CN110130316A - The method of thaw collapse after service channel bottom pre-pouring grout system and control freezing construction - Google Patents

The method of thaw collapse after service channel bottom pre-pouring grout system and control freezing construction Download PDF

Info

Publication number
CN110130316A
CN110130316A CN201910392423.5A CN201910392423A CN110130316A CN 110130316 A CN110130316 A CN 110130316A CN 201910392423 A CN201910392423 A CN 201910392423A CN 110130316 A CN110130316 A CN 110130316A
Authority
CN
China
Prior art keywords
injected hole
grouting pipe
service channel
slip casting
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910392423.5A
Other languages
Chinese (zh)
Inventor
杨平
司轩昂
张婷
何文龙
何冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Forestry University
Original Assignee
Nanjing Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Forestry University filed Critical Nanjing Forestry University
Priority to CN201910392423.5A priority Critical patent/CN110130316A/en
Publication of CN110130316A publication Critical patent/CN110130316A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/11Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means
    • E02D3/115Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means by freezing

Abstract

The invention discloses the methods of thaw collapse after service channel bottom pre-pouring grout system and control freezing construction, the system is equipped at least 1 row's injected hole in the design freezing range (9) of service channel bottom, and every row's injected hole at least 1, Grouting Pipe is inserted into design freezing range (9) from injected hole, the angle of every row's injected hole and tunnel center line is 10 ° -80 °, and the angle of Grouting Pipe and tunnel center line is 15 ° -75 °.Compared with prior art, the invention has the following advantages that after (1) pre-pouring grout system in service channel bottom of the present invention and control freezing construction thaw collapse method can after effective control freezing construction frozen soil melt caused by stratum settlement, without in service channel top and two sides pre-pouring grout, without carrying out compensation and grouting after freezing;(2) system and method short time limit of the present invention, and it is at low cost.

Description

The method of thaw collapse after service channel bottom pre-pouring grout system and control freezing construction
Technical field
The invention belongs to frozen construction technical field, it is related to a kind of method of thaw collapse after control service channel frozen construction, The method of thaw collapse specially after service channel bottom pre-pouring grout system and control freezing construction.
Background technique
Freezing consolidation is widely used in Shanghai, Nanjing, in the construction of the rich waters soft soil layer tunnel connection channel such as Suzhou, this Engineering method fastening strength is high, and sealing performance is good, but larger with the later period thaw collapse that this engineering method is constructed.Service channel frozen construction terminates Afterwards, stratum settlement, selected most dependence at slip casting position generally are controlled in such a way that frost free period tracking grouting fills the soil body Engineering experience, for grouting amount only only in accordance with daily Ground Subsidence Monitoring, the controllability of engineering is poor, it is difficult to fully control soft soil layer Work after thaw collapse, can make neighboring buildings generate sedimentation, cracking etc. adverse effects;Simultaneously because the thaw collapse influence period is longer, early period Slip casting it is not in place often lead to metro operation during, upper and lower line generates differential settlement, causes serious security risk.
To ensure going on smoothly for engineering, guarantees safety of surrounding environment, before some service channel frozen constructions, first joining Network channel is up and down and cement slurry is injected in two sides, carries out engineering with artificial freezing method construction again on the basis of the soil cement formed later. The soil layer that freezes for carrying out pre-pouring grout settles smaller during thawing, but cement consumption is larger, and artificial and equipment cost is larger.
One of the technical issues of thaw collapse freezes most critical after service channel pre-pouring grout control work is exactly to infuse in advance to service channel The construction of slurry, construction is more complicated, and construction cost is larger.Currently used method is exactly above and below service channel and two sides Cement slurry is injected, soil layer can be reinforced again and can control the thaw collapse after freezing, but to expend a large amount of grouting serous fluid, is employed a large amount of Equipment and artificial, and be affected to section of jurisdiction, construction period is longer.It has been investigated that service channel thaw collapse is mainly the bottom of by Caused by the thaw collapse in portion region, controlling bottom thaw collapse can be such that overall thaw collapse reaches in engineering permission subsidence range, not influence Neighboring buildings and the operation of subway later period, therefore need emphasis to reinforce the reinforcing to contact the bottom of the channel in construction.
Summary of the invention
The technical issues of solution: for overcome the deficiencies in the prior art, obtaining one kind being capable of quickly and effectively control freezing The construction method of thaw collapse after work, without on service channel top and two sides pre-pouring grout, without carrying out compensation and grouting after freezing, The present invention provides the methods of thaw collapse after service channel bottom pre-pouring grout system and control freezing construction.
Technical solution: service channel bottom pre-pouring grout system, design freezing range of the system in service channel bottom It is interior to be equipped at least 1 row's injected hole, and every row's injected hole at least 1, it is inserted into Grouting Pipe into design freezing range from injected hole, The angle of every row's injected hole and tunnel center line is 10 ° -80 °, and the angle of Grouting Pipe and tunnel center line is 15 ° -75 °.
Preferably, the injected hole is 3 rows, respectively the first injected hole, the second injected hole and third injected hole.
Preferably, the angle of the first injected hole and tunnel center line is 15 °, the angle of the second injected hole and tunnel center line It is 30 °, the angle of third injected hole and tunnel center line is 60 °.
Preferably, between the spacing between the first injected hole, the second injected hole and the second injected hole, third injected hole Away from than for 1:2-1:0.8.
Preferably, every row's injected hole has 7, and is arranged symmetrically along service channel center line.
Preferably, Grouting Pipe corresponding with the first injected hole, the second injected hole and third injected hole is respectively the first slip casting Pipe, the second Grouting Pipe and third Grouting Pipe, wherein the angle of the first Grouting Pipe and tunnel center line is 45 °, the second Grouting Pipe and The angle of third Grouting Pipe and tunnel center line is 60 °.
Preferably, the first Grouting Pipe, the second Grouting Pipe and third Grouting Pipe are merogenesis Grouting Pipe, and the ratio between slip casting depth is 1:2:2。
The method of thaw collapse after the construction of any description above service channel bottom pre-pouring grout system control freezing, includes following step It is rapid:
A. injected hole is arranged, left in service channel two sides using the section of jurisdiction of reserved injected hole when shield driving splices section of jurisdiction Right line is symmetrical arranged, and preferably both sides respectively set 4, and totally 8;
B. Grouting Pipe is arranged, pierces Grouting Pipe from reserved slip casting hole location, carries out slip casting, and Grouting Pipe merogenesis is arranged, preferably Grouting Pipe selects 30 × 6mm of Φ, 20# low-carbon seamless steel pipe Grouting Pipe, and 1m is a section;
C. injecting paste material and parameter, grouting equipment select BW250 type speed change grouting pump, and grouting serous fluid is with cement-sodium silicate Based on dual slurry, supplemented by single liquid cement slurry, cement slurry and water glass solution volume ratio are 3:1-4:1, wherein the cement slurry ratio of mud For 0.7-1.25, concentration of sodium silicate is 20Be ' -50Be ', and grouting pressure 0.2-0.8MPa, flow rate of grouting control is in 1.0- 2m3/h;
D. slip casting principle and mode, first in the injected hole slip casting of left line service channel two sides of the bottom section of jurisdiction, left line is all infused After slurry, then in right line slip casting, pre-pouring grout follows a small amount of, multiple, multiple spot, uniform principle, is infused section by section according to projected depth It starches, the injected hole among slip casting Shi Xiancong first row starts slip casting, is then successively perfused to the injected hole at both ends;Again from second row The injected hole at both ends starts slip casting, is then successively perfused to intermediate injected hole, then arranges intermediate injected hole to two from third The injected hole slip casting at end;
E. it arranges Freezing Station, equipment, piping connection, heat preservation and test instrumentation is installed, dissolve calcium chloride and unit fills fluorine and adds Oil;
F. after slip casting is completed, sealing of hole is carried out with hydrophilic epoxy resin concrete, is conserved 14 days, frozen construction is started, is kept - 30~-28 DEG C of minimum brine temp, until design frozen region reinforces and completes.
The utility model has the advantages that (1) pre-pouring grout system in service channel bottom of the present invention and control freezing construction after thaw collapse side Method can after effective control freezing construction frozen soil melt caused by stratum settlement, without pre- on service channel top and two sides Slip casting, without carrying out compensation and grouting after freezing;(2) system and method short time limit of the present invention, and it is at low cost.
Detailed description of the invention
Fig. 1 is the bottom substance schematic diagram of service channel bottom pre-pouring grout system of the present invention;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the B-B sectional view of Fig. 1;
Wherein, the first injected hole of 1-, the second injected hole of 2-, 3- third injected hole, the first Grouting Pipe of 4-, the second slip casting of 5- Pipe, 6- third Grouting Pipe, 7- service channel center line, the tunnel 8- center line, 9- design freezing range, and 10- reserves injected hole Section of jurisdiction.
Specific embodiment
Following embodiment further illustrates the contents of the present invention, but should not be construed as limiting the invention.Without departing substantially from In the case where spirit of that invention and essence, to modification made by the method for the present invention, step or condition and replaces, belong to the present invention Range.Unless otherwise specified, the conventional means that technological means used in embodiment is well known to those skilled in the art.
Embodiment 1
Service channel bottom pre-pouring grout system, the system are equipped with extremely in the design freezing range 9 of service channel bottom Few 1 row's injected hole, and every row's injected hole at least 1, Grouting Pipe, every row's note are inserted into design freezing range 9 from injected hole The angle for starching hole and tunnel center line is 10 ° -80 °, and the angle of Grouting Pipe and tunnel center line is 15 ° -75 °.
The injected hole is 3 rows, respectively the first injected hole 1, the second injected hole 2 and third injected hole 3.
The angle of first injected hole 1 and tunnel center line is 15 °, and the angle of the second injected hole 2 and tunnel center line is 30 °, third injected hole 3 and the angle of tunnel center line are 60 °.
The spacing between spacing and the second injected hole 2, third injected hole 3 between first injected hole 1, the second injected hole 2 Than for 1:2-1:0.8.
Every row's injected hole has 7, and is arranged symmetrically along service channel center line 7.
Grouting Pipe corresponding with the first injected hole 1, the second injected hole 2 and third injected hole 3 be respectively the first Grouting Pipe 4, Second Grouting Pipe 5 and third Grouting Pipe 6, wherein the first Grouting Pipe 4 and the angle of tunnel center line are 45 °, 5 He of the second Grouting Pipe The angle of third Grouting Pipe 6 and tunnel center line is 60 °.
First Grouting Pipe 4, the second Grouting Pipe 5 and third Grouting Pipe 6 are merogenesis Grouting Pipe, and the ratio between slip casting depth is 1:2: 2。
The method of thaw collapse after the construction of any description above service channel bottom pre-pouring grout system control freezing, includes following step It is rapid:
A. injected hole is arranged, left in service channel two sides using the section of jurisdiction of reserved injected hole when shield driving splices section of jurisdiction Right line is symmetrical arranged, and preferably both sides respectively set 4, and totally 8;
B. Grouting Pipe is arranged, pierces Grouting Pipe from reserved slip casting hole location, carries out slip casting, and Grouting Pipe merogenesis is arranged, preferably Grouting Pipe selects 30 × 6mm of Φ, 20# low-carbon seamless steel pipe Grouting Pipe, and 1m is a section;
C. injecting paste material and parameter, grouting equipment select BW250 type speed change grouting pump, and grouting serous fluid is with cement-sodium silicate Based on dual slurry, supplemented by single liquid cement slurry, cement slurry and water glass solution volume ratio are 3:1~4:1, wherein the cement slurry ratio of mud It is 0.7~1.25, concentration of sodium silicate is 20Be '~50Be ', and grouting pressure is 0.2~0.8MPa, and flow rate of grouting is controlled 1.0 ~2m3/h;
D. slip casting principle and mode, first in the injected hole slip casting of left line service channel two sides of the bottom section of jurisdiction, left line is all infused After slurry, then in right line slip casting, pre-pouring grout follows a small amount of, multiple, multiple spot, uniform principle, is infused section by section according to projected depth It starches, the injected hole among slip casting Shi Xiancong first row starts slip casting, is then successively perfused to the injected hole at both ends;Again from second row The injected hole at both ends starts slip casting, is then successively perfused to intermediate injected hole, then arranges intermediate injected hole to two from third The injected hole slip casting at end;
E. it arranges Freezing Station, equipment, piping connection, heat preservation and test instrumentation is installed, dissolve calcium chloride and unit fills fluorine and adds Oil;
F. after slip casting is completed, sealing of hole is carried out with hydrophilic epoxy resin concrete, is conserved 14 days, frozen construction is started, is kept - 30~-28 DEG C of minimum brine temp, until design frozen region reinforces and completes.
Embodiment 2
Suzhou Metro Connection Passage, it is silty clay layer, clay silt folder that place geology rises on ground from top to bottom Silty clay layer, silty sand ground, silty clay layer.Stratum locating for service channel is silty sand ground.Service channel buried depth 14m.Reinforce work Cheng Caiyong service channel bottom pre-pouring grout+horizontal freezing joint reinforcement.It is required according to designer, service channel reinforcement depth is 6m。
For this engineering using thaw collapse technology after contact bottom pre-pouring grout control work, specific technical solution is as follows:
A. injected hole is arranged, left in service channel two sides using the section of jurisdiction of reserved injected hole when shield driving splices section of jurisdiction Each 4, totally 8, right line.Service channel two sides are equipped with three rows in the part in service channel bottom design freezing range Injected hole, first row and tunnel centerlines are 15 °, arrange 7 injected holes, spacing 50cm;Second row and tunnel center Wire clamp angle is 30 degree, arranges 7 injected holes, spacing 50cm;Third row is 60 ° with tunnel centerlines, arranges 7 slip castings Hole, spacing 50cm;Spacing between first row and second row is 60cm, and the spacing between second row and third row is 70cm.
B. Grouting Pipe is arranged, is pierced Grouting Pipe to reserved slip casting hole location and is carried out slip casting, Grouting Pipe selects Φ 30mm seamless steel Pipe Grouting Pipe, 1m are a section.First row Grouting Pipe is oliquely downward inserted into the soil body from injected hole with 45 ° of direction, reaches design and freezes Tie the position of bottom range.Second row and third row's Grouting Pipe are oliquely downward inserted into the soil body from injected hole with 60 ° of direction.? The Grouting Pipe design reinforcement depth that third arranges injected hole arrangement is 6m, and point 6 section Grouting Pipes, each slip casting depth is 1m, that is, is segmented Slip casting is inserted into 1m Grouting Pipe every time, next section Grouting Pipe is inserted into after slip casting;It is set in the Grouting Pipe of second row injected hole arrangement Meter reinforcement depth is 6m, point 6 section Grouting Pipes, segmenting slip casting;First row injected hole arrangement Grouting Pipe design reinforcement depth 3m, Divide 3 section Grouting Pipes, segmenting slip casting.
C. injecting paste material and parameter, grouting equipment select BW250 type speed change grouting pump.Grouting serous fluid is with cement-sodium silicate Based on dual slurry, supplemented by single liquid cement slurry.Cement slurry and water glass solution volume ratio are as follows: 1:0.25, wherein the cement slurry ratio of mud For 1:0.8, concentration of sodium silicate is 20Be ', and grouting pressure 0.5MPa, flow rate of grouting control is in 2m3/h。
D. slip casting principle and method, the injected hole slip casting of the first section of jurisdiction in left line service channel two sides of the bottom, left line are whole After slip casting, then in right line slip casting.Pre-pouring grout follows a small amount of, multiple, multiple spot, uniform principle.Section by section according to projected depth Slip casting.Injected hole among slip casting Shi Xiancong first row starts slip casting, is then successively perfused to the injected hole at both ends;Again from second The injected hole at row both ends starts slip casting, is then successively perfused to intermediate injected hole.Then from the intermediate injected hole of third row to The injected hole slip casting at both ends.
E. it arranges Freezing Station, equipment, piping connection, heat preservation and test instrumentation is installed, dissolve calcium chloride and unit fills fluorine and adds Oil.
F. after slip casting is completed, sealing of hole is carried out with hydrophilic epoxy resin concrete, starts frozen construction, keeps minimum salt water temperature - 30~-28 DEG C of degree, until design frozen region reinforces and completes.
Embodiment 3
Changzhou Metro Connection Passage, locating soil layer are miscellaneous fill layer, silty clay layer, silty clay from top to bottom Layer, flour sand press from both sides clayey silt layer, silty sand ground, silty clay layer.Stratum locating for service channel is silty sand ground.Service channel buried depth 15m.Reinforcing engineering uses service channel bottom pre-pouring grout+horizontal freezing joint reinforcement.It is required according to designer, service channel Reinforcement depth is 8m.
For this engineering using thaw collapse technology after contact bottom pre-pouring grout control work, specific technical solution is as follows:
A. injected hole is arranged, left in service channel two sides using the section of jurisdiction of reserved injected hole when shield driving splices section of jurisdiction Each 4, totally 8, right line.Service channel two sides are equipped with three rows in the part in service channel bottom design freezing range Injected hole, first row and tunnel centerlines are 15 °, arrange 7 injected holes, spacing 50cm;Second row and tunnel center line Angle is 30 °, arranges 7 injected holes, spacing 60cm;Third row is 60 ° with tunnel centerlines, arranges 7 injected holes, Spacing is 60cm;Spacing between first row and second row is 60cm, and the spacing between second row and third row is 60cm.
B. Grouting Pipe is arranged, is pierced Grouting Pipe to reserved slip casting hole location and is carried out slip casting, Grouting Pipe selects Φ 30mm seamless steel Pipe Grouting Pipe, 1m are a section.First row Grouting Pipe is oliquely downward inserted into the soil body from injected hole with 45 ° of direction, reaches design and freezes Tie the position of bottom range.Second row and third row's Grouting Pipe are oliquely downward inserted into the soil body from injected hole with 60 ° of direction.? The Grouting Pipe design reinforcement depth that third arranges injected hole arrangement is 8m, and point 8 section Grouting Pipes, each slip casting depth is 1m, that is, is segmented Slip casting is inserted into 1m Grouting Pipe every time, next section Grouting Pipe is inserted into after slip casting;It is set in the Grouting Pipe of second row injected hole arrangement Meter reinforcement depth is 8m, point 8 section Grouting Pipes, segmenting slip casting;First row injected hole arrangement Grouting Pipe design reinforcement depth 5m, Divide 5 section Grouting Pipes, segmenting slip casting.
C. injecting paste material and parameter, grouting equipment select BW250 type speed change grouting pump.Grouting serous fluid is with cement-sodium silicate Based on dual slurry, supplemented by single liquid cement slurry.Cement slurry and water glass solution volume ratio are as follows: 1:0.25, wherein the cement slurry ratio of mud For 1:0.8, concentration of sodium silicate is 30Be ', and grouting pressure 0.8MPa, flow rate of grouting control is in 1.5m3/h。
D. slip casting principle and method, the injected hole slip casting of the first section of jurisdiction in left line service channel two sides of the bottom, left line are whole After slip casting, then in right line slip casting.Pre-pouring grout follows a small amount of, multiple, multiple spot, uniform principle.Section by section according to projected depth Slip casting.Injected hole among slip casting Shi Xiancong first row starts slip casting, is then successively perfused to the injected hole at both ends;Again from second The injected hole at row both ends starts slip casting, is then successively perfused to intermediate injected hole.Then from the intermediate injected hole of third row to The injected hole slip casting at both ends.
E. it arranges Freezing Station, equipment, piping connection, heat preservation and test instrumentation is installed, dissolve calcium chloride and unit fills fluorine and adds Oil.
F. after slip casting is completed, sealing of hole is carried out with hydrophilic epoxy resin concrete, starts frozen construction, keeps minimum salt water temperature - 30~-28 DEG C of degree, until design frozen region reinforces and completes.
Embodiment 4
Wuxi Metro Connection Passage, locating soil layer are miscellaneous fill layer, silty clay layer, silty sand ground, powder from top to bottom Matter clay layer, silty sand ground, silty clay layer.Stratum locating for service channel is that silty clay presss from both sides powder soil horizon.Service channel buried depth 18m, clear span are designed as 2.50m, clear height 2.75m.Reinforcing engineering is added using service channel bottom pre-pouring grout+horizontal freezing joint Gu.It is required according to designer, service channel reinforcement depth is 6m.
For this engineering using thaw collapse technology after contact bottom pre-pouring grout control work, specific technical solution is as follows:
A. injected hole is arranged, left in service channel two sides using the section of jurisdiction of reserved injected hole when shield driving splices section of jurisdiction Each 3, totally 6, right line.Service channel two sides are equipped with three rows in the part in service channel bottom design freezing range Injected hole, first row and tunnel centerlines are 30 °, arrange 7 injected holes, spacing 50cm;Second row and tunnel center line Angle is 45 °, arranges 7 injected holes, spacing 50cm;Third row is 60 ° with tunnel centerlines, arranges 7 injected holes, Spacing is 50cm;Spacing between first row and second row is 80cm, and the spacing between second row and third row is 80cm.
B. Grouting Pipe is arranged, is pierced Grouting Pipe to reserved slip casting hole location and is carried out slip casting, Grouting Pipe selects Φ 30mm seamless steel Pipe Grouting Pipe, 1m are a section.First row Grouting Pipe is oliquely downward inserted into the soil body from injected hole with 45 ° of direction, reaches design and freezes Tie the position of bottom range.Second row and third row's Grouting Pipe are oliquely downward inserted into the soil body from injected hole with 60 ° of direction.? The Grouting Pipe design reinforcement depth that third arranges injected hole arrangement is 8m, and point 8 section Grouting Pipes, each slip casting depth is 1m, that is, is segmented Slip casting is inserted into 1m Grouting Pipe every time, next section Grouting Pipe is inserted into after slip casting;It is set in the Grouting Pipe of second row injected hole arrangement Meter reinforcement depth is 6m, point 6 section Grouting Pipes, segmenting slip casting;First row injected hole arrangement Grouting Pipe design reinforcement depth 6m, Divide 6 section Grouting Pipes, segmenting slip casting.
C. injecting paste material and parameter, grouting equipment select BW250 type speed change grouting pump.Grouting serous fluid is with cement-sodium silicate Based on dual slurry, supplemented by single liquid cement slurry.Cement slurry and water glass solution volume ratio are as follows: 1:0.5, wherein the cement slurry ratio of mud be 1:1, concentration of sodium silicate are 50Be ', and grouting pressure 0.3MPa, flow rate of grouting control is in 1.8m3/h。
D. slip casting principle and method, the injected hole slip casting of the first section of jurisdiction in left line service channel two sides of the bottom, left line are whole After slip casting, then in right line slip casting.Pre-pouring grout follows a small amount of, multiple, multiple spot, uniform principle.Section by section according to projected depth Slip casting.Injected hole among slip casting Shi Xiancong first row starts slip casting, is then successively perfused to the injected hole at both ends;Again from second The injected hole at row both ends starts slip casting, is then successively perfused to intermediate injected hole.Then from the intermediate injected hole of third row to The injected hole slip casting at both ends.
E. it arranges Freezing Station, equipment, piping connection, heat preservation and test instrumentation is installed, dissolve calcium chloride and unit fills fluorine and adds Oil.
F. after slip casting is completed, sealing of hole is carried out with hydrophilic epoxy resin concrete, starts frozen construction, keeps minimum salt water temperature - 30~-28 DEG C of degree, until design frozen region reinforces and completes.
Embodiment 5
Changzhou Metro Connection Passage, locating soil layer are fill stratum, clay layer, silty clay layer, flour sand from top to bottom Powder soil horizon, silty sand ground are pressed from both sides, sandy silt presss from both sides silty clay layer.Stratum locating for service channel is that sandy silt presss from both sides farinose argillic horizon. Service channel buried depth 14m.Reinforcing engineering uses service channel bottom pre-pouring grout+horizontal freezing joint reinforcement.According to designer It is required that service channel reinforcement depth is 7m.
For this engineering using thaw collapse technology after contact bottom pre-pouring grout control work, specific technical solution is as follows:
A. injected hole is arranged, left in service channel two sides using the section of jurisdiction of reserved injected hole when shield driving splices section of jurisdiction Each 3, totally 6, right line.Service channel two sides are equipped with three rows in the part in service channel bottom design freezing range Injected hole, first row and tunnel centerlines are 20 °, arrange 6 injected holes, spacing 50cm;Second row and tunnel center Wire clamp angle is 55 °, arranges 6 injected holes, spacing 50cm;Third row is 75 ° with tunnel centerlines, arranges 6 slip castings Hole, spacing 50cm;Spacing between first row and second row is 50cm, and the spacing between second row and third row is 50cm.
B. Grouting Pipe is arranged, is pierced Grouting Pipe to reserved slip casting hole location and is carried out slip casting, Grouting Pipe selects Φ 25mm seamless steel Pipe Grouting Pipe, 1m are a section.First row Grouting Pipe is oliquely downward inserted into the soil body from injected hole with 45 ° of direction, reaches design and freezes Tie the position of bottom range.Second row and third row's Grouting Pipe are oliquely downward inserted into the soil body from injected hole with 60 ° of direction.? The Grouting Pipe design reinforcement depth that third arranges injected hole arrangement is 7m, and point 7 section Grouting Pipes, each slip casting depth is 1m, that is, is segmented Slip casting is inserted into 1m Grouting Pipe every time, next section Grouting Pipe is inserted into after slip casting;It is set in the Grouting Pipe of second row injected hole arrangement Meter reinforcement depth is 7m, point 7 section Grouting Pipes, segmenting slip casting;First row injected hole arrangement Grouting Pipe design reinforcement depth 5m, Divide 5 section Grouting Pipes, segmenting slip casting.
C. injecting paste material and parameter, grouting equipment select BW250 type speed change grouting pump.Grouting serous fluid is with cement-sodium silicate Based on dual slurry, supplemented by single liquid cement slurry.Cement slurry and water glass solution volume ratio are as follows: 3:1, wherein the cement slurry ratio of mud is 1: 1.25, concentration of sodium silicate is 35Be ', and grouting pressure 0.6MPa, flow rate of grouting control is in 1.6m3/h。
D. slip casting principle and method, the injected hole slip casting of the first section of jurisdiction in left line service channel two sides of the bottom, left line are whole After slip casting, then in right line slip casting.Pre-pouring grout follows a small amount of, multiple, multiple spot, uniform principle.Section by section according to projected depth Slip casting.Injected hole among slip casting Shi Xiancong first row starts slip casting, is then successively perfused to the injected hole at both ends;Again from second The injected hole at row both ends starts slip casting, is then successively perfused to intermediate injected hole.Then from the intermediate injected hole of third row to The injected hole slip casting at both ends.
E. it arranges Freezing Station, equipment, piping connection, heat preservation and test instrumentation is installed, dissolve calcium chloride and unit fills fluorine and adds Oil.
F. after slip casting is completed, sealing of hole is carried out with hydrophilic epoxy resin concrete, starts frozen construction, keeps minimum salt water temperature - 30~-28 DEG C of degree, until design frozen region reinforces and completes.

Claims (8)

1. service channel bottom pre-pouring grout system, which is characterized in that design freezing range of the system in service channel bottom (9) at least 1 row's injected hole, and every row's injected hole at least 1 are equipped in, the insertion into design freezing range (9) from injected hole The angle of Grouting Pipe, every row's injected hole and tunnel center line is 10 ° -80 °, the angle of Grouting Pipe and tunnel center line is 15 ° - 75°。
2. service channel bottom pre-pouring grout system according to claim 1, which is characterized in that the injected hole is 3 rows, point It Wei not the first injected hole (1), the second injected hole (2) and third injected hole (3).
3. service channel bottom pre-pouring grout system according to claim 2, which is characterized in that the first injected hole (1) and tunnel The angle of road center line is 15 °, and the angle of the second injected hole (2) and tunnel center line is 30 °, third injected hole (3) and tunnel The angle of center line is 60 °.
4. service channel bottom pre-pouring grout system according to claim 2 or 3, which is characterized in that the first injected hole (1), Spacing ratio between spacing between second injected hole (2) and the second injected hole (2), third injected hole (3) is 1:2-1:0.8.
5. service channel bottom pre-pouring grout system according to claim 2 or 3, which is characterized in that every row's injected hole has 7 It is a, and be arranged symmetrically along service channel center line (7).
6. service channel bottom pre-pouring grout system according to claim 2 or 3, which is characterized in that with the first injected hole (1), the second injected hole (2) and the corresponding Grouting Pipe of third injected hole (3) are respectively the first Grouting Pipe (4), the second Grouting Pipe (5) With third Grouting Pipe (6), wherein the angle of the first Grouting Pipe (4) and tunnel center line is 45 °, the second Grouting Pipe (5) and third The angle of Grouting Pipe (6) and tunnel center line is 60 °.
7. service channel bottom pre-pouring grout system according to claim 6, which is characterized in that the first Grouting Pipe (4), second Grouting Pipe (5) and third Grouting Pipe (6) are merogenesis Grouting Pipe, and the ratio between slip casting depth is 1:2:2.
8. the method for thaw collapse after claim 1-3,6 any service channel bottom pre-pouring grout system control freezing constructions, It is characterized in that comprising the steps of:
A. injected hole is arranged, when shield driving splices section of jurisdiction, in service channel two sides using the section of jurisdiction of reserved injected hole, left and right line It is symmetrical arranged;
B. Grouting Pipe is arranged, pierces Grouting Pipe from reserved slip casting hole location, carries out slip casting, the setting of Grouting Pipe merogenesis;
C. injecting paste material and parameter, grouting serous fluid is based on cement-sodium silicate double liquid, supplemented by single liquid cement slurry, grouting pressure For 0.2-0.8MPa, flow rate of grouting is controlled in 1.0-2.0m3/h;
D. slip casting principle and mode, first in the injected hole slip casting of left line service channel two sides of the bottom section of jurisdiction, left line whole slip casting is complete Bi Hou, then in right line slip casting, pre-pouring grout follows a small amount of, multiple, multiple spot, uniform principle, according to projected depth slip casting section by section, note Injected hole among slurry Shi Xiancong first row starts slip casting, is then successively perfused to the injected hole at both ends;Again from second row both ends Injected hole start slip casting, be then successively perfused to intermediate injected hole, then from the intermediate injected hole of third row to both ends Injected hole slip casting;
E. it arranges Freezing Station, equipment, piping connection, heat preservation and test instrumentation is installed, dissolve calcium chloride and unit fills fluorine oiling;
F. after slip casting is completed, sealing of hole is carried out with hydrophilic epoxy resin concrete, starts frozen construction after maintenance, keeps minimum salt water Temperature -30~-28 DEG C, until design frozen region reinforces and completes.
CN201910392423.5A 2019-05-13 2019-05-13 The method of thaw collapse after service channel bottom pre-pouring grout system and control freezing construction Pending CN110130316A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910392423.5A CN110130316A (en) 2019-05-13 2019-05-13 The method of thaw collapse after service channel bottom pre-pouring grout system and control freezing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910392423.5A CN110130316A (en) 2019-05-13 2019-05-13 The method of thaw collapse after service channel bottom pre-pouring grout system and control freezing construction

Publications (1)

Publication Number Publication Date
CN110130316A true CN110130316A (en) 2019-08-16

Family

ID=67573409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910392423.5A Pending CN110130316A (en) 2019-05-13 2019-05-13 The method of thaw collapse after service channel bottom pre-pouring grout system and control freezing construction

Country Status (1)

Country Link
CN (1) CN110130316A (en)

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101463724A (en) * 2008-12-30 2009-06-24 上海隧道工程股份有限公司 Construction method for connection passage by double-row hole horizontal freezing method
KR101440258B1 (en) * 2013-08-22 2014-09-17 정재민 Messer construction method with grouting means
CN104453942A (en) * 2014-10-17 2015-03-25 海南大学 Construction method for restraining frost heave and thaw settlement in cup-shaped horizontal freezing
CN104963334A (en) * 2015-07-13 2015-10-07 南京林业大学 Construction method for utilizing grouting freezing pipe to reinforce and freeze contact passage to restrain frost heaving and thaw collapsing
CN105569661A (en) * 2015-10-12 2016-05-11 上海勘测设计研究院有限公司 Arrangement structure and construction method of river-crossing underground square
CN106089214A (en) * 2016-06-21 2016-11-09 中铁十局集团第三建设有限公司 Service channel manual pipe jacking reinforced construction method
CN107083977A (en) * 2017-06-23 2017-08-22 中国矿业大学 A kind of grouting strengthening method of many granularities of argillaceous soft rock tunnel subregion
CN107268600A (en) * 2017-08-01 2017-10-20 江苏燕宁建设工程有限公司 Grouting strengthening method, pipe jacking construction method and application
CN107740699A (en) * 2017-09-01 2018-02-27 北京中煤矿山工程有限公司 The method that ground pours construction freezing method Metro Connection Passage concrete structure
CN207598254U (en) * 2017-12-21 2018-07-10 中铁二十一局集团轨道交通工程有限公司 A kind of shield radial direction stratum bracing means
CN108825269A (en) * 2018-05-30 2018-11-16 宁波大学 Mechanical Method service channel T socket part position adaptive waterproof construction
CN108843328A (en) * 2018-06-25 2018-11-20 佳琳 A kind of Metro Connection Passage excavation construction support construction method
CN108894247A (en) * 2018-07-25 2018-11-27 佳琳 A kind of Metro Connection Passage periphery soil body subsidence pressure circle spray reinforcement structure and construction method
CN109083645A (en) * 2018-08-01 2018-12-25 南宁轨道交通集团有限责任公司 Shield tunnel and service channel method for synchronously constructing under the conditions of rich water round gravel stratum
CN109268018A (en) * 2018-09-27 2019-01-25 中铁十八局集团有限公司 The device and method of synchronous thaw settlement grouting when a kind of defrosting
CN109488334A (en) * 2018-10-25 2019-03-19 中铁第勘察设计院集团有限公司 Deep hole grouting reinforcement means and equipment in shield tunnel
CN109611098A (en) * 2019-01-18 2019-04-12 马钢集团矿业有限公司 A kind of shaft of vertical well quick freezing method under the conditions of deep layer runoff water is larger
CN109668747A (en) * 2018-11-06 2019-04-23 宁波大学 Mechanical Method service channel development machine receives model test platform and its test method
CN210066718U (en) * 2019-05-13 2020-02-14 南京林业大学 Pre-grouting system at bottom of communication channel

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101463724A (en) * 2008-12-30 2009-06-24 上海隧道工程股份有限公司 Construction method for connection passage by double-row hole horizontal freezing method
KR101440258B1 (en) * 2013-08-22 2014-09-17 정재민 Messer construction method with grouting means
CN104453942A (en) * 2014-10-17 2015-03-25 海南大学 Construction method for restraining frost heave and thaw settlement in cup-shaped horizontal freezing
CN104963334A (en) * 2015-07-13 2015-10-07 南京林业大学 Construction method for utilizing grouting freezing pipe to reinforce and freeze contact passage to restrain frost heaving and thaw collapsing
CN105569661A (en) * 2015-10-12 2016-05-11 上海勘测设计研究院有限公司 Arrangement structure and construction method of river-crossing underground square
CN106089214A (en) * 2016-06-21 2016-11-09 中铁十局集团第三建设有限公司 Service channel manual pipe jacking reinforced construction method
CN107083977A (en) * 2017-06-23 2017-08-22 中国矿业大学 A kind of grouting strengthening method of many granularities of argillaceous soft rock tunnel subregion
CN107268600A (en) * 2017-08-01 2017-10-20 江苏燕宁建设工程有限公司 Grouting strengthening method, pipe jacking construction method and application
CN107740699A (en) * 2017-09-01 2018-02-27 北京中煤矿山工程有限公司 The method that ground pours construction freezing method Metro Connection Passage concrete structure
CN207598254U (en) * 2017-12-21 2018-07-10 中铁二十一局集团轨道交通工程有限公司 A kind of shield radial direction stratum bracing means
CN108825269A (en) * 2018-05-30 2018-11-16 宁波大学 Mechanical Method service channel T socket part position adaptive waterproof construction
CN108843328A (en) * 2018-06-25 2018-11-20 佳琳 A kind of Metro Connection Passage excavation construction support construction method
CN108894247A (en) * 2018-07-25 2018-11-27 佳琳 A kind of Metro Connection Passage periphery soil body subsidence pressure circle spray reinforcement structure and construction method
CN109083645A (en) * 2018-08-01 2018-12-25 南宁轨道交通集团有限责任公司 Shield tunnel and service channel method for synchronously constructing under the conditions of rich water round gravel stratum
CN109268018A (en) * 2018-09-27 2019-01-25 中铁十八局集团有限公司 The device and method of synchronous thaw settlement grouting when a kind of defrosting
CN109488334A (en) * 2018-10-25 2019-03-19 中铁第勘察设计院集团有限公司 Deep hole grouting reinforcement means and equipment in shield tunnel
CN109668747A (en) * 2018-11-06 2019-04-23 宁波大学 Mechanical Method service channel development machine receives model test platform and its test method
CN109611098A (en) * 2019-01-18 2019-04-12 马钢集团矿业有限公司 A kind of shaft of vertical well quick freezing method under the conditions of deep layer runoff water is larger
CN210066718U (en) * 2019-05-13 2020-02-14 南京林业大学 Pre-grouting system at bottom of communication channel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张鹏;蒋尊涛;: "预注浆加固技术在冻结法地铁联络通道施工中的应用", 建井技术, vol. 36, no. 01, pages 30 - 32 *
赵建平;: "联络通道施工对隧道的影响分析", 低温建筑技术, no. 04, pages 115 - 117 *

Similar Documents

Publication Publication Date Title
CN107676097B (en) A kind of high hydraulic pressure soft soil layer HFE composite shield originating method
CN104963334B (en) Reinforced with slip casting freezing pipe and freeze the construction method that service channel suppresses frozen swell and melt settlement
CN105134284B (en) One kind is based on horizontal orientation drilling liquid nitrogen circulating freezing resistance anti-reflection mash gas extraction method
CN103015402B (en) Construction method for inhibiting frost heaving and thaw collapse of horizontally frozen end through cement-soil reinforcement method
CN105804761B (en) Construction method suitable for liquefied sand stratum shield near-distance passing through building
CN106437726B (en) Shallow-depth-excavation tunnel crosses ground fissure crushed zone construction method
CN110359921A (en) Wear the construction method of building in a kind of shield short distance side
CN105909260B (en) Subway station water stop structure for protecting groundwater environment and construction method thereof
CN109208637A (en) Increase the construction method of open-cut station newly on the basis of existing tunnel
CN102352757B (en) Method for controlling upward floating of pipe piece during shield machine air pushing through mining tunnel
CN105804758A (en) Shallow-earthing, large-section and small-distance construction method for rectangular pipe jacking overpass subway tunnel
CN104806253B (en) A kind of construction method punched between rectangular top pipe passage
CN205975649U (en) Freezing pipe curtain steel pipe supporting construction
CN110130936A (en) It dashes forward in a kind of shield tunneling process and meets the construction method of untreated solution cavity or crack
CN105297742A (en) Structure and method of water stopping support of underground space
CN111593726A (en) Joint reinforcement method for underground tunnel penetrating sensitive pipeline of water-rich stratum and butt joint of existing structure MJS + artificial freezing
CN105239585A (en) In-pile freezing structure of deep underground space and constructing method
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
CN108843328A (en) A kind of Metro Connection Passage excavation construction support construction method
CN104088652A (en) Method for horizontal dynamic controlled-freezing water stopping between pipe roofs
CN106677791B (en) A kind of construction method of shallow embedding shield driven tunnel crossing highway
KR100538316B1 (en) The apparatus and method of earth grouting using compressed air system for intermittent vibrated wave production
CN210066718U (en) Pre-grouting system at bottom of communication channel
CN105971638A (en) Application of WSS construction method in shield tool changing reinforcement of water-rich sand layer
CN105040710A (en) Support structure for bilge well construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination