CN110144907A - Discarded pit reclamation method based on architecture sediment filling engineering - Google Patents

Discarded pit reclamation method based on architecture sediment filling engineering Download PDF

Info

Publication number
CN110144907A
CN110144907A CN201910406322.9A CN201910406322A CN110144907A CN 110144907 A CN110144907 A CN 110144907A CN 201910406322 A CN201910406322 A CN 201910406322A CN 110144907 A CN110144907 A CN 110144907A
Authority
CN
China
Prior art keywords
pit
architecture sediment
blowing
air
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910406322.9A
Other languages
Chinese (zh)
Other versions
CN110144907B (en
Inventor
杨策
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Lvnong Ecological Environment Co ltd
Original Assignee
Hangzhou Lunong Environmental Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Lunong Environmental Engineering Co Ltd filed Critical Hangzhou Lunong Environmental Engineering Co Ltd
Priority to CN202010181271.7A priority Critical patent/CN111236207B/en
Priority to CN201910406322.9A priority patent/CN110144907B/en
Publication of CN110144907A publication Critical patent/CN110144907A/en
Application granted granted Critical
Publication of CN110144907B publication Critical patent/CN110144907B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0084Production methods for working underwater using pneumatical means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/0023Slurry
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0045Composites

Abstract

This application discloses the discarded pit reclamation methods based on architecture sediment filling engineering, include the following steps: S1: hard pipe being protruded into the hole bottom in pit, and passes through the pipe constantly air-blowing into pit;S2: while through the pipe air-blowing into pit on one side, toppling over architecture sediment into pit on one side, stops toppling over architecture sediment when the moisture content of the sludge in pit is down to 60%;S3: further into sludge, air-blowing stops air-blowing after the moisture content of sludge is down to 30%;S4: pouring into the broken foam of stalk, fruits and vegetables residue and feces of livestock and poultry into sludge, and makes to maintain the 240h~280h that ferments at 25 DEG C~40 DEG C of three's temperature;S5: soil is toppled in the top of fermentation residue.

Description

Discarded pit reclamation method based on architecture sediment filling engineering
Technical field
The present invention relates to pit reparative regeneration field more particularly to a kind of discarded pits based on architecture sediment filling engineering Reclamation method.
Background technique
In recent years as the sharp increase of ore extraction amount leaves a large amount of outdoor discarded pits, over time, give up Water can be full of in barrow hole, these water-filled discarded pits are generally used to carry out fishery cultivating, but China's cultivated land resource is tight , these discarded pits are used to carry out fishery cultivating to be a kind of huge waste.
Annual urban construction project can all generate a large amount of architecture sediment, architecture sediment main component be brick, concrete block, Soil and a small amount of reinforcing bar, wherein most important or brick is with concrete block, at present for the main application of architecture sediment Still it is used as the ballast aggregate repaired the roads, but the architecture sediment for consumption of repairing the roads is extremely limited, more architecture sediments are still worked as Outskirts of a town have been poured into as building waste.Architecture sediment is poured into outskirts of a town and wastes vast resources, more occupies a large amount of plough Ground.
Based on above-mentioned thinking, the present invention provides a kind of method that the pit for carrying out soil remodeling based on architecture sediment is repaired.
Summary of the invention
The present invention is in view of the above-mentioned problems, propose a kind of discarded pit reclamation method based on architecture sediment filling engineering.
The technical solution adopted by the present invention is as follows:
A kind of discarded pit reclamation method based on architecture sediment filling engineering, includes the following steps:
S1: hard pipe is protruded into the hole bottom in pit, and passes through the pipe constantly air-blowing into pit;
S2: while through the pipe air-blowing into pit on one side, architecture sediment is toppled over into pit on one side, when in pit The moisture content of sludge stop toppling over architecture sediment when being down to 60%;
S3: further into sludge, air-blowing stops air-blowing after the moisture content of sludge is down to 30%;
S4: pouring into the broken foam of stalk, fruits and vegetables residue and feces of livestock and poultry into sludge, and makes to maintain three's temperature 25 DEG C~40 Ferment 240h~280h at DEG C;
S5: soil is toppled in the top of fermentation residue.
Because being filled with water in pit, architecture sediment is toppled over while the air-blowing into pit following beneficial effect:
1, gas can constantly emit upwards from the hole bottom in pit, and gas will constantly leave out of pit, and gas Body leaves from pit can take away certain moisture, can thus accelerate the evaporation rate of water, accelerate the dry speed in pit;
2, because the main brick of ingredient, concrete block, soil and a small amount of reinforcing bar of architecture sediment, are poured into architecture sediment During in pit, four density soil is most light and is that can uniquely be dissolved in water, and is fallen together when four When in water inlet, brick, concrete block and reinforcing bar are since autologous density is larger, and air-flow, which can not be blown, floats to the surface place, so brick Block, concrete block and reinforcing bar, which are understood, oneself is deposited to pit bottom, and soil is due to being dissolved in water, in air-flow in the effect of blowing floating Under, it will not be accumulated in pit bottom;
3, architecture sediment is toppled over while ventilating can make the mud in pit be uniform and stable, be not in differential settlement Different phenomenon.
When the water content of mud is down to 60% stop topple over architecture sediment be because this when mud concentration compared with Height, viscosity is larger, and architecture sediment, some small volumes and the lesser small brick of density and small concrete are toppled over while ventilating Block can't sink under pit, and can due to mud viscosity and air-flow on the effect of blowing, be suspended in the surface of mud, be It avoids below this farmland reclaimed or arable land surface soil without these small concrete blocks and small brick, in the aqueous of mud Amount is down to 60% stopping and topples over architecture sediment.
Further air-blowing is to work as mud to accelerate mud and dry up during mud water content is down to 30% by 60% Water content be down to 30%, be actually mud, be no longer mud.It will appear sedimentation during this, relatively In sedimentation under natural conditions, air-flow can be taken away in lower layer's mud during from pit bottom to mud surface motions Moisture can accelerate the dry and sedimentation of lower layer's mud in this way.
When mud water content is down to 30%, it is put into ferments into the broken foam of stalk, fruits and vegetables residue and feces of livestock and poultry at this time Organic fertilizer is prepared, the laborious of soil is improved, is built up fertility for farming crops.Because being actually mud, topple over The broken foam of stalk, fruits and vegetables residue and feces of livestock and poultry on mud can all stay in the surface of mud substantially, and maintaining fermentation temperature is 10 DEG C First~40 DEG C are to be able to fermentative degradation organic matter quickly, be second the volatilization in order to accelerate the moisture in mud.
After the fermentation has been completed, then on the surface of mud topple one layer of soil, the water content of this soil to topple how many, The rear of soil depends entirely on the purposes in the pit after reclaiming at there is mostly thickness, as being used as paddy field or farmland after reclaiming, The soil water content and soil dosage toppled needed for the two purposes are different.
In the present solution, repair pit using the method for architecture sediment combination air-blowing, the pit after reclaiming can be with As paddy field, perhaps farmland and the paddy field reclaimed via pit or farmland soil fertility content are high.
Optionally, the temperature for the gas that the pipe blasts is 30 DEG C~40 DEG C.
Take this temperature and have following two the utility model has the advantages that
1, because being containing aquatic animals such as more fish, shrimps in the water in pit, and the animals such as fishes and shrimps are toppling over building slag All dead in the process of soil, the gas for being passed through 30 DEG C~40 DEG C temperature can accelerate the activity of microorganism in water, can accelerate The corpse of fishes and shrimps decomposes, and fishes and shrimps corpse is decomposed to obtain fertilizer and can be dissolved in mud, improves the fertility of mud;
2, above-mentioned temperature can accelerate the dry speed of mud.
Optionally, the broken foam of the stalk, fruits and vegetables residue and the mass ratio of feces of livestock and poultry three are 3:3:1.
Said ratio only has more excellent proportion.
The beneficial effects of the present invention are: pit is repaired using the method for architecture sediment combination air-blowing, after reclaiming Pit may be used as paddy field, and perhaps farmland and the paddy field reclaimed via pit or farmland soil fertility content are high.
Specific embodiment:
Below with reference to each case study on implementation, the present invention will be described in detail.
Case study on implementation 1
Implement ground: pit is discarded in Zhejiang Deqing County;Pit situation: outdoor, bosom 45m is deep, and most shallow place is apart from ground 2m, area of the pit bottom most portion at earth's surface about 20m~30m, earth's surface are 2.27 hectares, are implemented the time started 2011 It repairs Secondary Reclamation Time in June, 2013 in May, is paddy field entirely around pit.
The preparation stage is repaired, pavement is built above pit, laying pipeline builds conveyer belt.
The first stage is repaired, gas is heated to 30 DEG C~40 DEG C using air blower and heat exchanger and (is amounted to by pipe 1007 root canals, pipe is steel pipe, and the caliber of pipe is 50cm~60cm) by gas drum into the bottom in pit, gas is from pit Bottom constantly emits up, will topple over architecture sediment in pit by conveyer belt, air-blowings on one side topple over architecture sediment while, not The water content of disconnected detection mud, when being entirely substantially water in pit, the outlet speed for controlling every root canal is 3m2/ s, works as beginning When toppling over architecture sediment, the outlet speed of every root canal is gradually decreased, and appropriate adjustment architecture sediment launches speed.
Second stage is repaired, the water in pit gradually becomes mud, and the liquid level of mud is close to earth's surface, the water content of mud It is 60% or so, stops launching architecture sediment at this time, the outlet speed for adjusting every root canal is 1m2/ s, and with this gas speed Degree is blown to the water content of mud and is down to 30%, and mud has changed into mud at this time, stops air-blowing at this time, using crane by pipe from It is extracted in mud, enables mud is dry in its natural state to settle a period of time, when opening when being settled down to apart from earth's surface about 1m for mud Beginning next step repair, the time for completing second stage is in March, 2012.
The phase III is repaired, topples over mud after straw disintegrating slag, green vegetable leaf and chicken and duck excrement are mixed in the ratio of 3:3:1 Surface, fermentation material with a thickness of 10cm, ferment under open-air atmosphere, under daytime sunshine state, the temperature of fermentation material may be up to 40 DEG C, Night temperatures are lower to be kept the temperature fermentation material in fermentation material surface capping straw mattress, and second day sunrise time-division took away straw mattress again, This process maintain 20 days, if encounter have more rainy weather number of days it is more when, be appropriately extended fermentation time.It ferments this mistake Mud in journey in pit understands oneself, and further sedimentation is dry.
Fourth stage is repaired, because pit is nearby paddy field thus, so this pit, which is used as paddy field after repairing, carrys out rice cultivation, So this stage topples over damp soil in pit, and removes the equipment such as pavement and conveyer belt, it will be wet using cultivator The Soil and Fertilizer of profit is sufficiently mixed, and when with cultivator mixed soil and fertilizer, soil is continuously replenished, so that pit Surface is concordant with earth's surface.It completes this wheel and repairs in June, 12.Pit, which is repaired, at this time completes, but pit can not also carry out at this time Crop cultivation, because still there is gap between brick and concrete block at this time, soil can still be infiltered, the soil on pit surface Earth still will appear biggish sedimentation, if being used directly to rice cultivation at this time, it may appear that cause rice dead because of impeded drainage It is in poor harvest.So complete the First Year not rice cultivation after repairing, its natural subsidence 1 year again is allowed.
After natural subsidence 1 year, soil, the mud on pit surface are filled with substantially in brick and concrete block in pit Soil will not settle again substantially, after one layer of damp soil is padded on surface again, so that the soil face in pit and earth's surface are close flat It together, can rice cultivation.
Case study on implementation 2
Implement ground: Meishan, changxing, zhejiang Province county discards pit;Pit situation: outdoor, bosom 42m is deep, and most shallow place is apart from ground 2m, area of the pit bottom most portion at earth's surface about 25m or so, earth's surface are 3.27 hectares, are implemented the time started 2012 years 7 Month, it repairs Secondary Reclamation Time in October, 2013, is nursery stock base entirely around pit.
The preparation stage is repaired, pavement is built above pit, laying pipeline builds conveyer belt.
The first stage is repaired, gas is heated to 30 DEG C~40 DEG C using air blower and heat exchanger and (is amounted to by pipe 2000 root canals, pipe is steel pipe, and the caliber of pipe is 50cm~60cm) by gas drum into the bottom in pit, gas is from pit Bottom constantly emits up, will topple over architecture sediment in pit by conveyer belt, air-blowings on one side topple over architecture sediment while, not The water content of disconnected detection mud, when being entirely substantially water in pit, the outlet speed for controlling every root canal is 3m2/ s, works as beginning When toppling over architecture sediment, the outlet speed of every root canal is gradually decreased, and appropriate adjustment architecture sediment launches speed.
Second stage is repaired, the water in pit gradually becomes mud, and the liquid level of mud is close to earth's surface, the water content of mud It is 60% or so, stops launching architecture sediment at this time, the outlet speed for adjusting every root canal is 1m2/ s, and with this gas speed Degree is blown to the water content of mud and is down to 30%, and mud has changed into mud at this time, stops air-blowing at this time, using crane by pipe from It is extracted in mud, the time for completing second stage is in January, 2013.
The phase III is repaired, because January, temperature was too low, fermenting speed is slow, so after completing second stage and repairing, first Stack one layer of dry soil again in muck surface, by pit surface it is padded at earth's surface 0.4m, it is dry to its natural subsidence It ferments again after dry 4 months.Into after May, straw disintegrating slag, green vegetable leaf and chicken and duck excrement are mixed in the ratio of 3:3:1 After topple over mud surface, fermentation material with a thickness of 10cm, ferment under open-air atmosphere, under daytime sunshine state, the temperature of fermentation material Up to 50 DEG C, to avoid excessive temperature from causing microorganism dead, one is spilt to fermentation material every 3~4 hours under daytime sunshine Secondary cold water, this process maintain 20 days, and May is still higher than 10 degree rainy weather temperature, so without being kept the temperature Processing extends fermentation time.
Fourth stage is repaired, because the June and July after May are the traditional plum rain seasons in Jiangnan, rainfall may consequently contribute to mine The further sedimentation of soil in cheating, so the soil natural in pit is allowed to settle in June and July 2 months.
Repaired for the 5th stage, because pit is nearby nursery stock base thus, so this pit is used as farmland after repairing to plant Vegetables utilize cultivator so this stage topples over damp soil in pit, and removes the equipment such as pavement and conveyer belt Damp soil and fertilizer are sufficiently mixed, and when with cultivator mixed soil and fertilizer, soil is continuously replenished, so that mine The surface in hole is concordant with earth's surface.Using August and the xeothermic feature short of rain of September, soil is allowed to dry out, completed at this time to soil It repairs, because having already passed through the natural subsidence close to 5 months at this time, significantly sinking can further occur in the soil on pit surface Drop, and entering after October to June next year is all precipitation less season, is not in waterlogging phenomenon in pit, so the year October is used to planting vegetable.
Growth characteristics based on seasonal characteristic and various vegetables, potato, celery in the case where being sowed in pit October current year And radish.
Into after in September, 14, because soil will appear a small amount of sedimentation, in order to plant a greater variety of crops, because This fills out one layer of soil into pit again, that is, is properly completed reparation.
The above description is only a preferred embodiment of the present invention, not thereby limits scope of patent protection of the invention, all It is directly or indirectly to be used in other related technical areas, together with Structural Transformation made by present specification Reason includes within the scope of the present invention.

Claims (3)

1. a kind of discarded pit reclamation method based on architecture sediment filling engineering, which comprises the steps of:
S1: the pipe of hard is protruded into the hole bottom in pit, and passes through the pipe constantly air-blowing into pit;
S2: while through the pipe air-blowing into pit on one side, architecture sediment is toppled over into pit on one side, when the dirt in pit Stop toppling over architecture sediment when the moisture content of mud is down to 60%;
S3: further into sludge, air-blowing stops air-blowing after the moisture content of sludge is down to 30%;
S4: pouring into the broken foam of stalk, fruits and vegetables residue and feces of livestock and poultry into sludge, and makes to maintain at 10 DEG C~40 DEG C of three's temperature Ferment 240h~280h;
S5: soil is toppled in the top of fermentation residue.
2. the discarded pit reclamation method based on architecture sediment filling engineering as described in claim 1, which is characterized in that described The temperature for the gas that pipe blasts is 30 DEG C~40 DEG C.
3. the discarded pit reclamation method based on architecture sediment filling engineering as described in claim 1, which is characterized in that described The broken foam of stalk, fruits and vegetables residue and the mass ratio of feces of livestock and poultry three are 3:3:1.
CN201910406322.9A 2019-05-16 2019-05-16 Abandoned mine pit reclamation method based on building residue soil filling engineering Active CN110144907B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202010181271.7A CN111236207B (en) 2019-05-16 2019-05-16 Method for restoring abandoned mine pit into paddy field based on building residue soil filling engineering
CN201910406322.9A CN110144907B (en) 2019-05-16 2019-05-16 Abandoned mine pit reclamation method based on building residue soil filling engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910406322.9A CN110144907B (en) 2019-05-16 2019-05-16 Abandoned mine pit reclamation method based on building residue soil filling engineering

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202010181271.7A Division CN111236207B (en) 2019-05-16 2019-05-16 Method for restoring abandoned mine pit into paddy field based on building residue soil filling engineering

Publications (2)

Publication Number Publication Date
CN110144907A true CN110144907A (en) 2019-08-20
CN110144907B CN110144907B (en) 2020-04-24

Family

ID=67595656

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202010181271.7A Active CN111236207B (en) 2019-05-16 2019-05-16 Method for restoring abandoned mine pit into paddy field based on building residue soil filling engineering
CN201910406322.9A Active CN110144907B (en) 2019-05-16 2019-05-16 Abandoned mine pit reclamation method based on building residue soil filling engineering

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202010181271.7A Active CN111236207B (en) 2019-05-16 2019-05-16 Method for restoring abandoned mine pit into paddy field based on building residue soil filling engineering

Country Status (1)

Country Link
CN (2) CN111236207B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112145180A (en) * 2020-09-21 2020-12-29 浙江绿农生态环境有限公司 Mutual-layer backfill method for waste open pit residue soil slurry

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160101942A1 (en) * 2014-10-13 2016-04-14 Red Leaf Resources, Inc. Containment systems and methods with reduced friction
CN107018698A (en) * 2016-02-02 2017-08-08 中国矿业大学(北京) The restorative procedure of coal mine small-sized Collapse Pit
CN107938643A (en) * 2017-12-08 2018-04-20 安徽金联地矿科技有限公司 A kind of topography and geomorphology administering method based on waste stone mine
CN109429610A (en) * 2019-01-04 2019-03-08 杰瑞(莱州)矿山治理有限公司 It is a kind of to carry out the artificial soil and its reclamation method that land reclamation uses using gold mine tailings slag backfill mining area

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104380870B (en) * 2014-10-21 2017-02-15 中国地质大学(北京) Method for land reclamation of coal mine area based on utilization of demolished building wastes
CN104641755B (en) * 2014-12-09 2016-10-05 涞水丰源环保科技有限公司 The land remediation method of discarded Exploit sand and stone field
RU2655548C1 (en) * 2017-06-26 2018-05-28 Анатолий Юрьевич Ермаков Method for recultivation of open-pit workings
CN109496481B (en) * 2017-09-14 2022-08-19 中国瑞林工程技术股份有限公司 Closed tailing pond reclamation system and method
CN108532580B (en) * 2018-05-31 2020-02-28 山西智德安全技术股份有限公司 Comprehensive treatment method for recovering ecological environment of gangue dump

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160101942A1 (en) * 2014-10-13 2016-04-14 Red Leaf Resources, Inc. Containment systems and methods with reduced friction
CN107018698A (en) * 2016-02-02 2017-08-08 中国矿业大学(北京) The restorative procedure of coal mine small-sized Collapse Pit
CN107938643A (en) * 2017-12-08 2018-04-20 安徽金联地矿科技有限公司 A kind of topography and geomorphology administering method based on waste stone mine
CN109429610A (en) * 2019-01-04 2019-03-08 杰瑞(莱州)矿山治理有限公司 It is a kind of to carry out the artificial soil and its reclamation method that land reclamation uses using gold mine tailings slag backfill mining area

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵庆祥等: "《废水处理工 初级》", 28 February 2005 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112145180A (en) * 2020-09-21 2020-12-29 浙江绿农生态环境有限公司 Mutual-layer backfill method for waste open pit residue soil slurry
CN112145180B (en) * 2020-09-21 2021-07-13 浙江绿农生态环境有限公司 Mutual-layer backfill method for waste open pit residue soil slurry
CN113236255A (en) * 2020-09-21 2021-08-10 浙江绿农生态环境有限公司 Method for repairing mine pit into construction land for agricultural residential building by slag-soil-slurry interbedding backfilling
CN113236255B (en) * 2020-09-21 2023-10-13 浙江绿农生态环境有限公司 Method for repairing pit into land for construction of house of agriculture by backfilling slag soil and mud layers

Also Published As

Publication number Publication date
CN111236207A (en) 2020-06-05
CN111236207B (en) 2021-04-20
CN110144907B (en) 2020-04-24

Similar Documents

Publication Publication Date Title
CN103155776B (en) The method of solid carbon is realized by the herbal plantation of fast-growing, harvesting and landfill
CN105519274B (en) A kind of integrated approach of extensive coastal new Climacteric symptoms farmland ecology exploitation
CN102204434B (en) Method for preventing water erosion desertification by using biological crust
WO2015101295A1 (en) Water and soil conservation and ecological restoration method of high and steep, abandoned slag piles at high elevation with large temperature differential in dry, hot valley
CN102577789B (en) Method of cyclic sustainable vegetation recovery for waste dump of grassland mining area
CN103609303B (en) A kind of hillock near-nature forest ecological system reconstruction method
CN110089353A (en) A kind of hard side slope greening restoration method
CN108299114B (en) New regulation arable land farming layer building material of main part, arable layer construction method and application
CN104798656B (en) The long tree-planting method of weathered rockses falling zone terrestrial water
CN104604479B (en) A kind of distension capsule sedge transplants the method for fast quick-recovery peat bog vegetation
CN105210770B (en) Dust storm forward position Desert Regions sacsaoul Ecology method of forestation
CN107197743A (en) A kind of high-survival rate oil tea cultural method
CN103039405A (en) Method for mass-producing palatable live bait water earthworms for eel offspring seeds
CN106718607B (en) A method of directly repairing metal abandoned mine slag muck field using wet-land pine tree container seedling
CN108817078A (en) A method of utilizing compositae plant cadmium pollution soil repair
CN102783334B (en) A kind of aquatic culture method for wild trident maple plant stump bonsai
CN110144907A (en) Discarded pit reclamation method based on architecture sediment filling engineering
CN107409723A (en) A kind of low altitude area implantation methods of rhizoma Gastrodiae
CN105875164A (en) Method for no-tillage watermelon cultivation in Northern Jiangsu intertidal zone saline-alkali soil
CN111492915A (en) Cultivation method of organic desert rice
CN104170627B (en) It is applicable to the biological anchoring guard technology of massif
CN108811581B (en) Method for improving coastal heavy saline-alkali soil
CN112219659A (en) Green ecological planting and breeding method for rice frogs
CN105993262A (en) Purple soil hilly area gentle slope honeycomb surface forest and grass composite planting high-efficiency utilization method
CN106211994A (en) A kind of house site and the method for comprehensive utilization of unwanted plant land used

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 310000 Room 1405, Building 2, Qianjiang International Times Square, 111 Chengxing Road, Jianggan District, Hangzhou City, Zhejiang Province

Patentee after: Zhejiang lvnong ecological environment Co.,Ltd.

Address before: 310000 Room 1405, Building 2, Qianjiang International Times Square, 111 Chengxing Road, Jianggan District, Hangzhou City, Zhejiang Province

Patentee before: HANGZHOU LVNONG ENVIRONMENTAL ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20200924

Address after: Room 332, 147 Kaixuan Road, Jianggan District, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou Puyuan High Tech Co.,Ltd.

Address before: 310000 Room 1405, Building 2, Qianjiang International Times Square, 111 Chengxing Road, Jianggan District, Hangzhou City, Zhejiang Province

Patentee before: Zhejiang lvnong ecological environment Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201218

Address after: Room 3901, building 2, Qianjiang international times square, Jianggan District, Hangzhou City, Zhejiang Province

Patentee after: Zhejiang lvnong ecological environment Co.,Ltd.

Address before: Room 332, 147 Kaixuan Road, Jianggan District, Hangzhou City, Zhejiang Province

Patentee before: Hangzhou Puyuan High Tech Co.,Ltd.

TR01 Transfer of patent right