CN103015399B CN201210575187.9A CN201210575187A CN103015399B CN 103015399 B CN103015399 B CN 103015399B CN 201210575187 A CN201210575187 A CN 201210575187A CN 103015399 B CN103015399 B CN 103015399B
Authority
CN
China
Prior art keywords
water discharging
discharging body
pore pressure
foundation
liquefaction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210575187.9A
Other languages
Chinese (zh)
Other versions
CN103015399A (en
Inventor
董志良
李燕
陈伟东
刘嘉
周琦
陈平山
罗彦
邱青长
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Fourth Harbor Engineering Co Ltd
CCCC Fourth Harbor Engineering Institute Co Ltd
Guangzhou Harbor Engineering Quality Inspection Co Ltd
CCCC National Engineering Research Center of Dredging Technology and Equipment Co Ltd
Original Assignee
CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd
CCCC Fourth Harbor Engineering Co Ltd
CCCC Fourth Harbor Engineering Institute Co Ltd
Guangzhou Harbor Engineering Quality Inspection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd, CCCC Fourth Harbor Engineering Co Ltd, CCCC Fourth Harbor Engineering Institute Co Ltd, Guangzhou Harbor Engineering Quality Inspection Co Ltd filed Critical CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd
Priority to CN201210575187.9A priority Critical patent/CN103015399B/en
Publication of CN103015399A publication Critical patent/CN103015399A/en
Application granted granted Critical
Publication of CN103015399B publication Critical patent/CN103015399B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of quake evaluation system of Liquefaction Foundation, it arranges permanent vertical pore pressure dissipation water discharging body and horizontal pore pressure dissipation water discharging body in Liquefaction Foundation, and vertical pore pressure dissipation water discharging body is communicated with horizontal pore pressure dissipation water discharging body and connects with top drainage system.This method, for Liquefaction Foundation, arranges permanent dissipation of excess pore-water pressure passage, controls and reduce excess pore water pressure, prevents and treats, thus improve the antidetonation liquefaction performance of this ground from the source producing liquefaction.Arrange dissipation passage to arrange before ground stabilization, the construction period as the drainage system of basement process, as permanent excess pore pressure dissipation passage after the construction period completes.Also after can being arranged in ground stabilization, as the permanent facility of operation phase.

Description

The quake evaluation system of Liquefaction Foundation and method for processing foundation
Technical field
The present invention relates to the technical field of the Soft Ground such as port works, traffic engineering, construction work, highway engineering.
Background technology
Along with the sustained and rapid development of China's economy, the infrastructure scale of China's Coastal Areas is unprecedented in recent years, in order to solve the engineering problems of land utilization such as port and pier, building, highway, a large amount of reclamation engineerings has been carried out in the area such as Tianjin, Wenzhou, Lianyun Harbour, Xiamen, Nansha Area, Guangzhou and Shenzhen Yantian in recent years.
These engineerings are carry out the materials such as waterpower hydraulic reclamation waste silt, Extra-fine sand, silt on the beach of alluvial mostly, then carry out stiffening basic ground.Engineering quantity due to China's reclaiming land around sea reaches unprecedented scale, cause the worsening shortages of hydraulic reclamation resource, particularly antidetonation liquefies good medium coarse sand, a lot of local faced without sand can condition, for this situation, increasing engineering adopts local than more rich flour sand, fine sand, as Harbor, Tianjin, Cao Feidian etc.This kind of hydraulic reclamation material is exactly the problem of liquefaction to the engineering properties that Effects on Engineering is maximum, in addition these coastal areas mud, layer of sand, powder soil horizon, argillic horizon that generally also extensively distribution is deep below barged-in fill, these waterpower hydraulic reclamations and original saturated silty sand, the Liquefaction of silt under the effect of earthquake are global difficult problems, particularly after completion of works, superstructure is during runing.
Under the horizontal vibration effect that earthquake produces, between the soil body, generation adjustment is tending towards closely knit by position, and the soil body becomes closely knit certainly will get rid of pore water.If under periodicity dynamic loading sharply, if the bad and impeded drainage of the water permeability of the soil body, the draining in last cycle does not also complete, rear cycle draining again, the water that should drain has little time to discharge, and water is incompressible, so just create excess pore water pressure, now sand soil classifiction greatly reduces.With time of vibration continuity, excess pore water pressure is constantly accumulated superposition and increases, and finally makes the shear strength of the soil body completely lose, and this phenomenon is referred to as liquefaction.
Sand liquefaction phenomenon is as a kind of principal mode of earthquake disaster; usually can cause differential settlement and the structural damage of building foundation; as: sandblasting stream soil, bunding slump, ground cracking sinks, construction cracking collapses, harbour destruction etc.; cause major disaster and casualties, bring huge disaster to the mankind.
It is the necessary condition that liquefaction occurs that excess pore water pressure raises.Reduce saturated sand, silt outside the pore water pressure of power particularly under cyclic force effect be a kind of important channel solving liquefaction.
Summary of the invention
The present invention aims to provide a kind of effective, convenient, cost-saving, is applied to the method that Liquefaction Foundation improves quake evaluation performance.
In order to achieve the above object, present invention employs following technology: a kind of quake evaluation system of Liquefaction Foundation, it is characterized in that, in Liquefaction Foundation, arrange permanent vertical pore pressure dissipation water discharging body and horizontal pore pressure dissipation water discharging body, vertical pore pressure dissipation water discharging body is communicated with horizontal pore pressure dissipation water discharging body and connects with top drainage system.
Described vertical pore pressure dissipation water discharging body runs through the sand or powder soil horizon that arrive Liquefaction Foundation.
Described horizontal pore pressure dissipation water discharging body is layed in the stabilized zone of foundation settlement, or liquable sand or powder soil horizon, and the displacement produced to prevent ground destroys horizontal pore pressure dissipation water discharging body.
Specifically, described vertical pore pressure dissipation water discharging body is selected from one or more the adrainage material in collecting well, pipe well, vertical plastic draining board, cardboard, sand pile, sand wick, sand-gravel pile.
Specifically, described horizontal pore pressure dissipation water discharging body is selected from one or more drainage patterns such as sand, rubble or slag bed course, plastic draining board, plastic blind-ditch, rubble french drain, sand quilt, sand pocket, horizontal drainage ditch, horizontal drain pipe.
Further, described horizontal pore pressure dissipation water discharging body surface is also coated with and prevents external impurities from entering horizontal pore pressure dissipation passage and produce the anti-blocking layer of blocking, and described anti-blocking layer is selected from cover plate, parcel geotextiles or for one or more materials such as the geotextiles that filters.
The connected mode of described vertical pore pressure dissipation water discharging body and horizontal pore pressure dissipation water discharging body is selected from overlap joint, bundle, tie up in one or more modes used in combination.
A quake evaluation method for processing foundation for Liquefaction Foundation, is characterized in that comprising the following steps:
Before ground stabilization, as above arbitrary described system is set, as the ingredient of ground stabilization measure in construction;
Carry out stiffening basic ground;
After ground stabilization completes, retain the permanent passage of the excess pore water pressure that this system produces as ground dissipation earthquake.
A quake evaluation method for processing foundation for Liquefaction Foundation, is characterized in that: the dissipation passage of excess pore water pressure when as above arbitrary described system occurs as operation phase earthquake to the ground setting completing consolidation process.
This method, for Liquefaction Foundation, arranges permanent dissipation of excess pore-water pressure passage, controls and reduce excess pore water pressure, prevents and treats, thus improve the antidetonation liquefaction performance of this ground from the source producing liquefaction.Arrange dissipation passage to arrange before ground stabilization, the construction period as the drainage system of basement process, as permanent excess pore pressure dissipation passage after the construction period completes.Also after can being arranged in ground stabilization, as the permanent facility of operation phase.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the quake evaluation system of Liquefaction Foundation.
Wherein, the vertical pore pressure dissipation water discharging body 2 horizontal pore pressure dissipation water discharging body 3 top drainage system 4 of Liquefaction Foundation 1
specific implementation method
Embodiment 1
This example for arranging the embodiment of quake evaluation system in the Liquefaction Foundation completing consolidation process.
1, as shown in Figure 1, for completing the Liquefaction Foundation 1 of consolidation process.Vertical pore pressure dissipation water discharging body 2 is plugged in this ground.Described vertical pore pressure dissipation water discharging body is selected from one or more the adrainage material in collecting well, pipe well, vertical plastic draining board, cardboard, sand pile, sand wick, sand-gravel pile.Described vertical pore pressure dissipation water discharging body 2 must run through mud, mucky soil or the argillic horizon that surface may exist, and arrives the sand in Liquefaction Foundation or powder soil horizon.
Vertical pore pressure dissipation water discharging body 2 plug spacing and the degree of depth calculates according to the architectural characteristic of geological conditions, seismic behavior or building.
2, lay horizontal pore pressure dissipation water discharging body 3 on the surface of Liquefaction Foundation 1, cover cover plate, outsourcing geotextiles or filtration beds, prevent other foreign material admission passages, keep the patency of its draining.Wherein, described horizontal pore pressure dissipation water discharging body is selected from one or more drainage patterns such as sand, rubble or slag bed course, plastic draining board, plastic blind-ditch, rubble french drain, sand quilt, sand pocket, horizontal drainage ditch, horizontal drain pipe.
Described horizontal pore pressure dissipation water discharging body is layed in the stabilized zone of foundation settlement, or the sand in Liquefaction Foundation 1 or powder soil horizon, require that the degree of depth imbedding sand or powder soil horizon is at least more than 50cm, the displacement preventing ground from producing destroys horizontal pore pressure dissipation water discharging body.According to water-flowing amount and the draining characteristics of vertical pore pressure dissipation water discharging body 2, the spacing, draining parameter etc. of calculated level pore pressure dissipation water discharging body.
The used in combination of one or more modes such as 3, be connected vertical pore pressure dissipation water discharging body 2 with horizontal pore pressure dissipation water discharging body 3, the mode of connection can adopt overlap joint, bundle, tie up.
4, top drainage system 4 is town road Uniting.Horizontal pore pressure dissipation water discharging body 3 is connected with top drainage system 4, forms the pore pressure dissipation passage of solid space.Connect mode can adopt the used in combination of one or more modes such as bind, provided pipe overlap joint, communicating pipe, thus the excess pore water pressure that earthquake is produced can unimpeded, discharge rapidly.
Embodiment 2
This example is for arranging the embodiment of quake evaluation system in the Liquefaction Foundation before stiffening basic ground.
Before ground stabilization, arrange the quake evaluation system of Liquefaction Foundation of the present invention, setting steps, as described in embodiment respectively walks, does not repeat them here.The quake evaluation system set, as the ingredient of ground stabilization measure in construction, belongs to permanent structure.
Stiffening basic ground is carried out according to actual conditions.
After ground stabilization completes, retain the permanent passage of the excess pore water pressure that this quake evaluation system produces as ground dissipation earthquake.

Claims (6)

1. the quake evaluation system of a Liquefaction Foundation, it is characterized in that, vertical pore pressure dissipation water discharging body and horizontal pore pressure dissipation water discharging body are set in Liquefaction Foundation, vertical pore pressure dissipation water discharging body runs through the sand or powder soil horizon that arrive Liquefaction Foundation, horizontal pore pressure dissipation water discharging body is layed in the stabilized zone of foundation settlement, or be layed in sand or the powder soil horizon of Liquefaction Foundation, vertical pore pressure dissipation water discharging body is communicated with horizontal pore pressure dissipation water discharging body and connects with top drainage system, the permanent passage of the excess pore water pressure that this system of permanent reservation produces as ground dissipation earthquake, and described vertical pore pressure dissipation water discharging body is selected from collecting well, pipe well, vertical plastic draining board, cardboard, sand pile, sand wick, one or more drainage pattern in sand-gravel pile.
2. the quake evaluation system of Liquefaction Foundation according to claim 1, is characterized in that: described horizontal pore pressure dissipation water discharging body is selected from one or more drainage patterns in sand, rubble or slag bed course, plastic draining board, plastic blind-ditch, rubble french drain, sand quilt, sand pocket, horizontal drainage ditch, horizontal drain pipe.
3. the quake evaluation system of Liquefaction Foundation according to claim 1, it is characterized in that: described horizontal pore pressure dissipation water discharging body surface is also coated with and prevents external impurities from entering horizontal pore pressure dissipation passage and produce the anti-blocking layer of blocking, described anti-blocking layer is selected from cover plate, parcel geotextiles or for one or more materials in the geotextile that filters.
4. the quake evaluation system of Liquefaction Foundation according to claim 1, is characterized in that: the connected mode of described vertical pore pressure dissipation water discharging body and horizontal pore pressure dissipation water discharging body is selected from the used in combination of one or more modes in overlap joint, binding.
5. a quake evaluation method for processing foundation for Liquefaction Foundation, is characterized in that comprising the following steps:
Before ground stabilization, the arbitrary described system of Claims 1 to 4 is set, as the ingredient of ground stabilization measure in construction;
Carry out stiffening basic ground;
After ground stabilization completes, retain the permanent passage of the excess pore water pressure that this system produces as ground dissipation earthquake.
6. a quake evaluation method for processing foundation for Liquefaction Foundation, is characterized in that: the dissipation passage of excess pore water pressure when the system as described in as arbitrary in Claims 1 to 4 to the ground setting completing consolidation process occurs as operation phase earthquake.
CN201210575187.9A 2012-12-26 2012-12-26 The quake evaluation system of Liquefaction Foundation and method for processing foundation Active CN103015399B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210575187.9A CN103015399B (en) 2012-12-26 2012-12-26 The quake evaluation system of Liquefaction Foundation and method for processing foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210575187.9A CN103015399B (en) 2012-12-26 2012-12-26 The quake evaluation system of Liquefaction Foundation and method for processing foundation

Publications (2)

Publication Number Publication Date
CN103015399A CN103015399A (en) 2013-04-03
CN103015399B true CN103015399B (en) 2015-09-16

Family

ID=47964461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210575187.9A Active CN103015399B (en) 2012-12-26 2012-12-26 The quake evaluation system of Liquefaction Foundation and method for processing foundation

Country Status (1)

Country Link
CN (1) CN103015399B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947678B (en) * 2014-03-28 2017-06-30 中国二十冶集团有限公司 Mud boundary banding deep basal pit processing method
CN105804046A (en) * 2016-04-06 2016-07-27 化学工业岩土工程有限公司 Processing method for soft clay foundation
CN105887807B (en) * 2016-04-14 2017-12-26 河海大学 A kind of precast reinforced concrete pile of three-dimensional draining and construction method
CN106939591B (en) * 2017-04-01 2019-05-24 温州浙南地质工程有限公司 A kind of spraying equipment of sand plate in forced-ventilated controllable sand plate compound structure of constructing
CN108374406A (en) * 2018-02-07 2018-08-07 河海大学 The anti-foundation liquefaction system and application method of automatic sensing P wave and Active Drainage
CN113356180A (en) * 2020-03-06 2021-09-07 陈赐贤 Structure for preventing structure from liquefying
CN112962574B (en) * 2021-03-24 2022-05-17 长江勘测规划设计研究有限责任公司 Underground water comprehensive utilization system and method combined with earthquake liquefaction foundation treatment scheme

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101250868A (en) * 2008-03-12 2008-08-27 中交第四航务工程局有限公司 Precipitation prepressing association motivation induration deep densification method
CN101581092A (en) * 2009-06-09 2009-11-18 陈杰德 Method for processing soft ground by rapid pressurizing pre-compression
CN101824817A (en) * 2010-05-06 2010-09-08 任再永 Drainage consolidation construction method for treating soft soil foundation by container stacking loading
CN203238616U (en) * 2012-12-26 2013-10-16 中交四航工程研究院有限公司 Earthquake-resistance and hazard-reduction system for liquefiable foundation

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3648299B2 (en) * 1995-10-24 2005-05-18 若築建設株式会社 Consolidation promotion method for soft ground
US6003912A (en) * 1996-04-09 1999-12-21 Chrysler Corporation Bi-metal vehicle bumper structure
JP2004190374A (en) * 2002-12-12 2004-07-08 Port & Airport Research Institute Soft ground improving method and soft ground improving unit
CN101922146A (en) * 2009-09-15 2010-12-22 东南大学 Method for performing foundation treatment by using permeable concrete pipe piles

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101250868A (en) * 2008-03-12 2008-08-27 中交第四航务工程局有限公司 Precipitation prepressing association motivation induration deep densification method
CN101581092A (en) * 2009-06-09 2009-11-18 陈杰德 Method for processing soft ground by rapid pressurizing pre-compression
CN101824817A (en) * 2010-05-06 2010-09-08 任再永 Drainage consolidation construction method for treating soft soil foundation by container stacking loading
CN203238616U (en) * 2012-12-26 2013-10-16 中交四航工程研究院有限公司 Earthquake-resistance and hazard-reduction system for liquefiable foundation

Also Published As

Publication number Publication date
CN103015399A (en) 2013-04-03

Similar Documents

Publication Publication Date Title
CN103015399B (en) The quake evaluation system of Liquefaction Foundation and method for processing foundation
CN103031836B (en) A kind of method of building road on new hydraulically filled sludge ground fast
CN102383413B (en) Method for constructing strengthened saturated-flow plastic silt soft soil foundation
CN100480472C (en) Quick reinforcing method and reinforcing device for super soft weak soil
CN103758113B (en) A kind of grid encloses the anti-liquefied foundation reinforcement means of hoop
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN106930231B (en) A kind of construction method applied to engineering flood bank reinforcing of passing the flood period
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
CN104131530B (en) Levee revetment structure under rapid and soft foundation severe environment
CN107761668B (en) Coastal shore reservoir land-building type revetment structure and construction method thereof
CN102071689A (en) Optimized construction method of static pressure pile close to existing tunnel
CN103276717B (en) The method of composite earthwork synthetic materials reinforcement cushion soft soil foundation
CN107881987A (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN204676485U (en) A kind of Eco-economic Type bank protection structure
CN203238616U (en) Earthquake-resistance and hazard-reduction system for liquefiable foundation
CN203057815U (en) Coastal saline-alkali soil greening alkali discharging system
CN202881901U (en) Stepped undercurrent type ecological embankment structure
CN202925538U (en) Rammer used in construction on frozen earth
CN107905243A (en) A kind of sheet-pile cofferdam structure and its construction method suitable for soft soil foundation
CN210658236U (en) Slag stacking structure
CN111335290B (en) Offshore artificial island structure suitable for silt foundation and construction method
CN203113358U (en) Clay sandstone cofferdam structure
CN202925540U (en) Arrangement structure of device for processing soft soil foundation in coastal reclamation region
CN104947630A (en) Over-current slag collecting weir for water conservancy and hydropower engineering and construction method thereof
KR20150021098A (en) Waterside structures reinforced method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 510230 Guangzhou Qianjin Road, Guangdong, No. 157

Applicant after: Zhongjiao Sihang Engineering Inst. Co., Ltd.

Applicant after: CCCC Fourth Harbor Engineering Co., Ltd.

Applicant after: CCCC Fourth Harbor Geotechnical Engineering Co., Ltd.

Applicant after: Guangzhou Harbor Engineering Quality Examination Co., Ltd.

Address before: 510230 Guangzhou Qianjin Road, Guangdong, No. 157

Applicant before: Zhongjiao Sihang Engineering Inst. Co., Ltd.

Applicant before: CCCC Fourth Harbor Engineering Co., Ltd.

Applicant before: Guangzhou Sihang Geotechnical Engineering Co., Ltd.

Applicant before: Guangzhou Harbor Engineering Quality Examination Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210929

Address after: No. 157, Guangzhou City, Guangdong, Guangdong

Patentee after: CCCC FOURTH HARBOR ENGINEERING INSTITUTE Co.,Ltd.

Patentee after: CCCC Fourth Harbor Engineering Co.,Ltd.

Patentee after: GUANGZHOU HARBOR ENGINEERING QUALITY EXAMINATION Co.,Ltd.

Patentee after: NATIONAL ENGINEERING RESEARCH CENTER OF DREDGING TECHNOLOGY AND EQUIPMENT

Address before: No. 157, Guangzhou City, Guangdong, Guangdong

Patentee before: CCCC FOURTH HARBOR ENGINEERING INSTITUTE Co.,Ltd.

Patentee before: CCCC Fourth Harbor Engineering Co.,Ltd.

Patentee before: CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co.,Ltd.

Patentee before: GUANGZHOU HARBOR ENGINEERING QUALITY EXAMINATION Co.,Ltd.

TR01 Transfer of patent right