CN106592648B - A kind of ground crack resistence processing method - Google Patents
A kind of ground crack resistence processing method Download PDFInfo
- Publication number
- CN106592648B CN106592648B CN201710074078.1A CN201710074078A CN106592648B CN 106592648 B CN106592648 B CN 106592648B CN 201710074078 A CN201710074078 A CN 201710074078A CN 106592648 B CN106592648 B CN 106592648B
- Authority
- CN
- China
- Prior art keywords
- cushion cap
- backfill
- cystosepiment
- brick mold
- precast slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The invention discloses a kind of ground crack resistence processing methods, comprising the following steps: A: the processing of column lower cushion cap: A-1: carrying out the determination of the difference of place long-term settlement amount and pile foundation settling amount by way of estimating, that is, determines differential settlement;A-2: determine that cushion cap top mark is high according to the differential settlement determined in A-1, column is located on cushion cap;A-3: making a circle outside cushion cap and build brick mold, and No. two cystosepiments are arranged between brick mold and cushion cap;A-4: the bed course between brick mold and No. two cystosepiments is cut off with cutting machine, disengages the two;A-5: carrying out the outer earthen backfill compacting of brick mold, and cushion cap top does not backfill in brick fetal membrane;A-6: the placement of precast slab and precast slab reinforcing bar is carried out;A-7: one-piece casting flooring surface layer forms laminated floor slab, and No.1 cystosepiment is arranged in flooring surface layer and intercolumniation.The present invention is cystosepiment, concrete, reinforcing bar, brick, mortar using material, is that material is generallyd use in engineering, and buying is convenient.
Description
Technical field
The present invention relates to technical field of construction, specifically a kind of ground crack resistence processing method.
Background technique
In recent years, with the mushroom development of continuous development and the urban construction of China's economy, especially some coastal cities
Land Demand constantly expands, existing land resources be no longer satisfied city continue development demand, sea reclamation at
For the main land development form of China's coastal region.Currently, the construction technology used in Scale Sea Reclamation Project is with waterpower hydraulic reclamation
Based on method.Waterpower hydraulic reclamation method refers to mechanical using dredger and slush pump etc., and the mud in river or surrounding waters is passed through
Special construction pipeline has the land of use value by natural sediment to desired target location.Medium coarse sand is one
The prettyr good water conservancy hydraulic reclamation material of kind has had corresponding result of study to show to carry out epeirogenetic using medium coarse sand, can obtain
Preferable achievement.Since the market price of sand is relatively high, and material resource is rare, and the use of medium coarse sand is gradually decreased in engineering.It will
Material of the mud as water conservancy hydraulic reclamation in river or surrounding waters, is not only able to river training, port and pier, can also protect
Environment reduces transportation cost, shortens the foundation stabilization duration, is a kind of good method achieved many things at one stroke.Therefore, in Practical Project usually
Select material of the mud as waterpower hydraulic reclamation from coastal waters seabed or river.Since hydraulic reclamation soil's water content is very high, hole
Than very big, decrement is also very high, intensity and permeability are very low, and the hydraulic reclamation time is shorter, not yet consolidate under Gravitative Loads, also
Be say natural surface subsidence be earth's surface is loose or half loose barged-in fill under gravity, by loosely to it is fine and closely woven at
Rock process, therefore barged-in fill area building settlement is larger and the sedimentation deadline is very long, so that the land subsidence for forming large area is existing
As when locally sedimentation is uneven use and beauty can be influenced with ground cracking.
For sea-filling region major structure of construction, pile foundation is generally used, under the load of main structure is passed to by stake
The supporting course of the preferable soil property in portion, it is ensured that the sedimentation of main structure meets the requirement of specification.It is at present usually save the cost, one layer of ground
Face generally directlys adopt building coats way, i.e., 100mm concrete topping is directly done after rammed earth.This method because of surface layer below
The soil body does not consolidate also, and after house is using many years, ground floor understands Continuous Settlement and settling amount is very big, and in column periphery cushion cap position
It is smaller to set place's sedimentation, causes to crack on column periphery cushion cap junction ground along cushion cap side, land subsidence other than the cushion cap of column periphery, because
This normal treatment process has seriously affected the use and beauty of building.The method for solving ground floor cracking at present, which is mainly changed, fills out
Sand-gravel-cushion Technioue, deal pile, cement mixing pile, drain bar add the method for processing foundation such as piling prepressing, or directly do one layer it is overhead existing
Pour reinforced concrete floor.
Although above-mentioned processing method can effectively solve problem, but higher cost.How low cost solves barged-in fill area one
The problem of layer ground cracking, be building field urgent problem to be solved.
Summary of the invention
It is mentioned above in the background art to solve the purpose of the present invention is to provide a kind of ground crack resistence processing method
Problem.
To achieve the above object, the invention provides the following technical scheme:
A kind of ground crack resistence processing method, comprising the following steps:
A: the processing of column lower cushion cap:
A-1: carrying out the determination of the difference of place long-term settlement amount and pile foundation settling amount by way of estimating, that is, it is heavy to determine
It is poor to drop;
A-2: determine that cushion cap top mark is high according to the differential settlement determined in A-1, column is located on cushion cap;
A-3: making a circle outside cushion cap and build brick mold, and No. two cystosepiments are arranged between brick mold and cushion cap;
A-4: the bed course between brick mold and No. two cystosepiments is cut off with cutting machine, disengages the two;
A-5: carrying out the outer earthen backfill compacting of brick mold, and cushion cap top does not backfill in brick fetal membrane;
A-6: the placement of precast slab and precast slab reinforcing bar is carried out;
A-7: one-piece casting flooring surface layer forms laminated floor slab, surface thickness and precast concrete plate thickness, prefabricated mixed
Concrete board reinforcing bar and concrete strength are calculated by design to be determined, No.1 cystosepiment is arranged in flooring surface layer and intercolumniation;
B: the processing of ground beam under filling wall:
B-1: carrying out earthen backfill, and No. two cystosepiments are arranged between backfill and ground beam;
B-2: the bed course between ground beam and No. two cystosepiments is cut off with cutting machine, disengages the two;
B-3: No.1 cystosepiment is set between construction flooring surface layer and wall.
As a further solution of the present invention: the precast concrete board ends are placed in brick mold and backfill, across
Cushion cap is crossed, and reserves precast slab reinforcing bar in backfill.
As a further solution of the present invention: described precast slab one end is placed in brick mold and backfill, and
Precast slab reinforcing bar is reserved in backfill, the precast slab other end protrudes into inside cushion cap to column side, concrete
Native plate and intercolumniation are arranged No.1 cystosepiment, and the template of laminated floor slab that precast slab is poured as after.
As further scheme of the invention: No. two cystosepiments are the cystosepiment of 100 millimeters thicks.
As further scheme of the invention: the No.1 cystosepiment is the cystosepiment of 30 millimeters thicks.
Compared with prior art, the beneficial effects of the present invention are:
(1) present invention is cystosepiment, concrete, reinforcing bar, brick, mortar using material, is that material is generallyd use in engineering,
Buying is convenient;
(2) present invention does not need large-scale professed machine equipment, and construction method is simple, convenient for operation;
(3) construction cost of the present invention is lower, cheap, and compared with traditional method for processing foundation, this method is maximum
Advantage is exactly low in cost;
(4) high treating effect, the present invention can ground problem of Cracking caused by one layer of Earth cave of effective solution,
After this method is handled, one layer of ground is not cracked in the long-term use, Equalsettlement;
(5) if sedimentation is larger, one layer of ground only need to be done again on existing ground, it is simple and convenient;
(6) construction and service stage are easy to maintenance simple;
(7) have a wide range of application.
Detailed description of the invention
Fig. 1 is the processing method floor map of crack resistence at ground crack resistence processing method center pillar lower cushion cap;
Fig. 2 is the processing profiles schematic diagram in Fig. 1 at 1-1;
Fig. 3 is the processing profiles schematic diagram in Fig. 1 at 2-2;
Fig. 4 is the diagrammatic cross-section one of crack resistence processing method at indoor wall in ground crack resistence processing method;
Fig. 5 is the diagrammatic cross-section two of crack resistence processing method at indoor wall in ground crack resistence processing method.
In figure: 1- cushion cap, 2- column, 3- No.1 cystosepiment, 4- brick mold, No. bis- cystosepiments of 5-, 6- surface thickness, the building 7-
Face surface layer, 8- precast slab reinforcing bar, 9- bed course, 10- backfill, 11- precast slab, 12- wall, 13- ground beam.
Specific embodiment
The technical solution of the patent is explained in further detail With reference to embodiment.
Please refer to Fig. 1-5, a kind of ground crack resistence processing method, comprising the following steps:
A: the processing of 2 lower cushion cap 1 of column:
A-1: carrying out the determination of the difference of place long-term settlement amount and pile foundation settling amount by way of estimating, that is, it is heavy to determine
It is poor to drop;
A-2: determine that cushion cap top mark is high according to the differential settlement determined in A-1, column 2 is located on cushion cap 1;
A-3: making a circle outside cushion cap 1 and build brick mold 4, and No. two cystosepiments 5 are arranged between brick mold 4 and cushion cap 1;
A-4: the bed course 9 between brick mold 4 and No. two cystosepiments 5 is cut off with cutting machine, disengages the two;
A-5: carrying out the outer earthen backfill of brick mold 4 compacting, and cushion cap top does not backfill in brick fetal membrane;
A-6: the placement of precast slab 11 and precast slab reinforcing bar 8 is carried out;
A-7: one-piece casting flooring surface layer 7 forms laminated floor slab, surface thickness 6 and 11 thickness of precast slab, pre-
Concrete slab reinforcing bar 8 and concrete strength processed are calculated by design and are determined, No.1 cystosepiment 3 is arranged between flooring surface layer 7 and column 2;
B: the processing of ground beam under filling wall:
B-1: carrying out earthen backfill, and No. two cystosepiments 5 are arranged between backfill 10 and ground beam 13;
B-2: the bed course 9 between ground beam 13 and No. two cystosepiments 5 is cut off with cutting machine, disengages the two;
B-3: No.1 cystosepiment 3 is set between construction flooring surface layer 7 and wall 12.
11 both ends of precast slab are placed in brick mold 4 and backfill 10, across cushion cap 1, and in backfill
Precast slab reinforcing bar 8 is reserved on 10.
Described 11 one end of precast slab is placed in brick mold 4 and backfill 10, and is reserved in backfill 10 pre-
Concrete slab reinforcing bar 8 processed, 11 other end of precast slab protrude into inside cushion cap 1 to 2 side of column, precast slab 11 and column 2
Between No.1 cystosepiment 3, and the template of laminated floor slab that precast slab 11 is poured as after are set.
No. two cystosepiments 5 are the cystosepiment of 100 millimeters thicks.
The No.1 cystosepiment 3 is the cystosepiment of 30 millimeters thicks.
The present invention is cystosepiment, concrete, reinforcing bar, brick, mortar using material, is to generally use material in engineering, adopts
Purchaser is just;The present invention does not need large-scale professed machine equipment, and construction method is simple, convenient for operation;Construction cost of the present invention
Lower, cheap, compared with traditional method for processing foundation, the maximum advantage of this method is exactly low in cost;Treatment effect
It is good, the present invention can ground problem of Cracking caused by one layer of Earth cave of effective solution, after this method is handled, one
Layer ground is not cracked in the long-term use, Equalsettlement;If sedimentation is larger, only one need to be done again on existing ground
Layer ground, it is simple and convenient;Construction and service stage are easy to maintenance simple;Have a wide range of application.
Embodiment:
Taizhou Wan circular economy industrial Nesting Zone is located at Taizhou plain east, passes through Linhai City within the scope of the administrative region of a city of Taizhou, green pepper
Jiang Qu, Taizhou economic development zone, Luqiao District and Wenling city, about 562 square kilometres of the gross area.Domestic landforms are to impact Plain, beach
Based on painting, east side littoral has long coastline.Gather divide into north, east, Nan San great form a team, medium-sized and small enterprises undertaking area work
Journey is located in east forms a team.About 200 mu of land area, arrange that the land used block image is good along the main road Peng Bei great Dao and Ju Hai, and
Adjoin public lawn and business auxiliary facility, life & amusement are convenient and efficient.
Engineering name: Taizhou Wan circular economy industrial Nesting Zone medium-sized and small enterprises undertaking area engineering
Construction scale: total land area: 160126m2;
Overall floorage: 171142m2;
Total investment of engineering: 44576.82 ten thousand yuan.
This engineering design service life is 50 years.
One layer of ground of all workshops of this engineering is all made of above-mentioned crack resistence processing method, achieves good effect, guarantees
The normal use of floor.
The preferred embodiment of the patent is described in detail above, but this patent is not limited to above-mentioned embodiment party
Formula within the knowledge of one of ordinary skill in the art can also be under the premise of not departing from this patent objective
It makes a variety of changes.
Claims (3)
1. a kind of ground crack resistence processing method, which comprises the following steps:
A: the processing of column lower cushion cap:
A-1: carrying out the determination of the difference of place long-term settlement amount and pile foundation settling amount by way of estimating, that is, determines sedimentation
Difference;
A-2: determine that cushion cap top mark is high according to the differential settlement determined in A-1, column is located on cushion cap;
A-3: making a circle outside cushion cap and build brick mold, and No. two cystosepiments are arranged between brick mold and cushion cap;
A-4: the bed course between brick mold and No. two cystosepiments is cut off with cutting machine, disengages the two;
A-5: carrying out the outer earthen backfill compacting of brick mold, and cushion cap top does not backfill in brick mold;
A-6: the placement of precast slab and precast slab reinforcing bar is carried out;The precast concrete board ends are placed on
In brick mold and backfill, across cushion cap, and precast slab reinforcing bar is reserved in backfill;The precast slab one
End is placed in brick mold and backfill, and precast slab reinforcing bar is reserved in backfill, the precast slab other end
It protrudes into inside cushion cap to column side, precast slab and intercolumniation be arranged No.1 cystosepiment, and precast slab is poured as after
The template of laminated floor slab;
A-7: one-piece casting flooring surface layer forms laminated floor slab, surface thickness and precast concrete plate thickness, precast concrete
Slab muscle and concrete strength are calculated by design to be determined, No.1 cystosepiment is arranged in flooring surface layer and intercolumniation;
B: the processing of ground beam under filling wall:
B-1: carrying out earthen backfill, and No. two cystosepiments are arranged between backfill and ground beam;
B-2: the bed course between ground beam and No. two cystosepiments is cut off with cutting machine, disengages the two;
B-3: No.1 cystosepiment is set between construction flooring surface layer and wall.
2. crack resistence processing method in ground according to claim 1, which is characterized in that No. two cystosepiments are 100 millis
The thick cystosepiment of rice.
3. crack resistence processing method in ground according to claim 1, which is characterized in that the No.1 cystosepiment is 30 millimeters
Thick cystosepiment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710074078.1A CN106592648B (en) | 2017-02-10 | 2017-02-10 | A kind of ground crack resistence processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710074078.1A CN106592648B (en) | 2017-02-10 | 2017-02-10 | A kind of ground crack resistence processing method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106592648A CN106592648A (en) | 2017-04-26 |
CN106592648B true CN106592648B (en) | 2019-05-21 |
Family
ID=58585909
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710074078.1A Active CN106592648B (en) | 2017-02-10 | 2017-02-10 | A kind of ground crack resistence processing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106592648B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924404A (en) * | 2019-12-21 | 2020-03-27 | 山东天齐置业集团股份有限公司 | Construction method for deep backfill filling wall foundation |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103470044A (en) * | 2013-07-03 | 2013-12-25 | 天津二十冶建设有限公司 | Construction method capable of controlling cracks in concrete floor |
CN103953118A (en) * | 2014-04-18 | 2014-07-30 | 中国水电顾问集团华东勘测设计研究院有限公司 | Connecting structure for preventing ground inside room of factory building from transmitting sedimentation to plinth and wall body |
CN205012596U (en) * | 2015-09-06 | 2016-02-03 | 方远建设集团股份有限公司 | Defense sector face is uniform settlement structure not |
-
2017
- 2017-02-10 CN CN201710074078.1A patent/CN106592648B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103470044A (en) * | 2013-07-03 | 2013-12-25 | 天津二十冶建设有限公司 | Construction method capable of controlling cracks in concrete floor |
CN103953118A (en) * | 2014-04-18 | 2014-07-30 | 中国水电顾问集团华东勘测设计研究院有限公司 | Connecting structure for preventing ground inside room of factory building from transmitting sedimentation to plinth and wall body |
US20150299978A1 (en) * | 2014-04-18 | 2015-10-22 | Hydrochina Huadong Engineering Corporation Limited | Connection Structure for Blocking Settlement of Ground |
CN205012596U (en) * | 2015-09-06 | 2016-02-03 | 方远建设集团股份有限公司 | Defense sector face is uniform settlement structure not |
Non-Patent Citations (1)
Title |
---|
"软土地基上厂房基础的设计";刘世明等;《浙江建筑》;20150107;第31卷(第10期);第21-24页第1-5节 |
Also Published As
Publication number | Publication date |
---|---|
CN106592648A (en) | 2017-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107419630A (en) | A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction | |
CN206902488U (en) | A kind of soft soil foundation high-filled embankment of effectively control settlement after construction | |
CN103195158A (en) | Municipal drainage pipeline slurry balance pipe-jacking construction method | |
CN102635124A (en) | Construction method aiming to large open caisson in weak soil area | |
CN203213095U (en) | Underground water supply and drainage building anti-floating structure | |
CN102677661A (en) | Reinforcement method for foundation of silt soft-based cast-in-place box girder support | |
CN102926398A (en) | Construction method of inclined column type corrosion resistant foundation for power line in salt lake area | |
CN108560542A (en) | A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag | |
CN101597888B (en) | Construction method of municipal drainage culvert sinking trough | |
CN208219694U (en) | A kind of prefabricated barricade | |
CN109706952A (en) | Large-scale well-sinking construction method | |
CN104762956B (en) | Method for forming pile based on construction waste recycled aggregate | |
CN105155383A (en) | Construction process of bubble light soil | |
CN106087880B (en) | A kind of dam that 300 meter level is high and its construction technology | |
CN109898556A (en) | A kind of underground pipe gallery structure and sunk type construction method | |
CN113818402A (en) | Reinforcing and reinforcing structure of clay core rockfill dam and construction method thereof | |
CN106592648B (en) | A kind of ground crack resistence processing method | |
CN208023600U (en) | A kind of caisson structure suitable for complex environment | |
CN206457856U (en) | A kind of ground crack resistence structure | |
CN106988317A (en) | One kind is used for underground pipe gallery method for processing foundation | |
CN204282295U (en) | Pile formula case cylinder breakwater structure | |
CN104153350A (en) | Octagonal meshed water-stopping rectangular pile of support | |
CN206815279U (en) | A kind of assembled high-rise pile cap revetment structure | |
CN112195701A (en) | Soft soil foundation structure and construction method thereof | |
CN110158547A (en) | A kind of cement sand and gravel buttress dam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |