened the sedimentation and deformation of enrockment dam body; Cross water and be equivalent to the sedimentation that has discharged the loose rock dam dam bodys in advance, the sedimentation and deformation control and the safety of dam body that help the enrockment dam body are stable.
Description of drawings
Below in conjunction with accompanying drawing and instance invention is described further.
Fig. 1 is a sectional structure sketch map of the present invention.
Fig. 2 is a sketch map after reinforced gabion of the present invention is jettisoninged.
Among the figure, 1 piles up for the rock downstream fresh limestone of dam slope, and 2 is the reinforced gabion bank protection, and 3 is reinforced gabion, 4 enrockment area concrete masks, and 5 for connecting anchor pole, and 6 is the reinforced gabion river bottom protection.
The specific embodiment
Operating principle of the present invention is following: in the Filling Construction of Concrete Face Rockfill Dam process; Wash away enrockment dam body damage situations analysis later according to mountain torrents; Find that the above dam body of loose rock dam center line is not damaged basically, but the dam center line ruined then seriously in the major river bed part with the lower part dam body, have in addition can be washed into wide nearly several meters; Reach several meters coombe deeply, the limit part is then intact basically but pull in to shore in the loose rock dam downstream.According to this situation; Through repeatedly investigating correlation engineering and checking through engineering practice; To the limited medium and small project of flow conductivity, domatic to enrockment dam body downstream side, after taking the reinforced gabion construction of prevention work, can stand the test that repeatedly Freshets roar down from the mountains washes away; And the total settling amount of enrockment dam body is more much smaller than design in advance, has obtained the goodish construction period to cross the water preliminary sedimentation and fall construction effect.
Embodiment:
A. empty reinforced gabion 3 is put neatly and after integrally welded, in gabion 3, is loaded stone;
B. reinforced gabion 3 is piled up along enrockment dam body downstream side slope one word, links into an integrated entity with reinforcing bar each other; Empty reinforced gabion is put neatly and after integrally welded, with loader the stone that diameter is not more than 70cm inserted in the gabion, seal a reinforced gabion 3 with pricking silk;
C. make of indented bars and connect anchor pole 5, with reinforced gabion 3 and two sides massif anchor together, treat that water flows through the dam after, accomplished the water preliminary sedimentation and fell.
Reinforced gabion 3 is built by laying bricks or stones along the enrockment dam body and highly is no more than upper reaches dam facing reclamation level.
The reinforced gabion 3 length * wide 300 * 200cm that are not less than.
Claims (3)
1. overflow pre-settling construction method for concrete face rock-fill dam is characterized in that:
A. empty reinforced gabion is put neatly and after integrally welded, in gabion, is loaded stone;
B. reinforced gabion is piled up along enrockment dam body downstream side slope one word, links into an integrated entity with reinforcing bar each other;
C. do the connection anchor pole with indented bars, with reinforced gabion and two sides massif anchor together, treat that water flows through the dam after, accomplished the water preliminary sedimentation and fell.
2. overflow pre-settling construction method for concrete face rock-fill dam according to claim 1 is characterized in that: reinforced gabion is built by laying bricks or stones along the enrockment dam body and highly is no more than upper reaches dam facing reclamation level.
3. overflow pre-settling construction method for concrete face rock-fill dam according to claim 1 and 2 is characterized in that: the reinforced gabion length * wide 300 * 200cm that is not less than.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009102723038A CN101691744B (en) | 2009-09-30 | 2009-09-30 | Overflow pre-settling construction method for concrete face rock-fill dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009102723038A CN101691744B (en) | 2009-09-30 | 2009-09-30 | Overflow pre-settling construction method for concrete face rock-fill dam |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101691744A CN101691744A (en) | 2010-04-07 |
CN101691744B true CN101691744B (en) | 2012-02-01 |
Family
ID=42080453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009102723038A Expired - Fee Related CN101691744B (en) | 2009-09-30 | 2009-09-30 | Overflow pre-settling construction method for concrete face rock-fill dam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101691744B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101982617B (en) * | 2010-10-22 | 2012-11-14 | 中国水电顾问集团华东勘测设计研究院 | Debris retaining structure for debris fields and construction method thereof |
CN104099896A (en) * | 2014-07-17 | 2014-10-15 | 黄河勘测规划设计有限公司 | Permeable impact-resistant distribution dam suitable for confluence of natural main river channel and natural branch river channel |
CN113430962B (en) * | 2021-06-29 | 2022-10-18 | 四川大学 | Self-bursting type water passing bridge culvert suitable for area where mountain torrents are easy to occur |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1587536A (en) * | 2004-07-15 | 2005-03-02 | 国家电力公司华东勘测设计研究院 | Back ward water draining system of face plate rock-fill dam dam body and its construction method |
CN101285305A (en) * | 2008-06-04 | 2008-10-15 | 中国水电顾问集团华东勘测设计研究院 | Folded line type concrete panel rock-fill dam and construction method thereof |
CN101429759A (en) * | 2008-12-12 | 2009-05-13 | 中国葛洲坝集团股份有限公司 | Inverse drainage processing method in high concrete panel rock-fill dam construction period |
CN101476309A (en) * | 2009-01-15 | 2009-07-08 | 中国葛洲坝集团股份有限公司 | Dam body prepressing inverted filling construction method for ultra-high concrete panel rock-fill dam |
-
2009
- 2009-09-30 CN CN2009102723038A patent/CN101691744B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1587536A (en) * | 2004-07-15 | 2005-03-02 | 国家电力公司华东勘测设计研究院 | Back ward water draining system of face plate rock-fill dam dam body and its construction method |
CN101285305A (en) * | 2008-06-04 | 2008-10-15 | 中国水电顾问集团华东勘测设计研究院 | Folded line type concrete panel rock-fill dam and construction method thereof |
CN101429759A (en) * | 2008-12-12 | 2009-05-13 | 中国葛洲坝集团股份有限公司 | Inverse drainage processing method in high concrete panel rock-fill dam construction period |
CN101476309A (en) * | 2009-01-15 | 2009-07-08 | 中国葛洲坝集团股份有限公司 | Dam body prepressing inverted filling construction method for ultra-high concrete panel rock-fill dam |
Non-Patent Citations (1)
Title |
---|
JP特开平9-184126A 1997.07.15 |
Also Published As
Publication number | Publication date |
---|---|
CN101691744A (en) | 2010-04-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202298556U (en) | Novel prevention structure for landslide converting-type debris flow | |
CN207633352U (en) | A kind of slope reinforcement structure for rapid rescue construction | |
CN107245981B (en) | Revetment barricade is anti-skid-reinforcement combined type restoration of the ecosystem structure and construction method | |
CN104389320B (en) | Construction method of pile foundation anchor rope prestress high retaining wall | |
CN211200423U (en) | Civil engineering side slope protection reinforced structure | |
CN107250460A (en) | Pre- ingot bar keeping wall method for preventing landslide | |
CN107724334A (en) | Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure | |
CN101691755A (en) | Method for constructing liquified discarded soil in construction of subaqueous structure | |
CN110847197A (en) | Comprehensive treatment method for loess tunnel entrance section crossing landslide body | |
CN107288046A (en) | Especially big high-order mud-rock flow Self-resetting power consumption is blocked structure and implementation | |
CN101691744B (en) | Overflow pre-settling construction method for concrete face rock-fill dam | |
CN109083109A (en) | It is a kind of multistage energy dissipating and infiltration mud-rock flow blocking dam and its method of construction | |
CN207314271U (en) | Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure | |
CN110805049B (en) | Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure | |
CN109610407B (en) | Ecological barricade of landslide prevention based on dead weight is balanced | |
CN203007961U (en) | Gabion cofferdam structure | |
CN205444232U (en) | Stock - gravity type infiltration retaining wall | |
CN107869351A (en) | A kind of method of the high narrow large-scale solution cavity Cavity treatment security protection of type | |
CN101705668B (en) | Damming water conservancy project construction structure constructed in flowing water and construction method thereof | |
CN207933975U (en) | A kind of high stability concrete structure for slope protection system | |
CN105569055A (en) | Structure for preventing mountain landslide | |
CN105178338A (en) | Soil slope protecting structure and protecting method thereof | |
CN104947630B (en) | For the mistake adfluxion slag weir of Hydraulic and Hydro-Power Engineering and its construction method | |
KR101081564B1 (en) | Using flexible pipes leaking vertical green terraced retaining wall | |
CN211900696U (en) | Karst tunnel groundwater open type drainage structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120201 Termination date: 20190930 |
|
CF01 | Termination of patent right due to non-payment of annual fee |