CN107486940A - A kind of water channel is passed by one's way the production method of prefabricated component - Google Patents
A kind of water channel is passed by one's way the production method of prefabricated component Download PDFInfo
- Publication number
- CN107486940A CN107486940A CN201710726691.7A CN201710726691A CN107486940A CN 107486940 A CN107486940 A CN 107486940A CN 201710726691 A CN201710726691 A CN 201710726691A CN 107486940 A CN107486940 A CN 107486940A
- Authority
- CN
- China
- Prior art keywords
- prefabricated component
- water channel
- mould
- way
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 36
- 230000002787 reinforcement Effects 0.000 claims abstract description 93
- 239000004567 concrete Substances 0.000 claims abstract description 65
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 61
- 239000010959 steel Substances 0.000 claims abstract description 61
- 238000012423 maintenance Methods 0.000 claims abstract description 33
- 238000005266 casting Methods 0.000 claims abstract description 17
- 239000012141 concentrate Substances 0.000 claims abstract description 6
- 239000011241 protective layer Substances 0.000 claims abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 47
- 239000010410 layer Substances 0.000 claims description 42
- 239000003638 chemical reducing agent Substances 0.000 claims description 23
- 238000003032 molecular docking Methods 0.000 claims description 21
- 238000000034 method Methods 0.000 claims description 19
- 239000004576 sand Substances 0.000 claims description 18
- 235000019738 Limestone Nutrition 0.000 claims description 17
- 239000006028 limestone Substances 0.000 claims description 17
- OYPRJOBELJOOCE-UHFFFAOYSA-N Calcium Chemical compound [Ca] OYPRJOBELJOOCE-UHFFFAOYSA-N 0.000 claims description 16
- 239000011575 calcium Substances 0.000 claims description 16
- 229910052791 calcium Inorganic materials 0.000 claims description 16
- 230000003014 reinforcing effect Effects 0.000 claims description 16
- HEMHJVSKTPXQMS-UHFFFAOYSA-M Sodium hydroxide Chemical compound [OH-].[Na+] HEMHJVSKTPXQMS-UHFFFAOYSA-M 0.000 claims description 15
- 239000002245 particle Substances 0.000 claims description 13
- 238000009826 distribution Methods 0.000 claims description 12
- 239000010438 granite Substances 0.000 claims description 12
- 239000004568 cement Substances 0.000 claims description 10
- 239000002994 raw material Substances 0.000 claims description 10
- 239000000203 mixture Substances 0.000 claims description 9
- 239000000843 powder Substances 0.000 claims description 6
- LFQSCWFLJHTTHZ-UHFFFAOYSA-N Ethanol Chemical compound CCO LFQSCWFLJHTTHZ-UHFFFAOYSA-N 0.000 claims description 5
- LSNNMFCWUKXFEE-UHFFFAOYSA-N Sulfurous acid Chemical compound OS(O)=O LSNNMFCWUKXFEE-UHFFFAOYSA-N 0.000 claims description 5
- 150000004645 aluminates Chemical class 0.000 claims description 5
- 238000005056 compaction Methods 0.000 claims description 5
- 238000003780 insertion Methods 0.000 claims description 5
- 230000037431 insertion Effects 0.000 claims description 5
- OTYBMLCTZGSZBG-UHFFFAOYSA-L potassium sulfate Chemical compound [K+].[K+].[O-]S([O-])(=O)=O OTYBMLCTZGSZBG-UHFFFAOYSA-L 0.000 claims description 5
- 229910052939 potassium sulfate Inorganic materials 0.000 claims description 5
- 235000011151 potassium sulphates Nutrition 0.000 claims description 5
- 238000002360 preparation method Methods 0.000 claims description 5
- 238000005452 bending Methods 0.000 claims description 2
- 238000001035 drying Methods 0.000 claims description 2
- 238000001914 filtration Methods 0.000 claims description 2
- 239000002893 slag Substances 0.000 claims description 2
- NINIDFKCEFEMDL-UHFFFAOYSA-N Sulfur Chemical compound [S] NINIDFKCEFEMDL-UHFFFAOYSA-N 0.000 claims 1
- 239000005864 Sulphur Substances 0.000 claims 1
- 239000003795 chemical substances by application Substances 0.000 claims 1
- 239000010883 coal ash Substances 0.000 claims 1
- 230000003467 diminishing effect Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 17
- 238000009434 installation Methods 0.000 description 12
- 230000008569 process Effects 0.000 description 10
- 238000007789 sealing Methods 0.000 description 10
- 238000013461 design Methods 0.000 description 6
- 230000008859 change Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 239000010881 fly ash Substances 0.000 description 5
- 239000000463 material Substances 0.000 description 5
- 238000011049 filling Methods 0.000 description 4
- 230000002262 irrigation Effects 0.000 description 4
- 238000003973 irrigation Methods 0.000 description 4
- 210000003205 muscle Anatomy 0.000 description 4
- 239000003818 cinder Substances 0.000 description 3
- 238000007906 compression Methods 0.000 description 3
- 230000006835 compression Effects 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 3
- 238000005469 granulation Methods 0.000 description 3
- 230000003179 granulation Effects 0.000 description 3
- 238000011065 in-situ storage Methods 0.000 description 3
- 244000144972 livestock Species 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 230000007704 transition Effects 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000001125 extrusion Methods 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 230000013011 mating Effects 0.000 description 2
- 230000001932 seasonal effect Effects 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000003513 alkali Substances 0.000 description 1
- 239000002585 base Substances 0.000 description 1
- 230000000740 bleeding effect Effects 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
- 229940079593 drug Drugs 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000036571 hydration Effects 0.000 description 1
- 238000006703 hydration reaction Methods 0.000 description 1
- 239000010977 jade Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 239000000565 sealant Substances 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/08—Producing shaped prefabricated articles from the material by vibrating or jolting
- B28B1/093—Producing shaped prefabricated articles from the material by vibrating or jolting by means directly acting on the material, e.g. by cores wholly or partly immersed in the material or elements acting on the upper surface of the material
- B28B1/0935—Producing shaped prefabricated articles from the material by vibrating or jolting by means directly acting on the material, e.g. by cores wholly or partly immersed in the material or elements acting on the upper surface of the material using only elements wholly or partly immersed in the material, e.g. cores
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/24—Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
- B28B11/245—Curing concrete articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0002—Auxiliary parts or elements of the mould
- B28B7/0014—Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0029—Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0064—Moulds characterised by special surfaces for producing a desired surface of a moulded article, e.g. profiled or polished moulding surfaces
- B28B7/0079—Moulds characterised by special surfaces for producing a desired surface of a moulded article, e.g. profiled or polished moulding surfaces with surfaces for moulding interlocking means, e.g. grooves and ribs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/16—Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
- B28B7/18—Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
- C04B28/02—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
- C04B28/06—Aluminous cements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B13/00—Irrigation ditches, i.e. gravity flow, open channel water distribution systems
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Ceramic Engineering (AREA)
- Manufacturing & Machinery (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Inorganic Chemistry (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Pass by one's way the production method of prefabricated component, comprise the following steps the invention discloses a kind of water channel:(1)Making and the mould needed for water channel prefabricated component same shape, mould is inverted and put, from bottom casting concrete;(2)On die inside on even application mould oil or pad on plastic sheeting;(3)The framework of steel reinforcement made is inserted in and poured in mould, and adjusts the protective layer of concrete;(4)Field fabrication pours required concrete;Concrete is poured among die top, uniformly divided to both ends, then is vibrated 1~3 minute with vibrator, then troweling is carried out to upper surface;Close die cap plate;(5)Water channel prefabricated component after casting concrete conserves at the scene, and temperature tears side mould open after being more than 500h DEG C during maintenance, and temperature tears internal model open after being more than 1500h DEG C during watering maintenance, and prefabricated component concentrates stacking after form removal, during maintenance temperature up to more than 2000h DEG C when dispatch from the factory use.The features such as efficiency of construction can be greatly improved in the present invention.
Description
Technical field
The present invention relates to a kind of hydraulic engineering field, and in particular to a kind of water channel is passed by one's way the production method of prefabricated component.
Background technology
Water channel is the main tool of the filling such as irrigation and water conservancy, traffic, municipal administration, sewage, rainy day draining row's engineering, and concrete
The U-shaped gool mould of soil is one of main tool for producing gool.
With greatly developing for China's modern agriculture and water resource infrastructure, country and place are built to agricultural and water conservancy basis
If scale of investment it is increasing.China is one to the relatively backward country of agricultural technology, vast in territory, water resource assignment ten
Divide inequality, it is particularly very in short supply to west area, the water resource of drug in some provinces.At the same time, due to filling row's mode and material
It is unreasonable, great lot of water resources is not utilized and protected well, is had become in China's agriculture project and water conservancy construction
The poorly efficient serious problems utilized of water resource.Over more than 20 years, precast concrete gool(Referred to as U-shaped gool)It is special in China each province and city
It is not popularization and application in western water resources regional agricultural water conservancy project in short supply, it is agriculture abundant with hydraulic department has obtained various regions
Certainly, significant economic benefit and social benefit are achieved.
Also there is many through retrieving the pass by one's way Chinese patent literature of prefabricated component of relevant water channel, it is as follows:
1st, Chinese patent<Application number> 200620034095.X<Utility model title>Concrete prefabricated groove<Applicant>Fan Yun
It is clever<Address>Development zone Pingshan, Deyang City the Yellow River, Sichuan Province Jie Bei sections(In the bureau of agriculture of Jingyang District)<Summary>It the utility model is related to
A kind of concrete prefabricated groove for farmland water channel, the groove by a pair of shape of cross sections be " L " shape prefabricated components it is opposite
Arrangement combinations form a "u"-shaped groove, and the different bottom plate of width, structure can be set up between the mating surface of the component of two " L " shapes
The groove water channel different into various circulatioies, there is positioning spigot in the mating surface of each component.
2nd, Chinese patent<Application number> 201520717706.X<Utility model title>A kind of new prefabricated water channel<Application
People>Deng Zenghua<Address>Ganzhou City of Jiangxi Province Shicheng County agricultural development office<Summary>A kind of new prefabricated water channel, is related to one
Kind rural water conservancy transformation facility, especially a kind of new prefabricated water channel, including U-lag, the upper edge of U-lag are provided with road deck;Its
It is characterized in:Often save U-lag end and be provided with water stopping trough, two save U-lag junction bar connectings, then in the water stopping trough at U-lag end
With novel water-stop rubber filling, sealing effect is played.
3rd, Chinese patent<Application number> 201020113216.6<Utility model title>Anti-deformation combined penstock<Application
People>Tian Shucheng<Address>7 buildings west gates of house west wing Unit 1 in Samples, Huadian, Jilin Province city three<Summary>It the utility model is related to water conservancy work
Journey technical field, be it is a kind of be widely used in that agricultural irrigation, traffic municipal administration be defeated, Anti-deformation combined penstock of drainage system, it is special
Putting is:It includes some blocks of canal plates, and the joint of adjacent canal plate is connected by sealing connecting strip with sealant sealing, canal plate with
Convex edge is equipped with below the canal plate of canal plate joint, the joint of vertical or horizontal canal plate is in contact by the convex edge of its joint
Flat recess consolidate block and the connecting screw that is placed in sealing connecting strip is connected;The joint of vertical and horizontal canal plate is right by its
The connecting screw that the cross recess that the convex edge at the place of connecing is in contact consolidates block and is placed in sealing connecting strip is connected.
4th, Chinese patent<Application number> 201520000756.6<Utility model title>A kind of prefabricated drainage ditch pours into
Pattern has<Applicant>Jiangxi technical college<Address>Nanchang City, Jiangxi Province Qingshanhu District precious jade lake garden in university<Summary>This practicality
New to disclose a kind of casting mold of prefabricated drainage ditch, including dolly, external mold and internal model, external mold is in matrix, and internal model is in U
Type, drainage ditch are taken shape in the cavity between external mold and internal model.
The shortcomings of the prior art has:1st, the process of construction cycle is long, cost is high, needs artificial more, the construction period
Between easily influenceed, it is necessary to excavate larger construction place, to be more easily damaged, not easy care, it is impossible to reuse, tear open by weather
Except fairly cumbersome, original Land Environment of destructible etc.;2nd, water channel gool is easily by earth pressure crimp or damage, both pole
The big service life for influenceing beam groove, and a larger increase cost input, waste of resource;3rd, during water channel gool installation docking, joint
Sealing is poor, easy leak, causes water source to access maximum utilization;4th, it is more to make water channel prefabricated component process of passing by one's way,
It is too cumbersome during modulus, labour and working time are greatly wasted, work efficiency is low.
Applicant it is hereby stated that:We are an enterprises for researching and producing water conservancy irrigation canals and ditches cement prefab, are in the past few years being ground
To study carefully and be made that many products in terms of developing water conservancy irrigation canals and ditches cement prefab, the product having at present has already passed through experiment and examined,
Will put goods on the market, the several patent application documents that have applied on the same day are all our own scientific achievements, the present invention with《It is a kind of
The production method of retaining wall prefabricated component》、《A kind of water channel engineering system and construction method》、《A kind of water channel gool side leads to prefabricated component
Production method》、《A kind of production method of water channel gool prefabricated component》、《A kind of production method of water channel threeway prefabricated component》、《One
The production method of kind water channel corner prefabricated component》Process structure have similar part, but be our series of products, apply for a patent
Purpose be for our series of products of protection, rather than for other purposes.
The content of the invention
The purpose of the present invention is the defects of being directed to prior art, there is provided one kind can solve the problems, such as water channel engineering across road, can be full
Sufficient mechanized construction, efficiency of construction can be greatly improved, the larger shortening engineering construction duration, firm in structure, anti-extrusion deformation is strong, tears open
Dress is convenient, can reuse, and Butt sealing is good, and appearance is neat, and streamline is attractive in appearance, and installation is quick, removes convenient water channel mistake
The production method of road prefabricated component.
In order to realize the invention described above purpose, the technical scheme used for:
A kind of water channel is passed by one's way the production method of prefabricated component, and described method comprises the following steps:
(1)Making and the mould needed for water channel prefabricated component same shape, mould is inverted and put, from bottom casting concrete;
(2)On die inside on even application mould oil or pad on plastic sheeting;
(3)The framework of steel reinforcement made is inserted in and poured in mould, and adjusts the protective layer of concrete, described framework of steel reinforcement
Trough rim by inside and outside stressing conditions configuration principal rod, bottom land is by upper and lower stressing conditions configuration principal rod, by the reinforcing bar of configuration point
Then solution is welded into unit member, several unit members is welded to connect with longitudinal reinforcement to be formed into the shape that can be processed
The framework of steel reinforcement of gool, the both ends distribution unit component on framework of steel reinforcement is closeer, and intermediate distribution unit member is sparse and uniform;
(4)Field fabrication pours required concrete;Concrete is poured among mold bottom, uniformly divided to both ends, then
Vibrated, vibrated 1~3 minute using direct insertion vibrator, discharged the bubble in concrete, combine concrete compaction, then to mould
Have notch upper surface and carry out troweling;Closed die cover plate;
(5)Water channel prefabricated component after casting concrete conserves at the scene, removable side mould after temperature is more than 500h DEG C during maintenance,
Removable internal model after temperature is more than 1500h DEG C during watering maintenance, tear prefabricated component after internal model open and concentrate stacking, Wen Da during maintenance
Can dispatch from the factory use at more than 2000h DEG C.
Temperature is time × outdoor temperature when above-described, and the chronomere is hour, and time numerical value takes >=16
Positive integer, time numerical value can use the numerical value such as 16,18,20,21,22,23,24,25,26, the outdoor temperature unit for degree Celsius,
Outdoor temperature >=20 DEG C, outdoor temperature can change with seasonal variations, and winter makes outdoor temperature is relatively low, and time numerical value accordingly obtains
Greatly, i.e., compared with multiple spot the time required to maintenance, summer outdoor temperature highest, time numerical value is relative to get the small value, i.e., is contracted the time required to maintenance
It is short.
Above-described mould includes end cap mould, die cap plate, die cavity, side wall template and framework of steel reinforcement;Described side wall mould
Plate is secured by bolts on die cavity;Framework of steel reinforcement is cased with the die cavity, end cap template, blending bolt are cased with die cavity both ends
It is connected, described end cap template is provided with boss, and described boss is the model of docking groove, after pouring, at the end of prefabricated component
Docking groove is formed on face, die cavity top surface is provided with die cap plate;Docking groove on prefabricated component enables the prefabricated component of abutting joint two-by-two
Carry out sealing docking, filled up in docking groove using cement mortar, it is such fill up mode both quick and can carry out it is fine
Sealing, avoid water from being leaked from docking groove well, can guarantee that output and save water.
Framework of steel reinforcement described above includes second layer distributing bar, first layer distributing bar, reinforcement distributing bar and longitudinal direction
Reinforcing bar, the second layer distributing bar, first layer distributing bar and reinforcement distributing bar connect and compose unit member, first layer structure
Make reinforcing bar and reinforcement distributing bar and second layer distributing bar is sandwiched in centre, the bottom of first layer distributing bar and reinforcement construction steel
The bottom of muscle is arranged side by side, and second layer distributing bar bottom is less than the bottom of first layer distributing bar and reinforcement distributing bar, several
Unit member connects into framework of steel reinforcement by longitudinal reinforcement.
Above-described die cavity is welded or is stamped to form using steel plate bending, and steel plate edge is propped up using angle steel or channel-section steel
Support.
Two symmetrical chamferings are provided with the top of above-described die cavity, described chamfering is 45 ° or 60 °;Bottom is provided with two
Individual symmetrical boss, described boss are the model of supporting table.
Through hole is equipped with the side wall and side wall template of above-described die cavity, and two through holes are corresponding, when pouring
Two through holes are connected with cylinder again, after pouring, lifting hole(eyelet) is made.
More than
Above-described concrete includes the raw material of following parts by weight:60~70 parts of coarse-fine aggregate, aluminate cement 10~20
Part, 5~10 parts of granulated blast-furnace slag, 5~10 parts of flyash, 1~3 part of high efficiency water reducing agent, described high efficiency water reducing agent are alcohol
Waste liquid dry powder adds the weight ratio of sulfoacid calcium water reducer to be 1:1.
Above-described coarse-fine aggregate is river sand and the mixture of limestone or granite particle, river sand and limestone or flower
The weight ratio of hilllock rock particle is 1:1~1.5;The modulus of fineness of the river sand is 2.2~3.0, and the limestone or granite are broken
Material diameter is 5~30mm.
It by sulfite liquor is raw material that above-described sulfoacid calcium water reducer preparation method, which is, adds sodium hydroxide
PH value is adjusted to 8~10, is passed through after air reacts 10~12h at 70~80 DEG C and adds potassium sulfate, reacted at 70~80 DEG C
40~50min, filtering, sulfoacid calcium water reducer is produced after drying.
Prefabricated component corresponding matching of passing by one's way obtained by above is provided with cover plate 14 of passing by one's way.
The protrusion substantive distinguishing features and significant progress that the present invention has relative to prior art:
1st, the present invention can meet mechanized construction, efficiency of construction can be greatly improved, the larger shortening engineering construction duration, structure is hard
Gu anti-extrusion deformation is strong, convenient disassembly, it can reuse, Butt sealing is good, and appearance is neat, and streamline is attractive in appearance, and installation is fast
Speed, it is convenient to remove.
2nd, the water channel that the present invention produces is passed by one's way, and prefabricated component appearance is neat, and composition water channel can be so that water channel entirety appearance
Neatly, carefully and neatly done attractive in appearance, when mounted, work efficiency improves more than 7 times than common construction method, and the construction period shorten to 80~90%.
3rd, materials needed for present invention production are few, can save cast-in-place concrete investment 12~35%, larger to reduce cost throwing
Enter, great economic interests can be produced.
4th, the mould of production and application of the present invention, its making is simple and convenient, and assembling is quick, and process simplifies, and modulus, is convenient in demoulding
Quickly;And reinforcement component is cased with a mold, it is firm so to build the beam groove preform structure being molded as, resistance to compression and tensile capacity
By force;Reinforcement frame is made up of two-layer structure reinforcing bar, reinforcement distributing bar and longitudinal reinforcement, overall uniform force, and power conductibility is good.
5th, the present invention reduces cement consumption, increases substantially concrete gool prefabricated component using flyash as admixture
Intensity, effectively suppress the alkali-aggregate reaction of concrete, significantly improve the alkali resistant aggregate reaction performance of concrete, it is pre- to improve gool
The durability of product;The bleeding quantity of concrete is reduced, improves the workability of concrete;Improve the compactness of concrete, significantly carry
The impermeability of high gool prefabricated component.
6th, the sulfoacid calcium water reducer that uses of the present invention can reduce water consumption more than 10%, compression strength averagely improve 15% with
On, the significant workability for improving concrete, the durability of concrete is greatly enhanced, at the beginning of significantly reducing hydrated cementitious
The heat of hydration of phase.
7th, the present invention solves the problems, such as water channel engineering across road, can ensure that the unimpeded of road, the smooth water flowing of and can;Cross
Road cover plate is fitted close with the boss that water channel is passed by one's way on prefabricated component, and both are flush at upper plane, road can be kept originally
Planarization, overall structure are firmly and pressure-resistant;And can Fast Installation.
8th, prefabricated component of the present invention has docking groove in joint, and concrete is filled up in docking groove, can greatly reduce water
The loss of flow, substantially increases water use efficiency;Because joint has docking groove, there is gap between the prefabricated component of two docking,
All connect as one, this gap be prefabricated component because expanded by heating or pre- cold events generation variable provide space,
Protect prefabricated component.
9. framework of steel reinforcement design of the present invention is special, the reinforcement constitution includes second layer distributing bar, first layer construction steel
Muscle, reinforcement distributing bar and longitudinal reinforcement, the second layer distributing bar, first layer distributing bar are connected with reinforcement distributing bar
Second layer distributing bar is sandwiched in centre by Component units component, first layer distributing bar and reinforcement distributing bar, several units
Component connects into reinforcement constitution by longitudinal reinforcement.This reinforcement constitution design is special, can ensure that water channel water channel threeway is prefabricated
Part is sturdy and durable, can be through under pressure indeformable compared with more than several times of existing water channel Quality advance.
10th, the water channel prefabricated component after casting concrete of the present invention conserves at the scene, after temperature is more than 500h DEG C during maintenance
I.e. removable side mould, removable die cavity after temperature is more than 1500h DEG C during watering maintenance, prefabricated component, which is concentrated, after form removal chamber stacks, and conserves
Can dispatch from the factory use during more than Shi Wenda 2000h DEG C;This kind of maintenance method is taken, can reach accurate to water channel prefabricated component
Maintenance, the quality of water channel prefabricated component is improved, strengthen the resistance to compression of water channel prefabricated component and tensile capacity;It can also save unnecessary artificial
Input, the unnecessary waste of water is also avoided that, reduces production cost.
Brief description of the drawings
Fig. 1 is that a kind of water channel of the present invention is passed by one's way the dimensional structure diagram of prefabricated-member mould.
Fig. 2 is that water channel is passed by one's way the dimensional structure diagram of prefabricated component.
Fig. 3 is the dimensional structure diagram of die cavity.
Fig. 4 is the structural representation of end cap mould.
Fig. 5 be enhancing water channel pass by one's way intensity framework of steel reinforcement dimensional structure diagram.
Fig. 6 is the structural representation of cover plate of passing by one's way.
Fig. 7 is the main structure diagram of framework of steel reinforcement.
Element title and serial number in figure:End cap template 1, die cap plate 2, die cavity 3, side wall template 4, bolt 5, boss 6,
Second layer distributing bar 7, first layer distributing bar 8, reinforcement distributing bar 9, longitudinal reinforcement 10, supporting table 11, docking groove 12, hang
Hole 13, cover plate 14 of passing by one's way, cover plate lifting hole(eyelet) 15, bolt hole 16.
Framework of steel reinforcement is not put in Fig. 1 on die cavity, in order to cheaply observe inside combination rear mold, therefore not by framework of steel reinforcement set
On.
Embodiment
With reference to embodiments of the invention, the present invention is described in more detail.
Embodiment 1:
Referring to shown in Fig. 1 to 7, a kind of water channel is passed by one's way the production method of prefabricated component, and described method comprises the following steps:
(1)Making and the mould needed for water channel prefabricated component same shape, mould is inverted and put, from bottom casting concrete;
(2)On die inside on even application mould oil or pad on plastic sheeting;
(3)The framework of steel reinforcement made is inserted in and poured in mould, and adjusts the protective layer of concrete, described framework of steel reinforcement
Trough rim by inside and outside stressing conditions configuration principal rod, bottom land is by upper and lower stressing conditions configuration principal rod, by the reinforcing bar of configuration point
Then solution is welded into unit member, several unit members is welded to connect with longitudinal reinforcement to be formed into the shape that can be processed
The framework of steel reinforcement of gool, the both ends distribution unit component on framework of steel reinforcement is closeer, and intermediate distribution unit member is sparse and uniform;
(4)Field fabrication pours required concrete;Concrete is poured among mold bottom, uniformly divided to both ends, then
Vibrated, vibrated 1~3 minute using direct insertion vibrator, discharged the bubble in concrete, combine concrete compaction, then to mould
Have notch upper surface and carry out troweling;Closed die cover plate;
(5)Water channel prefabricated component after casting concrete conserves at the scene, removable side mould after temperature is more than 500h DEG C during maintenance,
Removable internal model after temperature is more than 1500h DEG C during watering maintenance, tear prefabricated component after internal model open and concentrate stacking, Wen Da during maintenance
Can dispatch from the factory use at more than 2000h DEG C.
Temperature is time × outdoor temperature when above-described, and the chronomere is hour, and time numerical value takes >=16
Positive integer, i.e. time add up and value >=16, time numerical value can use the numerical value such as 16,17,18,19,20,21,22,23,24, described
Outdoor temperature unit for degree Celsius, outdoor temperature >=20 DEG C, outdoor temperature can change with seasonal variations, when outdoor temperature is less than
At 20 DEG C, do not construct;And outdoor temperature is high, time numerical value is relative to get the small value, i.e., shortens the time required to maintenance.
After cast in situs terminates, so that it may pair when be included in curing time, it is 9 points of morning to pour end, i.e., since 9 points of morning
Timing;Take that 9 points of morning, totally 12 hours, outdoor temperature were 30 DEG C to 21 points at night the period, when temperature for 12 × 30=
360h·℃;21 points to 9 points of morning next day at night, totally 12 hours, when temperature be 12 × 28=336h DEG C;Two periods
Numerical value is added, and as 360+336=696h DEG C is more than 500h DEG C, can remove the die cap plate, side wall mould, end cap mould of mould.
Watering maintenance, from 10 points of morning to 21 points at night, outdoor temperature is 30 DEG C, when temperature be 11 × 30=330h DEG C;
21 points to 9 points of morning at night, and outdoor temperature is 28 DEG C, when temperature be 12 × 28=336h DEG C;9 points to 21 points of morning, outdoor temp
Spend for 32 DEG C, when temperature be 12 × 32=384h DEG C;21 points to 9 points of morning at night, and outdoor temperature is 30 DEG C, when temperature be 12
×30=360h·℃;9 points to 14 points of morning, outdoor temperature be 31 DEG C, when temperature be 5 × 31=155h DEG C;By the stage
Numerical value adds up, and as 330+336+384+360+155=1565 are more than 1500h DEG C, you can removes die cavity, prefabricated component is hung
Die cavity, carry out stacking maintenance.
Continuing to conserve, the value accumulated value of temperature reaches 2000h DEG C when will be all, from 14 points to 21 points at night of afternoon,
Outdoor temperature be 31 DEG C, when temperature be 7 × 31=217h DEG C;21 points to 9 points of morning at night, and outdoor temperature is 29 DEG C, Shi Wen
For 12 × 29=348h DEG C;9 points to 21 points of morning, outdoor temperature be 32 DEG C, when temperature be 12 × 32=384h DEG C;At night 21
For point to 9 points of morning, outdoor temperature is 30 DEG C, when temperature be 12 × 30=360h DEG C;9 points to 21 points of morning, outdoor temperature 33
DEG C, when temperature be 12 × 33=396h DEG C;21 points to 9 points of morning at night, and outdoor temperature is 30 DEG C, when temperature for 12 × 30=
360h·℃;The numerical value in the stage is added up, as 217+348+384+360+396+360=2065 reach 2000h DEG C with
On, illustrate the standard for having met maintenance, can dispatch from the factory use.
Mould needed for above method includes end cap mould 1, die cap plate 2, die cavity 3, side wall template 4 and framework of steel reinforcement;It is described
Side wall template 4 be fixed on by bolt 5 on die cavity 3;Framework of steel reinforcement is cased with described die cavity 3, the top surface of die cavity 3 is provided with die cap
Plate 2, the both ends of die cavity 3 are fixed with end cap template 1;End cap template 1 is provided with boss 6 and bolt hole 16, the spiral shell in end cap template 1
Keyhole 16 is inserted in the bolt on die cavity 3, then is fixed, and boss 6 is the model of docking groove 12, at the both ends of prefabricated component after pouring
On be correspondingly formed docking groove 12, in rundown process, the mode taking both ends while tighten, and the angle of offside wall form 4 is entered
Row regulation so that side wall template 4 meets design requirement in the side wall angle of die cavity 3, and the end cap template 1 after tightening can also be to side wall
Template 4 is reinforced, it is ensured that side wall template 4 is all without displacement, angle change or outward during casting concrete
Blow.
Framework of steel reinforcement described above includes second layer distributing bar 7, first layer distributing bar 8, reinforcement distributing bar 9 and indulged
To reinforcing bar 10, second layer distributing bar 7, first layer distributing bar 8 and reinforcement distributing bar 9 are combined into Component units component, by
Several unit members connect composition framework of steel reinforcement by longitudinal reinforcement 10, and longitudinal reinforcement 10 can carry out positioning admittedly to unit member
Fixed, and can is put up a resistance to vertical and horizontal stress;In unit member, the bottom of second layer distributing bar 7 is higher than first layer structure
The bottom of reinforcing bar 8 and reinforcement distributing bar 9 is made, steel bar arrangement is intensive, and angle position uses arc transition, and power is divided very well
Dissipate, avoid the occurrence of concentration stress, whole unit member power resistance strength can be improved, also larger can improve prefabricated component power resistance strength, energy
Protect prefabricated component to be damaged in hoisting process, can also strengthen prefabricated component resistance because of the intensity of physical features extruding, greatly prolonging prefabricated component makes
Use the life-span.
In order to realize fast hoisting, lifting hole(eyelet) 13 need to be provided with prefabricated component, lifting hole(eyelet) 13 be made by die cavity 3 side wall and
Side wall template 4 is provided with through hole, and two through holes are corresponding, is again connected two through holes with cylinder when pouring, through pouring
Afterwards, lifting hole(eyelet) 13 is made.
More than obtained by prefabricated component of passing by one's way coordinates with it is to pass by one's way cover plate 14, in order to install cover plate 14 of passing by one's way,
The two sides of die cavity 3 is provided with support rim, and support rim is the model of supporting table 11, after pouring, is formed on prefabricated component inwall
Supporting table 11;Supporting table 11 supports installation to pass by one's way cover plate 14, and cover plate 14 of passing by one's way can facilitate pedestrian, livestock or car by can be smoothly
Solve the problems, such as that water channel is passed by one's way;In order to which Fast Installation is passed by one's way cover plate, on the cover board provided with cover plate lifting hole(eyelet) 15;Cover plate manufacture craft
According to pass by one's way the width of prefabricated component and length is designed the corresponding mould of cover plate 14 of passing by one's way, be put into designed plane reinforcing bar
Structure, concrete is poured into, is uniformly shakeout, vibrated 1~3 minute with vibrator, then carry out upper surface troweling, supported at the scene
Shield, cover plate 14 of passing by one's way finally is made.
Concrete used above includes the raw material of following parts by weight:60 parts of coarse-fine aggregate, 10 parts of aluminate cement, granulation
5 parts of blast-furnace cinder, 5 parts of flyash, 1 part of high efficiency water reducing agent, described high efficiency water reducing agent are that alcohol effluent dry powder adds sulfoacid calcium to subtract
The weight ratio of aqua is 1:1.
Coarse-fine aggregate used above is river sand and the mixture of limestone or granite particle, river sand and limestone or flower hilllock
The weight ratio of rock particle is 1:1~1.5;The modulus of fineness of the river sand is 2.2~3.0, limestone or the granite particle
Footpath is 5~30mm.
It by sulfite liquor is raw material that above-described sulfoacid calcium water reducer preparation method, which is, adds sodium hydroxide
PH value is adjusted to 8, is passed through after air reacts 10h at 70 DEG C and adds potassium sulfate, 40min is reacted at 70 DEG C, filter, dry
After produce sulfoacid calcium water reducer.
Embodiment 2:
Referring to shown in Fig. 1 to 7, a kind of water channel is passed by one's way the production method of prefabricated component, and described method comprises the following steps:
(1)Making and the mould needed for water channel prefabricated component same shape, mould is inverted and put, from bottom casting concrete;
(2)On die inside on even application mould oil or pad on plastic sheeting;
(3)The framework of steel reinforcement made is inserted in and poured in mould, and adjusts the protective layer of concrete, described framework of steel reinforcement
Trough rim by inside and outside stressing conditions configuration principal rod, bottom land is by upper and lower stressing conditions configuration principal rod, by the reinforcing bar of configuration point
Then solution is welded into unit member, several unit members is welded to connect with longitudinal reinforcement to be formed into the shape that can be processed
The framework of steel reinforcement of gool, the both ends distribution unit component on framework of steel reinforcement is closeer, and intermediate distribution unit member is sparse and uniform;
(4)Field fabrication pours required concrete;Concrete is poured among die top, uniformly divided to both ends, then
Vibrated, vibrated 1~3 minute using direct insertion vibrator, discharged the bubble in concrete, combine concrete compaction, then to mould
Have notch upper surface and carry out troweling;Closed die cover plate;
(5)Water channel prefabricated component after casting concrete conserves at the scene, and temperature is more than 500h DEG C during maintenance。It is removable side afterwards
Mould, temperature is more than 1500h DEG C when watering conserves。Removable internal model afterwards, tear prefabricated component after internal model open and concentrate and stack, Wen Da during maintenance
2000h·℃。Can dispatch from the factory use during the above.
After cast in situs terminates, so that it may pair when be included in curing time, pour end be at 11 points at noon, i.e., opened for 11 points from noon
Beginning timing;Period takes at 11 points at noon, and to 21 points at night, totally 10 hours, outdoor temperature are 30 DEG C, when temperature for 10 × 30=
300h·℃;21 points to 9 points of morning next day at night, totally 12 hours, when temperature be 12 × 28=336h DEG C;Two periods
Numerical value is added, and as 300+336=636h DEG C is more than 500h DEG C, can remove the die cap plate, side wall mould, end cap mould of mould.
Watering maintenance, from 10 points of morning to 21 points at night, outdoor temperature is 30 DEG C, when temperature be 11 × 30=330h DEG C;
21 points to 9 points of morning at night, and outdoor temperature is 28 DEG C, when temperature be 12 × 28=336h DEG C;9 points to 21 points of morning, outdoor temp
Spend for 32 DEG C, when temperature be 12 × 32=384h DEG C;21 points to 9 points of morning at night, and outdoor temperature is 30 DEG C, when temperature be 12
×30=360h·℃;9 points to 14 points of morning, outdoor temperature be 31 DEG C, when temperature be 5 × 31=155h DEG C;By the stage
Numerical value adds up, and as 330+336+384+360+155=1565 are more than 1500h DEG C, you can removes die cavity, prefabricated component is hung
Die cavity, carry out stacking maintenance.
Continuing to conserve, the value accumulated value of temperature reaches 2000h DEG C when will be all, from 14 points to 21 points at night of afternoon,
Outdoor temperature be 31 DEG C, when temperature be 7 × 31=217h DEG C;21 points to 9 points of morning at night, and outdoor temperature is 29 DEG C, Shi Wen
For 12 × 29=348h DEG C;9 points to 21 points of morning, outdoor temperature be 32 DEG C, when temperature be 12 × 32=384h DEG C;At night 21
For point to 9 points of morning, outdoor temperature is 30 DEG C, when temperature be 12 × 30=360h DEG C;9 points to 21 points of morning, outdoor temperature 33
DEG C, when temperature be 12 × 33=396h DEG C;21 points to 9 points of morning at night, and outdoor temperature is 30 DEG C, when temperature for 12 × 30=
360h·℃;The numerical value in the stage is added up, as 217+348+384+360+396+360=2065 reach 2000h DEG C with
On, illustrate the standard for having met maintenance, can dispatch from the factory use.
Mould needed for above method includes end cap mould 1, die cap plate 2, die cavity 3, side wall template 4 and framework of steel reinforcement;It is described
Side wall template 4 be fixed on by bolt 5 on die cavity 3;Framework of steel reinforcement is cased with described die cavity 3, the top surface of die cavity 3 is provided with die cap
Plate 2, the both ends of die cavity 3 are fixed with end cap template 1;End cap template 1 is provided with boss 6 and bolt hole 16, the spiral shell in end cap template 1
Keyhole 16 is inserted in the bolt on die cavity 3, then is fixed, and boss 6 is the model of docking groove 12, at the both ends of prefabricated component after pouring
On be correspondingly formed docking groove 12, in rundown process, the mode taking both ends while tighten, and the angle of offside wall form 4 is entered
Row regulation so that side wall template 4 meets design requirement in the side wall angle of die cavity 3, and the end cap template 1 after tightening can also be to side wall
Template 4 is reinforced, it is ensured that side wall template 4 is all without displacement, angle change or outward during casting concrete
Blow.
The framework of steel reinforcement includes second layer distributing bar 7, first layer distributing bar 8, reinforcement distributing bar 9 and longitudinal steel
Muscle 10, second layer distributing bar 7, first layer distributing bar 8 and reinforcement distributing bar 9 are combined into Component units component, by some
Individual unit member connects composition framework of steel reinforcement by longitudinal reinforcement 10, and the unit member distribution at framework of steel reinforcement both ends is closeer, middle
Relatively dredge, and unit member can be fixed on the positioning for longitudinal reinforcement 10, and can is put up a resistance to vertical and horizontal stress;
In unit member, the bottom of second layer distributing bar 7 is higher than the bottom of first layer distributing bar 8 and reinforcement distributing bar 9, reinforcing bar cloth
Put intensive, angle position uses arc transition, and power is disperseed very well, avoids the occurrence of concentration stress, can improve whole unit
Component power resistance strength, also larger prefabricated component power resistance strength can be improved, prefabricated component can be protected to be damaged in hoisting process, can also be strengthened pre-
Product resistance greatly prolongs prefabricated component service life because of the intensity of physical features extruding.
In order to realize fast hoisting, lifting hole(eyelet) 13 need to be provided with prefabricated component, lifting hole(eyelet) 13 be made by die cavity 3 side wall and
Side wall template 4 is provided with through hole, and two through holes are corresponding, is again connected two through holes with cylinder when pouring, through pouring
Afterwards, lifting hole(eyelet) 13 is made.
More than obtained by prefabricated component of passing by one's way coordinates with it is to pass by one's way cover plate 14, in order to install cover plate 14 of passing by one's way,
The two sides of die cavity 3 is provided with support rim, and support rim is the model of supporting table 11, after pouring, is formed on prefabricated component inwall
Supporting table 11;Supporting table 11 supports installation to pass by one's way cover plate 14, and cover plate 14 of passing by one's way can facilitate pedestrian, livestock or car by can be smoothly
Solve the problems, such as that water channel is passed by one's way;In order to which Fast Installation is passed by one's way cover plate, on the cover board provided with cover plate lifting hole(eyelet) 15;Cover plate manufacture craft
According to pass by one's way the width of prefabricated component and length is designed the corresponding mould of cover plate 14 of passing by one's way, be put into designed plane reinforcing bar
Structure, concrete is poured into, is uniformly shakeout, vibrated 1~3 minute with vibrator, then carry out upper surface troweling, supported at the scene
Shield, cover plate 14 of passing by one's way finally is made.
Concrete used above includes the raw material of following parts by weight:65 parts of coarse-fine aggregate, 15 parts of aluminate cement, granulation
7 parts of blast-furnace cinder, 7 parts of flyash, 2 parts of high efficiency water reducing agent, described high efficiency water reducing agent are that alcohol effluent dry powder adds sulfoacid calcium to subtract
The weight ratio of aqua is 1:1.
Coarse-fine aggregate used is river sand and the mixture of limestone or granite particle, and river sand and limestone or granite are broken
The weight ratio of material is 1:1.2;The modulus of fineness of the river sand be 2.2~3.0, limestone or granite the particle footpath be 5~
30mm。
It by sulfite liquor is raw material that above-described sulfoacid calcium water reducer preparation method, which is, adds sodium hydroxide
PH value is adjusted to 9, is passed through after air reacts 11h at 75 DEG C and adds potassium sulfate, 45min is reacted at 75 DEG C, filter, dry
After produce sulfoacid calcium water reducer.
Embodiment 3:
Referring to shown in Fig. 1 to 7, a kind of water channel is passed by one's way the production method of prefabricated component, and described method comprises the following steps:
(1)Making and the mould needed for water channel prefabricated component same shape, mould is inverted and put, from bottom casting concrete;
(2)On die inside on even application mould oil or pad on plastic sheeting;
(3)The framework of steel reinforcement made is inserted in and poured in mould, and adjusts the protective layer of concrete, described framework of steel reinforcement
Trough rim by inside and outside stressing conditions configuration principal rod, bottom land is by upper and lower stressing conditions configuration principal rod, by the reinforcing bar of configuration point
Then solution is welded into unit member, several unit members is welded to connect with longitudinal reinforcement to be formed into the shape that can be processed
The framework of steel reinforcement of gool, the both ends distribution unit component on framework of steel reinforcement is closeer, and intermediate distribution unit member is sparse and uniform;
(4)Field fabrication pours required concrete;Concrete is poured among die top, uniformly divided to both ends, then
Vibrated, vibrated 1~3 minute using direct insertion vibrator, discharged the bubble in concrete, combine concrete compaction, then to mould
Have notch upper surface and carry out troweling;Closed die cover plate;
(5)Water channel prefabricated component after casting concrete conserves at the scene, removable side mould after temperature is more than 500h DEG C during maintenance,
Removable internal model after temperature is more than 1500h DEG C during watering maintenance, tear prefabricated component after internal model open and concentrate stacking, Wen Da during maintenance
Can dispatch from the factory use at more than 2000h DEG C.
After cast in situs terminates, so that it may pair when be included in curing time, pour end be at 15 points in afternoon, i.e., opened for 15 points from afternoon
Beginning timing;Period removes 15 points of noon to 21 points at night, and totally 6 hours, outdoor temperature are 30 DEG C, when temperature for 6 × 30=
180h·℃;21 points to 9 points of morning next day at night, totally 12 hours, when temperature be 12 × 28=336h DEG C;Two periods
Numerical value is added, and as 180+336=516h DEG C is more than 500h DEG C, can remove the die cap plate, side wall mould, end cap mould of mould.
Watering maintenance, from 9 points of morning to 21 points at night, outdoor temperature is 30 DEG C, when temperature be 12 × 30=360h DEG C;
21 points to 9 points of morning at night, and outdoor temperature is 28 DEG C, when temperature be 12 × 28=336h DEG C;9 points to 21 points of morning, outdoor temp
Spend for 32 DEG C, when temperature be 12 × 32=384h DEG C;21 points to 9 points of morning at night, and outdoor temperature is 30 DEG C, when temperature be 12
×30=360h·℃;9 points to 14 points of morning, outdoor temperature be 31 DEG C, when temperature be 5 × 31=155h DEG C;By the stage
Numerical value adds up, and as 360+336+384+360+155=1595 are more than 1500h DEG C, you can removes die cavity, prefabricated component is hung
Die cavity, carry out stacking maintenance.
Continuing to conserve, the value accumulated value of temperature reaches 2000h DEG C when will be all, from 14 points to 21 points at night of afternoon,
Outdoor temperature be 31 DEG C, when temperature be 7 × 31=217h DEG C;21 points to 9 points of morning at night, and outdoor temperature is 29 DEG C, Shi Wen
For 12 × 29=348h DEG C;9 points to 21 points of morning, outdoor temperature be 32 DEG C, when temperature be 12 × 32=384h DEG C;At night 21
For point to 9 points of morning, outdoor temperature is 30 DEG C, when temperature be 12 × 30=360h DEG C;9 points to 21 points of morning, outdoor temperature 33
DEG C, when temperature be 12 × 33=396h DEG C;21 points to 9 points of morning at night, and outdoor temperature is 30 DEG C, when temperature for 12 × 30=
360h·℃;The numerical value in the stage is added up, as 217+348+384+360+396+360=2065 reach 2000h DEG C with
On, illustrate the standard for having met maintenance, can dispatch from the factory use.
Mould needed for above method includes end cap mould 1, die cap plate 2, die cavity 3, side wall template 4 and framework of steel reinforcement;It is described
Side wall template 4 be fixed on by bolt 5 on die cavity 3;Framework of steel reinforcement is cased with described die cavity 3, the top surface of die cavity 3 is provided with die cap
Plate 2, the both ends of die cavity 3 are fixed with end cap template 1;End cap template 1 is provided with boss 6 and bolt hole 16, the spiral shell in end cap template 1
Keyhole 16 is inserted in the bolt on die cavity 3, then is fixed, and boss 6 is the model of docking groove 12, at the both ends of prefabricated component after pouring
On be correspondingly formed docking groove 12, in rundown process, the mode taking both ends while tighten, and the angle of offside wall form 4 is entered
Row regulation so that side wall template 4 meets design requirement in the side wall angle of die cavity 3, and the end cap template 1 after tightening can also be to side wall
Template 4 is reinforced, it is ensured that side wall template 4 is all without displacement, angle change or outward during casting concrete
Blow.
The framework of steel reinforcement includes second layer distributing bar 7, first layer distributing bar 8, reinforcement distributing bar 9 and longitudinal steel
Muscle 10, second layer distributing bar 7, first layer distributing bar 8 and reinforcement distributing bar 9 are combined into Component units component, by some
Individual unit member connects composition framework of steel reinforcement by longitudinal reinforcement 10, and the unit member distribution at framework of steel reinforcement both ends is closeer, middle
Relatively dredge, and unit member can be fixed on the positioning for longitudinal reinforcement 10, and can is put up a resistance to vertical and horizontal stress;
In unit member, the bottom of second layer distributing bar 7 is higher than the bottom of first layer distributing bar 8 and reinforcement distributing bar 9, reinforcing bar cloth
Put intensive, angle position uses arc transition, and power is disperseed very well, avoids the occurrence of concentration stress, can improve whole unit
Component power resistance strength, also larger prefabricated component power resistance strength can be improved, prefabricated component can be protected to be damaged in hoisting process, can also be strengthened pre-
Product resistance greatly prolongs prefabricated component service life because of the intensity of physical features extruding.
In order to realize fast hoisting, lifting hole(eyelet) 13 need to be provided with prefabricated component, lifting hole(eyelet) 13 be made by die cavity 3 side wall and
Side wall template 4 is provided with through hole, and two through holes are corresponding, is again connected two through holes with cylinder when pouring, through pouring
Afterwards, lifting hole(eyelet) 13 is made.
More than obtained by prefabricated component of passing by one's way coordinates with it is to pass by one's way cover plate 14, in order to install cover plate 14 of passing by one's way,
The two sides of die cavity 3 is provided with support rim, and support rim is the model of supporting table 11, after pouring, is formed on prefabricated component inwall
Supporting table 11;Supporting table 11 supports installation to pass by one's way cover plate 14, and cover plate 14 of passing by one's way can facilitate pedestrian, livestock or car by can be smoothly
Solve the problems, such as that water channel is passed by one's way;In order to which Fast Installation is passed by one's way cover plate, on the cover board provided with cover plate lifting hole(eyelet) 15;Cover plate manufacture craft
According to pass by one's way the width of prefabricated component and length is designed the corresponding mould of cover plate 14 of passing by one's way, be put into designed plane reinforcing bar
Structure, concrete is poured into, is uniformly shakeout, vibrated 1~3 minute with vibrator, then carry out upper surface troweling, supported at the scene
Shield, cover plate 14 of passing by one's way finally is made.
Concrete used above includes the raw material of following parts by weight:70 parts of coarse-fine aggregate, 20 parts of aluminate cement, granulation
10 parts of blast-furnace cinder, 10 parts of flyash, 3 parts of high efficiency water reducing agent, described high efficiency water reducing agent are that alcohol effluent dry powder adds sulfoacid calcium
The weight ratio of water reducer is 1:1.
Coarse-fine aggregate used above is river sand and the mixture of limestone or granite particle, river sand and limestone or flower hilllock
The weight ratio of rock particle is 1:1.5;The modulus of fineness of the river sand is 2.2~3.0, and limestone or granite the particle footpath is
5~30mm.
It by sulfite liquor is raw material that above-described sulfoacid calcium water reducer preparation method, which is, adds sodium hydroxide
PH value is adjusted to 10, is passed through after air reacts 12h at 80 DEG C and adds potassium sulfate, 50min is reacted at 80 DEG C, filter, dry
After produce sulfoacid calcium water reducer.
Taken construction method comprises the following steps:
(1)Clear base unwrapping wire:The width that the Breadth Maximum taken more than prefabricated component is 20~30cm is as clear baseline, using pulverized limestone mark
Know line;
(2)Excavated using excavator or manually in the region of pulverized limestone identification scribe, the rational stacking earthwork, and it is manually levelling
Bottom, it is determined that the sideline of installation and Bottom Altitude;
(3)The prefabricated component of job site will be transported to, be lifted with excavator, the prefabricated component sling is put into foundation trench, is directed at side
Line and Bottom Altitude is leveled up, then, remove suspension hook;
(4)After installation terminates, the site error of prefabricated component has been installed in amendment, reaches design requirement, and reinforcing prevents from deforming;
(5)With the U-shaped docking groove of cement fine sand slurry filling prefabricated component joint, the weight ratio of cement and fine sand is 1:4~5, sand
Slurry with hold it is agglomerating preferably;
(6)After mortar joint condenses, the space on backfill prefabricated component both sides, compacting, remaining earth material etc. is transported out of.
Claims (10)
- The production method of prefabricated component 1. a kind of water channel is passed by one's way, it is characterised in that:Described method comprises the following steps:(1)Making and the mould needed for water channel prefabricated component same shape, mould is inverted and put, from bottom casting concrete;(2)On die inside on even application mould oil or pad on plastic sheeting;(3)The framework of steel reinforcement made is inserted in and poured in mould, and adjusts the protective layer of concrete, described framework of steel reinforcement Trough rim by inside and outside stressing conditions configuration principal rod, bottom land is by upper and lower stressing conditions configuration principal rod, by the reinforcing bar of configuration point Then solution is welded into unit member, several unit members is welded to connect with longitudinal reinforcement to be formed into the shape that can be processed The framework of steel reinforcement of gool, the both ends distribution unit component on framework of steel reinforcement is closeer, and intermediate distribution unit member is sparse and uniform;(4)Field fabrication pours required concrete;Concrete is poured among mold bottom, uniformly divided to both ends, then Vibrated, vibrated 1~3 minute using direct insertion vibrator, discharged the bubble in concrete, combine concrete compaction, then to mould Have notch upper surface and carry out troweling;Closed die cover plate;(5)Water channel prefabricated component after casting concrete conserves at the scene, removable side mould after temperature is more than 500h DEG C during maintenance, Removable internal model after temperature is more than 1500h DEG C during watering maintenance, tear prefabricated component after internal model open and concentrate stacking, Wen Da during maintenance Can dispatch from the factory use at more than 2000h DEG C.
- The production method of prefabricated component 2. water channel according to claim 1 is passed by one's way, it is characterised in that:When described when temperature is Between × outdoor temperature, the chronomere is hour, the time numerical value >=16 positive integer, the outdoor temperature unit is Celsius Degree, outdoor temperature take >=20 DEG C.
- The production method of prefabricated component 3. water channel according to claim 1 is passed by one's way, it is characterised in that:Described mould includes end Cover mold(1), die cap plate(2), die cavity(3), side wall template(4)And framework of steel reinforcement;Described side wall template(4)Pass through bolt(5) It is fixed on die cavity(3)On;The die cavity(3)On be cased with framework of steel reinforcement, die cavity(3)End cap template is cased with both ends(1), and use spiral shell Bolt(5)It is connected, the end cap template(1)Provided with boss(6), described boss(6)For docking groove(12)Model, pour Afterwards, docking groove is formed on the end face of prefabricated component(12);And die cavity(3)Top surface is provided with die cap plate(2);The framework of steel reinforcement includes Second layer distributing bar(7), first layer distributing bar(8), reinforcement distributing bar(9)And longitudinal reinforcement(10), the second layer Distributing bar(7), first layer distributing bar(8)With reinforcement distributing bar(9)Connect and compose unit member, first layer distributing bar (8)With reinforcement distributing bar(9)By second layer distributing bar(7)Centre is sandwiched in, several unit members pass through longitudinal reinforcement (10)Connect into framework of steel reinforcement.
- The production method of prefabricated component 4. water channel according to claim 3 is passed by one's way, it is characterised in that:Described die cavity(3)Adopt Welded or be stamped to form with steel plate bending, steel plate edge is supported using angle steel or channel-section steel.
- The production method of prefabricated component 5. water channel according to claim 3 is passed by one's way, it is characterised in that:Described die cavity(3)Top Portion is provided with two symmetrical chamferings, and described chamfering is 45 ° or 60 °;Bottom is provided with two symmetrical boss, and described boss is Supporting table(11)Model.
- The production method of prefabricated component 6. water channel according to claim 3 is passed by one's way, it is characterised in that:Described die cavity(3)'s Side wall and side wall template(4)On be equipped with through hole, and two through holes are corresponding, again connected two through holes with cylinder when pouring Connect, after pouring, lifting hole(eyelet) is made(13).
- The production method of prefabricated component 7. water channel according to claim 1 is passed by one's way, it is characterised in that:Described concrete includes The raw material of following parts by weight:60~70 parts of coarse-fine aggregate, 10~20 parts of aluminate cement, 5~10 parts of granulated blast-furnace slag, powder 5~10 parts of coal ash, 1~3 part of high efficiency water reducing agent, described high efficiency water reducing agent are the weight that alcohol effluent dry powder adds sulfoacid calcium water reducer Amount is than being 1:1.
- The production method of prefabricated component 8. water channel according to claim 7 is passed by one's way, it is characterised in that:Described coarse-fine aggregate is The weight of the mixture of river sand and limestone or granite particle, river sand and limestone or granite particle ratio is 1:1~1.5; The modulus of fineness of the river sand is 2.2~3.0, and limestone or granite the particle footpath is 5~30mm.
- The production method of prefabricated component 9. water channel according to claim 7 is passed by one's way, it is characterised in that:Described sulfoacid calcium diminishing It by sulfite liquor is raw material that agent preparation method, which is, adds sodium hydroxide and adjusts pH value to 8~10, is passed through air 70 Potassium sulfate is added after reacting 10~12h at~80 DEG C, 40~50min is reacted at 70~80 DEG C, filtering, sulphur is produced after drying Sour calcium water reducer.
- The production method of prefabricated component 10. water channel according to claim 1 is passed by one's way, it is characterised in that:Obtained passing by one's way is pre- Product corresponding matching is provided with cover plate of passing by one's way(14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710726691.7A CN107486940A (en) | 2017-08-22 | 2017-08-22 | A kind of water channel is passed by one's way the production method of prefabricated component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710726691.7A CN107486940A (en) | 2017-08-22 | 2017-08-22 | A kind of water channel is passed by one's way the production method of prefabricated component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107486940A true CN107486940A (en) | 2017-12-19 |
Family
ID=60646207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710726691.7A Pending CN107486940A (en) | 2017-08-22 | 2017-08-22 | A kind of water channel is passed by one's way the production method of prefabricated component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107486940A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108501175A (en) * | 2018-04-04 | 2018-09-07 | 夏璐 | A method of making outdoor scene and illuminator using plasticizing quick hardening cement |
CN110158749A (en) * | 2018-02-12 | 2019-08-23 | 红塔烟草(集团)有限责任公司 | Section arc trench water drainage cover board and mold |
CN111794341A (en) * | 2020-08-06 | 2020-10-20 | 国投信开水环境投资有限公司 | Channel for sewage treatment plant and construction method |
CN114131750A (en) * | 2021-11-30 | 2022-03-04 | 中交二公局第三工程有限公司 | Method for avoiding pouring hollow tungsten tailing concrete prefabricated part |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EA200101065A1 (en) * | 2001-08-07 | 2002-06-27 | Александр Юрьевич Баскаков | FORM FOR CASTING OF FIGURED PRODUCTS FROM A CONCRETE MIXTURE AND A METHOD OF MANUFACTURING ELEMENTS OF A DRAINAGE SYSTEM WITH ITS USE |
CN1802335A (en) * | 2003-01-15 | 2006-07-12 | 联邦科学和工业研究组织 | Cement products |
CN204530642U (en) * | 2015-03-06 | 2015-08-05 | 广西壮族自治区水利科学研究院 | A kind of closed conduit groove prefabricated component |
CN105818266A (en) * | 2015-01-09 | 2016-08-03 | 四川华西绿舍建材有限公司 | Channel plate mold and method for manufacturing channel plate by means of channel plate mold |
CN106007593A (en) * | 2016-05-25 | 2016-10-12 | 象州县科学技术局 | Method for producing concrete channel prefabricated part from mineral slag |
-
2017
- 2017-08-22 CN CN201710726691.7A patent/CN107486940A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EA200101065A1 (en) * | 2001-08-07 | 2002-06-27 | Александр Юрьевич Баскаков | FORM FOR CASTING OF FIGURED PRODUCTS FROM A CONCRETE MIXTURE AND A METHOD OF MANUFACTURING ELEMENTS OF A DRAINAGE SYSTEM WITH ITS USE |
CN1802335A (en) * | 2003-01-15 | 2006-07-12 | 联邦科学和工业研究组织 | Cement products |
CN105818266A (en) * | 2015-01-09 | 2016-08-03 | 四川华西绿舍建材有限公司 | Channel plate mold and method for manufacturing channel plate by means of channel plate mold |
CN204530642U (en) * | 2015-03-06 | 2015-08-05 | 广西壮族自治区水利科学研究院 | A kind of closed conduit groove prefabricated component |
CN106007593A (en) * | 2016-05-25 | 2016-10-12 | 象州县科学技术局 | Method for producing concrete channel prefabricated part from mineral slag |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158749A (en) * | 2018-02-12 | 2019-08-23 | 红塔烟草(集团)有限责任公司 | Section arc trench water drainage cover board and mold |
CN108501175A (en) * | 2018-04-04 | 2018-09-07 | 夏璐 | A method of making outdoor scene and illuminator using plasticizing quick hardening cement |
CN111794341A (en) * | 2020-08-06 | 2020-10-20 | 国投信开水环境投资有限公司 | Channel for sewage treatment plant and construction method |
CN114131750A (en) * | 2021-11-30 | 2022-03-04 | 中交二公局第三工程有限公司 | Method for avoiding pouring hollow tungsten tailing concrete prefabricated part |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107486940A (en) | A kind of water channel is passed by one's way the production method of prefabricated component | |
CN108675699A (en) | A kind of corrosion-resistant geopolymer filling concrete pile material and preparation method thereof and construction technology | |
CN207616844U (en) | Foundation platform precast concrete side form and molding machine | |
CN109826084A (en) | A kind of aqueduct method for repairing seepage | |
CN207327274U (en) | A kind of water channel engineering system | |
CN206844275U (en) | Mutual buckle type precast concrete cover ditch and its suspender | |
CN107443548A (en) | A kind of production method of water channel gool prefabricated component | |
CN201162233Y (en) | Rear irrigation zone structure with higher ground water level | |
CN107471404A (en) | A kind of water channel gool side leads to the production method of prefabricated component | |
CN107471425A (en) | A kind of production method of water channel threeway prefabricated component | |
CN105822068B (en) | Ultralong thin walled concrete walls under hot environment pour and maintenance process | |
CN107471424A (en) | A kind of water channel engineering system and construction method | |
CN112761158A (en) | Green construction method for integral outer wall (three-in-one) of reverse construction underground engineering steel concrete key pin occlusive row pile | |
CN206600524U (en) | A kind of modularization assembling steel backrest | |
CN101994328B (en) | Method for making counterweight for excavator | |
CN215715464U (en) | Bottom foundation structure of box corrugated steel channel | |
CN207310188U (en) | A kind of water channel gool prefabricated-member mould | |
CN211229151U (en) | Concrete masonry module | |
CN212000674U (en) | Novel reverse construction method assembly type non-pressure culvert | |
CN108571068A (en) | The insertion of steel fabric sheet cross section carries out high-strength concrete pouring construction engineering method | |
CN107471426A (en) | A kind of production method of water channel corner prefabricated component | |
CN107443567A (en) | A kind of production method of retaining wall prefabricated component | |
CN207310186U (en) | A kind of water channel gool side leads to prefabricated-member mould | |
CN210288471U (en) | Steel slag concrete retaining wall protective structure | |
CN208280156U (en) | The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171219 |
|
RJ01 | Rejection of invention patent application after publication |