CN108677980A - A kind of upstream cofferdam that taking into account communication function increases method and structure - Google Patents

A kind of upstream cofferdam that taking into account communication function increases method and structure Download PDF

Info

Publication number
CN108677980A
CN108677980A CN201810765453.1A CN201810765453A CN108677980A CN 108677980 A CN108677980 A CN 108677980A CN 201810765453 A CN201810765453 A CN 201810765453A CN 108677980 A CN108677980 A CN 108677980A
Authority
CN
China
Prior art keywords
waste
cofferdam
upstream
downstream
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810765453.1A
Other languages
Chinese (zh)
Other versions
CN108677980B (en
Inventor
吴银刚
程瑞林
杜帅群
王坤
段伟
鲁传银
唐腾飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201810765453.1A priority Critical patent/CN108677980B/en
Publication of CN108677980A publication Critical patent/CN108677980A/en
Application granted granted Critical
Publication of CN108677980B publication Critical patent/CN108677980B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Abstract

The invention discloses a kind of upstream cofferdams for taking into account communication function to increase method and structure, is to increase cofferdam height instead of traditional Gravity Retaining Wall or soil engineering bag filled type barricade using thin wall counterfort wall;Waste is carried out in top barricade upstream to fill, to widen weir top width so that more Construction traffics can pass through simultaneously, accelerate major project construction progress;It is filled increasing downstream both ends at the top of cofferdam and also carrying out waste so that Construction traffic can go to downstream agent engineering by increasing cofferdam and construct.Structure is increased in this cofferdam using the present invention, has been saved engineering cost, has been increased to resist and topple over intensity, has accelerated construction progress, pass the flood period for flood control and won the valuable construction time, the safety of major project construction is greatly improved for a certain degree.

Description

A kind of upstream cofferdam that taking into account communication function increases method and structure
Technical field
The present invention relates to hydro-structure field, more particularly, to a kind of upstream cofferdam for taking into account communication function increase method and The upstream cofferdam for taking into account communication function of this method design increases easy structure.
Technical background
Cofferdam major function be exactly prevent water and soil from entering building build position, in order that in cofferdam internal drainage, Excavation pit, and the building built, so cofferdam height is higher than the peak level being likely to occur in the construction time.However it is close Year over due to rainy season concentrate, continue, cause flooding of rivers, the exceeded event of flood repeated, this allow for script design Increased especially important of just seeming on the basis of good cofferdam.
It is more about the research increased on the basis of cofferdam at present;Increase basic using in cofferdam in traditional cofferdam Top is poured Gravity Retaining Wall or is increased using the method for geotextile tube bag filling etc., these methods are although feasible, still Increase that structural style is larger, the concrete material or packing material of waste increase cost of investment, extend the construction period, and And have a single function, it is only capable of providing a kind of effect for resisting flood, and safety such as anti-overturning, impermeability are frequently not special Height, for developing, so rapidly water conservancy is only inadequate for this.
Invention content
The technical problem to be solved by the present invention is to:A kind of weir top structure of traffic convenience is provided and increases cofferdam Method can quickly increase convenient for cofferdam, to overcome existing cofferdam structure that can not resist over-level flood, have a single function, construct The deficiencies of period is long, uneconomical.
The invention is realized in this way:
A kind of upstream cofferdam structure that taking into account communication function increases method, and this method is replaced using thin wall counterfort wall Traditional Gravity Retaining Wall or soil engineering bag filled type barricade increases cofferdam height;Waste is carried out in top barricade upstream to fill out It builds, to widen weir top width so that more Construction traffics can pass through simultaneously, accelerate major project construction progress;It is enclosed increasing Weir crest subordinate swims both ends and also carries out waste and fill so that Construction traffic can go to downstream agent engineering by increasing cofferdam and be applied Work.
A kind of upstream cofferdam for taking into account communication function by preceding method design increases easy structure, including increases concrete Structure and fill waste structure;It is described increase concrete structure use counterfort wall, the counterfort wall by thin shingle nail, help Wall and anchoring joint bar composition;The thin shingle nail, counterfort are anchored in coffered foundation by the anchoring joint bar.
Wherein, the waste structure of filling includes that upstream side waste fills, waste is filled and abandoned on the right side of downstream on the left of downstream Slag fills;The upstream side waste fills the upstream for being located at the thin shingle nail and forms barrage structure, on the left of the downstream Waste, which fills to fill to be respectively provided at left and right sides of the underwater bed of the thin shingle nail with waste on the right side of downstream, forms twice aileron.
Further, described to increase concrete structure and waste to fill structure respectively independent but mutually hold mutually.
Structural approach is increased according to certain engineering actual field needs in the cofferdam of the present invention, increases structure for cofferdam top The disadvantage that build is larger, cost of investment is larger replaces traditional Gravity Retaining Wall or soil engineering bag using thin wall counterfort wall Filled type barricade increases cofferdam height;It is single for traditional function, the needs of modern certain casting crafts, on the barricade of top Trip carry out waste fill, to widen weir top width so that more Construction traffics can pass through simultaneously, accelerate major project construct into Journey is filled so that Construction traffic can go to downstream master by increasing cofferdam increasing downstream both ends at the top of cofferdam and also carrying out waste Body engineering is constructed;Structure is increased in such cofferdam, from increasing in structure, considerably reduces the amount of pouring of concrete, To the construction casting process improved, counterfort also improves the stability for the structure increased, upstream side waste, waste material profit With also improving the permeability of barricade;From the perspective of construction transportation, due to filling for waste, it is anti-to not only increase cofferdam Toppling property has also widened weir crest width, has been connected to the route that pours of upstream cofferdam and downstream agent engineering, and increased route pair The process that many engineerings are to speed up major project construction is vital, these are all traditional to increase cofferdam and cannot compare 's.
The present invention is suitable for keeping out over-level flood, is also applied for providing traffic convenience for downstream agent engineering, be it is a kind of both Can keep the flood in check, also can based on engineering pour provide traffic convenience and its construction casting technique it is also relatively simple, economical one Kind increases cofferdam.
Structure is increased in this cofferdam using the present invention, has been saved engineering cost, has been increased to resist and topple over intensity, has accelerated and apply Work process passes the flood period for flood control and has won the valuable construction time, and major project construction is greatly improved for a certain degree Safety.
Description of the drawings
Fig. 1 is that structure three-dimensional design sketch is increased in the cofferdam of the present invention;
Fig. 2 is that structure top view is increased in the cofferdam of the present invention;
Fig. 3 is the left view in Fig. 1;
Reference sign:The thin shingle nails of 1-, 2- counterforts, the upstream sides 3- waste fill, and waste fills on the left of the downstreams 4-, 5- Coffered foundation, 6- anchor joint bar, and waste fills on the right side of the downstreams 7-.
Specific implementation mode
The present invention is described in detail below with reference to drawings and examples.
As shown in Figure 1-Figure 3:The upstream cofferdam for taking into account communication function of the present invention increases easy structure, it is mixed including increasing Xtah Crude Clay structure is stacked with waste structure, waste structure is filled, is compacted at the upstream side for increasing barricade, while in the case where increasing structure Also waste is filled in the left and right ends of trip side so that and downstream agent structure carries out path connected.Increase concrete structure and waste It is respectively independent but mutually hold mutually to fill structure.
Increase concrete structure and use counterfort wall, counterfort wall is a kind of armored concrete thin wall-type earth-retaining Wall is mainly characterized by simple structure, easy for construction, and wall body section is smaller, and sole mass is light, can preferably play material Strength character adapts to the lower ground of bearing capacity.Counterfort wall includes thin shingle nail 1, counterfort 2 and anchoring joint bar 6, counterfort 2 stand on and increase cofferdam downstream, and anchoring joint bar 6 is located at heightened foundation face, anchor joint bar 6 and thin shingle nail 1 and counterfort 2 are anchored at and are enclosed In weir basis 5 so that basic cofferdam forms an entirety with batardeau concrete structure is increased, while being promoted and increasing concrete structure Anti-overturning.
It includes increasing structure upstream side to fill waste 3 and downstream side left and right ends waste that waste, which fills structure, i.e. downstream is left Side waste fills waste on the right side of 4 and downstream and fills 7, and both sides waste is close to counterfort wall, is bulldozed after filling, compacting, wherein It fills waste 3 and widens weir crest width as possible in upstream side so that driving vehicle can pass through simultaneously, widen traffic road in this way Road also increases anti-seepage effect, and to increase the water-retaining capacity and the traffic capacity in entire cofferdam, Ying Congjia is filled in downstream side or so Ground is gradually decreased down according to certain slope at the top of high cofferdam, width should ensure that at least opposing traffic.
When pouring, placement layer by layer, first casting concrete entity barricade (paying attention to parting) is answered then to fill upstream and downstream side respectively Waste building body, then increase pouring in this way successively, can also so in casting process until corresponding elevation Carry out road.The ability for resisting over-level flood is increased in this way, is also poured for our major projects and traffic route is provided, It is a kind of easy for construction, structure is increased in a kind of structurally simple, economical cofferdam saved, accelerate construction progress.
The specific application example of the above only present invention, the present invention also has other embodiments, all to use equivalent replacement Or the technical solution that equivalent transformation is formed, it all falls within protection domain of the presently claimed invention.

Claims (4)

1. a kind of upstream cofferdam structure for taking into account communication function increases method, it is characterised in that:Using thin wall counterfort wall generation Increase cofferdam height for traditional Gravity Retaining Wall or soil engineering bag filled type barricade;Waste is carried out in top barricade upstream to fill out It builds, to widen weir top width so that more Construction traffics can pass through simultaneously, accelerate major project construction progress;It is enclosed increasing Weir crest subordinate swims both ends and also carries out waste and fill so that Construction traffic can go to downstream agent engineering by increasing cofferdam and be applied Work.
2. a kind of upstream cofferdam for taking into account communication function by method of claim 1 design increases easy structure, feature exists In:Including increasing concrete structure and filling waste structure;The concrete structure of increasing uses counterfort wall, the buttress type Barricade is made of thin shingle nail (1), counterfort (2) and anchoring joint bar (6);The anchoring joint bar (6) by the thin shingle nail (1), Counterfort (2) is anchored in coffered foundation (5).
3. the upstream cofferdam for taking into account communication function according to claim 2 increases easy structure, it is characterised in that:It is described to fill Waste structure includes that upstream side waste fills (3), downstream left side waste fills waste on the right side of (4) and downstream and fills (7);On described Trip side waste fills (3) and is located at the upstream of the thin shingle nail (1) and forms barrage structure, and waste fills on the left of the downstream (4) and on the right side of downstream waste fills the underwater bed left and right sides formation twice wing that (7) are respectively provided at the thin shingle nail (1) Wall.
4. the upstream cofferdam for taking into account communication function according to claim 2 increases easy structure, it is characterised in that:It is described to increase It is respectively independent but mutually hold mutually that concrete structure and waste fill structure.
CN201810765453.1A 2018-07-12 2018-07-12 Upstream cofferdam heightening method and structure taking traffic function into consideration Active CN108677980B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810765453.1A CN108677980B (en) 2018-07-12 2018-07-12 Upstream cofferdam heightening method and structure taking traffic function into consideration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810765453.1A CN108677980B (en) 2018-07-12 2018-07-12 Upstream cofferdam heightening method and structure taking traffic function into consideration

Publications (2)

Publication Number Publication Date
CN108677980A true CN108677980A (en) 2018-10-19
CN108677980B CN108677980B (en) 2023-10-31

Family

ID=63813696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810765453.1A Active CN108677980B (en) 2018-07-12 2018-07-12 Upstream cofferdam heightening method and structure taking traffic function into consideration

Country Status (1)

Country Link
CN (1) CN108677980B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258469A (en) * 2019-06-05 2019-09-20 中国电建集团成都勘测设计研究院有限公司 The flat system in synthesis field for high-mountain gorge areas construction of hydropower plant
CN110847126A (en) * 2019-11-27 2020-02-28 中国电建集团贵阳勘测设计研究院有限公司 Compromise small-size sluice structure of flood discharge and layering water intaking, reposition of redundant personnel function

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101245603A (en) * 2008-01-23 2008-08-20 中国水利水电科学研究院 Floating arch cofferdam and construction method
CN102296572A (en) * 2011-06-23 2011-12-28 中国水电顾问集团华东勘测设计研究院 Earth and rockfill dam body seepage monitoring structure provided with abandoned dreg site behind dam and construction method thereof
CN103469814A (en) * 2013-09-24 2013-12-25 兰州理工大学 Novel barricade supporting structure for road or river bank dam and construction method thereof
CN104060619A (en) * 2013-03-22 2014-09-24 中国水电顾问集团贵阳勘测设计研究院 Construction method and structure of hydraulic core-wall rockfill dam without cofferdams
CN104153380A (en) * 2014-04-11 2014-11-19 中国水利水电第十一工程局有限公司 Anti-seepage cofferdam structure and construction process
CN104196041A (en) * 2014-08-09 2014-12-10 葛洲坝集团基础工程有限公司 Construction method for concrete diaphragm wall cofferdam heightening
CN104264698A (en) * 2014-09-05 2015-01-07 中国葛洲坝集团国际工程有限公司 Construction method of clay core earth rock cofferdam
CN104314089A (en) * 2014-11-10 2015-01-28 中国水利水电第十四工程局有限公司 Method for composite geo-membrane sloping core cofferdam
CN104695455A (en) * 2015-03-06 2015-06-10 华能澜沧江水电股份有限公司 High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof
CN106013193A (en) * 2016-07-12 2016-10-12 中国电建集团成都勘测设计研究院有限公司 Geomembrane cofferdam top structure and cofferdam heightening method
CN106120823A (en) * 2016-07-08 2016-11-16 中南大学 A kind of Temporary Cofferdam combination against seepage structure and rapid constructing method
CN206495188U (en) * 2017-01-25 2017-09-15 中国电建集团西北勘测设计研究院有限公司 A kind of buttress type duplex rock
CN107237339A (en) * 2017-08-03 2017-10-10 杭州江润科技有限公司 A kind of concrete cut increases leakage preventing structure and its construction method
CN208717926U (en) * 2018-07-12 2019-04-09 中国电建集团贵阳勘测设计研究院有限公司 A kind of upstream cofferdam that taking into account communication function increases easy structure

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101245603A (en) * 2008-01-23 2008-08-20 中国水利水电科学研究院 Floating arch cofferdam and construction method
CN102296572A (en) * 2011-06-23 2011-12-28 中国水电顾问集团华东勘测设计研究院 Earth and rockfill dam body seepage monitoring structure provided with abandoned dreg site behind dam and construction method thereof
CN104060619A (en) * 2013-03-22 2014-09-24 中国水电顾问集团贵阳勘测设计研究院 Construction method and structure of hydraulic core-wall rockfill dam without cofferdams
CN103469814A (en) * 2013-09-24 2013-12-25 兰州理工大学 Novel barricade supporting structure for road or river bank dam and construction method thereof
CN104153380A (en) * 2014-04-11 2014-11-19 中国水利水电第十一工程局有限公司 Anti-seepage cofferdam structure and construction process
CN104196041A (en) * 2014-08-09 2014-12-10 葛洲坝集团基础工程有限公司 Construction method for concrete diaphragm wall cofferdam heightening
CN104264698A (en) * 2014-09-05 2015-01-07 中国葛洲坝集团国际工程有限公司 Construction method of clay core earth rock cofferdam
CN104314089A (en) * 2014-11-10 2015-01-28 中国水利水电第十四工程局有限公司 Method for composite geo-membrane sloping core cofferdam
CN104695455A (en) * 2015-03-06 2015-06-10 华能澜沧江水电股份有限公司 High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof
CN106120823A (en) * 2016-07-08 2016-11-16 中南大学 A kind of Temporary Cofferdam combination against seepage structure and rapid constructing method
CN106013193A (en) * 2016-07-12 2016-10-12 中国电建集团成都勘测设计研究院有限公司 Geomembrane cofferdam top structure and cofferdam heightening method
CN206495188U (en) * 2017-01-25 2017-09-15 中国电建集团西北勘测设计研究院有限公司 A kind of buttress type duplex rock
CN107237339A (en) * 2017-08-03 2017-10-10 杭州江润科技有限公司 A kind of concrete cut increases leakage preventing structure and its construction method
CN208717926U (en) * 2018-07-12 2019-04-09 中国电建集团贵阳勘测设计研究院有限公司 A kind of upstream cofferdam that taking into account communication function increases easy structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258469A (en) * 2019-06-05 2019-09-20 中国电建集团成都勘测设计研究院有限公司 The flat system in synthesis field for high-mountain gorge areas construction of hydropower plant
CN110847126A (en) * 2019-11-27 2020-02-28 中国电建集团贵阳勘测设计研究院有限公司 Compromise small-size sluice structure of flood discharge and layering water intaking, reposition of redundant personnel function

Also Published As

Publication number Publication date
CN108677980B (en) 2023-10-31

Similar Documents

Publication Publication Date Title
CN202718138U (en) Self-locking type ecological retaining wall structure
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
CN210216254U (en) Concrete guardrail structure
CN108677980A (en) A kind of upstream cofferdam that taking into account communication function increases method and structure
CN208717926U (en) A kind of upstream cofferdam that taking into account communication function increases easy structure
CN113215995B (en) Method for constructing bridge road in narrow space
CN215052148U (en) A kind of guarantee that meets the rapid flood discharge requirement in the river course leads to the urinal
CN206928250U (en) Canyon Area high dam hydroelectric project slag field ditch-water flow guide system
CN100516367C (en) Geotechnical soil-ballasted sack cofferdam for water piers of river-crossing bridge and its production method
CN211228180U (en) Culvert structure capable of protecting embankment
CN104372765A (en) Frame column type frame bank protection structure for city watercourse and construction method of bank protection structure
CN201687123U (en) Water-penetrating and soil-retaining humanized ecological brick and soil-retaining wall
CN207862744U (en) A kind of composite construction of bridge, tunnel, embankment
CN109944215A (en) A kind of Reinforcement of Earth Rockfill Dam engineering disappears unrestrained protective slope structure
CN203096697U (en) Ballast field structure at earth and rockfill dam toe
CN210031683U (en) Earth and rockfill dam reinforcement engineering wave dissipation slope protection structure
CN209099304U (en) A kind of hydraulic engineering protection river levee
CN108867225B (en) Method for processing water falling hole in karst landform road subgrade range
CN207597544U (en) A kind of high resiliency water conservancy chute
CN206736646U (en) The closed U-type groove structure of anti-floating
CN109281286A (en) A kind of construction method of mountain area energy dissipating diversion channel
CN215857503U (en) Ecological concrete cylinder revetment
CN204436418U (en) Lid digs top board structure that is prefabricated in subway station and cast-in-place combination
CN220888175U (en) Bridge head filling embankment structure
CN220202602U (en) Anti-consolidation sedimentation type mixing dam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant