CN208280156U - The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit - Google Patents

The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit Download PDF

Info

Publication number
CN208280156U
CN208280156U CN201820462526.5U CN201820462526U CN208280156U CN 208280156 U CN208280156 U CN 208280156U CN 201820462526 U CN201820462526 U CN 201820462526U CN 208280156 U CN208280156 U CN 208280156U
Authority
CN
China
Prior art keywords
pile
framing
iron case
template
pile framing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820462526.5U
Other languages
Chinese (zh)
Inventor
矫贵峰
周波
黄端
邵丽丽
顾锦博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU NANTONG SANJIAN CONSTRUCTION GROUP Co.,Ltd.
Kangboda Construction Technology Group Co.,Ltd.
Original Assignee
Kang Boda Energy Technology Co Ltd
Jiangsu Nantong Three Construction Group Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kang Boda Energy Technology Co Ltd, Jiangsu Nantong Three Construction Group Ltd By Share Ltd filed Critical Kang Boda Energy Technology Co Ltd
Priority to CN201820462526.5U priority Critical patent/CN208280156U/en
Application granted granted Critical
Publication of CN208280156U publication Critical patent/CN208280156U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The non-fully pile foundation cushion cap under precipitation state, including pile framing iron case template and pile foundation (8), set up defences on the inside of pile framing iron case template water layer and protective layer (7) inside a kind of foundation pit;Cushion cap lower part concrete (23) is set in the pile framing iron case template, and pile framing top and attached underplate concrete (25) are set on cushion cap lower part concrete (23).The utility model is simple and reasonable, strong operability, easy for construction, can thoroughly prevent pile foundation cushion cap position and leak, while can save a large amount of base pit dewatering cost.

Description

The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit
Technical field
The utility model relates to building fields, and in particular to the pile foundation inside a kind of foundation pit non-fully under precipitation state is held Platform and production method.
Background technique
For building in the building of Thief zone coefficient soil layer for closing on river, river, lake, extra large position, in foundation pit Underground water directly fed by river, river water, lake water or the seawater closed on.When foundation soil is sandstone, the contour infiltration of gravel When soil layer, the speed for carrying out dewatering construction using the conventional measures such as deep-well or comprehensive precipitation pipe network that catchment is much too late to close on water source The speed of the recharge of ground water can not or be difficult underground water a large amount of in foundation pit being down to foundation pit bottom surface or less completely;Simultaneously as The foundation pit bottom absolute altitude of pile framing is usually less than the bottom surface absolute altitude of sole plate, and underground water can be from sole plate lower part when dewatering construction Permeable ground largely pours into pile framing foundation pit (e.g., foundation pit of elevator shaft), and the pile framing foundation pit in deep part is caused to locate for a long time Among the immersion of water, it can not or be difficult water to be reduced to pile framing foundation pit below ground and guarantee to be in inside pile framing foundation pit It is long-term it is anhydrous can Construction State.Adverse effect is brought to the construction of foundation engineering, has seriously lagged applying for foundation engineering Work progress, is substantially increased the precipitation expense investment of foundation pit, while bringing to pile foundation cushion cap position and greatly leaking Hidden danger.
Utility model content
In order to solve the above technical problems, the utility model provides inside a kind of foundation pit the pile foundation under non-fully precipitation state Plinth cushion cap, including pile framing iron case template and pile foundation, the pile framing iron case are located on blinding concrete;The pile framing iron Case template includes pile framing iron case side wall template and the pile framing iron case bottom plate being attached thereto, in each pile framing iron case side Along suspension hook is set on wall form, pile crown reserved opening side wall template, pile framing iron bottom plate are set in pile framing iron case bottom plate Peg is uniformly distributed on the bottom surface of template, the inner surface of pile crown reserved opening side wall template sets steel plate waterstop strip;In pile framing It sets up defences on the inside of iron case template water layer and protective layer;Pile crown anchor bar is set in the pile foundation, in pile framing iron bottom template die Pile framing bottom reinforcement bars are set on the inside of plate, set pile framing side wall reinforcing bar, pile framing bottom reinforcement bars on the inside of pile framing iron case side wall template On set pile crown reinforcement mesh reinforcing bar;At the middle part in pile framing iron case form height direction, if distributing bar in the middle part of pile framing, described Cushion cap lower part concrete is set in pile framing iron case template;At the top in pile framing iron case form height direction, if pile framing top And attached baseplate reinforcing bar, pile framing top and attached underplate concrete are set on the concrete of the cushion cap lower part.
Further, the suspension hook quantity in each pile framing iron case side wall template is no less than 1, two opposite pile framings Lift hook position in iron case side wall template is symmetrical.
Further, pile foundation is blocked with pile framing iron case template using pile crown water-tight concrete closely knit and anti-in pile crown It seeps and sets pile crown waterproof on concrete.
Further, pile framing iron case template material is steel plate.
Further, the spacing 300-500mm of peg and peg.
Further, the gap width between pile crown reserved opening side wall template and pile foundation is no less than 200mm.
Further, blinding concrete uses underwater casting, settlement reservation 10-20mm.
The utility model is directed to the Thief zone coefficient soil layer for closing on river, river, lake, extra large position, in pile framing foundation pit It is difficult or precipitation and can not keeps in foundation pit long-term completely and anhydrous can provide a kind of in non-fully precipitation shape under execution conditions Pile framing construction technology under state.Simple and reasonable, strong operability, easy for construction, speed of application is fast, can thoroughly prevent Pile foundation cushion cap position leaks;A large amount of base pit dewatering cost can be saved simultaneously, and remarkable in economical benefits is worth It is widely popularized.
Detailed description of the invention
Fig. 1 is the utility model top view.
Fig. 2 is the utility model pile crown and reserved opening formwork gap position casting concrete structural schematic diagram.
Fig. 3 is the structural schematic diagram that the utility model construction is completed.
In figure, 1. pile framing iron case side wall templates, 2. suspension hooks, 3. pile framing iron case bottom plates, 4. pile crown reserved openings Side wall template, 5. pegs, 6. steel plate waterstop strips, 7. waterproof layers and protective layer, 8. pile foundations, 9. pile crown anchor bars, 10. bed courses Concrete, 11. foundation pits, 12. pile crown water-tight concretes, 13. section steel beams, 14. socket reinforcing bar, 15. backfills, and 16. pile framings are attached Belong to waterproof bottom cushion, 17. pile crown waterproofs, 18. pile framing bottom reinforcement bars, 19. pile framing side wall reinforcing bars, 20. pile crown reinforcing mats Piece reinforcing bar, 21. column wall joint bars, distributing bar in the middle part of 22. pile framings, 23. cushion cap lower part concrete, 24. pile framing tops and attached Belong to baseplate reinforcing bar, 25. pile framing tops and attached underplate concrete.
Specific embodiment
The non-fully pile foundation cushion cap under precipitation state, including pile framing iron case template and pile foundation 8 inside a kind of foundation pit, The pile framing iron case is located on blinding concrete 10.Blinding concrete 10 uses underwater casting, slightly above designed elevation 10- After avoiding pile framing iron case template in place, the reduction of bed course absolute altitude is made because being squeezed by 20mm.Pile framing iron case template and pile foundation 8 are blocked closely knit using pile crown water-tight concretes 12, and are set pile crown waterproof 17 on pile crown water-tight concrete 12, are effectively prevent seeping Water.The pile framing iron case template includes pile framing iron case side wall template 1 and the pile framing iron case bottom plate 3 being attached thereto, Iron case side wall template and iron bottom template die plate matter are steel plate.Edge sets suspension hook 2 in each pile framing iron case side wall template 1, Suspension hook quantity in each iron case side wall template is no less than 1,2 positional symmetry of suspension hook in opposite two iron case side wall templates 1, Sling pile framing iron case template steadily.Pile crown reserved opening side wall template 4 is set in pile framing iron case bottom plate 3. The bottom of pile framing iron case bottom plate 3 is uniformly distributed peg 5, and 5 diameter of peg is 8-12mm, length 80-100mm, peg Spacing 300-500mm, pile framing iron case template is tightly bonded together with blinding concrete 10.Pile crown reserved opening side 4 inside of wall form, half high-order bit sets continuous closed doughnut-shaped steel plate sealing piece 6, and 6 thickness of steel plate waterstop strip is not less than 5mm, width Not less than 50mm.Gap position between pile crown reserved opening side wall template 4 and pile foundation 8, gap width are no less than 200mm, The gap position uses the concrete higher than one seepage-resistant grade of pile framing concrete, is poured under water to pile crown reserved opening side 4 upper surface vibration compacting of wall form simultaneously smoothes out, and connect pile foundation 8 effectively with pile framing iron case impermeable.In pile framing iron case It sets up defences on the inside of template water layer and protective layer 7.Pile crown anchor bar 9 is set in the pile foundation 8, in pile framing iron case bottom plate 3 On set pile framing bottom reinforcement bars 18, and set column wall joint bar 21, pile framing iron in pile framing iron case bottom plate 3 by design requirement Pile framing side wall reinforcing bar 19 is set in case side wall template 1, pile framing bottom reinforcement bars 18 are after encountering pile crown reserved opening side wall template 4 It is folded upward at an anchorage length, pile crown reinforcement mesh reinforcing bar 20 is set on the reinforcing bar after this bending, in pile framing iron case template The middle part level of short transverse sets distributing bar 22 in the middle part of pile framing.Casting concrete in two times in pile framing iron case template, Pile framing iron case template installs fixed after-pouring cushion cap lower part concrete (23), then in pile framing iron case form height direction Top is horizontally disposed with pile framing top and attached baseplate reinforcing bar 24, then carries out pile framing top and attached underplate concrete 25 It pours.
The non-fully pile foundation cushion cap production method under precipitation state inside a kind of foundation pit, includes the following steps:
1) pile framing iron case template construct: steel plate and steel welding pile extension cushion cap iron case template are used, in pile framing iron case mould Waterproof layer is carried out on the inside of plate and protective layer 7 is constructed.
2) concrete placed under water: pouring blinding concrete 10 under water and smooth out, and the upper surface of blinding concrete 10 is high In designed elevation 10-20mm, the settling amount of pile framing iron case is reserved.
3) pile framing iron case template is arranged: before 10 initial set of blinding concrete, lifting pile framing iron case template is in place, by setting Meter requires position and the absolute altitude of adjustment pile framing iron case template.
4) pour bottom reserved opening: the gap position between pile foundation 8 and pile crown reserved opening side wall template 4 is adopted Be higher than one seepage-resistant grade of pile framing concrete pile crown water-tight concrete 12, pour under water to pile crown reserved opening side Along flushing on wall form 4, with vibrator vibration compacting and smooth out.
5) fixed section steel beam: along section steel beam 13 is placed in pile framing iron case template, by socketing reinforcing bar 14, section steel beam 13 Pile framing iron case template is connected and fixed with pile foundation 8 with pile crown anchor bar 9.
6) waterproof and reinforcing bar binding construction: in the foundation pit 11 on the outside of pile framing iron case template, backfill 15 is successively used It carries out foundation pit backfill and the attached waterproof bottom cushion 16 of pile framing is constructed;Using pumping equipment, it is discharged in pile framing iron case template After the water in portion, carry out pile crown waterproof 17 and construct, and on the inside of pile framing iron case template waterproof layer and the construction of protective layer 7 to waterproof 16 position of bottom cushion;Then pile framing bottom reinforcement bars 18, pile framing side wall reinforcing bar 19, pile crown reinforcement mesh reinforcing bar are successively carried out 20, the binding construction of column wall joint bar 21 and pile framing middle part distributing bar 22;Pile framing bottom reinforcement bars 18 arrive the level of pile foundation 8 An anchorage length truncation is folded upward at behind position.
7) it pours cushion cap lower part concrete: pouring cushion cap lower part concrete 23 in pile framing iron case template, wherein cushion cap The gravity of lower part concrete 23 is greater than the buoyancy of cushion cap iron case.Then the 23 surface dabbing of concrete in cushion cap lower part is removed and is socketed Reinforcing bar 14 and the section steel beam 13 for being placed in pile framing iron case template top bind pile framing top and attached baseplate reinforcing bar 24.
8) it pours cushion cap top concrete: pouring pile framing top and attached underplate concrete 25, be finally completed pile foundation Bearing platform construction.

Claims (7)

1. the non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit, it is characterised in that: including pile framing iron case template With pile foundation (8), the pile framing iron case is located on blinding concrete (10);The pile framing iron case template includes pile framing iron Case side wall template (1) and the pile framing iron case bottom plate (3) being attached thereto, on each pile framing iron case side wall template (1) Along suspension hook (2) are set, pile crown reserved opening side wall template (4), pile framing iron bottom plate are set in pile framing iron case bottom plate (3) It is uniformly distributed on the bottom surface of template (3) peg (5), the inner surface of pile crown reserved opening side wall template (4) sets steel plate waterstop strip (6);It sets up defences on the inside of pile framing iron case template water layer and protective layer (7);Pile crown anchor bar is set on the pile foundation (8) (9), it is set pile framing bottom reinforcement bars (18) on the inside of pile framing iron case bottom plate (3), on the inside of pile framing iron case side wall template (1) If pile framing side wall reinforcing bar (19), pile crown reinforcement mesh reinforcing bar (20) is set on pile framing bottom reinforcement bars (18);In pile framing iron case It is mixed to set cushion cap lower part if distributing bar (22) in the middle part of pile framing, in the pile framing iron case template for the middle part in form height direction Solidifying soil (23);At the top in pile framing iron case form height direction, if pile framing top and attached baseplate reinforcing bar (24), described to hold Pile framing top and attached underplate concrete (25) are set on platform lower part concrete (23).
2. pile foundation cushion cap described in accordance with the claim 1, it is characterised in that: each pile framing iron case side wall template (1) On suspension hook (2) quantity be no less than 1, suspension hook (2) positional symmetry on two opposite pile framing iron case side wall templates (1).
3. pile foundation cushion cap described in accordance with the claim 1, it is characterised in that: the pile foundation (8) and pile framing iron case template It is closely knit using pile crown water-tight concrete (12) closure, and pile crown waterproof (17) are set on pile crown water-tight concrete (12).
4. pile foundation cushion cap described in accordance with the claim 1, it is characterised in that: the pile framing iron case template material is steel plate.
5. pile foundation cushion cap described in accordance with the claim 1, it is characterised in that: the spacing of the peg (5) is 300-500mm.
6. pile foundation cushion cap described in accordance with the claim 1, it is characterised in that: the pile crown reserved opening side wall template (4) with Gap width between pile foundation (8) is no less than 200mm.
7. pile foundation cushion cap described in accordance with the claim 1, it is characterised in that: the blinding concrete (10) uses and pours under water It builds, settlement reservation 10-20mm.
CN201820462526.5U 2018-04-03 2018-04-03 The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit Active CN208280156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820462526.5U CN208280156U (en) 2018-04-03 2018-04-03 The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820462526.5U CN208280156U (en) 2018-04-03 2018-04-03 The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit

Publications (1)

Publication Number Publication Date
CN208280156U true CN208280156U (en) 2018-12-25

Family

ID=64750440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820462526.5U Active CN208280156U (en) 2018-04-03 2018-04-03 The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit

Country Status (1)

Country Link
CN (1) CN208280156U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396761A (en) * 2018-04-03 2018-08-14 江苏南通三建集团股份有限公司 The non-fully pile foundation cushion cap and production method under precipitation state inside a kind of foundation pit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396761A (en) * 2018-04-03 2018-08-14 江苏南通三建集团股份有限公司 The non-fully pile foundation cushion cap and production method under precipitation state inside a kind of foundation pit

Similar Documents

Publication Publication Date Title
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN100412275C (en) Waterproof and plugging construction method for precipitation well in foundation pit
CN103741714B (en) Full-cover excavation top-down construction method for underground engineering
CN106320377B (en) A kind of rich water soft clay area deep basal pit covered back-digging construction method
CN205242419U (en) Steel sheet caisson of usefulness that secretly blocks water
CN107059903A (en) Bottom plate plugging dewatering well construction method is worn in foundation ditch
CN207512745U (en) A kind of caisson device and its foundation pit structure
CN108396761A (en) The non-fully pile foundation cushion cap and production method under precipitation state inside a kind of foundation pit
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
CN104358275B (en) Darker elevator shaft or collecting well construction method
CN109235493A (en) Basement beam slab is backbreak and short formwork construction method in a kind of contrary sequence method
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN113174958A (en) Construction method for foundation pit of adjacent road under poor ground condition
CN112878332A (en) Basement elevator shaft sump construction structure and method thereof
CN109706952A (en) Large-scale well-sinking construction method
CN102235007B (en) Method for supporting deep foundation with upper nail-lower pile combination
CN105484277A (en) Component for tubular well precipitation construction in elevator foundation pit or sump and construction method
CN108035379A (en) A kind of pipe gallery and its construction method
CN103215950B (en) Pile foundation extension construction method in backfilling area
CN203160254U (en) Pit support structure
CN205205844U (en) Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN208280156U (en) The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit
CN207109804U (en) A kind of quick spreading structure configuration of soft soil foundation bored concrete pile
CN109653223A (en) River anti-floating weighting board construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 226100 No.588, Hong Kong Road, Haimen Economic and Technological Development Zone, Nantong City, Jiangsu Province

Patentee after: JIANGSU NANTONG SANJIAN CONSTRUCTION GROUP Co.,Ltd.

Patentee after: Kangboda Construction Technology Group Co.,Ltd.

Address before: No. 131, Haiman City, Jiangsu Province, Haimen City, Jiangsu

Patentee before: JIANGSU NANTONG SANJIAN CONSTRUCTION GROUP Co.,Ltd.

Patentee before: KANGBODA ENERGY SAVING TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address
PP01 Preservation of patent right

Effective date of registration: 20221101

Granted publication date: 20181225

PP01 Preservation of patent right