CN107938643A - A kind of topography and geomorphology administering method based on waste stone mine - Google Patents

A kind of topography and geomorphology administering method based on waste stone mine Download PDF

Info

Publication number
CN107938643A
CN107938643A CN201711298394.3A CN201711298394A CN107938643A CN 107938643 A CN107938643 A CN 107938643A CN 201711298394 A CN201711298394 A CN 201711298394A CN 107938643 A CN107938643 A CN 107938643A
Authority
CN
China
Prior art keywords
mine
landform
geomorphology
topography
waste stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711298394.3A
Other languages
Chinese (zh)
Inventor
牛杏杏
明桂林
孙忠伟
张传琦
王代飞
秦月琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI JINLIAN GEOLOGY AND MINERAL RESOURCES TECHNOLOGY Co Ltd
Original Assignee
ANHUI JINLIAN GEOLOGY AND MINERAL RESOURCES TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI JINLIAN GEOLOGY AND MINERAL RESOURCES TECHNOLOGY Co Ltd filed Critical ANHUI JINLIAN GEOLOGY AND MINERAL RESOURCES TECHNOLOGY Co Ltd
Priority to CN201711298394.3A priority Critical patent/CN107938643A/en
Publication of CN107938643A publication Critical patent/CN107938643A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins

Abstract

The invention discloses a kind of topography and geomorphology administering method based on waste stone mine, it is related to mine management technical field.Survey landform;Clear up mine;Region division;Pit backfills;It is firm to build;Vegetation is multiple green;Build cistern;Rain drainage;Record and maintenance.Topography and geomorphology of the invention by surveying abandoned mine, effective region division is carried out to mine, and it is smooth to make full use of waste stone to carry out the landforms in mine, sowed grass seeds by duster using geotechnical grid, linked network and soil moved in improve the original or plant raw basin and improve the ecological environment in mine, the situation that mine rock is exposed, geology is unstable and easily causes danger effectively is changed, and certain economic benefit can be produced.

Description

A kind of topography and geomorphology administering method based on waste stone mine
Technical field
The invention belongs to mine management technical field, is controlled more particularly to a kind of topography and geomorphology based on waste stone mine Reason method.
Background technology
With the fast development of China's economy, more and more stone ores are produced, and the ore that it is exploited is extensive by people Among life and all trades and professions produced, but stone ore leaves big and small waste stone ore deposit after being produced Mountain, not only affects to local ecology, but also has some potential safety problems.Country advocates mine closures Afterwards, to reclaim, but middle technical reason, the topography and geomorphology regulation effect in mine are undesirable always due in reality.
At present, the topography and geomorphology administering method of some abandoned mines is difficult the state before the ecological recovery in mine is arrived, And can not effectively change exposed mine rock, local instability and the situation easily caused danger, these situations are in certain journey Life production on degree to local people brings puzzlement.
The content of the invention
It is an object of the invention to provide a kind of topography and geomorphology administering method based on waste stone mine, by mine Landforms divide region, and the mode administered respectively recovers the ecological environment in mine, solve that existing mine entironment is poor, rock Exposed the problem of easily causing danger.
In order to solve the above technical problems, the present invention is achieved by the following technical solutions:
The present invention is a kind of topography and geomorphology administering method based on waste stone mine, is comprised the following steps:
(1) landform is surveyed:The topography and geomorphology in waste stone mine is reconnoitred, and geology is surveyed;
(2) mine is cleared up:Mine surface rubble and loosening rock are cleared up;
(3) region division:According to mine landforms, mine is divided into concave relief, level land shape, slope surface landform and convex landform;
(4) pit backfills:Dangerous pit is filled using mixture, and the progress strong rammer of the pit to filling is closely knit;
(5) consolidate and build:Surfacing is carried out to level land shape, slope surface landform and convex landform or cuts slope, and pours mixed mud Reinforced;
(6) vegetation is multiple green:Soil moved in improve the original is filled to plane landform;Slope surface landform is taken linked network sow grass seeds by duster soil moved in improve the original or plant life Basin;Geotechnical grid measure is taken convex landform to carry out again green or build sightseeing platform;
(7) cistern is built:A cistern is built to concave relief, is used in case early period irrigates;
(8) rain drainage:Rhone is set to level land shape, slope surface landform and convex landform, rhone is led into cistern;It is right Cistern sets overflow groove, and overflow groove is led to outside mine;
(9) record and conserve:Growing state and mining geology change to mine vegetation carry out periodic logging, and to planting Periodically watered and applied fertilizer.
Further, the mixture in the step (4) is mixed by slag, loess and rubble.
Further, organic fertilizer is included in the soil moved in improve the original in the step (6).
Further, the height above sea level of the overflow groove in the step (8) is less than the height above sea level of the plane landform.
The invention has the advantages that:
1st, the present invention carries out region division according to abandoned mine landforms, and administers respectively, can effective adaptation to local conditions, change It is apt to the problem of existing mine entironment is poor, and economic benefit is low.
2nd, the present invention using geotechnical grid or build sightseeing platform, linked network sow grass seeds by duster soil moved in improve the original or plant raw basin and cistern come plus The problem of vegetation coverage in strong mine, solution mine rock is exposed, easily causes danger, and the life to people brings puzzlement.
Certainly, implement any of the products of the present invention and do not necessarily require achieving all the advantages described above at the same time.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, embodiment will be described below required Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is the construction technology flow chart of the present invention.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained all other without creative efforts Embodiment, belongs to the scope of protection of the invention.
As shown in Figure 1, the present invention is a kind of topography and geomorphology administering method based on waste stone mine, including following step Suddenly:
(1) landform is surveyed
The topography and geomorphology in waste stone mine is reconnoitred, and geology is surveyed.Can effectively to mine Looks and geological condition carry out detailed understanding, and formulate corresponding treatment decision-making.
(2) mine is cleared up
Mine surface rubble and loosening rock are cleared up.
(3) region division
According to mine landforms, mine is divided into concave relief, level land shape, slope surface landform and convex landform.
(4) pit backfills
Dangerous pit is filled using mixture, and the progress strong rammer of the pit to filling is closely knit.Effectively utilize waste stone To be transformed pit and be repaired.
(5) consolidate and build
Surfacing is carried out to level land shape, slope surface landform and convex landform or cuts slope, and pours mixed mud and is reinforced.To portion Divide geology unstable, effectively reinforced, avoid something unexpected happened.
(6) vegetation is multiple green
Soil moved in improve the original is filled to plane landform;Take slope surface landform linked network to sow grass seeds by duster and soil moved in improve the original or plant raw basin;Convex landform is adopted Geotechnical grid measure is taken to carry out again green or build sightseeing platform.
(7) cistern is built
A cistern is built to concave relief, is used in case early period irrigates.Using the physical features in mine, provided for vegetation growth Good water resource.
(8) rain drainage
Rhone is set to level land shape, slope surface landform and convex landform, rhone is led into cistern;Cistern is set and is overflow Sink, overflow groove is led to outside mine.
(9) record and conserve
Growing state and mining geology change to mine vegetation carry out periodic logging, and are periodically watered to vegetation And fertilising.The effect that mine landforms are administered is reacted according to the actual conditions of record.
Wherein, the mixture in the step (4) is mixed by slag, loess and rubble.
Wherein, organic fertilizer is included in the soil moved in improve the original in the step (6).
Wherein, the height above sea level of the overflow groove in the step (8) is less than the height above sea level of the plane landform.Can be effective Growth of the water to the vegetation of level land shape in cistern is avoided to impact.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means At least one implementation of the present invention is contained in reference to the embodiment or example particular features, structures, materials, or characteristics described In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example. Moreover, particular features, structures, materials, or characteristics described can close in any one or more embodiments or example Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help and illustrates the present invention.Preferred embodiment is not detailed All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification, It can make many modifications and variations.This specification is chosen and specifically describes these embodiments, is in order to preferably explain the present invention Principle and practical application so that skilled artisan can be best understood by and utilize the present invention.The present invention is only Limited by claims and its four corner and equivalent.

Claims (4)

  1. A kind of 1. topography and geomorphology administering method based on waste stone mine, it is characterised in that:Comprise the following steps:
    (1) landform is surveyed:The topography and geomorphology in waste stone mine is reconnoitred, and geology is surveyed;
    (2) mine is cleared up:Mine surface rubble and loosening rock are cleared up;
    (3) region division:According to mine landforms, mine is divided into concave relief, level land shape, slope surface landform and convex landform;
    (4) pit backfills:Dangerous pit is filled using mixture, and the progress strong rammer of the pit to filling is closely knit;
    (5) consolidate and build:Surfacing is carried out to level land shape, slope surface landform and convex landform or cuts slope, and pours mixed mud progress Reinforce;
    (6) vegetation is multiple green:Soil moved in improve the original is filled to plane landform;Take slope surface landform linked network to sow grass seeds by duster and soil moved in improve the original or plant raw basin;It is right Convex landform takes geotechnical grid measure to carry out again green or build sightseeing platform;
    (7) cistern is built:A cistern is built to concave relief, is used in case early period irrigates;
    (8) rain drainage:Rhone is set to level land shape, slope surface landform and convex landform, rhone is led into cistern;To water storage Pond sets overflow groove, and overflow groove is led to outside mine;
    (9) record and conserve:Growing state to mine vegetation and mining geology change carry out periodic logging, and to vegetation into Row periodically watering and fertilising.
  2. A kind of 2. topography and geomorphology administering method based on waste stone mine according to claim 1, it is characterised in that institute Stating the mixture in step (4) is mixed by slag, loess and rubble.
  3. A kind of 3. topography and geomorphology administering method based on waste stone mine according to claim 1, it is characterised in that institute State and organic fertilizer is included in the soil moved in improve the original in step (6).
  4. A kind of 4. topography and geomorphology administering method based on waste stone mine according to claim 1, it is characterised in that institute The height above sea level for stating the overflow groove in step (8) is less than the height above sea level of the plane landform.
CN201711298394.3A 2017-12-08 2017-12-08 A kind of topography and geomorphology administering method based on waste stone mine Pending CN107938643A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711298394.3A CN107938643A (en) 2017-12-08 2017-12-08 A kind of topography and geomorphology administering method based on waste stone mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711298394.3A CN107938643A (en) 2017-12-08 2017-12-08 A kind of topography and geomorphology administering method based on waste stone mine

Publications (1)

Publication Number Publication Date
CN107938643A true CN107938643A (en) 2018-04-20

Family

ID=61946353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711298394.3A Pending CN107938643A (en) 2017-12-08 2017-12-08 A kind of topography and geomorphology administering method based on waste stone mine

Country Status (1)

Country Link
CN (1) CN107938643A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110144907A (en) * 2019-05-16 2019-08-20 杭州绿农环境工程有限公司 Discarded pit reclamation method based on architecture sediment filling engineering
CN110747868A (en) * 2019-10-25 2020-02-04 卢明枝 Mine side slope repairing method
CN111021375A (en) * 2019-12-17 2020-04-17 河南省地质环境规划设计院有限公司 Recovery and treatment method for mine geological environment
CN111133946A (en) * 2020-01-15 2020-05-12 厦门海石生态环境股份有限公司 Rapid greening method for abandoned mine side slope
CN111226641A (en) * 2020-01-17 2020-06-05 高善峰 Ecological recovery system for abandoned mine
CN111456082A (en) * 2020-04-01 2020-07-28 安徽金联地矿科技有限公司 Re-greening method for mine slope surface
CN113877958A (en) * 2021-10-08 2022-01-04 中煤科工集团北京土地整治与生态修复科技研究院有限公司 Mining area terrain remodeling partition and repairing method
CN115075292A (en) * 2022-03-08 2022-09-20 中国矿业大学(北京) Method for developing and utilizing logistics storage space of waste open-air sand pit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT6873U1 (en) * 2003-04-23 2004-05-25 Krismer Handelsgesellschaft M REINFORCING CONSTRUCTION
CN101818499A (en) * 2010-03-05 2010-09-01 深圳市如茵生态环境建设有限公司 Revegetation system on steep rocky slopes and implementing method thereof
CN104818721A (en) * 2015-03-24 2015-08-05 中国地质大学(北京) Geological environment treatment method suitable for steep wall and deep pit type abandoned mine
CN205035813U (en) * 2015-08-11 2016-02-17 重庆任甲生物科技有限公司 Ecological treatment system that softens in stereoplasm abrupt slope
CN106988320A (en) * 2017-04-26 2017-07-28 李德群 Limestone zone discards pit and is transformed into reservoir, the pool, the reclamation method in pond
CN107152030A (en) * 2017-06-30 2017-09-12 西安科技大学 A kind of Slope of Open Pit Coal Mine administering method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT6873U1 (en) * 2003-04-23 2004-05-25 Krismer Handelsgesellschaft M REINFORCING CONSTRUCTION
CN101818499A (en) * 2010-03-05 2010-09-01 深圳市如茵生态环境建设有限公司 Revegetation system on steep rocky slopes and implementing method thereof
CN104818721A (en) * 2015-03-24 2015-08-05 中国地质大学(北京) Geological environment treatment method suitable for steep wall and deep pit type abandoned mine
CN205035813U (en) * 2015-08-11 2016-02-17 重庆任甲生物科技有限公司 Ecological treatment system that softens in stereoplasm abrupt slope
CN106988320A (en) * 2017-04-26 2017-07-28 李德群 Limestone zone discards pit and is transformed into reservoir, the pool, the reclamation method in pond
CN107152030A (en) * 2017-06-30 2017-09-12 西安科技大学 A kind of Slope of Open Pit Coal Mine administering method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110144907A (en) * 2019-05-16 2019-08-20 杭州绿农环境工程有限公司 Discarded pit reclamation method based on architecture sediment filling engineering
CN110747868A (en) * 2019-10-25 2020-02-04 卢明枝 Mine side slope repairing method
CN111021375A (en) * 2019-12-17 2020-04-17 河南省地质环境规划设计院有限公司 Recovery and treatment method for mine geological environment
CN111133946A (en) * 2020-01-15 2020-05-12 厦门海石生态环境股份有限公司 Rapid greening method for abandoned mine side slope
CN111226641A (en) * 2020-01-17 2020-06-05 高善峰 Ecological recovery system for abandoned mine
CN111456082A (en) * 2020-04-01 2020-07-28 安徽金联地矿科技有限公司 Re-greening method for mine slope surface
CN113877958A (en) * 2021-10-08 2022-01-04 中煤科工集团北京土地整治与生态修复科技研究院有限公司 Mining area terrain remodeling partition and repairing method
CN113877958B (en) * 2021-10-08 2023-03-03 中煤科工集团北京土地整治与生态修复科技研究院有限公司 Mining area terrain remodeling partition and repairing method
CN115075292A (en) * 2022-03-08 2022-09-20 中国矿业大学(北京) Method for developing and utilizing logistics storage space of waste open-air sand pit

Similar Documents

Publication Publication Date Title
CN107938643A (en) A kind of topography and geomorphology administering method based on waste stone mine
CN105961120B (en) One kind being suitable for arid biogeographic zone ecological restoration of mine side slope vegetation quick recovery method
CN101451355B (en) Water retention method of back fill course
CN101818499B (en) Revegetation system on steep rocky slopes and implementing method thereof
CN102733401B (en) Method for treating dump slope of surface mine
CN210827501U (en) Greening structure of stock ground rock slope
CN101112157A (en) Method for greening high precipitous rock slope
CN109137941A (en) A kind of repairing and treating method in mine
CN204626423U (en) Feldspathic sandstone Artificial Side-slope flexible bank protection engineering method structure
CN110249813B (en) Method for greening high and steep rocky slope in mining pit
CN103416278A (en) Method for culturing vegetation in Karst landform region
CN108677871A (en) A kind of construction method of assembled grass planting concrete precast block and its ecological revetment
CN107023022A (en) It is a kind of based on the stone pit waste side slope massif shaping methods for harvesting alignment sequence
CN201826318U (en) Simple ecological slope protecting structure for loose soil of road
CN106988320A (en) Limestone zone discards pit and is transformed into reservoir, the pool, the reclamation method in pond
CN206547425U (en) A kind of side slope plants raw slot structure from seeping water
CN110424421A (en) Abandoned mine raised fields goes along with sb. to guard him ecological restoring method
CN113235623A (en) Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof
CN108914951A (en) A kind of construction method based on fish-scale pit shape slope protection coiled material
CN100582384C (en) Novel ecological slope protection substrate building method
CN109005722B (en) Comprehensive reclamation method for land reclamation of iron ore waste stone yard
Frumkin Interaction between karst, water and agriculture over the climatic gradient of Israel
CN104762946A (en) Filler and method for ecologically repairing damaged mountain
CN110226431A (en) A kind of planting technique structure and its construction method for high precipitous rock slope
CN108130897B (en) A kind of soil basketing method during highway construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420