CN108868789B - A kind of stratum active support and change method suitable for shield construction tunnel - Google Patents

A kind of stratum active support and change method suitable for shield construction tunnel Download PDF

Info

Publication number
CN108868789B
CN108868789B CN201810731432.8A CN201810731432A CN108868789B CN 108868789 B CN108868789 B CN 108868789B CN 201810731432 A CN201810731432 A CN 201810731432A CN 108868789 B CN108868789 B CN 108868789B
Authority
CN
China
Prior art keywords
shield
slip casting
jurisdiction
section
stress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810731432.8A
Other languages
Chinese (zh)
Other versions
CN108868789A (en
Inventor
仇文革
孙克国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Tianyou Chi Technology Co Ltd Tunnel
Original Assignee
Chengdu Tianyou Chi Technology Co Ltd Tunnel
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Tianyou Chi Technology Co Ltd Tunnel filed Critical Chengdu Tianyou Chi Technology Co Ltd Tunnel
Priority to CN201810731432.8A priority Critical patent/CN108868789B/en
Publication of CN108868789A publication Critical patent/CN108868789A/en
Application granted granted Critical
Publication of CN108868789B publication Critical patent/CN108868789B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of stratum active support and change method suitable for shield construction tunnel, slagged tap by Suporting structure assembly debugging, digging, pipe-plate lining is assembled, shield synchronization slip casting and secondary grouting form;Shield synchronization slip casting: when i.e. section of jurisdiction is detached from shield drive end unit, the synchronous progress slip casting between section of jurisdiction and stratum, Simultaneous Monitoring grouting pressure when slip casting, grouting pressure value is close or equal to or is greater than stress of primary rock value, pressure from surrounding rock is timely transmitted on section of jurisdiction, grouting pressure is then to lift the form control formation displacement of power;Secondary grouting: i.e. immediately following after the shield synchronization slip casting, the cavity to be formed is shunk to the section of jurisdiction back side by the injected hole reserved on section of jurisdiction and carries out slip casting.The method of the present invention, it is mainly used in shallow tunnel or tunnel proximity engineering, using stratum active underpinning technique, active control formation displacement solves the safety issue of proximity building due to caused by constructing tunnel and controls influence of the Shallow Tunnel Construction to ground settlement.

Description

A kind of stratum active support and change method suitable for shield construction tunnel
Technical field
The invention belongs to Construction Technique of Underground Works fields, specifically, are related to a kind of suitable for shield construction tunnel Stratum active support and change method.
Background technique
Instantly with the fast development of China's traffic infrastructure, tunnel has become a part indispensable in capital construction, City underground, across river sea-crossing engineering shield method are had become for engineering method first choice.Shield tunnel is built in city, by buried pipe Line, existing tunnel, the existing construction of structures in ground influence, it is more demanding to the control being displaced in surface displacement and ground.But due to The influence of execution conditions, formation condition and environmental condition, different regions constructing tunnel, which causes to be displaced in earth's surface deformation and ground, to be had Its own the characteristics of.
Caused surface displacement mostlys come from following two to shield machine in the construction process: (1) tunnel excavation causes week The side soil body generates disturbance, and the periphery soil body is in loose condition (of surface) at this time, and country rock is from loosely to closely knit to certain self-bearing ability In this conversion process, ground settlement can be caused;(2) shield machine is during tunneling forward, when section of jurisdiction is detached from shield tail, Certain gap is formd between the soil body and section of jurisdiction.It is excessive when deforming, when being more than surface settlement control standard, it will cause road surface and open Split, top existing building inclination, collapse in addition earth's surface part collapse etc. construction accidents, it is too numerous to enumerate.
And according to current research the result shows that, shield tail synchronous grouting can only control shield tail abjection after ground settlement.However, When shield crossing stratum settlement requires great proximity engineering strictly or region (above wear a plurality of railway line, close on groups of building etc.), Back synchronous injection cannot restore ground settlement caused by shield-tunneling construction early period, and layer is displaced beyond control, solve due to tunnel The safety issue of proximity building caused by road is constructed.
Summary of the invention
In order to solve the above technical problems, the purpose of the present invention is to provide a kind of stratum suitable for shield construction tunnel Active support and change method is mainly used in shallow tunnel or tunnel proximity engineering, can be to stratum using stratum active underpinning technique Power is lifted in application, to control formation displacement, solve the safety issue of proximity building due to caused by constructing tunnel and Control influence of the Shallow Tunnel Construction to ground settlement.
What the object of the invention was realized in: a kind of stratum active support and change method suitable for shield construction tunnel, Be characterized in that: by (a) Suporting structure assembly debugging, (b) digging are slagged tap, (c) pipe-plate lining is assembled, (d) shield synchronization slip casting and (e) secondary grouting forms;Step (d) shield synchronization slip casting: when i.e. section of jurisdiction is detached from shield drive end unit, section of jurisdiction and stratum it Between it is synchronous carry out slip casting, Simultaneous Monitoring grouting pressure when slip casting, grouting pressure value is close or equal to or is greater than stress of primary rock value, will Pressure from surrounding rock is timely transmitted on section of jurisdiction, and grouting pressure is then to lift the form control formation displacement of power;The step (e) two Secondary slip casting: it to be formed immediately following being shunk by the injected hole reserved on section of jurisdiction to the section of jurisdiction back side after the shield synchronization slip casting Cavity carries out slip casting;After synchronous grouting, slurries more or less have 1%~3% body during solidification Product shrinks or/and will form cavity at the section of jurisdiction back side due to loss occurs for slurries, therefore secondary grouting can further reach Underpin stratum, command displacement, the purpose for inhibiting sedimentation.
Further, calculating analysis process of above-mentioned steps (d) shield synchronization slip casting to the stress of primary rock: 1. have with large size It limits difference software and carries out Geometric Modeling by actual conditions;2. carrying out stress of primary rock balance to overall model;3. to displacement, speed, After plastic zone is zeroed out, tunneling is not solved, and extracts the out-of-balance force on tunnel periphery, out-of-balance force at this time is protolith Stress;It is solved 4. the value of grouting pressure is increased according to monitoring data by the stress of primary rock in proportion.
Further, the slurries that synchronous grouting described in above-mentioned steps (d) shield synchronization slip casting uses are added with swelling agent, It reduces because slurries condensation settles degree caused by shrinking.
Further, secondary grouting pressure is greater than the stress of primary rock in above-mentioned steps (e) secondary grouting.
Further, above-mentioned synchronous grouting pressure and secondary grouting pressure are 0.1MPa bigger than the stress of primary rock on the whole.Into One step lifts power by what secondary grouting provided, formation displacement caused by preventing synchronous grouting ineffective, to formation displacement reality Now control comprehensively.
The utility model has the advantages that
A kind of stratum active support and change method suitable for shield construction tunnel of the present invention, has the advantage that
(1) dynamical feedback can be carried out by the monitoring to surface displacement, calculates its corresponding grouting pressure, is based on stress (super) compensation concept proposes stratum active underpinning technique, and changing passive control is active control, subsidence value is greatly reduced, even It is enabled to generate lifting effect.
(2) the stratum active underpinning technique in the present invention determines grouting design pressure with the super compensation of stress for foundation, specifically It can be adjusted accordingly according to Bit andits control standard, but totally should be 0.1MPa bigger than stratum initial field stress, and by secondary injection What slurry provided lifts power, formation displacement caused by preventing synchronous grouting ineffective, realizes control comprehensively to formation displacement.
Detailed description of the invention
Fig. 1 is embodiment shield construction flow chart;
Fig. 2 is tunnel structure schematic diagram;
Fig. 3 is native storehouse pressure maintaining schematic diagram;
1 it is wherein tunnel, 2 be section of jurisdiction, 3 be synchronous grouting layer, 4 be secondary injection pulp layer, 5 be stratum, 6 be injected hole, 7 is Tunneling direction, 8 be support pressure, 9 be soil pressure, 10 be pore water pressure.
Specific embodiment
Below with reference to embodiment and attached drawing, the invention will be further described.
Embodiment with tunnel construction as an example, and combine Fig. 1 and 3 shown in:
(a) Suporting structure assembly is debugged: assembled shield machine, and shield launching end reinforces, while to shield pedestal, track It is installed;Shield is marched into the arena at this time, and lifting is gone into the well, reaction frame installation;Assembled debugging and sondage are carried out to shield machine component.
(b) digging is slagged tap: start to tunnel and slag tap, in tunneling process, and correction in time and Tu Cang guarantor as shown in connection with fig. 2 Pressure schematic diagram carries out the work of the pressure maintaining in native storehouse, and the control pressure of support pressure than usual is slightly higher.
(c) pipe-plate lining is assembled: injected hole is reserved or opened up on section of jurisdiction, and pipe sheet assembling is then divided into staggered joint erection and leads to Seam is assembled, after selecting erection method, is installed according to principle from bottom to top, specific erection sequence by the block that binds position It determines.
(d) shield synchronization slip casting: it is detached from shield tail along with section of jurisdiction, synchronous grouting work is carried out in time, and to guarantee slip casting Pressure and grouting amount, grouting pressure need access to the even more than stress of primary rock, and the specific magnitude of the stress of primary rock need to combine similar Under the conditions of monitoring data and calculate analysis integrated determination, it is as follows to calculate analysis process, 1. presses with large-scale finite difference software Actual conditions carry out Geometric Modeling;2. carrying out initial field stress balance to overall model;3. speed, plastic zone carries out to displacement After clearing, tunneling is not solved, and extracts the out-of-balance force on tunnel periphery, out-of-balance force at this time is the stress of primary rock;4. infusing The value of slurry pressure is increased according to monitoring data by the stress of primary rock in proportion to be solved;To which the stress of primary rock is timely transmitted to Section of jurisdiction, grouting pressure is also to lift the form control formation displacement of power.
(e) secondary grouting: after synchronous grouting, slurries have 1%~3% or so body during solidification Product is shunk, and there are also being lost because of slurries, will form cavity at the section of jurisdiction back side;Therefore secondary injection should be closely followed after synchronous grouting Slurry, secondary grouting pressure should be higher than that the stress of primary rock, achieve the purpose that underpin stratum, inhibit sedimentation.
(f) shield machine continuation is tunneled forward, the process for repeating step b-e.
Finally, it should be noted that foregoing description is only the preferred embodiment of the present invention, the ordinary skill people of this field Member under the inspiration of the present invention, without prejudice to the purpose of the present invention and the claims, can make multiple similar tables Show, such as size, the distribution of injected hole, such transformation are fallen within the scope of protection of the present invention.

Claims (4)

1. a kind of stratum active support and change method suitable for shield construction tunnel, it is characterised in that: by the assembly of (a) Suporting structure Debugging, (b) digging are slagged tap, (c) pipe-plate lining is assembled, (d) shield synchronization slip casting and (e) secondary grouting form;
Step (d) shield synchronization slip casting: i.e. section of jurisdiction be detached from shield drive end unit when, between section of jurisdiction and stratum synchronize infused Slurry, Simultaneous Monitoring grouting pressure when slip casting, grouting pressure value is close or equal to or is greater than stress of primary rock value, and pressure from surrounding rock is timely It is transferred on section of jurisdiction;The wherein calculating analysis process of the stress of primary rock value: practical feelings 1. are pressed with large-scale finite difference software Condition carries out Geometric Modeling;2. carrying out stress of primary rock balance to overall model;3. being opened after being zeroed out to displacement, speed, plastic zone It holes and does not solve, extract the out-of-balance force on tunnel periphery, out-of-balance force at this time is the stress of primary rock;4. the value of grouting pressure Increased in proportion according to monitoring data by the stress of primary rock and is solved;
Step (e) secondary grouting: i.e. immediately following after the shield synchronization slip casting, by the injected hole reserved on section of jurisdiction to pipe It shrinks the cavity to be formed and carries out slip casting in the piece back side.
2. a kind of stratum active support and change method suitable for shield construction tunnel according to claim 1, feature exist In: the slurries that synchronous grouting described in step (d) shield synchronization slip casting uses are added with swelling agent.
3. a kind of stratum active support and change method suitable for shield construction tunnel according to claim 1 or 2, feature Be: secondary grouting pressure is greater than the stress of primary rock in step (e) secondary grouting.
4. a kind of stratum active support and change method suitable for shield construction tunnel according to claim 3, feature exist In: the synchronous grouting pressure and secondary grouting pressure are 0.1MPa bigger than the stress of primary rock on the whole.
CN201810731432.8A 2018-07-05 2018-07-05 A kind of stratum active support and change method suitable for shield construction tunnel Active CN108868789B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810731432.8A CN108868789B (en) 2018-07-05 2018-07-05 A kind of stratum active support and change method suitable for shield construction tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810731432.8A CN108868789B (en) 2018-07-05 2018-07-05 A kind of stratum active support and change method suitable for shield construction tunnel

Publications (2)

Publication Number Publication Date
CN108868789A CN108868789A (en) 2018-11-23
CN108868789B true CN108868789B (en) 2019-10-18

Family

ID=64299206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810731432.8A Active CN108868789B (en) 2018-07-05 2018-07-05 A kind of stratum active support and change method suitable for shield construction tunnel

Country Status (1)

Country Link
CN (1) CN108868789B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110110489B (en) * 2019-05-28 2022-09-23 中铁第四勘察设计院集团有限公司 Rock stratum shield method tunnel surrounding rock pressure calculation method
CN112160759A (en) * 2020-10-20 2021-01-01 李强 Method for starting and trial tunneling of tunnel shield crossing river
CN114776323B (en) * 2022-04-01 2023-04-11 成都未来智隧科技有限公司 Method for controlling double compensation of stratum and stress loss of shield tunnel

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007327174A (en) * 2006-06-06 2007-12-20 Kajima Corp Segment for tunnel
CN101126319B (en) * 2007-10-09 2010-11-17 中铁二局股份有限公司 Shield tunnel lateral cross-over pile base construction method
CN103306684A (en) * 2012-03-08 2013-09-18 中铁隧道集团有限公司 Process for grouting on back of shield segment
CN102767377B (en) * 2012-08-13 2014-08-06 中铁一局集团有限公司 Loess strata subway tunnel earth pressure balance shield construction method
CN102926759A (en) * 2012-11-05 2013-02-13 中铁隧道集团有限公司 Long-distance tunneling construction method for big-diameter slurry shield underwater shallow earthing
CN103882854B (en) * 2014-04-08 2016-06-15 中铁二十五局集团轨道交通工程有限公司 The construction method of the continuous undercrossing tunnel of shield and viaduct
CN107060786A (en) * 2017-06-19 2017-08-18 湖南大学 A kind of Shield Construction Method Used method that groups of building are worn under karst region

Also Published As

Publication number Publication date
CN108868789A (en) 2018-11-23

Similar Documents

Publication Publication Date Title
CN101126319B (en) Shield tunnel lateral cross-over pile base construction method
CN108868789B (en) A kind of stratum active support and change method suitable for shield construction tunnel
CN103775092B (en) Tunnels in Shallow Buried tunneling remaining core soil in advance improvement CRD construction
CN205134331U (en) Foundation ditch excavation bearing structure
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN110700841B (en) Double-side-wall guide pit type excavation method for tunnel excavation
CN107268600A (en) Grouting strengthening method, pipe jacking construction method and application
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
CN202416263U (en) Concrete faced rockfill dam compounded with gravity dam
CN104389315A (en) Consolidation grouting drilled pile wall and construction method thereof
CN103993885A (en) Construction method for underground excavation tunnel side-direction hole opening supporting system
CN108301842A (en) A kind of fixing device and construction method for controlling duct pieces of shield tunnel floating
CN107965327A (en) Arcuately tunnel bottom liner structure and its drainage system
CN104775368B (en) Prefabricated jacking box culvert provided with steel blade corners
CN110055973A (en) Construction space foundation pit enclosure structure and water-stopping method under by high metal bridge in limited time
CN106087996B (en) Manual digging pile construction method based on self leveling backpressure device
CN104929129A (en) Concrete cover-weight consolidation grouting method for non-cover-weight combination of different holes through guide pipes
CN208884535U (en) A kind of distortion-free Larsen steel sheet pile supporting construction
CN208472713U (en) A kind of composite structure mini pile for administering small-sized landslide
CN203821326U (en) Force transferring hole structure for arch dam foundation processing
CN203741782U (en) Multi-section face plate structure of high concrete faced rockfill dam
CN103132487A (en) Method of reducing horizontal displacement of concrete faced rockfill dam and concrete faced rockfill dam
CN115952578A (en) Method for analyzing deformation influence of existing railway passing through sand-gravel stratum tunnel
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN203347799U (en) Shield tunneling machine capable of achieving three-dimensional grouting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20181123

Assignee: Chengdu future smart Tunnel Technology Co.,Ltd.

Assignor: CHENGDU TIANYOU TUNNELKEY CO.,LTD.

Contract record no.: X2023510000015

Denomination of invention: A Stratum Active Underpinning Method Suitable for Shield Tunneling Construction

Granted publication date: 20191018

License type: Common License

Record date: 20230821