CN107724334A - Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure - Google Patents
Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure Download PDFInfo
- Publication number
- CN107724334A CN107724334A CN201710980129.7A CN201710980129A CN107724334A CN 107724334 A CN107724334 A CN 107724334A CN 201710980129 A CN201710980129 A CN 201710980129A CN 107724334 A CN107724334 A CN 107724334A
- Authority
- CN
- China
- Prior art keywords
- mold
- bagged concrete
- reinforced gabion
- reinforcement cage
- steel reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
- E02B3/122—Flexible prefabricated covering elements, e.g. mats, strips
- E02B3/123—Flexible prefabricated covering elements, e.g. mats, strips mainly consisting of stone, concrete or similar stony material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/205—Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Revetment (AREA)
Abstract
The present invention relates to a kind of mold-bagged concrete protective slope structure and a kind of steel reinforcement cage with anchor structure, belong to Geotechnical Engineering field, can apply in fields such as Hydraulic and Hydro-Power Engineering, municipal works, river regulations.The present invention provides a kind of mold-bagged concrete protective slope structure, with reinforced gabion combination application, extends the usage time of mold-bagged concrete, improves its bank protection ability.Mold-bagged concrete protective slope structure, domatic in side slope is fixedly installed mold-bagged concrete, the top surface of side slope is extended at the top of mold-bagged concrete, and it is fixedly installed reinforced gabion on the mold-bagged concrete of side slope top surface, reinforced gabion bottom is fixedly installed anchor pole, and anchor pole is anchored in side slope after passing through mold-bagged concrete.Grouting Pipe is provided with the top of reinforced gabion, entirety is formed by the block stone inside slip casting reinforced gabion and mold-bagged concrete.Mold-bagged concrete extends at the toe of side slope to river valley, and carries out presser feet by reinforced gabion in extension.
Description
Technical field
The present invention relates to a kind of mold-bagged concrete protective slope structure and a kind of steel reinforcement cage with anchor structure, belong to ground work
Journey field, it can apply in fields such as Hydraulic and Hydro-Power Engineering, municipal works, river regulations.
Background technology
Mold-bagged concrete bank protection has rapid, saving expense of constructing, particularly applied under water compared with traditional masonry project
The convenient superiority of work.External mold-bagged concrete bank protection sees the Toronto navigation channel experiment work being completed for 1969 earliest
Cheng Zhong.After the eighties in 19th century, according to the invention of American Architecture technology company, (nineteen sixty is special for Japanese Asahi Kasei Corporation
Profit) various mould bags have been made with the type cloth of high tenacity polyester fiber 66 it is also known as method cloth.Method cloth has water penetration, make concrete residual moisture by
It can in time be excluded after to pouring pressure, reduce the ratio of mud, accelerated concrete or mortar solidification, obtain high density, high intensity
Concrete or mortar masonry.China just promotes the use of geotextile in hydraulic engineering in recent years, and mold-bagged concrete is coastal
Applied in dike mill, river slope bank-protection works and also belong to the stage at the early-stage.
Mold-bagged concrete bank protection is exactly with woven geotechnical fabric bag to make Flexible formwork assembly, using concrete pump by microlith coagulation
Soil pressure enters mould bag, and formation has certain thickness, the concrete unit of certain planar dimension, and some units are coupled to by mould bagging
It is overall, so as to reach the function of bank protection.
Mould bag belongs to geosynthetics, and it is with double-deck baggy fabric of the high-strength chemical-fibre long filament through being woven from.Mould bag
Along 2 directions in length and breadth every a segment distance (being mostly 25cm~20cm) between upper and lower two layers, have certain length (be mostly 7cm~
Nylon rope 10cm), upper and lower two-layer fabrics are bound up, and the thickness for controlling perfusion to shape.Because it can play template
Effect, therefore be called mould bag.Mould bag basic pattern can be divided into mortar type and coagulation type according to packing material difference, according to mould bag
Bank protection effect is different with structure.Because uniform section type concrete lining self-bearing ability is strong, 1 can be layered on:On 1 abrupt slope, it can increase
Add domatic stability against sliding, prevent from coming down.It is commonly used for River Embankment bank protection, channel, pond lining cutting.
Currently in order to preventing mould bag coasting, often it is appropriately arranged with beyond top of the slope mould bag upper limb binds concrete groove
The stake of gully position.The spacing of guide pile is depending on the conditions such as length of grade, the gradient, mould bag thickness.Typically demarcate in the junior unit of mould bagging
Face sets a guide pile, is fastened the steel pipe penetrated in mould bag perforation hole with nylon rope, and the other end is by take-up device with determining
Position stake is connected.With strand thick stick is tensed on per pile, to adjust mould bag upper and lower position and stent bag.The larger construction of stormy waves shows
, it can be disperseed to push down the mould bag completed with sand pocket, prevent stormy waves from conjugate mould bag.But slided preventing mold-bagged concrete protective slope structure
Dynamic fixing device is relatively single, often lacks complete protective slope structure system, causes many mold-bagged concrete bank protections to be transported
Sliding rupture just occurs after row a period of time.
The mold-bagged concrete protective slope structure found at present, it is the most famous with following two:First, Ling Chunhai et al. is introduced
The third villages of Mei Jiang power station flood season left bank diversion canal uses the applicable cases and effect of geotechnical fabric bag concrete revetment, referring to [icepro
Spring is extra large, Zhang Zhenxin, application [J] the people pearls of Zhang Yuanhai geotechnical fabric bags concrete in the protection of the third village power station left bank flood season
River, 2003,6:33-35 pages of], due to open channel excavation slope by design 1:1 is changed to l:0.4, whole side slope is top-heavy,
Under the influence of current, side slope pin, which is necessarily formed, draws brush.For this, opposite side toe is covered with block stone presser feet, side slope with rock ballast, spats and
The upstream face of bank protection carries out erosion control processing using mold-bagged concrete.Presser foot block stone design side slope is 1: 1.2, bottom width 10.5m, is filled out
High 4m;Bank protection rock ballast is filled on presser foot block stone, and design side slope is 1: 1.2, bottom width 6.3m, top width 1.5m, is filled to elevation
68m, bank protection bottom set the maintenance packway of a wide 1m.
In the case where plum river stream and rainy season charge for remittance wash away, bank protection side boundaries, bottom boundary are formed and emptied, and can influence mould bag shield
Slope resistance to overturning, bank protection safety is directly affected, therefore, mould bag top, side are taken mixed along slope ditching, mould bag knuckle and backfill
Solidifying soil processing, bottom boundary make the processing of boulder presser feet;
Second, Liu Yangmin and Yue Yiquan describe application of the geotechnical fabric bag concrete in Hydraulic and Hydro-Power Engineering bank protection, referring to
[application [J] the engineering constructions of Liu Yangmin, Yue Yi power geotechnical fabric bags concrete in Hydraulic and Hydro-Power Engineering bank protection, 2004,117
(3):54-55 pages of], project post-evaluation design is wide without filter point mould bag using C20 mold-bagged concretes lining shield, mould bag model rectangle
4m, it is 150mm to enrich thickness, and seam crossing is using geotechnological anti-filter cloth overlap joint wide 1.6m.The laying of geotechnical fabric bag is applied using segmentation
The method of work and continuous productive process is carried out.Vertical dike can axially be divided into 3 sections of base section, concrete revetment section and horizontal bedding section, suitable
Dike is axially 1 section (using mould bag breadth 4m as modulus) per 12m.Every section carries out base section construction first, then carries out slope successively
Section and the construction of bedding section or both are constructed simultaneously.Direct-axis to can it is separated by a distance progress multistage parallel operations, two construction sections away from
From using 12m as modulus.Slope section geotechnical fabric bag is laid from top to bottom, is worn in top of the slope with what steel pipe penetrated that top of the slope mould bag sews in advance
In pipe cloth, fixation is adjusted.Horizontal bedding is laid from toe to bedding head end.Mould bag tension and relaxation appropriateness is paid attention to during laying, is avoided
Stress concentration and artificial damage.Want modulus bag to be coincide with ground, layer contacts face smooth, prevent mould bag wrinkle from forming penetrating passage
Phenomenon.Underwater portion is then first pulled open mould bagging with canoe, is then lain in mould bagging on station keeping ship with rope, to prevent water
The mould bagging volume of lower part together or positioning, again loosens rope in concrete filling., will while mould bag is laid
The reserved draining hole site of PVC drain pipe insertion mould bag, then carry out charging for concrete.
Current technology is often only referred to how to lay mold-bagged concrete, and for fixed, bottom at the top of mold-bagged concrete
Presser feet is introduced seldom, and currently used way is exactly to take to make along the processing of slope ditcher fill concrete, bottom boundary at top
Handled with boulder presser feet.This processing method often leads to that top destruction just occurs after using very short time, and it is sliding to produce part
Move, the phenomenon of top solid failure occur.And sliding phenomenon often occurs under strong flow action in bottom boulder, so as to from mould
Bag concrete bottom is destroyed, and lacks a kind of system of the fixation mold-bagged concrete of system.
The content of the invention
The purpose of the present invention is for weak point present in above-mentioned existing background technology, there is provided a kind of mold-bagged concrete
Protective slope structure, with reinforced gabion combination application, extend the usage time of mold-bagged concrete, improve its bank protection ability.
The technical solution adopted for the present invention to solve the technical problems is:Mold-bagged concrete protective slope structure, on the slope of side slope
Face is fixedly installed mold-bagged concrete, and the top surface of side slope is extended at the top of mold-bagged concrete, and positioned at the mould of side slope top surface
Reinforced gabion is fixedly installed on bag concrete, reinforced gabion bottom is fixedly installed anchor pole, after anchor pole passes through mold-bagged concrete
It is anchored in side slope.
It is further:Reinforced gabion is rectangle;Anchor pole is vertically arranged, and anchor pole top is stretched into reinforced gabion, bottom
Stretch out reinforced gabion.
It is further:Grouting Pipe is provided with the top of reinforced gabion, by the block stone inside slip casting reinforced gabion with
Mold-bagged concrete forms entirety.
It is further:Grouting Pipe is vertically arranged.
It is further:Mold-bagged concrete extends at the toe of side slope to river valley, and passes through reinforced gabion in extension
Carry out presser feet.
It is further:Reinforced gabion at toe is also rectangle.
Corresponding with the top fixed form of mold-bagged concrete protective slope structure, present invention simultaneously provides one kind to have anchoring knot
The steel reinforcement cage of structure, including for depositing the steel reinforcement cage of block stone, steel reinforcement cage bottom is fixedly installed anchor pole.Steel reinforcement cage is rectangle;
Anchor pole is vertically arranged, and anchor pole one end is stretched into steel reinforcement cage, and the other end stretches out steel reinforcement cage.Grouting Pipe is provided with the top of steel reinforcement cage, is noted
Slurry pipe is vertically arranged.
The beneficial effects of the invention are as follows:Anchored using in the reinforced gabion that building-site is easier to make and cost is cheap
Mold-bagged concrete, so as to further increase mold-bagged concrete along domatic anchor force, it is set to paste slope finer and close, and slip casting
Reinforced gabion afterwards can not only anchor mold-bagged concrete structure, and can form natural road surface and block protection structure, protect road
The vehicle in face and pedestrian.
The present invention is quick, convenient, and can effectively improve mold-bagged concrete antiskid performance and service life.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the floor map of the anchor pole distribution of the present invention;
In figure mark for:1- reinforced gabions, 2- anchor poles, 3- Grouting Pipes, 4- side slopes, 5- mold-bagged concretes.
Embodiment
Below in conjunction with the accompanying drawings and embodiment the invention will be further described.
As shown in Figure 1 and Figure 2, the present invention is fixedly installed mold-bagged concrete 5 in the domatic of side slope 4, mold-bagged concrete 5
Top extends to the top surface of side slope 4, and is fixedly installed reinforced gabion 1, steel on the mold-bagged concrete 5 of the top surface of side slope 4
The bottom of muscle gabion 1 is fixedly installed anchor pole 2, and anchor pole 2 is anchored in side slope 4 after passing through mold-bagged concrete 5.Mold-bagged concrete 5 exists
Top is anchored by reinforced gabion 1, improves mold-bagged concrete 5 along domatic anchor force, it is pasted slope finer and close, this
Outside, reinforced gabion 1 is easier to make in building-site and cost is cheap.
To improve anchoring effect, reinforced gabion 1 is preferably rectangle;2 yuan of anchor pole is elected as vertically arranged, and the top of anchor pole 2 is stretched
Enter in reinforced gabion 1, reinforced gabion 1 is stretched out in bottom.
The top of reinforced gabion 1 is provided with Grouting Pipe 3, passes through the block stone inside slip casting reinforced gabion 1 and mould bag coagulation
Soil 5 forms overall.Reinforced gabion 1 after slip casting not only can further anchor mold-bagged concrete structure, and can be formed certainly
Protection structure is blocked on right road surface, protects vehicle and the pedestrian on road surface.Grouting Pipe 3 is preferably vertically arranged.
The present invention has done further improvement to mold-bagged concrete 5 in the fixed structure of toe simultaneously, and mold-bagged concrete 5 is on side
Extend at the toe on slope 4 to river valley, and presser feet is carried out by reinforced gabion 1 in extension.Relative to use of the prior art
The processing of boulder presser feet, does not fear current scour, improves the ability of resistant slide, may be such that patch slope is finer and close at toe, prolongs
The usage time of long mold-bagged concrete.Reinforced gabion 1 at toe is preferably also rectangle.
Corresponding with the top fixed form of mold-bagged concrete protective slope structure, present invention simultaneously provides one kind to have anchoring knot
The steel reinforcement cage of structure, including for depositing the steel reinforcement cage of block stone, steel reinforcement cage bottom is fixedly installed anchor pole 2.Steel reinforcement cage is rectangle;
Anchor pole 2 is vertically arranged, and the one end of anchor pole 2 is stretched into steel reinforcement cage, and the other end stretches out steel reinforcement cage.Grouting Pipe 3 is provided with the top of steel reinforcement cage,
Grouting Pipe 3 is vertically arranged.When in use, the block stone that particle diameter differs is put into inside steel reinforcement cage, finally steel reinforcement cage is formed and closed
Structure.
Embodiment:
The construction procedure of mold-bagged concrete protective slope structure is:
(1) first, mold-bagged concrete is carried out pasting slope arrangement, top of the slope has more 1.2m or so distance, and bottom of slope reaches river valley
0.5m or so;
(2) after mold-bagged concrete fills concrete, steel reinforcement cage is put into mold-bagged concrete top, then insertion is appropriate long
Anchor bar as anchor pole, be anchored to road surface at least more than 0.5m;
(3) the block stone of certain particle diameter is put into steel reinforcement cage inside, and is put into Grouting Pipe simultaneously;
(4) using the reinforced gabion template made in advance, Grouting Pipe is passed through using the concrete as mold-bagged concrete
To the slip casting of reinforced gabion inside, so that its internal block stone forms entirety with mold-bagged concrete, mold-bagged concrete is further anchored
Protective slope structure;
(5) for mold-bagged concrete slurry is poured in after it has some strength, is put into non-slip casting in the part of riverbed bottom
Reinforced gabion presser feet, you can protect its toe.
Claims (10)
1. mold-bagged concrete protective slope structure, domatic in side slope (4) are fixedly installed mold-bagged concrete (5), it is characterised in that:Mould
The top surface of side slope (4) is extended at the top of bag concrete (5), and it is fixed on the mold-bagged concrete (5) of side slope (4) top surface
Reinforced gabion (1) is provided with, reinforced gabion (1) bottom is fixedly installed anchor pole (2), after anchor pole (2) passes through mold-bagged concrete (5)
It is anchored in side slope (4).
2. mold-bagged concrete protective slope structure as claimed in claim 1, it is characterised in that:Reinforced gabion (1) is rectangle;Anchor pole
(2) vertically arranged, anchor pole (2) top is stretched into reinforced gabion (1), reinforced gabion (1) is stretched out in bottom.
3. mold-bagged concrete protective slope structure as claimed in claim 1, it is characterised in that:Grouting Pipe is provided with the top of reinforced gabion (1)
(3), formed by the internal block stone of slip casting reinforced gabion (1) with mold-bagged concrete (5) overall.
4. mold-bagged concrete protective slope structure as claimed in claim 3, it is characterised in that:Grouting Pipe (3) is vertically arranged.
5. the mold-bagged concrete protective slope structure as described in any one in Claims 1-4, it is characterised in that:Mold-bagged concrete
(5) extend at the toe of side slope (4) to river valley, and presser feet is carried out by reinforced gabion (1) in extension.
6. mold-bagged concrete protective slope structure as claimed in claim 5, it is characterised in that:Reinforced gabion (1) at toe is also
Rectangle.
7. the steel reinforcement cage with anchor structure, including for depositing the steel reinforcement cage of block stone, it is characterised in that:Steel reinforcement cage bottom is fixed
It is provided with anchor pole (2).
8. there is the steel reinforcement cage of anchor structure as claimed in claim 7, it is characterised in that:Steel reinforcement cage is rectangle;Anchor pole (2)
Vertically arranged, anchor pole (2) one end is stretched into steel reinforcement cage, and the other end stretches out steel reinforcement cage.
9. there is the steel reinforcement cage of anchor structure as claimed in claim 7 or 8, it is characterised in that:Note is provided with the top of steel reinforcement cage
Slurry pipe (3).
10. there is the steel reinforcement cage of anchor structure as claimed in claim 9, it is characterised in that:Grouting Pipe (3) is vertically arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710980129.7A CN107724334A (en) | 2017-10-19 | 2017-10-19 | Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710980129.7A CN107724334A (en) | 2017-10-19 | 2017-10-19 | Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107724334A true CN107724334A (en) | 2018-02-23 |
Family
ID=61212120
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710980129.7A Pending CN107724334A (en) | 2017-10-19 | 2017-10-19 | Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107724334A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108824428A (en) * | 2018-09-06 | 2018-11-16 | 沙洲职业工学院 | A kind of quick anchoring device preventing reservoir landslide and construction method |
CN108867669A (en) * | 2018-09-06 | 2018-11-23 | 沙洲职业工学院 | A kind of retaining structure on quick reply landslide |
CN109356091A (en) * | 2018-11-21 | 2019-02-19 | 中国电建集团成都勘测设计研究院有限公司 | Mountain stream river levee engineering |
CN110080167A (en) * | 2019-04-29 | 2019-08-02 | 水利部交通运输部国家能源局南京水利科学研究院 | Mould bag fills sludge solidification ecological slope protection construction method |
CN111034582A (en) * | 2019-12-19 | 2020-04-21 | 郑楚英 | Water-intercepting micro-irrigation method for concrete frame slope protection plants |
CN113481938A (en) * | 2021-07-10 | 2021-10-08 | 绿美艺环境建设集团有限公司 | Silty river stone cage combined plant-growing protection pad ecological revetment and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1037157A (en) * | 1996-07-27 | 1998-02-10 | Nisshoku Corp | Protection and greening construction method of river immersion region |
CN1534141A (en) * | 2003-03-31 | 2004-10-06 | Method of proceeding engineering surface protection using ecological material | |
JP2005016112A (en) * | 2003-06-25 | 2005-01-20 | Isao Ogata | Construction method of permeable bagged dry-mixed concrete block, tough emergency disaster temporary earth retention and permanent revetment |
CN105874959A (en) * | 2016-04-13 | 2016-08-24 | 北京林业大学 | Edge slope vegetation ecological restoration method and system |
CN206204879U (en) * | 2016-09-12 | 2017-05-31 | 辽宁省水利水电科学研究院 | A kind of bar planting formula concrete revetment mould bag |
CN207314271U (en) * | 2017-10-19 | 2018-05-04 | 中国电建集团成都勘测设计研究院有限公司 | Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure |
-
2017
- 2017-10-19 CN CN201710980129.7A patent/CN107724334A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1037157A (en) * | 1996-07-27 | 1998-02-10 | Nisshoku Corp | Protection and greening construction method of river immersion region |
CN1534141A (en) * | 2003-03-31 | 2004-10-06 | Method of proceeding engineering surface protection using ecological material | |
JP2005016112A (en) * | 2003-06-25 | 2005-01-20 | Isao Ogata | Construction method of permeable bagged dry-mixed concrete block, tough emergency disaster temporary earth retention and permanent revetment |
CN105874959A (en) * | 2016-04-13 | 2016-08-24 | 北京林业大学 | Edge slope vegetation ecological restoration method and system |
CN206204879U (en) * | 2016-09-12 | 2017-05-31 | 辽宁省水利水电科学研究院 | A kind of bar planting formula concrete revetment mould bag |
CN207314271U (en) * | 2017-10-19 | 2018-05-04 | 中国电建集团成都勘测设计研究院有限公司 | Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure |
Non-Patent Citations (1)
Title |
---|
刘兴池: "护岸新技术在塔里木河干流河道治理工程中的运用分析", 《北京农业》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108824428A (en) * | 2018-09-06 | 2018-11-16 | 沙洲职业工学院 | A kind of quick anchoring device preventing reservoir landslide and construction method |
CN108867669A (en) * | 2018-09-06 | 2018-11-23 | 沙洲职业工学院 | A kind of retaining structure on quick reply landslide |
CN109356091A (en) * | 2018-11-21 | 2019-02-19 | 中国电建集团成都勘测设计研究院有限公司 | Mountain stream river levee engineering |
CN109356091B (en) * | 2018-11-21 | 2024-01-19 | 中国电建集团成都勘测设计研究院有限公司 | Mountain stream river embankment project |
CN110080167A (en) * | 2019-04-29 | 2019-08-02 | 水利部交通运输部国家能源局南京水利科学研究院 | Mould bag fills sludge solidification ecological slope protection construction method |
CN111034582A (en) * | 2019-12-19 | 2020-04-21 | 郑楚英 | Water-intercepting micro-irrigation method for concrete frame slope protection plants |
CN111034582B (en) * | 2019-12-19 | 2021-09-17 | 郑楚英 | Water-intercepting micro-irrigation method for concrete frame slope protection plants |
CN113481938A (en) * | 2021-07-10 | 2021-10-08 | 绿美艺环境建设集团有限公司 | Silty river stone cage combined plant-growing protection pad ecological revetment and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107724334A (en) | Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure | |
CN103410167B (en) | Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method | |
CN106120823B (en) | A kind of Temporary Cofferdam combination against seepage structure and rapid constructing method | |
CN207314271U (en) | Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure | |
CN106284081B (en) | A kind of blast cofferdam is as cast-in-place box beam bracket foundation construction method | |
CN106930231B (en) | A kind of construction method applied to engineering flood bank reinforcing of passing the flood period | |
CN101333818A (en) | Pile film cofferdam and its construction method | |
CN107190602A (en) | A kind of river degradation section pile formula foam concrete light road bank structure and construction method | |
CN112030878A (en) | Rapid rush-to-pass construction method along river subgrade water damage | |
CN112343003A (en) | Reinforcing and seepage-proofing treatment method for ultra-shallow soil covering of river bed in tunnel underpass river construction | |
CN207267975U (en) | A kind of bed stabilization structure for being used under shield tunnel wear river | |
CN209760147U (en) | A ecological bank protection for hydraulic engineering | |
CN207582477U (en) | A kind of concrete cofferdam and earth rock cofferdam combined cofferdam | |
CN201495521U (en) | Hinged large earth bags for river emergency and flood prevention | |
CN208604552U (en) | For the stake woods dam under complex geological condition | |
CN105569055B (en) | A kind of structure for preventing landslide | |
CN104947630B (en) | For the mistake adfluxion slag weir of Hydraulic and Hydro-Power Engineering and its construction method | |
CN208293630U (en) | A kind of structural system of the antiseismic liquefaction uplifting in subway station | |
CN207295418U (en) | The concrete buttress structure for preventing high gradient slope bridge pier from deviating | |
CN105256763A (en) | Diking method based on bamboo raft frame structure | |
CN205875096U (en) | Rockfill self-breaking dam | |
CN206267097U (en) | For the concrete hinge soft raft structure of antiscour protection works under water | |
CN101691744B (en) | Overflow pre-settling construction method for concrete face rock-fill dam | |
CN108505547A (en) | A kind of structural system and method for the antiseismic liquefaction uplifting in subway station | |
CN111335290B (en) | Offshore artificial island structure suitable for silt foundation and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180223 |