CN108825269A - Mechanical Method service channel T socket part position adaptive waterproof construction - Google Patents

Mechanical Method service channel T socket part position adaptive waterproof construction Download PDF

Info

Publication number
CN108825269A
CN108825269A CN201810540216.5A CN201810540216A CN108825269A CN 108825269 A CN108825269 A CN 108825269A CN 201810540216 A CN201810540216 A CN 201810540216A CN 108825269 A CN108825269 A CN 108825269A
Authority
CN
China
Prior art keywords
service channel
water
jurisdiction
shield tunnel
sealing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810540216.5A
Other languages
Chinese (zh)
Other versions
CN108825269B (en
Inventor
刘干斌
朱瑶宏
丁修恒
董子博
周俊宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Youxin Construction Co ltd
Original Assignee
Ningbo University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo University filed Critical Ningbo University
Priority to CN201810540216.5A priority Critical patent/CN108825269B/en
Publication of CN108825269A publication Critical patent/CN108825269A/en
Application granted granted Critical
Publication of CN108825269B publication Critical patent/CN108825269B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members
    • E21D11/386Sealing means positioned between adjacent lining members inflatable sealing means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of Mechanical Method service channel T socket part position adaptive waterproof construction, including outsourcing waterproof system, the compound section of jurisdiction waterproof construction of shield tunnel, shield tunnel wall after sealing injecting cement paste, service channel section of jurisdiction waterproof construction and service channel wall after sealing injecting cement paste;Outsourcing waterproof system include be set to tunnel main structure bottom plate, top plate closure steel plate and be set to tunnel main structure two sides side wall block steel plate, block steel plate subelement modularity be welded on service channel steel pipe sheet;The compound section of jurisdiction waterproof construction of shield tunnel include the compound section of jurisdiction of shield tunnel, shield tunnel concrete pipe sheet, the hydro-expansive rubber item of longitudinal joint, hydro-expansive rubber thin slice, cement-base infiltration crystallization type coating, circumferential weld water-swellable gasket.The beneficial effects of the invention are as follows:The processing of closure steel plate industry modularity that the present invention uses, easy for installation, piece is few, waterproof effect is good, and can guarantee construction speed.

Description

Mechanical Method service channel T socket part position adaptive waterproof construction
Technical field
The present invention relates to a kind of waterproof constructions of tunnel structure, more particularly, to a kind of Mechanical Method service channel and shield tunnel The waterproof construction of road T socket part position.
Background technique
With rapid economic development, China Transportation Industry be also pushed ahead with speed with rapid changepl. never-ending changes and improvements, wherein Iron is also to build in more and more cities.Currently, China's Metro Tunnel mainly uses Dryopteris sublaetaChing et Hsu side Method, to ensure construction quality and construction safety, the waterproof in construction is the most important thing of entire work progress, needs to carry out subway The waterproofness of main body.During metro operation, the percolating water situation in tunnel is also very universal, and harmfulness is more serious, such as Fruit cannot efficiently solve leakage problem, then can affect greatly to the total quality of subway tunnel, to influence ground The service life of iron tunnel structure and safety.In the waterproof of subway tunnel, construction joint is part the weakest, therefore, It is particularly important to the water-proofing treatment work of construction joint.Under normal circumstances, construction joint refers to due to by construction method or technology Influence, lead to occur gap in concrete structure.This largely affects the self waterproofing effect of concrete.According to applying The actual demand and design of work project need, and reasonable solution are taken, to improve the total quality of subway tunnel.
The water-repellent type of subway tunnel can be divided into 3 kinds, i.e. dewatering type, water proof type and anti-row's mating type at present.Waterproof Type is that very directly, easily a kind of drainage pattern, application are relatively broad.Since Structural Lining is constantly subjected to the shadow of water pressure It rings, compared to for other two methods, leakproof is not strong, and leak once occurs and is also difficult to solve;Anti- row's mating type energy Waterproof and the advantage of draining are organically combined, though reduce the hydraulic pressure of Structural Lining to a certain extent based on waterproof Power, thus a possibility that greatly reducing leak, meanwhile, the subway tunnel drainage system expense excessive without consumption.It is selecting When selecting the water-repellent type of subway tunnel, local engineering geology, hydrogeology, subway waterproof-ing grade and environment are comprehensively considered It is required that etc., under the premise of draining does not adversely affect environment, meet the reliability of waterproof.
To solve the problems, such as that freezing Freezing Method for Cross-passage Construction is brought, the ground such as Europe, Japan and Hong Kong are carried out in succession The research of service channel development machine, research and development non-freezing, main tunnel space are small, cut the technologies items such as export & import, channel design complexity Mechanical Method Freezing Method for Cross-passage Construction under part is equipped and technology, main tunnel-contact admittance tunnel T socket part position waterproof in this technology The safety used subsequent for tunnel is even more important.
In recent years, a large amount of research work, application number have been done in terms of tunnel water proofing and construction method both at home and abroad 201010277951.5 patent disclose《A kind of construction method of tunnel waterproof system》, which includes being set to tunnel The side wall waterproof steel plate of the waterproof slab steel plate of road main structure bottom plate and the two sides for being set to tunnel main structure, this method packet It includes modularity and processes the subelement of waterproof steel plate, waterproof slab steel plate construction of leveling blanket, mounting base waterproof steel plate and installation Side wall waterproof steel plate and subsequent operation.The patent of application number 201510724005.3 discloses《It a kind of tunnel waterproofing construction and applies Work method》, which is made of the permeable layer and waterproof layer being sequentially formed at outside base, and waterproof layer is by muti-piece waterproof board group At the waterproof layer of same section is applied by one whole splash guard, is formed overlap joint along the adjacent splash guard of tunnel depth direction and is fixed.
The construction method of tunnel waterproof system disclosed in the prior art carries out large tunnel for high-moisture region When construction, generally existing construction procedure is various, method is complicated is difficult to realize, applies that low efficiency, long in time limit and there are comparable peaces The defect of full property problem.Some even after the completion of tunnel waterproof system applies, is difficult to guarantee constructing tunnel and subsequent use Safety.
Summary of the invention
The purpose of the present invention is overcoming deficiency in the prior art, it is adaptive to provide a kind of Mechanical Method service channel T socket part position Answer waterproof construction.
This Mechanical Method service channel T socket part position adaptive waterproof construction, including outsourcing waterproof system, shield tunnel are compound Section of jurisdiction waterproof construction, shield tunnel wall after sealing injecting cement paste, service channel section of jurisdiction waterproof construction and service channel wall after only Water injecting cement paste;
Outsourcing waterproof system include be set to tunnel main structure bottom plate, top plate closure steel plate and be set to tunnel main body The side wall of structure two sides blocks steel plate, blocks steel plate subelement modularity and is welded on service channel steel pipe sheet;
The compound section of jurisdiction waterproof construction of shield tunnel includes the compound section of jurisdiction of shield tunnel, shield tunnel concrete pipe sheet, longitudinal joint Hydro-expansive rubber item, hydro-expansive rubber thin slice, cement-base infiltration crystallization type coating, circumferential weld water-swellable gasket, Ethylene propylene diene rubber elastic sealing gasket, waterstop sealing pad and sealing plate;Hydro-expansive rubber item, hydro-expansive rubber thin slice, water Mud base infiltration crystallization type coating surface is closely attached to shield tunnel multiple tube on piece, and the compound section of jurisdiction part ring of shield tunnel, longitudinal joint are set Set ethylene propylene diene rubber elastic sealing gasket;Waterstop sealing pad, sealing plate are fixed on the compound section of jurisdiction of shield tunnel by sealing bolt On;Sealing injecting cement paste includes cement-silicate two fluid grouting reinforcing body after the wall of shield tunnel;
Service channel section of jurisdiction waterproof construction includes service channel steel pipe sheet, service channel concrete pipe sheet, water-swellable rubber Foam strip is set between the vertical of glue gasket and foam strip, service channel steel pipe sheet and service channel concrete pipe sheet, circumferential weld, is met Water-expansible rubber gasket;Sealing injecting cement paste includes cement-silicate two fluid grouting reinforcing body and ultra-fine water after the wall of service channel Muddy water glass slip casting sealing and reinforcing body.
As preferred:Gasket is pressed completely in people's gasket groove, and the sectional area of gasket groove is not less than gasket Sectional area, the depth-to-width ratio of filleting slot are not less than 2.5, and groove depth is 25~55mm, and single side groove width is 5~10mm.
As preferred:Waterstop sealing pad is High-molecular rubber material.
As preferred:The dual slurry of cement-silicate two fluid grouting reinforcing body is made of A liquid and B liquid, A, B liquid each component Volume proportion is 1: 1;A liquid group is divided into ordinary portland cement and water, and the weight proportion of A liquid each component is:Cement 30~50%, Remainder is water;B liquid group is divided into waterglass and water, and the weight proportion of B liquid each component is:Waterglass 45~50%, remainder It is divided into water.
As preferred:Block steel plate, service channel steel pipe sheet, the triangular gap closure slip casting in the compound section of jurisdiction of shield tunnel Slurries be adaptive expansion slurry, be made of A liquid and B liquid, the volume proportion of A, B liquid each component is 1: 1;A liquid group is divided into swollen The weight proportion of swollen cement and water, A liquid each component is:Expanding cement 30~50%, remainder are water;B liquid group is divided into water glass The weight proportion of glass and water, B liquid each component is:Waterglass 45~50%, remainder are water.
As preferred:Reinforced concrete circle beam, the setting of service channel lower part is arranged in shield tunnel and service channel junction Armored concrete.
The beneficial effects of the invention are as follows:
1, the closure steel plate industry modularity processing that the present invention uses, easy for installation, piece is few, waterproof effect is good It is good, and can guarantee construction speed.In the solution of the present invention, by the subelement deformation joint welding steel for blocking steel plate Waterstop makes to block the double effects that steel plate is provided simultaneously with rigid waterproofing and outboard template, improves and apply according to the method for the present invention The waterproof performance of the tunnel waterproof system of work, it is ensured that the construction safety and engineering matter of tunnel waterproof system or even entire Tunnel Engineering Amount.
2, the new early strength of adaptive expansion slurry that the present invention uses is high, and later strength growth is larger, and long-term strength is steady It is fixed to rise, and since expanding cement is in the high sulfur type aquation sulphur aluminic acid (entringite) of hardening initial stage generation, so that dual slurry is generated volume Expansion, improves the pore structure of slurry under constraint condition, and reduces overall porosity, and capillary aperture reduces, to improve slurry Density and impermeability, so as to reduce Mechanical Method service channel to a certain extent and shield tunnel T connects part leakage Possibility.
3, construction method of the invention is easy to operate, strong operability, and construction efficiency is high.
Detailed description of the invention
Fig. 1 is Mechanical Method Freezing Method for Cross-passage Construction schematic diagram;
Fig. 2 is Mechanical Method service channel T socket part position waterproof construction schematic diagram;
Fig. 3 is service channel and shield tunnel linked system schematic diagram;
Fig. 4 is service channel section of jurisdiction waterproof construction schematic diagram;
Fig. 5 is waterproof structure of shield-structured tunnel segment schematic diagram;
Fig. 6 is elastic sealing gasket schematic diagram;
Fig. 7 is elastic sealing gasket cross-sectional view;
Description of symbols:1- shield tunnel concrete pipe sheet;The compound section of jurisdiction of 2- shield tunnel;Connector between the section of jurisdiction 3- System;4- service channel steel pipe sheet;5- service channel concrete pipe sheet;6- steel pipe sheet injected hole;7- sealing bolt;8- service channel Reserve injected hole in section of jurisdiction;9- superfine cement waterglass slip casting sealing and reinforcing body;10- aluminium sulfate slightly expanded concrete;11- meets water Expanded rubber item;12- blocks steel plate;13- reinforced concrete circle beam;14- rigid reinforcement body;15- waterstop sealing pad;16- sealing Plate;The compound section of jurisdiction concrete pipe sheet of 17-;18- foam strip;19- hydro-expansive rubber sealing cushion;20- water-swellable gasket; 21- cement-base infiltration crystallization type coating;22- hydro-expansive rubber thin slice;23- ethylene propylene diene rubber elastic sealing gasket;24- cement Silicate double solution grouting reinforcing body;25- armored concrete.
Specific embodiment
The present invention is described further below with reference to embodiment.The explanation of following embodiments is merely used to help understand this Invention.It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, also Can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the protection scope of the claims in the present invention It is interior.
Embodiment one
As shown in Figures 1 to 5, the Mechanical Method service channel T socket part position adaptive waterproof construction, mainly by shield Behind structure tunnel and service channel T socket part position setting outsourcing waterproof system, the compound tunnel segment structure waterproof of 7 ring steel reinforced concrete of shield tunnel and wall Injecting cement paste sealing, service channel tunnel segment structure waterproof and grouting behind shaft or drift lining body sealing, and block steel plate 12, service channel steel pipe sheet 4, it is anti-to form a set of service channel and shield tunnel T socket part position to block slip casting for the shield tunnel triangular gap in compound section of jurisdiction 2 Water system.The setting of 3 region of interest of linked system is met between shield tunnel concrete pipe sheet 1, the compound section of jurisdiction 2 of shield tunnel and section of jurisdiction Water-expansible rubber item 11, water-swellable gasket 20, cement-base infiltration crystallization type coating 21, hydro-expansive rubber thin slice 22, three First EP rubbers elastic sealing gasket 23 and sealing bolt 7 use secondary grouting in shield tunnel outer wall, form cement-silicate Two fluid grouting reinforcing body 24, to form the waterproof construction system of shield tunnel.Service channel steel pipe sheet 4 is micro- using aluminium sulfate Expansive concrete 10 is filled, and foam is used between service channel steel pipe sheet 4 and the vertical of service channel concrete pipe sheet 5, circumferential weld Item 18, hydro-expansive rubber sealing cushion 19 are carried out joint seal and are manually infused after the completion of assembled using steel pipe sheet injected hole 6 Slurry is reserved injected hole 8 using service channel section of jurisdiction and is manually infused to form superfine cement waterglass slip casting sealing and reinforcing body 9 Slurry, to form cement-silicate two fluid grouting reinforcing body 24.
After the completion of shield tunnel, service channel are constructed respectively, reinforcing bar is set in shield tunnel and service channel T socket part position Concrete ring beam 13 and armored concrete 25.It blocks steel plate 12 and carries out subelement planning, modularity processing, is welded on connection at assembly Top, bottom and the side of network channel pipe piece 4.Using the fixed sealing of sealing bolt 7 on the inside of compound section of jurisdiction concrete pipe sheet 17 Gasket 15 and sealing plate 16, it is adaptively swollen in shield tunnel and service channel gap site injection superfine cement waterglass biliquid Swollen slurry is to form superfine cement waterglass slip casting sealing and reinforcing body 9, to constitute shield tunnel and service channel T socket part position Water-proof system.
It blocks steel plate 12 and uses Q235B grades of steel, watertightness weld seam, it then follows first up and down, the principle that rear left backhand welding connects.Butt welding 45 ° of grooves should be set up to be fully welded, overlap welding should be fully welded, and welding uses E43XX type welding rod.Surface should be evened after the completion of welding out, gone forward side by side 100% magnetic spy of row wound.Corrosion-inhibiting coating after welding destroys should all brush solvent-free super thick epoxy coating 2 again.Block steel 12 blanking cut lengths allowance control of plate is within hand cut ± 1.5mm, within automatic semi-automatic cutting ± 1.0mm, vertically Within the 2% of steel plate thickness, and within the scope of ± 1.5mm, cutting periphery is required to be smooth smooth for degree control.Steel plate 12 is blocked to exist The processing of elimination burr, greasy dirt and attachment is done before use, and in the inorganic antirusting paint of upstream face brushing for blocking steel plate 12.
Two kinds of gasket joints on the compound section of jurisdiction 2 of shield tunnel generate after being pressurized by gasket along arc length direction Compression and hydro-expansive rubber meet the expansive force generated after water and reach waterproof efficacy.The compound section of jurisdiction 2 of shield tunnel Seam between shield tunnel concrete pipe sheet 1 is using water-swellable water-stop glue as temporary leaking water measure.Shield tunnel is multiple 2 circumferential weld surface mount of section of jurisdiction, one of 2mm excellent pay and conditions water-expansible rubber thin slice 22 is closed, position should be close to the steel plate provided with water-stop glue. Extrados, each 100mm range brushing in intrados two sides of shield tunnel compound section of jurisdiction 2 and 1 seam of shield tunnel concrete pipe sheet Cement based penetration crystallization type water proofing paint, dosage 1.5kg/m2.Sealing injecting cement paste includes that cement-silicate two fluid grouting adds after wall Solid 24.Segment joint gasket should meet under the seam maximum joint open of calculating and the magnitude of misalignment of estimation, buried depth head 2 Non-leakage technical requirements under~3 times of hydraulic pressure.
The technical performance index (water bar, hydro-expansive rubber thin slice index) of hydro-expansive rubber sealing cushion sizing material 19 is such as Shown in table 1.
The technical performance index of 1 water-expansible rubber gasket sizing material of table
The physical and mechanical property indexs of water-swellable water-stop glue are as shown in table 2.
The physical and mechanical property indexs of 2 water-swellable water-stop glue of table
The physical and mechanical property indexs of ethylene propylene diene rubber elastic sealing gasket 23 are as shown in table 3.
The physical and mechanical property indexs of 3 EPDM of table (EPDM) caoutchouc elasticity gasket
Cement based penetration crystallization type water proofing paint performance indicator is as shown in table 4.
4 cement based penetration crystallization type water proofing paint performance indicator of table
Cement-silicate two fluid grouting reinforcing body 24 uses 2 Double-liquid mud-injection pump synchronous groutings, and synchronous grouting is using lag Artificial slip casting.Slurries are cement-water-clay system, are injected by the injected hole that section of jurisdiction is reserved, and injection point is 4 points, pressure Control is less than 0.35MPa, and injection phase is 4 rings after front ring;After shield receives and completes the installation of portal interface, for filling slurry Liquid shrinks the gap generated and blocks breakthrough should carry out secondary grouting after completing driving, and slurries use cement-sodium silicate liquid It starches, pressure control is less than 0.35MPa in injection process.
Closure steel plate 12, service channel steel pipe sheet 4, the injection of the shield tunnel triangular gap in compound section of jurisdiction 2 are adaptive swollen Swollen slurry forms slip casting sealing and reinforcing body with plugging gap, and the sealing and reinforcing body is arranged by service channel steel pipe sheet 4 Injected hole inject adaptive expansion dual slurry to triangular gap, slurries include A liquid and B liquid composition, A, B liquid each component Volume proportion is 1: 1.A liquid group is divided into expanding cement and water, and the weight proportion of A liquid each component is:Expanding cement 30~50% remains Remaining part is divided into water.B liquid group is divided into waterglass and water, and the weight proportion of B liquid each component is:Waterglass 45~50%, remainder For water.The specific surface area of expanding cement particle is typically up to 4800 ± 200cm2/ g, the free swelling rate of expanding cement is 8~10 × 10-4, the seif-citing rate of 0.1~0.3MPa can be established in dual slurry, met the sedimentation of T socket part position, shunk requirement;Expanding cement coagulation Native anti-penetration grade is greater than S30.
Embodiment two
Ningbo Rail Transit Line 3 first stage of the project south business district station~Yinzhou District government station section service channel, south Business district station~Yinzhou District government station starting point mileage ZDK7+794.800, terminal mileage ZDK8+754.100, length of tunnel is about 959.3m.Service channel mileage is ZDK8+214.377, and buried depth is 16.94m at this, line spacing is 17m.The service channel uses Mechanical Method construction.Shield tunnel diameter 6200, section of jurisdiction thickness 350 lay 8 injected holes on service channel hole periphery.Contact is logical Road digging diameter 3290mm, small section of jurisdiction diameter 3150mm, ring width 550mm, the every ring in the small section of jurisdiction of service channel lay 5 injected holes.
1, shield tunnel, service channel section of jurisdiction be vertical, ring seam waterproof
Pipe sheet assembling uses staggered joint erection.Just build ring (section of jurisdiction) piecemeal use one piece of block that binds, two pieces of adjacent blocks, three pieces The scheme — that is, 5+1 mode of calibrated bolck.This section uses the small block that binds, radial first to overlap 2/3, then 1/3 method of longitudinal push-in is applied Work.
(1) gasket waterproof
Tunnel duct piece seam waterproof is using sealings such as ethylene propylene diene rubber elastic sealing gaskets 23, in the gasket groove of section of jurisdiction Ethylene propylene diene rubber elastic sealing gasket 23 is pasted, it is compacted come waterproof by compression by it, as shown in Figure 6.
Elastic packing cushion material is ethylene propylene diene rubber, and in factory process at sharp-featured frame shape rubber ring, elasticity is close The cross section of packing is in detail as shown in Figure 7.Elastic sealing gasket is marched into the arena before stickup, it is necessary to by product send to qualified inspection center into Its examination of materials of row.
Brushing one pack system neoprene-phenolic aldehyde alite paste in the gasket groove of section of jurisdiction.Before brushing, section of jurisdiction surface should be dried, and be applied Alite paste uniformly should answer full coat in gasket groove when brush.It is cool to set a period of time (10~15min, with gas after alite paste brushing Epidemic disaster and it is different), be inserted in gasket groove when finger contact is not viscous, then by the frame shape rubber ring processed.Gasket exists Paste it is preposition in warming shaping 36h in 40 DEG C~60 DEG C of drying chamber, avoid gasket flexure, deformation.After stickup, section of jurisdiction quadrangle For gasket there is not allowed that shrugging, sunken shoulder phenomenon, entire gasket surface should forbid skew, distortion in the same plane.Section of jurisdiction exists It pastes in installing gasket 12h, underground must not be sent assembled.The gasket of block two sides of binding applies surface lubricant before assembly, with Reduce mill resistance when binding block insertion between gasket.
(2) filleting waterproof
Filleting operation is to achieve the purpose that seal waterproof by the filling and bonding force of caulking material.Generally require filleting material Material has good cementability (bear the hydrostatic pressure of lining cutting outer wall) with basal plane, preferable elasticity (adapt to tunnel deformation), And its material property must keep stable.When pipe sheet assembling, the filleting slot fragmentation sometimes at corner and edge, it is serious very To exposing reinforcing bar.Underground water will be directly entered tunnel by section of jurisdiction crack around the elastic sealing gasket of seam in this way, make simultaneously At steel bar corrosion, structural strength is influenced.The section of jurisdiction of damage should be repaired when repairing to original size, the especially shape of filleting slot Shape and size.The silt sundries in filleting slot is removed with wire brush, is rinsed well with clear water.Brushing interfacial agents are to make neoprene The firm connection of latex cement and section of jurisdiction is not fallen off and seamless.Interface treating agent uses YJ-302 interface treating agent.Brushing range It is within the scope of slot inner wall, each 15mm range in longitudinal joint two sides and each 16mm in circumferential weld two sides.The interfacial agents mixed and stirred every time should be at 2 hours Inside it is finished.
(3) node waterproof
Shield tunnel bolt hole, hole for hoist (injected hole) use water swelling rubber ring sealing.Rubber ring internal diameter 25mm, outside Diameter 39mm.
(4) waterproof outside section of jurisdiction
After service channel shield driving, by manually injecting closely knit slurries to this gap in time, reach outside section of jurisdiction Waterproof and the purpose for controlling stratum settlement.
(5) secondary grouting
For shield tunnel, to carrying out secondary grouting within the scope of 20 rings before and after the left and right line of proposed service channel.Selection can infuse Property is strong, durable, consolidating strength is high, the normal silicate of relative low price pollution-free to underground water and ambient enviroment Cement slurry.
2, steel pipe sheet sealing
The steel construction part welding for duct pieces of shield tunnel being originated and being received 6 pieces of compound sections of jurisdiction at portal is linked as entirety, adopts It is reduced and is deformed with wandering sequence, divide multi-layer welding, 3~5mm of every layer of throat thickness.Block 12 blanking cut lengths allowance control of steel plate Within hand cut ± 1.5mm, within automatic semi-automatic cutting ± 1.0mm, degree control steel plate thickness 2% it It is interior, and within the scope of ± 1.5mm, cutting periphery is required to be smooth smooth.The place of elimination burr, greasy dirt and attachment is done before use Reason, and in the inorganic antirusting paint of upstream face brushing for blocking steel plate 12.For closure steel plate 12, service channel steel pipe sheet 4, shield The triangular gap in tunnel recombination section of jurisdiction 2, the adaptive expansion slurry of slip casting injection being arranged by steel pipe sheet, with plugging gap shape At slip casting sealing and reinforcing body.

Claims (6)

1. a kind of Mechanical Method service channel T socket part position adaptive waterproof construction, it is characterised in that including outsourcing waterproof system, shield Tunnel recombination section of jurisdiction waterproof construction, shield tunnel wall after sealing injecting cement paste, service channel section of jurisdiction waterproof construction and service channel Wall after sealing injecting cement paste;
Outsourcing waterproof system include be set to tunnel main structure bottom plate, top plate closure steel plate (12) and be set to tunnel main body The closure steel plate (12) of structure two sides blocks steel plate (12) subelement modularity and is welded on service channel steel pipe sheet (4);
The compound section of jurisdiction waterproof construction of shield tunnel includes the compound section of jurisdiction of shield tunnel (2), shield tunnel concrete pipe sheet (1), indulges The chance of the hydro-expansive rubber item (11) of seam, hydro-expansive rubber thin slice (22), cement-base infiltration crystallization type coating (21), circumferential weld Water Expansion sealing pad (20), ethylene propylene diene rubber elastic sealing gasket (23), waterstop sealing pad (15) and sealing plate (16);It is swollen to meet water Swollen rubber strip (11), hydro-expansive rubber thin slice (22), cement-base infiltration crystallization type coating (21) surface are closely attached to shield tunnel On compound section of jurisdiction (2), the compound section of jurisdiction of shield tunnel (2) part ring, longitudinal joint setting ethylene propylene diene rubber elastic sealing gasket (23);Only Water seal washer (15), sealing plate (16) are fixed on the compound section of jurisdiction of shield tunnel (2) by sealing bolt (7);Shield tunnel Sealing injecting cement paste includes cement-silicate two fluid grouting reinforcing body (24) after wall;
Service channel section of jurisdiction waterproof construction includes service channel steel pipe sheet (4), service channel concrete pipe sheet (5), water-swellable The vertical of rubber gasket (19) and foam strip (18), service channel steel pipe sheet (4) and service channel concrete pipe sheet (5), circumferential weld Between be arranged foam strip (18), hydro-expansive rubber sealing cushion (19);Sealing injecting cement paste includes cement water after the wall of service channel Glass two fluid grouting reinforcing body (24) and superfine cement waterglass slip casting sealing and reinforcing body (9).
2. Mechanical Method service channel T socket part position adaptive waterproof construction according to claim 1, it is characterised in that gasket Completely in pressure people's gasket groove, the sectional area of gasket groove is not less than the sectional area of gasket, and the depth-to-width ratio of filleting slot is not Less than 2.5, groove depth is 25~55mm, and single side groove width is 5~10mm.
3. Mechanical Method service channel T socket part position adaptive waterproof construction according to claim 1, it is characterised in that sealing is close Packing (15) is High-molecular rubber material.
4. Mechanical Method service channel T socket part position adaptive waterproof construction according to claim 1, it is characterised in that cement water The dual slurry of glass two fluid grouting reinforcing body (24) is made of A liquid and B liquid, and the volume proportion of A, B liquid each component is 1: 1;A liquid group It is divided into ordinary portland cement and water, the weight proportion of A liquid each component is:Cement 30~50%, remainder are water;B liquid group It is divided into waterglass and water, the weight proportion of B liquid each component is:Waterglass 45~50%, remainder are water.
5. Mechanical Method service channel T socket part position adaptive waterproof construction according to claim 1, it is characterised in that block steel The slurries that plate (12), the triangular gap in service channel steel pipe sheet (4), the compound section of jurisdiction of shield tunnel (2) block slip casting are adaptive Slurry should be expanded, is made of A liquid and B liquid, the volume proportion of A, B liquid each component is 1: 1;A liquid group is divided into expanding cement and water, A The weight proportion of liquid each component is:Expanding cement 30~50%, remainder are water;B liquid group is divided into waterglass and water, and B liquid is each The weight proportion of component is:Waterglass 45~50%, remainder are water.
6. Mechanical Method service channel T socket part position adaptive waterproof construction according to claim 1, it is characterised in that shield tunnel Armored concrete (25) are arranged in road and service channel junction setting reinforced concrete circle beam (13), service channel lower part.
CN201810540216.5A 2018-05-30 2018-05-30 Mechanical method connecting channel T-shaped junction self-adaptive waterproof structure Active CN108825269B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810540216.5A CN108825269B (en) 2018-05-30 2018-05-30 Mechanical method connecting channel T-shaped junction self-adaptive waterproof structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810540216.5A CN108825269B (en) 2018-05-30 2018-05-30 Mechanical method connecting channel T-shaped junction self-adaptive waterproof structure

Publications (2)

Publication Number Publication Date
CN108825269A true CN108825269A (en) 2018-11-16
CN108825269B CN108825269B (en) 2020-02-07

Family

ID=64146486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810540216.5A Active CN108825269B (en) 2018-05-30 2018-05-30 Mechanical method connecting channel T-shaped junction self-adaptive waterproof structure

Country Status (1)

Country Link
CN (1) CN108825269B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339824A (en) * 2018-12-04 2019-02-15 中铁二十四局集团有限公司 A kind of duct pieces of shield tunnel Treatment Measures to Leakage method
CN110130316A (en) * 2019-05-13 2019-08-16 南京林业大学 The method of thaw collapse after service channel bottom pre-pouring grout system and control freezing construction
CN110410113A (en) * 2019-09-08 2019-11-05 天津大学前沿技术研究院有限公司 A kind of concrete pipe sheet filleting plugging device and method for blocking
CN110608052A (en) * 2019-10-22 2019-12-24 湘潭大学 Tunnel segment based on high-performance cement-based composite material and construction method thereof
CN111894605A (en) * 2020-08-06 2020-11-06 中铁隆工程集团有限公司 Structural design method of tunnel contact channel suitable for soft soil stratum
CN111963211A (en) * 2020-08-21 2020-11-20 上海市隧道工程轨道交通设计研究院 Steel structure for connecting shield tunnel with external channel
CN113202505A (en) * 2021-05-29 2021-08-03 浙江神州科技化工有限公司 Subway segment gap sealing construction process
CN113338993A (en) * 2021-06-23 2021-09-03 中铁一局集团有限公司 Connecting channel reinforcing ring beam structure and construction method thereof
CN113482690A (en) * 2021-08-16 2021-10-08 中铁第六勘察设计院集团有限公司 Calculation method for air distribution of tunnel ventilation system of ramp air exhaust type single-ramp highway
CN113622948A (en) * 2021-07-23 2021-11-09 北京市政建设集团有限责任公司 Shield tunnel connection channel pipeline device
CN114060040A (en) * 2021-11-11 2022-02-18 上海市基础工程集团有限公司 Horizontal T-joint construction method for directly jacking pipe into shield tunnel
CN114109441A (en) * 2021-10-08 2022-03-01 陕西同人应用材料有限公司 Composite cavity vacuum tension elastic die and rapid construction process using same
CN114837704A (en) * 2022-06-13 2022-08-02 深圳地铁建设集团有限公司 Sealing assembly suitable for plugging segment grouting hole and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101963062A (en) * 2010-09-08 2011-02-02 广州市建筑机械施工有限公司 Construction method for tunnel waterproofing system
CN101974319A (en) * 2010-10-21 2011-02-16 北京中煤矿山工程有限公司 Double-fluid rapid hardening slurry for roadway grouting and mollisol compaction grouting
CN102400694A (en) * 2011-10-28 2012-04-04 上海市第一市政工程有限公司 Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN106948833A (en) * 2017-04-05 2017-07-14 宁波大学 Pin-connected panel service channel structure and its construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101963062A (en) * 2010-09-08 2011-02-02 广州市建筑机械施工有限公司 Construction method for tunnel waterproofing system
CN101974319A (en) * 2010-10-21 2011-02-16 北京中煤矿山工程有限公司 Double-fluid rapid hardening slurry for roadway grouting and mollisol compaction grouting
CN102400694A (en) * 2011-10-28 2012-04-04 上海市第一市政工程有限公司 Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN106948833A (en) * 2017-04-05 2017-07-14 宁波大学 Pin-connected panel service channel structure and its construction method

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339824A (en) * 2018-12-04 2019-02-15 中铁二十四局集团有限公司 A kind of duct pieces of shield tunnel Treatment Measures to Leakage method
CN110130316A (en) * 2019-05-13 2019-08-16 南京林业大学 The method of thaw collapse after service channel bottom pre-pouring grout system and control freezing construction
CN110410113A (en) * 2019-09-08 2019-11-05 天津大学前沿技术研究院有限公司 A kind of concrete pipe sheet filleting plugging device and method for blocking
CN110608052A (en) * 2019-10-22 2019-12-24 湘潭大学 Tunnel segment based on high-performance cement-based composite material and construction method thereof
CN111894605A (en) * 2020-08-06 2020-11-06 中铁隆工程集团有限公司 Structural design method of tunnel contact channel suitable for soft soil stratum
CN111894605B (en) * 2020-08-06 2022-08-30 中铁隆工程集团有限公司 Structural design method of tunnel contact channel suitable for soft soil stratum
CN111963211A (en) * 2020-08-21 2020-11-20 上海市隧道工程轨道交通设计研究院 Steel structure for connecting shield tunnel with external channel
CN113202505A (en) * 2021-05-29 2021-08-03 浙江神州科技化工有限公司 Subway segment gap sealing construction process
CN113338993B (en) * 2021-06-23 2022-08-09 中铁一局集团有限公司 Connecting channel reinforcing ring beam structure and construction method thereof
CN113338993A (en) * 2021-06-23 2021-09-03 中铁一局集团有限公司 Connecting channel reinforcing ring beam structure and construction method thereof
CN113622948A (en) * 2021-07-23 2021-11-09 北京市政建设集团有限责任公司 Shield tunnel connection channel pipeline device
CN113622948B (en) * 2021-07-23 2023-08-18 北京市政建设集团有限责任公司 Shield tunnel connecting channel pipeline device
CN113482690A (en) * 2021-08-16 2021-10-08 中铁第六勘察设计院集团有限公司 Calculation method for air distribution of tunnel ventilation system of ramp air exhaust type single-ramp highway
CN114109441A (en) * 2021-10-08 2022-03-01 陕西同人应用材料有限公司 Composite cavity vacuum tension elastic die and rapid construction process using same
CN114109441B (en) * 2021-10-08 2024-05-28 陕西同人应用材料有限公司 Composite cavity vacuum tension elastic die and rapid construction process using same
CN114060040A (en) * 2021-11-11 2022-02-18 上海市基础工程集团有限公司 Horizontal T-joint construction method for directly jacking pipe into shield tunnel
CN114837704A (en) * 2022-06-13 2022-08-02 深圳地铁建设集团有限公司 Sealing assembly suitable for plugging segment grouting hole and construction method thereof
CN114837704B (en) * 2022-06-13 2024-10-29 深圳地铁建设集团有限公司 Sealing assembly suitable for plugging of grouting holes of segments and construction method of sealing assembly

Also Published As

Publication number Publication date
CN108825269B (en) 2020-02-07

Similar Documents

Publication Publication Date Title
CN108825269A (en) Mechanical Method service channel T socket part position adaptive waterproof construction
CN211924162U (en) Freezing hole sealing structure on shield tunnel concrete segment
CN105019919B (en) Tunnel and its construction method for transmitting fluid
CN108374664A (en) The closed station-crossing construction method of ventilating shaft steel bushing among rich water soft soil layer
CN210163948U (en) Construction system for pouring post-cast strip of basement roof
CN108716410B (en) Mechanical method connecting channel high-strength elastic wall post-grouting slurry and grouting method
CN103437417B (en) Part repair structure for steel lining of drainage pipeline
CN104018526A (en) EPR deformation joint repair water stopping structure and construction method thereof
CN109440951A (en) New-old concrete works intersection stitches waterproof construction and construction technology
CN207904991U (en) A kind of underground engineering repairing concrete crack construction
CN110469338A (en) A kind of artesian water stratum shield method of reseptance
CN112960942B (en) Thixotropic slurry for earth pressure balance jacking pipe in anhydrous sand layer, preparation method thereof, grouting method and slurry replacement method
CN102535518B (en) Plugging method of large seam of underground diaphragm wall
CN207378273U (en) A kind of direct-buried thermal insulation pipe duct device
CN212506725U (en) Basement waterproof structure
CN202927358U (en) A steel liner repair structure of a large-diameter concrete non-bearing pipeline fissure
CN209397743U (en) New-old concrete works intersection stitches waterproof construction
CN218177239U (en) Deformation joint water inrush soil body restoration structure
CN217579825U (en) Prefabricated pin-connected panel rainwater box culvert suitable for integrative machine of strutting
CN110863473A (en) Combined water blocking structure of embedded pressure steel pipe
CN110285266A (en) A kind of pipeline fills out culvert method
CN215564685U (en) Underground construction project connection structure
CN214429183U (en) Cable sleeve plugging structure with multi-layer combination of rigidity and flexibility
CN214836395U (en) Tunnel lining structure suitable for strong corrosive environment
CN106499415A (en) A kind of flashing member of Subway Tunnel duct pieces of shield tunnel and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221123

Address after: 315032 Building 3, No. 538, Kangzhuang South Road, Jiangbei District, Ningbo, Zhejiang

Patentee after: Ningbo Youxin Construction Co.,Ltd.

Address before: 315211, Fenghua Road, Jiangbei District, Zhejiang, Ningbo 818

Patentee before: Ningbo University

TR01 Transfer of patent right