A kind of method and this rock that reduces the rock horizontal movement
Technical field
The present invention relates to hydro science dam construction technique field, particularly relate to a kind of method and and this rock that reduces the rock horizontal movement.
Background technology
In Hydraulic and Hydro-Power Engineering, because irrigation draught or generating etc. need, the formation reservoir of usually will building a dam.The dam mainly contains the types such as concrete dam and loose rock dam, and dam type commonly used in loose rock dam has core wall rockfill dam and reinforced concrete face rockfill dam (hereinafter to be referred as face dam).World's dam construction technique development in recent years is very fast, has developed at present 300m level Clay Core Wall Rockfill Dam, the arched concrete dam of 300m level, 300m level concrete gravity dam, 200m level rock.
For further developing the western abundant hydraulic power potentials of China, the west area has the high dam of a collection of 300m level yet to be built, the phenomenon of the features as poor geologic conditions such as west area ubiquity relief joint growth, exist simultaneously traffic very inconvenient, the material such as cement and steel haul distance is far away, so loose rock dam have advantages of strong adaptability and reduced investment.In addition, the west area quality of earth material is bad, and the earth material source is less, if select Clay Core Wall Rockfill Dam, exploits earth material and need take a large amount of soils, increases the immigrant, and has greater environmental impacts, and therefore, rock more can adapt to the west area than core wall rockfill dam.Yet, the high rock of design and construction 300m level enlarges markedly because of the dam body hydraulic thrust, can produce larger horizontal movement (horizontal movement reach 450mm more than), therefore affect the face joint water stop security of system, reducing the horizontal movement that hydraulic thrust causes is the key technical problem that the high rock of 300m level is built.
Summary of the invention
Technical problem to be solved by this invention is to overcome existing high rock to produce the defective of larger horizontal movement because hydraulic thrust increases, a kind of method and this rock that reduces the rock horizontal movement is provided, by the upstream extremity bottom rock, the horizontal movement that gravity dam reduces dam body is set, forms a kind of safe and reliable rock compound with gravity dam.
In order to solve the problems of the technologies described above, the present invention adopts following technical scheme:
The present invention reduces the method for rock horizontal movement: the upstream extremity concreting gravity dam in the rock bottom, build rock on the basis of gravity dam.
Preferably, the toe board of above-mentioned rock and panel are placed on gravity dam.
Further, build the dry lean concrete district between the main rockfill area of described gravity dam and rock.The dry lean concrete district has low elastic modulus, can coordinate the compatibility of deformation of gravity dam and main rockfill area.
Preferably, aforementioned gravity dam dam crest height is with the time more than main rockfill area sedimentation half a year of lower area.Can make like this distortion of main rockfill area be tending towards convergence, toe board and panel can be placed on stable gravity dam, and the above rockfill of gravity dam dam crest height also can be placed on basicly stable main rockfill area.
Preferably, the aforementioned method that reduces high rock horizontal movement, described gravity dam is to be formed by the above concreting of C20 grade, described dry lean concrete district is formed by the following concreting of C15 grade.
The present invention also provides a kind of rock compound with gravity dam, it comprises main enrockment I district, main enrockment II district, draining rockfill area, Transition Materials district, bedding material district, clay blanket district, rock ballast lid heavily district and panel, is provided with the gravity dam district at the bottom of high rock and upstream extremity.
The above-mentioned rock compound with gravity dam, the upstream dam slope 1:0 in described gravity dam district~0.2, downstream dam slope 1:0.3~0.7, top width 12~40m, the bottom in gravity dam district extends to the basic upstream face of whole loose rock dam to 0.3~0.35 times of distance between the axis of dam, and the thickness of extension is 2~10m.
Above-mentioned high rock in conjunction with gravity dam is provided with the dry lean concrete district between gravity dam district and main enrockment I district.The height of described gravity dam is controlled at below 100m, and the height in the above main enrockment I of gravity dam dam crest height district is controlled at below 250m, and the whole height of rock is controlled in 350m.
compared with prior art, the upstream extremity of the present invention bottom common rock dam body built gravity dam, gravity dam is relatively not produce the rigid body of horizontal movement, horizontal movement at effect of water pressure lower panel loose rock dam can be controlled in 250mm, can satisfy the requirement of current face joint water stop system, and, main rockfill area sedimentation can make its distortion be tending towards restraining more than half a year and have the distortion that tunable gravity dam district and main rockfill area are set in the dry lean concrete district of low elastic modulus, make dam structure stable, broken through that high rock is subjected to the larger impact of horizontal movement and can not be higher than the limitation of 300m level, have significant economic benefit and social benefit.
Description of drawings
Fig. 1 is structural representation of the present invention.
The specific embodiment
High rock structure of the present invention as shown in Figure 1, it comprises that main enrockment I district 3, main enrockment II district 4, draining rockfill area 5, Transition Materials district 6, bedding material district 7, clay blanket district 8, rock ballast lid heavily distinguish 9 and panel 10, be provided with gravity dam district 1 at the bottom of high rock and upstream extremity, be provided with the dry lean concrete district between gravity dam district 1 and main enrockment I district 3.
1, at first build gravity dam district 1 and dry lean concrete district 2, gravity dam district 1 adopts the concreting of C25 grade, dry lean concrete district 2 adopts the concreting of C15 grade, with automobile, above-mentioned concrete is transported to gravity dam district 1 and the dry lean concrete district 2 of high rock, minute storehouse block placement until build is completed, the height in gravity dam district 1 is controlled at below 100m, its upstream dam slope 1:0~0.2, downstream dam slope 1:0.3~0.7, top width 12~40m, the bottom in gravity dam district 1 extends to the basic upstream face of whole loose rock dam to 0.3~0.35 times of distance between the axis of dam, the thickness of extension is 1~5m.
2, fill rock, first hard rock blasting is excavated, form main enrockment I district, the material source in draining rockfill area and main enrockment II district, the rock mass freshness is relatively preferably as main enrockment I district material, draining rockfill area material, the rock mass freshness is relatively relatively poor can be used as main enrockment II district material, with automobile, above-mentioned stockpile is transported to respectively high rock master enrockment I district 3, main enrockment II district 4 and draining rockfill area 5, the employing bulldozer is paved, bed thickness 80cm, then sprinkle water 15%, adopt the heavy vibrating roller of 25t to roll 8~10 times, satisfy the requirement of porosity 15~20%, continue enrockment watering grinding operation, when identical with the gravity dam height to the rockfill area height, more than rockfill area is placed sedimentation half a year, can make like this distortion of rockfill area be tending towards convergence, continue afterwards enrockment watering grinding operation, complete until fill, the above rockfill area height of gravity dam dam crest height is controlled in 250m.The toe board of rock and panel are placed on stable gravity dam.