CN107471424A - A kind of water channel engineering system and construction method - Google Patents

A kind of water channel engineering system and construction method Download PDF

Info

Publication number
CN107471424A
CN107471424A CN201710726561.3A CN201710726561A CN107471424A CN 107471424 A CN107471424 A CN 107471424A CN 201710726561 A CN201710726561 A CN 201710726561A CN 107471424 A CN107471424 A CN 107471424A
Authority
CN
China
Prior art keywords
water channel
prefabricated component
engineering system
component
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710726561.3A
Other languages
Chinese (zh)
Other versions
CN107471424B (en
Inventor
潘春光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710726561.3A priority Critical patent/CN107471424B/en
Publication of CN107471424A publication Critical patent/CN107471424A/en
Application granted granted Critical
Publication of CN107471424B publication Critical patent/CN107471424B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/04Producing shaped prefabricated articles from the material by tamping or ramming
    • B28B1/045Producing shaped prefabricated articles from the material by tamping or ramming combined with vibrating or jolting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/14Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/04Discharging the shaped articles
    • B28B13/06Removing the shaped articles from moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/02Making or lining canals

Landscapes

  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Sewage (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of water channel engineering system and construction method, described water channel engineering system includes water channel gool prefabricated component, water channel threeway prefabricated component, water channel corner prefabricated component, water channel side lead to prefabricated component, water channel and passed by one's way prefabricated component and water channel cover plate prefabricated component;Described water channel gool prefabricated component, water channel threeway prefabricated component, water channel corner prefabricated component, water channel side lead to prefabricated component and water channel is passed by one's way, and prefabricated component is attached according to canal system demand, forms water channel engineering system;Described water channel prefabricated component of passing by one's way is coordinated with water channel cover plate prefabricated component;Each prefabricated component place of abutting each other is provided with docking groove.The present invention can implement water channel engineering system factorial praluction, job site Fast Installation, and efficiency of construction is greatly improved, and shorten the construction period, the features such as reducing engineering cost.

Description

A kind of water channel engineering system and construction method
Technical field
The present invention relates to a kind of hydraulic engineering field, and in particular to a kind of water channel engineering system and construction method.
Background technology
Water channel is the main tool of the filling such as irrigation and water conservancy, traffic, municipal administration, sewage, rainy day draining row's engineering, and concrete The U-shaped gool mould of soil is one of main tool for producing gool.
With greatly developing for China's modern agriculture and water resource infrastructure, country and place are built to agricultural and water conservancy basis If scale of investment it is increasing.China is one to the relatively backward country of agricultural technology, vast in territory, water resource assignment ten Divide inequality, it is particularly very in short supply to west area, the water resource of drug in some provinces.At the same time, due to filling row's mode and material It is unreasonable, great lot of water resources is not utilized and protected well, is had become in China's agriculture project and water conservancy construction The poorly efficient serious problems utilized of water resource.Over more than 20 years, precast concrete gool(Referred to as U-shaped gool)It is special in China each province and city It is not popularization and application in western water resources regional agricultural water conservancy project in short supply, it is agriculture abundant with hydraulic department has obtained various regions Certainly, significant economic benefit and social benefit are achieved.
Also there is many through retrieving the Chinese patent literature about water channel prefabricated component, it is as follows:
1st, Chinese patent<Application number> 200620034095.X<Utility model title>Concrete prefabricated groove<Applicant>Fan Yun It is clever<Address>Development zone Pingshan, Deyang City the Yellow River, Sichuan Province Jie Bei sections(In the bureau of agriculture of Jingyang District)<Summary>It the utility model is related to A kind of concrete prefabricated groove for farmland water channel, the groove by a pair of shape of cross sections be " L " shape prefabricated components it is opposite Arrangement combinations form a "u"-shaped groove, and the different bottom plate of width, structure can be set up between the mating surface of the component of two " L " shapes The groove water channel different into various circulatioies, there is positioning spigot in the mating surface of each component.
2nd, Chinese patent<Application number> 201520717706.X<Utility model title>A kind of new prefabricated water channel<Application People>Deng Zenghua<Address>Ganzhou City of Jiangxi Province Shicheng County agricultural development office<Summary>A kind of new prefabricated water channel, is related to one Kind rural water conservancy transformation facility, especially a kind of new prefabricated water channel, including U-lag, the upper edge of U-lag are provided with road deck;Its It is characterized in:Often save U-lag end and be provided with water stopping trough, two save U-lag junction bar connectings, then in the water stopping trough at U-lag end With novel water-stop rubber filling, sealing effect is played.
3rd, Chinese patent<Application number> 201020113216.6<Utility model title>Anti-deformation combined penstock<Application People>Tian Shucheng<Address>7 buildings west gates of house west wing Unit 1 in Samples, Huadian, Jilin Province city three<Summary>It the utility model is related to water conservancy work Journey technical field, be it is a kind of be widely used in that agricultural irrigation, traffic municipal administration be defeated, Anti-deformation combined penstock of drainage system, it is special Putting is:It includes some blocks of canal plates, and the joint of adjacent canal plate is connected by sealing connecting strip with sealant sealing, canal plate with Convex edge is equipped with below the canal plate of canal plate joint, the joint of vertical or horizontal canal plate is in contact by the convex edge of its joint Flat recess consolidate block and the connecting screw that is placed in sealing connecting strip is connected;The joint of vertical and horizontal canal plate is right by its The connecting screw that the cross recess that the convex edge at the place of connecing is in contact consolidates block and is placed in sealing connecting strip is connected.
4th, Chinese patent<Application number> 201520000756.6<Utility model title>A kind of prefabricated drainage ditch pours into Pattern has<Applicant>Jiangxi technical college<Address>Nanchang City, Jiangxi Province Qingshanhu District precious jade lake garden in university<Summary>It is practical new Type discloses a kind of casting mold of prefabricated drainage ditch, including dolly, external mold and internal model, and external mold is in matrix, and internal model is in U Type, drainage ditch are taken shape in the cavity between external mold and internal model.
The shortcomings of the prior art has:1st, the process of construction cycle is long, cost is high, needs artificial more, the construction period Between easily influenceed, it is necessary to excavate larger construction place, to be more easily damaged, not easy care, it is impossible to reuse, tear open by weather Except fairly cumbersome, original Land Environment of destructible etc.;2nd, water channel gool is easily by earth pressure crimp or damage, both pole The big service life for influenceing beam groove, and a larger increase cost input, waste of resource;3rd, during water channel gool installation docking, work of constructing Skill is more, and scene is not easy to operate, meanwhile, joint sealing is poor, easy leak;4th, water channel channel and construction method process step are made It is rapid more, it is too cumbersome during modulus, labour and working time are greatly wasted, work efficiency is low.
Applicant it is hereby stated that:We are an enterprises for researching and producing water conservancy irrigation canals and ditches cement prefab, are in the past few years being ground To study carefully and be made that many products in terms of developing water conservancy irrigation canals and ditches cement prefab, the product having at present has already passed through experiment and examined, Will put goods on the market, the several patent application documents that have applied on the same day are all our own scientific achievements, the present invention with《It is a kind of The production method of retaining wall prefabricated component》、《A kind of water channel is passed by one's way the production method of prefabricated component》、《A kind of water channel gool side leads to prefabricated The production method of part》、《A kind of production method of water channel gool prefabricated component》、《A kind of production method of water channel threeway prefabricated component》、 《A kind of production method of water channel corner prefabricated component》Process structure have similar part, but be our series of products, apply The purpose of patent is for our series of products of protection, rather than for other purposes.
The content of the invention
The purpose of the present invention is the defects of being directed to prior art, there is provided one kind can meet mechanized construction, can be greatly improved Efficiency of construction, the larger shortening engineering construction duration, firm in structure, anti-extrusion deformation is strong, convenient disassembly, can reuse, right Good airproof performance is connect, appearance is neat, and streamline is attractive in appearance, and installation is quick, removes convenient water channel engineering system and construction method.
In order to realize the invention described above purpose, the technical scheme used for:
A kind of water channel engineering system, described water channel engineering system include water channel gool prefabricated component, water channel threeway prefabricated component, water channel Corner prefabricated component, water channel side, which lead to prefabricated component and water channel, passes by one's way prefabricated component;The water channel pass by one's way prefabricated component prepare water channel lid is installed Plate prefabricated component;Docking groove is equipped with each prefabricated component end face;By the water channel gool prefabricated component, water channel threeway prefabricated component, Water channel corner prefabricated component, water channel side lead to prefabricated component and water channel prefabricated component of passing by one's way and carry out corresponding connect according to water channel system design considerations Connect, connect and compose water channel engineering system.
Above-described prefabricated component is that framework of steel reinforcement and concrete are formed, and described framework of steel reinforcement is wrapped up by concrete.
Above-described prefabricated component is molded by being made after the casting concrete in mould, and water is crossed in obtained prefabricated component groove Section configuration is inverted trapezoidal structure, produces prefabricated component with mould, can realize industrial mass production, production efficiency is higher, materials Save, Productive statistics cost is low, produces larger economic benefit;It need not be made to engineering site, dig irrigation canals and ditches, prefabricated component is transported Extremely, it can just be installed, greatly improve project progress, whole water channel good airproof performance.
The processing step of above-described preform production is:
(1)Making and the mould needed for water channel prefabricated component same shape, mould is inverted and put, from bottom casting concrete;
(2)On die inside on even application mould oil or pad on plastic sheeting;
(3)The framework of steel reinforcement made is inserted in and poured in mould, and adjusts the protective layer of concrete, described framework of steel reinforcement Principal rod is configured according to the stressing conditions of trough rim, bottom land, trough rim is similarly configured by inside and outside stress, and bottom land is matched somebody with somebody by upper and lower stress Put, the framework of steel reinforcement adds including first module component distributing bar, second unit component distributing bar, distributing bar and bottom Strengthening tendons, first module component distributing bar, second unit component distributing bar and bottom reinforcement weld to form unit member, will Several unit members weld the framework of steel reinforcement to form gool by distributing bar, the unit member of both ends distribution on framework of steel reinforcement Closeer, the unit member of intermediate distribution is sparse and uniform;
(4)Component pours required concrete, is poured into from mold bottom, is uniformly divided to both ends, then, with direct insertion vibrator Vibration, time of vibration 1~3 minute, after concrete discharges bubble, troweling is carried out to concrete surface in die slot;Close the lid Plate;
(5)Water channel prefabricated component after casting concrete conserves at the scene, and temperature is more than removable side mould after 500hC during maintenance, Temperature reaches removable internal model after 1500hC during watering maintenance, tears prefabricated component after internal model open and concentrates stacking, and temperature reaches 2000h during maintenance Can dispatch from the factory use during more than C.
Temperature is time × temperature when above-described, and the chronomere is hour, the temperature unit for degree Celsius, The time and temperature are positive integer.
Temperature is time × outdoor temperature when above-described, and the chronomere is hour, and time numerical value takes >=16 Positive integer, i.e. time add up and value >=16, time numerical value can use the numerical value such as 16,17,18,19,20,21,22,23,24;It is described Outdoor temperature unit for degree Celsius, outdoor temperature >=20 DEG C;Outdoor temperature is monitored in real time, it is every to carry out once every other hour Calculate, then all values are added up, in maintenance processes, the value of temperature is cumulative more than 500h DEG C when will be all, so that it may tears open Die cap plate, side wall mould, the end cap mould of mould;In maintenance processes of sprinkling water, the value of temperature is cumulative when will be all is more than 1500h DEG C, so that it may remove die cavity, prefabricated component concentrates stacking after form removal chamber;Continue to conserve, the value of temperature is tired out when will be all Value added to reach 2000h DEG C, prefabricated component can is dispatched from the factory use, during calculating, the numerical value in each stage, is not counted in the numerical value of next stage It is interior.
Its groove madial wall of above-described prefabricated component and bottom angle are 95 °~98 °, are connected using chamfered transition, chamfering Angle is 45 ° or 60 °.
Hole for hoist is equipped with above-described prefabricated component, hole for hoist provides many just for prefabricated component in Fast Installation Profit, can quick aligning installation site lifting, and can ensure prefabricated component lifting when in level;Ensure that lifting is pre- during according to lifting Product stress balance, hole for hoist set location is set as follows:Take docking that hole for hoist is set for strip prefabricated component; To corner prefabricated component, on the corner two sides is correspondingly arranged hole for hoist;Hole for hoist is set in branch to threeway prefabricated component, corresponding to this Hole for hoist is set on main road on hole for hoist is diagonal.
Docking groove described above plays certain positioning action to installation, is deposited between the prefabricated component that and can to dock two-by-two In certain gap, certain variable spacing is provided to prefabricated component when expanding with heat and contract with cold, prefabricated component service life can be protected, again Can ensure docking groove fill up after sealing, be not on docking groove cement mortar by drawing crack phenomenon, ensure output, avoid Unnecessary water resource waste.
Side through hole of the place provided with square small displacement, side through hole are between above-described water channel side leads to prefabricated component in the sidewall Interior narrow outer width shape.
Above-described concrete includes cement, coarse sand and limestone or granite, and the particle diameter of limestone or granite is 5 ~30mm, coarse sand particle diameter are 1~5mm, and cement, coarse sand and limestone or granite prepare the concrete using C20 labels, grading For 2 grades.
Purposes of the above-described water channel engineering system in terms of water conservancy construction, municipal drainage system or highway bridge and culvert.
The construction method that the system is taken comprises the following steps:
(1)Clear base unwrapping wire:The width that the Breadth Maximum taken more than prefabricated component is 20~30cm is as clear baseline, using pulverized limestone mark Know line;
(2)Excavated using excavator or manually in the region of pulverized limestone identification scribe, the rational stacking earthwork, and it is manually levelling Bottom, it is determined that the sideline of installation and Bottom Altitude;
(3)The prefabricated component of job site will be transported to, be lifted with excavator, the prefabricated component sling is put into foundation trench, is directed at side Line and Bottom Altitude is leveled up, then, remove suspension hook;
(4)After installation terminates, the site error of prefabricated component has been installed in amendment, reaches design requirement, and reinforcing prevents from deforming;
(5)With the docking groove of cement fine sand slurry filling prefabricated component joint, the weight ratio of cement and fine sand is 1:4~5, mortar with Hold it is agglomerating preferably;
(6)After mortar joint condenses, the space on backfill prefabricated component both sides, compacting, remaining earth material etc. is transported out of.
The protrusion substantive distinguishing features and significant progress that the present invention has relative to prior art:
1st, the present invention can make small-sized water channel meet that batch production is produced in enormous quantities, carry out mechanized construction at the construction field (site), compared with It is big to shorten the engineering construction duration, ensure construction quality.Its is firm in structure, and anti-extrusion deformation is strong, convenient disassembly, can repeat profit With Butt sealing is good, and appearance is neat, and streamline is attractive in appearance, and installation is quick, and it is convenient to remove.
2nd, construction efficiency can be greatly improved in the present invention, improve more than 7 times than common construction method, the construction period shorten to 80~90%.
3rd, materials needed for present invention production are few, can save cast-in-place concrete investment 12~35%, larger to reduce cost throwing Enter, great economic interests can be produced.
4th, the mould of production and application of the present invention, its making is simple and convenient, and assembling is quick, and process simplifies, and modulus, is convenient in demoulding Quickly;And the bar construction being equipped with component so that the structure of gool prefabricated component is firmer, and resistance to compression and tensile capacity increase By force;The principal rod and construction muscle that bar construction frame is set make whole gool structure stress reasonable, can resist external force and component is broken It is bad.
5th, the concrete coarse aggregate that uses of the present invention is for limestone or granite, and particle diameter is 5~30mm, coarse sand for 1~ 5mm, using the concrete of C20 labels, grading is 2 grades, to the less demanding of raw material, is adapted to wide geographic area to use.
6. framework of steel reinforcement design of the present invention is special, it can ensure that small-sized water channel is not easy seepage, it is sturdy and durable, compared with existing Water conservancy Channel Quality improve more than 4 times.
7th, precast concrete produced by the invention is provided with U-shaped docking groove in joint, and U-shaped abutment joint is formed after connection, Concrete is filled up in seam(Or impervious viscous and material), the loss of water-carrying capacity can be greatly reduced, substantially increases water use efficiency; Meanwhile this U-shaped abutment joint protects prefabricated component not to install the water channel of prefabricated component because cold and hot deform provides the variable space It is damaged.
8th, the water channel prefabricated component after casting concrete of the present invention conserves at the scene, after temperature is more than 500h DEG C during maintenance Removable side mould, removable die cavity after temperature is more than 1500h DEG C during watering maintenance, prefabricated component, which is concentrated, after form removal chamber stacks, and conserves Can dispatch from the factory use during more than Shi Wenda 2000h DEG C;This kind of maintenance method is taken, can reach accurate to water channel prefabricated component Maintenance, the quality of water channel prefabricated component is improved, strengthen the resistance to compression of water channel prefabricated component and tensile capacity;It can also save unnecessary artificial Input, the unnecessary waste of water is also avoided that, reduces production cost.
9th, reinforcement constitution of the present invention include second layer distributing bar, first layer distributing bar, reinforcement distributing bar and Longitudinal reinforcement, the second layer distributing bar, first layer distributing bar and reinforcement distributing bar connect and compose unit member, and first Second layer distributing bar is sandwiched in centre by layer distributing bar and reinforcement distributing bar, and several unit members are connected by longitudinal reinforcement It is connected into reinforcement constitution.This reinforcement constitution design is special, can ensure that water channel prefabricated component is sturdy and durable, pre- compared with existing water channel Parts quality improves more than several times, can be through under pressure indeformable.
Brief description of the drawings
Fig. 1 is the overlooking the structure diagram of a kind of water channel engineering system of the present invention and construction method;
Fig. 2 is the left view structural representation of a kind of water channel engineering system of the present invention and construction method;
Fig. 3 is the structural representation of water channel gool prefabricated component;
Fig. 4 is the structural representation of water channel corner prefabricated component;
Fig. 5 is the structural representation of water channel threeway prefabricated component;
Fig. 6 is that water channel is passed by one's way the structural representation of prefabricated component;
Fig. 7 is the structural representation that water channel side leads to prefabricated component;
Fig. 8 is the structural representation of water channel cover plate prefabricated component;
Fig. 9 is water channel gool prefabricated component, the logical prefabricated component in water channel side, the reinforcement constitution structural representation for prefabricated component of passing by one's way;
Figure 10 is the reinforcement constitution structural representation of water channel threeway prefabricated component;
Figure 11 is the reinforcement constitution structural representation of water channel corner prefabricated component;
Element title and serial number in figure:Water channel gool prefabricated component 1, water channel threeway prefabricated component 2, U-shaped docking groove 3, water channel corner Prefabricated component 4, water channel side lead to prefabricated component 5, water channel cover plate prefabricated component 6, and water channel is passed by one's way prefabricated component 7, side through hole 8, first module component Distributing bar 9, second unit component distributing bar 10, distributing bar 11, bottom reinforcement 12, hole for hoist 13, cover plate hangs round 14, supplementary angle 15.
Embodiment
With reference to embodiments of the invention, the present invention is described in more detail.
Referring to shown in Fig. 1~11, a kind of water channel engineering system and construction method, described water channel engineering system include water channel Gool prefabricated component 1, water channel threeway prefabricated component 2, docking groove 3, water channel corner prefabricated component 4, the logical prefabricated component 5 in water channel side, water channel are passed by one's way Prefabricated component 7 and water channel cover plate prefabricated component 6;Described water channel gool prefabricated component 1, threeway prefabricated component 2, water channel corner prefabricated component 4, water Canal side leads to prefabricated component 5, water channel is passed by one's way prefabricated component 7 and water channel cover plate prefabricated component 6 are attached according to canal system demand, form water channel work Journey system;Described water channel prefabricated component 7 of passing by one's way must carry out cooperatively forming small culvert of passing by one's way with water channel cover plate prefabricated component 6;Described Water channel prefabricated component 7 of passing by one's way is provided with supporting table, supporting table support water channel cover plate prefabricated component 6, the top surface of water channel cover plate prefabricated component 6 and water channel Prefabricated component 7 of passing by one's way flushes, to provide condition across road;And it is provided with docking groove 3 in each prefabricated component joint;And water channel cover plate is pre- Round 14 is fallen in the top of product 6 provided with cover plate, and cover plate falls round 14 and conveniently water channel cover plate prefabricated component 6 is installed or removed.
Described docking groove 3 takes the shape of the letter U located at the end face of water channel prefabricated component, referred to as U-shaped docking groove;When two water channel prefabricated components When port is docked, starched in U-shaped docking groove with cement fine sand and filled up docking groove 3, the outflow for reducing water reduces water Loss, makes full use of water resource, while also strengthen the globality of water channel engineering system.
Described water channel engineering system includes water channel gool prefabricated component 1, water channel threeway prefabricated component 2, docking groove 3, water channel and turned Angle prefabricated component 4, water channel side lead to that prefabricated component 5 and water channel pass by one's way its groove madial wall of prefabricated component 7 and bottom angle is 95 °~98 °, Connected using chamfered transition, chamfer angle is 45 ° or 60 °, and the chamfering is supplementary angle 15, the easy cleaning mud of supplementary angle 15, also can Prevent mud from excessively accumulating.
Described prefabricated component is poured by mould and formed with concrete parcel reinforcement frame, preform shape for it is upper it is bigger under Smaller inverted trapezoidal structure.
It is described pour Mold Making production processing step be:
(1)Make and be inverted and put with the mould needed for water channel prefabricated component same shape, mould, mold bottom upward, pours from bottom Build concrete;
(2)Uniformly sprayed on die inside(Apply)Upper mould oil(Agent)Or the upper plastic sheeting of pad;
(3)The framework of steel reinforcement made is inserted in and poured in mould, and adjusts the protective layer of concrete, described reinforcement frame Principal rod is configured according to the stressing conditions of trough rim, bottom land, trough rim is similarly configured by inside and outside stress, and bottom land is matched somebody with somebody by upper and lower stress Put, be characterized in:The reinforcing bar of configuration is resolved into the shape that can be processed, is then welded into a unit member i.e. first module Component distributing bar 9, the skeleton that each unit component is formed into gool with reinforcement welding is distributing bar 11, each unit structure on skeleton Part distribution is that 2, both ends unit member 9 is closeer, and temporary location component is that second unit component distributing bar 10 is sparse and equal It is even, increase reinforcement 12 in the bottom of each unit structure.Thus formed unit distributing bar two port distributions of component compared with It is close, it is middle relatively to dredge, the intensity of overall water channel prefabricated component is enhanced, can also improve the anti-extrusion ability of water channel prefabricated component, can be improved The flexural capacity of hole for hoist;
(4)Casement pipe is put into the preformed hole of die side plate, hole for hoist 13 is made, then pours required concrete, is mixed Solidifying soil pours into from mold bottom, is uniformly divided to both ends, then, is vibrated, time of vibration 1~3 minute, mixed with direct insertion vibrator After solidifying soil discharge bubble, troweling is carried out to die slot upper surface;Lifting hole(eyelet) mould pipe is removed in concrete initial set;
(5)Water channel prefabricated component after casting concrete conserves at the scene, and temperature reaches removable side mould after 500h.C during maintenance, sprinkles water Temperature reaches removable internal model after 1500h.C during maintenance, tears prefabricated component after internal model open and concentrates and stacks, when maintenance temperature reach 2000h.C with Can dispatch from the factory use when upper.
After cast in situs terminates, so that it may pair when be included in curing time, pour end be at 11 points at noon, i.e., opened for 11 points from noon Beginning timing;Period takes at 11 points at noon, and to 21 points at night, totally 10 hours, outdoor temperature are 30 DEG C, when temperature for 10 × 30= 300h·℃;21 points to 9 points of morning next day at night, totally 12 hours, when temperature be 12 × 28=336h DEG C;Two periods Numerical value is added, and as 300+336=636h DEG C is more than 500h DEG C, can remove the die cap plate, side wall mould, end cap mould of mould.
Watering maintenance, from 10 points of morning to 21 points at night, outdoor temperature is 30 DEG C, when temperature be 11 × 30=330h DEG C; 21 points to 9 points of morning at night, and outdoor temperature is 28 DEG C, when temperature be 12 × 28=336h DEG C;9 points to 21 points of morning, outdoor temp Spend for 32 DEG C, when temperature be 12 × 32=384h DEG C;21 points to 9 points of morning at night, and outdoor temperature is 30 DEG C, when temperature be 12 ×30=360h·℃;9 points to 14 points of morning, outdoor temperature be 31 DEG C, when temperature be 5 × 31=155h DEG C;By the stage Numerical value adds up, and as 330+336+384+360+155=1565 are more than 1500h DEG C, you can removes die cavity, prefabricated component is hung Die cavity, carry out stacking maintenance.
Continuing to conserve, the value accumulated value of temperature reaches 2000h DEG C when will be all, from 14 points to 21 points at night of afternoon, Outdoor temperature be 31 DEG C, when temperature be 7 × 31=217h DEG C;21 points to 9 points of morning at night, and outdoor temperature is 29 DEG C, Shi Wen For 12 × 29=348h DEG C;9 points to 21 points of morning, outdoor temperature be 32 DEG C, when temperature be 12 × 32=384h DEG C;At night 21 For point to 9 points of morning, outdoor temperature is 30 DEG C, when temperature be 12 × 30=360h DEG C;9 points to 21 points of morning, outdoor temperature 33 DEG C, when temperature be 12 × 33=396h DEG C;21 points to 9 points of morning at night, and outdoor temperature is 30 DEG C, when temperature for 12 × 30= 360h·℃;The numerical value in the stage is added up, as 217+348+384+360+396+360=2065 reach 2000h DEG C with On, illustrate the standard for having met maintenance, can dispatch from the factory use.
Side through hole 8 of the place provided with square small displacement, side through hole 8 are between described water channel side leads to prefabricated component 5 in the sidewall Interior narrow outer width shape, outside dimension are more than the cm of inside dimension 2.The upper end line connection at the position lower ending opening of the side through hole and supplementary angle, on End is less than the cm of cell wall top 12~15;The mold thickness of side through hole is smaller 1cm than the thickness of cell wall, i.e., in mold releasability backside via 8 Do not communicated with the cross-section of river of gool, beaten~led to small as needed in the utilization of reality.
Described its both ends of prefabricated component set two holes for hoist 13 respectively, diagonally arranged.It is single that hole for hoist is located at end first On the position of second unit member distributing bar 10 of first component distributing bar 9, in the bottom of distributing bar 11.
Described concrete includes cement, coarse sand and limestone or granite, the particle diameter of limestone or granite for 5~ 30mm, coarse sand particle diameter are 1~5mm, and cement, coarse sand and limestone or granite prepare the concrete using C20 labels, and grading is 2 grades.
Described unit member distributing bar is by 1 larger U-shaped muscle and 1 less U-shaped muscle and 1 shorter U The superposition of shape muscle is welded.There is crotch at the top of larger U-shaped muscle, be overlapped on less U-shaped muscle and weld, shorter U-shaped Muscle bottom reinforcement 12 is welded on the U-shaped bottom being superimposed.
Taken construction method comprises the following steps:
(1)Clear base unwrapping wire:The width that the Breadth Maximum taken more than prefabricated component is 20~30cm is as clear baseline, using pulverized limestone mark Know line;
(2)Excavated using excavator or manually in the region of pulverized limestone identification scribe, the rational stacking earthwork, and it is manually levelling Bottom, it is determined that the sideline of installation and Bottom Altitude;
(3)The prefabricated component of job site will be transported to, be lifted with excavator, the prefabricated component sling is put into foundation trench, is directed at side Line and Bottom Altitude is leveled up, then, remove suspension hook;
(4)After installation terminates, the site error of prefabricated component has been installed in amendment, reaches design requirement, and reinforcing prevents from deforming;
(5)With the U-shaped docking groove of cement fine sand slurry filling prefabricated component joint, the weight ratio of cement and fine sand is 1:4~5, sand Slurry with hold it is agglomerating preferably;
(6)After mortar joint condenses, the space on backfill prefabricated component both sides, compacting, remaining earth material etc. is transported out of.

Claims (10)

  1. A kind of 1. water channel engineering system, it is characterised in that:Described water channel engineering system includes water channel gool prefabricated component(1), water Canal threeway prefabricated component(2), water channel corner prefabricated component(4), water channel side lead to prefabricated component(5)Passed by one's way prefabricated component with water channel(7);The water Canal is passed by one's way prefabricated component(7)Preparation is provided with water channel cover plate prefabricated component(6);Docking groove is equipped with each prefabricated component end face(3); By the water channel gool prefabricated component(1), water channel threeway prefabricated component(2), water channel corner prefabricated component(4), water channel side lead to prefabricated component(5) Passed by one's way prefabricated component with water channel(7)Corresponding connection is carried out according to water channel system design considerations, connects and composes water channel engineering system.
  2. 2. water channel engineering system according to claim 1, it is characterised in that:Described prefabricated component is framework of steel reinforcement and coagulation Soil is formed, and described framework of steel reinforcement is wrapped up by concrete.
  3. 3. water channel engineering system according to claim 1, it is characterised in that:Described prefabricated component in mould by pouring Shaping is made after concrete, the cross-section of river is shaped as inverted trapezoidal structure in obtained prefabricated component groove.
  4. 4. water channel engineering system according to claim 1, it is characterised in that:The processing step of described preform production For:
    (1)Making and the mould needed for water channel prefabricated component same shape, mould is inverted and put, from bottom casting concrete;
    (2)On die inside on even application mould oil or pad on plastic sheeting;
    (3)The framework of steel reinforcement made is inserted in and poured in mould, and adjusts the protective layer of concrete, described framework of steel reinforcement Principal rod is configured according to the stressing conditions of trough rim, bottom land, trough rim is similarly configured by inside and outside stress, and bottom land is matched somebody with somebody by upper and lower stress Put, the framework of steel reinforcement includes first module component distributing bar 9, second unit component distributing bar 10, the and of distributing bar 11 Bottom reinforcement 12, first module component distributing bar 9, second unit component distributing bar 10 and bottom reinforcement 12 weld shape Into unit member, several unit members are welded to the framework of steel reinforcement to form gool by distributing bar, both ends on framework of steel reinforcement The unit member of distribution is closeer, and the unit member of intermediate distribution is sparse and uniform;
    (4)Component pours required concrete, is poured into from mold bottom, is uniformly divided to both ends, then, with direct insertion vibrator Vibration, time of vibration 1~3 minute, after concrete discharges bubble, troweling is carried out to concrete surface in die slot;Close the lid Plate;
    (5)Water channel prefabricated component after casting concrete conserves at the scene, and temperature is more than removable side mould after 500hC during maintenance, Temperature reaches removable internal model after 1500hC during watering maintenance, tears prefabricated component after internal model open and concentrates stacking, and temperature reaches 2000h during maintenance Can dispatch from the factory use during more than C.
  5. 5. water channel engineering system according to claim 1, it is characterised in that:Described when temperature is time × outdoor temp Degree, the chronomere be hour, and time numerical value takes >=16 positive integer, and the outdoor temperature unit is degree Celsius outdoor temp >=20 DEG C of degree;The outdoor temperature takes positive integer.
  6. 6. water channel engineering system according to claim 1, it is characterised in that:Its groove madial wall of described prefabricated component and bottom Angle is 95 °~98 °, is connected using chamfered transition, and chamfer angle is 45 ° or 60 °.
  7. 7. water channel engineering system according to claim 1, it is characterised in that:Hole for hoist is equipped with described prefabricated component (13).
  8. 8. water channel engineering system according to claim 1, it is characterised in that:Described water channel side leads to prefabricated component(5)In side Wall middle is provided with the side through hole of square small displacement(8), side through hole(8)In interior narrow outer width shape.
  9. 9. water channel engineering system according to claim 4, it is characterised in that:Described concrete include cement, coarse sand and The particle diameter of limestone or granite, limestone or granite is 5~30mm, and coarse sand particle diameter is 1~5mm, cement, coarse sand and lime Rock or granite prepare the concrete using C20 labels, and grading is 2 grades.
  10. 10. the water channel engineering system according to claim, it is characterised in that:The construction method that the system is taken include with Lower step:
    (1)Clear base unwrapping wire:The width that the Breadth Maximum taken more than prefabricated component is 20~30cm is as clear baseline, using pulverized limestone mark Know line;
    (2)Excavated using excavator or manually in the region of pulverized limestone identification scribe, the rational stacking earthwork, and it is manually levelling Bottom, it is determined that the sideline of installation and Bottom Altitude;
    (3)The prefabricated component of job site will be transported to, be lifted with excavator, the prefabricated component sling is put into foundation trench, is directed at side Line and Bottom Altitude is leveled up, then, remove suspension hook;
    (4)After installation terminates, the site error of prefabricated component has been installed in amendment, reaches design requirement, and reinforcing prevents from deforming;
    (5)With the docking groove of cement fine sand slurry filling prefabricated component joint, the weight ratio of cement and fine sand is 1:4~5, mortar with Hold it is agglomerating preferably;
    (6)After mortar joint condenses, the space on backfill prefabricated component both sides, compacting, remaining earth material etc. is transported out of.
CN201710726561.3A 2017-08-22 2017-08-22 Canal engineering system and construction method Active CN107471424B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710726561.3A CN107471424B (en) 2017-08-22 2017-08-22 Canal engineering system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710726561.3A CN107471424B (en) 2017-08-22 2017-08-22 Canal engineering system and construction method

Publications (2)

Publication Number Publication Date
CN107471424A true CN107471424A (en) 2017-12-15
CN107471424B CN107471424B (en) 2024-03-22

Family

ID=60601911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710726561.3A Active CN107471424B (en) 2017-08-22 2017-08-22 Canal engineering system and construction method

Country Status (1)

Country Link
CN (1) CN107471424B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111691366A (en) * 2020-06-29 2020-09-22 张磊 Farmland hydraulic engineering's rapid Assembly formula ditch
CN114790723A (en) * 2021-01-26 2022-07-26 湖南省水利水电科学研究院 High-strength high-flow-rate reinforced concrete channel and installation method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2372369Y (en) * 1998-12-10 2000-04-05 梁书琴 Water flow control device for saving water and irrigating channel for paddy field
EA200101065A1 (en) * 2001-08-07 2002-06-27 Александр Юрьевич Баскаков FORM FOR CASTING OF FIGURED PRODUCTS FROM A CONCRETE MIXTURE AND A METHOD OF MANUFACTURING ELEMENTS OF A DRAINAGE SYSTEM WITH ITS USE
CN1802335A (en) * 2003-01-15 2006-07-12 联邦科学和工业研究组织 Cement products
CN101446082A (en) * 2008-12-25 2009-06-03 西北农林科技大学 Construction method for building anti-seepage channel by using soil curing agent
KR200444942Y1 (en) * 2008-11-17 2009-06-17 이경선 Watercourse for Agriculture
CN201943048U (en) * 2011-01-23 2011-08-24 刘爱民 Socket joint type ditch precast concrete component
CN103938582A (en) * 2014-05-09 2014-07-23 郝春亮 Combined-type paddy field cofferdam ridge
CN105818266A (en) * 2015-01-09 2016-08-03 四川华西绿舍建材有限公司 Channel plate mold and method for manufacturing channel plate by means of channel plate mold
CN106007593A (en) * 2016-05-25 2016-10-12 象州县科学技术局 Method for producing concrete channel prefabricated part from mineral slag
CN106087908A (en) * 2016-06-17 2016-11-09 新疆金土地水泥制品有限公司 Assembled channel precast segment
CN205934857U (en) * 2016-08-11 2017-02-08 张铁耀 Glass molten steel canal adaptor
CN106677132A (en) * 2017-01-16 2017-05-17 山东省水利科学研究院 Shape fixing channel and field all-angle seamless connection method thereof

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2372369Y (en) * 1998-12-10 2000-04-05 梁书琴 Water flow control device for saving water and irrigating channel for paddy field
EA200101065A1 (en) * 2001-08-07 2002-06-27 Александр Юрьевич Баскаков FORM FOR CASTING OF FIGURED PRODUCTS FROM A CONCRETE MIXTURE AND A METHOD OF MANUFACTURING ELEMENTS OF A DRAINAGE SYSTEM WITH ITS USE
CN1802335A (en) * 2003-01-15 2006-07-12 联邦科学和工业研究组织 Cement products
KR200444942Y1 (en) * 2008-11-17 2009-06-17 이경선 Watercourse for Agriculture
CN101446082A (en) * 2008-12-25 2009-06-03 西北农林科技大学 Construction method for building anti-seepage channel by using soil curing agent
CN201943048U (en) * 2011-01-23 2011-08-24 刘爱民 Socket joint type ditch precast concrete component
CN103938582A (en) * 2014-05-09 2014-07-23 郝春亮 Combined-type paddy field cofferdam ridge
CN105818266A (en) * 2015-01-09 2016-08-03 四川华西绿舍建材有限公司 Channel plate mold and method for manufacturing channel plate by means of channel plate mold
CN106007593A (en) * 2016-05-25 2016-10-12 象州县科学技术局 Method for producing concrete channel prefabricated part from mineral slag
CN106087908A (en) * 2016-06-17 2016-11-09 新疆金土地水泥制品有限公司 Assembled channel precast segment
CN205934857U (en) * 2016-08-11 2017-02-08 张铁耀 Glass molten steel canal adaptor
CN106677132A (en) * 2017-01-16 2017-05-17 山东省水利科学研究院 Shape fixing channel and field all-angle seamless connection method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111691366A (en) * 2020-06-29 2020-09-22 张磊 Farmland hydraulic engineering's rapid Assembly formula ditch
CN111691366B (en) * 2020-06-29 2022-08-19 萧县威辰机电工程设备有限公司 Farmland hydraulic engineering's rapid Assembly formula ditch
CN114790723A (en) * 2021-01-26 2022-07-26 湖南省水利水电科学研究院 High-strength high-flow-rate reinforced concrete channel and installation method

Also Published As

Publication number Publication date
CN107471424B (en) 2024-03-22

Similar Documents

Publication Publication Date Title
CN105201012B (en) Casting cable trench after assembly of L-shaped precast concrete and construction method of casting cable trench
CN207327274U (en) A kind of water channel engineering system
CN206844275U (en) Mutual buckle type precast concrete cover ditch and its suspender
CN107486940A (en) A kind of water channel is passed by one&#39;s way the production method of prefabricated component
CN107471424A (en) A kind of water channel engineering system and construction method
CN106400838B (en) A kind of city integrated Pipe rack of prefabricated assembled concrete and construction method
CN107443548A (en) A kind of production method of water channel gool prefabricated component
CN206308707U (en) A kind of city integrated Pipe rack of prefabricated assembled concrete
CN107471404A (en) A kind of water channel gool side leads to the production method of prefabricated component
CN109811613B (en) Temporary ground facility and integrated construction method thereof
CN205116220U (en) Pour cable pit after assembly of L type precast concrete spare
CN206859370U (en) Plastic rectangular straight line municipal drainage inspection shaft
CN207310188U (en) A kind of water channel gool prefabricated-member mould
CN207310186U (en) A kind of water channel gool side leads to prefabricated-member mould
CN101994328B (en) Method for making counterweight for excavator
CN115387393A (en) Post-cast strip pre-sealing quick construction method
CN107471425A (en) A kind of production method of water channel threeway prefabricated component
CN212129204U (en) Precast pier foundation of slip casting type recycled concrete
CN207904936U (en) Hinge type ecological revetment block
CN207327245U (en) A kind of water channel is passed by one&#39;s way prefabricated-member mould
CN208280156U (en) The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit
CN107443567A (en) A kind of production method of retaining wall prefabricated component
CN207616874U (en) A kind of water channel corner prefabricated-member mould
CN111236170A (en) Quick construction method for buried rock concrete gravity dam
CN207616875U (en) A kind of retaining wall prefabricated-member mould

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant