CN210262945U - Cemented sand gravel buttress dam structure - Google Patents

Cemented sand gravel buttress dam structure Download PDF

Info

Publication number
CN210262945U
CN210262945U CN201920893786.2U CN201920893786U CN210262945U CN 210262945 U CN210262945 U CN 210262945U CN 201920893786 U CN201920893786 U CN 201920893786U CN 210262945 U CN210262945 U CN 210262945U
Authority
CN
China
Prior art keywords
dam
gravel
seepage
retaining layer
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920893786.2U
Other languages
Chinese (zh)
Inventor
冯楚桥
余晓敏
罗代明
熊杰
徐江
刘其文
侯迪
王安礼
付国栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Survey and Design Research Institute for Water Resources and Hydropower
Original Assignee
Guizhou Survey and Design Research Institute for Water Resources and Hydropower
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Survey and Design Research Institute for Water Resources and Hydropower filed Critical Guizhou Survey and Design Research Institute for Water Resources and Hydropower
Priority to CN201920893786.2U priority Critical patent/CN210262945U/en
Application granted granted Critical
Publication of CN210262945U publication Critical patent/CN210262945U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a cemented sand gravel buttress dam structure, which comprises a dam foundation and a dam body arranged on the dam foundation, wherein the dam body comprises an anti-seepage water-retaining layer and a group of buttresses which are arranged behind the anti-seepage water-retaining layer and are perpendicular to the axis of the dam body, and cemented sand gravel is filled between the buttresses; the seepage-proof water-retaining layer is a trapezoidal structure which becomes thinner gradually from the dam foundation to the dam top; the seepage-proofing water-retaining layer is formed by pouring reinforced concrete, and the gradient of the seepage-proofing water-retaining layer is between the gravity dam and the gelled gravel dam. The utility model discloses utilize multistage buttress to share upper reaches water pressure, reduce the atress that the dam body gelled gravel stone material to can reduce gelled sand gravel section, not only can reach the purpose of optimizing the engineering investment, reducible demand to dam site department sand gravel material reserves moreover improves the adaptability of gelled sand gravel dam.

Description

Cemented sand gravel buttress dam structure
Technical Field
The utility model relates to a cemented sand gravel buttress dam structure belongs to hydraulic and hydroelectric engineering technical field.
Background
The cemented sand gravel dam is a new dam developed in recent years, and the section type is between the cemented sand gravel dam and the concrete gravity dam. The technology of constructing dam with gelled sand and gravel is a new type of dam technology developed on the basis of roller compacted concrete dam technology and face rockfill dam technology, and adopts sand and gravel materials (including sand, ballast, gravel and the like) added with a small amount of gelled materials to construct the dam, and uses high-efficiency earthwork transport machinery and compaction machinery to construct, so that the sand and gravel materials are changed into a continuous rigid body from a granular body. The technology for constructing the dam by the gelled sand gravel has the advantages of safety, reliability, high construction speed, simple process, good economy, reduction of environmental damage and the like.
Because of the local material utilization, the gelled gravel dam needs to utilize the riverbed gravel materials near the dam site, so that the dam type is not suitable for the area with less riverbed gravel material content (if the alternative material field is adopted, the economic advantage is lost). Meanwhile, the dam type is larger than a gravity dam, and more riverbed gravel materials are needed, so that the popularization of the dam type is limited in a plurality of riverbeds with less natural gravel material reserves.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cemented sand gravel buttress dam structure, this buttress dam rational utilization buttress bear the load, can reduce the slope of the upper and lower reaches dam slope of cemented sand gravel dam to reach and optimize the section, reduce the purpose of cemented sand gravel stone material quantity.
The technical scheme of the utility model: the utility model provides a cemented sand gravel buttress dam structure, includes the dam foundation and sets up the dam body on the dam foundation, the dam body include prevention of seepage water-retaining layer and set up behind prevention of seepage water-retaining layer and with a set of buttress that the dam body axis is perpendicular to was arranged, it has cemented sand gravel to fill between the buttress.
Furthermore, the seepage-proofing water-retaining layer is of a trapezoidal structure which becomes thinner gradually from the dam foundation to the dam top.
Furthermore, the seepage-proofing and water-retaining layer is formed by pouring reinforced concrete, and the gradient of the seepage-proofing and water-retaining layer is between the gravity dam and the gelled gravel dam.
Furthermore, the buttress is of a trapezoidal plate-shaped structure and is formed by pouring reinforced concrete.
Since the technical scheme is used, the utility model has the advantages of: the utility model discloses utilize multistage buttress to share upper reaches water pressure, reduce the atress that the dam body gelled gravel stone material to can reduce gelled sand gravel section, not only can reach the purpose of optimizing the engineering investment, reducible demand to dam site department sand gravel material reserves moreover improves the adaptability of gelled sand gravel dam.
Drawings
Fig. 1 is a front view of the structure diagram of the present invention;
FIG. 2 is a perspective view of the structure schematic diagram of the present invention
Description of reference numerals: 1-dam foundation, 2-buttress, 3-seepage-proofing and water-retaining layer and 4-gelled sand gravel.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the present invention is further described in detail with reference to the accompanying drawings and examples.
The embodiment of the utility model provides a: the structural schematic diagram of the cemented sand gravel buttress dam structure is shown in fig. 1 and fig. 2, and the cemented sand gravel buttress dam structure comprises a dam foundation 1 and a dam body arranged on the dam foundation 1, wherein the dam body comprises an anti-seepage water-retaining layer 3 and a group of buttresses 2 which are arranged behind the anti-seepage water-retaining layer 3 and are perpendicular to the axis of the dam body, the buttresses 2 are in a trapezoidal plate-shaped structure and are formed by pouring reinforced concrete, and cemented sand gravel stones 4 are filled between the buttresses 2. The seepage-proof water-retaining layer 3 is a trapezoidal structure which becomes thinner gradually from the dam foundation to the dam top; the seepage-proofing and water-retaining layer 3 is formed by pouring reinforced concrete, and the gradient of the seepage-proofing and water-retaining layer is between the gravity dam and the gelled gravel dam.
The utility model discloses utilize multistage buttress 2 to share upper reaches water pressure, reduce dam body gelatinization sand gravel 4's atress to can reduce gelatinization sand gravel 4's section, not only can reach the purpose of optimizing the engineering investment, reducible demand to gelatinization sand gravel 4 reserves of dam site department improves gelatinization sand gravel dam's adaptability moreover.

Claims (4)

1. The utility model provides a cemented sand gravel buttress dam structure, includes dam foundation (1) and sets up the dam body on dam foundation (1), its characterized in that: the dam body comprises an anti-seepage water-retaining layer (3) and a group of buttresses (2) which are arranged behind the anti-seepage water-retaining layer (3) and are perpendicular to the axis of the dam body, and gelled sand gravel (4) is filled between the buttresses (2).
2. The cemented sand and gravel buttress dam structure of claim 1, wherein: the seepage-proof water-retaining layer (3) is of a trapezoidal structure which becomes thinner gradually from the dam foundation to the dam top.
3. The cemented sand and gravel buttress dam structure of claim 2, wherein: the seepage-proofing water-retaining layer (3) is formed by pouring reinforced concrete, and the gradient of the seepage-proofing water-retaining layer is between the gravity dam and the gelled gravel dam.
4. The cemented sand and gravel buttress dam structure of claim 1, wherein: the buttress (2) is of a trapezoidal plate-shaped structure and is formed by pouring reinforced concrete.
CN201920893786.2U 2019-06-14 2019-06-14 Cemented sand gravel buttress dam structure Active CN210262945U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920893786.2U CN210262945U (en) 2019-06-14 2019-06-14 Cemented sand gravel buttress dam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920893786.2U CN210262945U (en) 2019-06-14 2019-06-14 Cemented sand gravel buttress dam structure

Publications (1)

Publication Number Publication Date
CN210262945U true CN210262945U (en) 2020-04-07

Family

ID=70042386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920893786.2U Active CN210262945U (en) 2019-06-14 2019-06-14 Cemented sand gravel buttress dam structure

Country Status (1)

Country Link
CN (1) CN210262945U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158547A (en) * 2019-06-14 2019-08-23 贵州省水利水电勘测设计研究院 A kind of cement sand and gravel buttress dam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158547A (en) * 2019-06-14 2019-08-23 贵州省水利水电勘测设计研究院 A kind of cement sand and gravel buttress dam

Similar Documents

Publication Publication Date Title
CN1952273B (en) Digging foundation with baffle and its construction method
CN203498799U (en) Prefabricated hollow pipe pile water-facing envelop enclosure
CN203256699U (en) Construction structure for water passing earth-rock dam
CN201485847U (en) Novel synchronous draining leakage and reinforcing device for tailing dams
CN202989867U (en) Junked tire protective surface combined steel-structure check dam
CN202416263U (en) Concrete faced rockfill dam compounded with gravity dam
CN104060619A (en) Construction method and structure of hydraulic core-wall rockfill dam without cofferdams
CN210262945U (en) Cemented sand gravel buttress dam structure
CN215669631U (en) Deep overburden foundation structure
CN110499743A (en) A kind of overlay film cemented gravel dam and its method of construction
CN201981551U (en) Supporting and retaining structure by combining iron-rib ecological retaining wall with concrete retaining wall
CN106368176A (en) High dam structure built on deep overburden of soil material shortage area
CN212000919U (en) Prevent structure that concrete face dam high toe wall destroyed
CN202090324U (en) Novel overflow cofferdam
CN106544987A (en) A kind of anti-seepage of channels construction method for storing flooded wetland
CN101603298A (en) A kind of dam joint structure and job practices thereof
CN202055261U (en) Landslide-proofing retaining wall
CN209741783U (en) Opposite-pull type sand gravel water retaining guide wall
CN113123301A (en) Partition structure of gravel soil core wall dam
CN203741782U (en) Multi-section face plate structure of high concrete faced rockfill dam
CN204753536U (en) Diversion tunnel structure with traffic function
CN210917243U (en) Concrete face rockfill dam for improving face plate stress deformation state
CN212248107U (en) Structure of core dam heightening face plate rock-fill dam
CN211646271U (en) Structure for building gravity dam by using vanadium titano-magnetite ore dressing waste rocks
CN110158547A (en) A kind of cement sand and gravel buttress dam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 550002 No.27 Baoshan South Road, Nanming District, Guiyang City, Guizhou Province

Patentee after: Guizhou water conservancy and Hydropower Survey, design and Research Institute Co.,Ltd.

Address before: 550002 No.27 Baoshan South Road, Nanming District, Guiyang City, Guizhou Province

Patentee before: GUIZHOU SURVEY & DESIGN Research Institute FOR WATER RESOURCES AND HYDROPOWER