CN110130936A CN201910489570.4A CN201910489570A CN110130936A CN 110130936 A CN110130936 A CN 110130936A CN 201910489570 A CN201910489570 A CN 201910489570A CN 110130936 A CN110130936 A CN 110130936A
Authority
CN
China
Prior art keywords
solution cavity
crack
shield
slip casting
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910489570.4A
Other languages
Chinese (zh)
Other versions
CN110130936B (en
Inventor
阳紫东
李应姣
杨梅
张桥
刘晓杰
梅灿
刘铮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Urban Rail Engineering Co Ltd
Original Assignee
China Railway 11th Bureau Group Urban Rail Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Urban Rail Engineering Co Ltd filed Critical China Railway 11th Bureau Group Urban Rail Engineering Co Ltd
Priority to CN201910489570.4A priority Critical patent/CN110130936B/en
Publication of CN110130936A publication Critical patent/CN110130936A/en
Application granted granted Critical
Publication of CN110130936B publication Critical patent/CN110130936B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention, which provides to dash forward in a kind of shield tunneling process, meets the construction method of untreated solution cavity.The construction method is in shield tunneling process, when support pressure declines or the amount of being unearthed reduces, the thick mud of Xiang Tucang injection allotment, it is carried out in tunneling process using the section of jurisdiction with reserved injected hole immediately assembled normal to shield Parameter reconstruction, after the completion of assembly, slip casting hole location bore detecting solution cavity or crack position are reserved by section of jurisdiction in Tu Cang decompression area, and in the hole location installation non-return valve injection polyurethane slurries being connected to solution cavity or crack, slip casting carries out reaming to slip casting position after completing, embedded sleeve valve steel pipe, injects cement slurry for leak position;Meanwhile being monitored for native storehouse decompression position ground, WSS grouting and reinforcing is used for sedimentation large area.The present invention blocks solution cavity crack using thick mud conditioning solution cavity, again by injection polyurethane, cement slurry, tie surface WSS slip casting stratum consolidation, effective solution shield prominent the problem of meeting untreated solution cavity.

Description

It dashes forward in a kind of shield tunneling process and meets the construction method of untreated solution cavity or crack
Technical field
The invention belongs to city track traffic engineering fields, particularly directed to shield when encountering untreated solution cavity or crack A kind of construction method, with guarantee shield can normally pass through solution cavity development area, it is ensured that shield-tunneling construction safety.
Background technique
As the infrastructure construction in China enters the white-hot stage, Construction of Urban Rail Traffic is also followed by capital construction Tide is able to sustained and rapid development, and shield-tunneling construction also plays an increasingly important role during subway construction.In China The area such as southern Yunnan, Guangxi, Guangdong, Guizhou, Sichuan is affected by karst, and it is molten shield crossing inevitably occur Hole development area, and karst brings pole to the construction of shield tunnel as complicated and can form the unfavorable geologies of high risks Big risk.The development of solution cavity not only seriously jeopardizes the stabilization of structure, but also is easy to happen " gushing ", " shield in the construction process Structure plants head ", therefore, it is necessary to be handled.Encryption, which is mended, before existing processing technique is generally constructed by tunneling shield surveys, and discloses Then solution cavity position carries out injecting treatment.But in solution cavity developmentally band, often there are some solution cavities or crack cannot be sent out Existing, this phenomenon can bring serious harm to shield-tunneling construction again.
At this stage, Shield Construction Technique not yet full maturity is still deposited for the shield construction method in molten soil cave development location In larger blank.Since shield Tu Cang will guarantee to balance with soil pressure, shield is in construction, if encountering untreated molten Hole or crack can be such that support pressure reduces, or even cause surface collapse, seriously jeopardize the safety in tunneling process.Therefore, it grinds Study carefully a kind of shield it is prominent meet untreated solution cavity when solution, have very important meaning to present subway work.
Summary of the invention
The present invention, which provides to dash forward in a kind of shield tunneling process in view of the deficiencies of the prior art, meets untreated solution cavity or crack Construction method, the processing method are the high concentration slurry processing solution cavity or crack using special proportion preparation, then special by injection Polyurethane slurries, the pre-buried steel sleeve valve barrel grouting very matched blocks solution cavity crack, and tie surface WSS construction carries out stratum consolidation, It can solve shield prominent the problem of meeting untreated solution cavity, and guarantee the Forming Quality in tunnel and the safety and stability of above ground structure, Reduce the risk that shield passes through solution cavity developmentally band.
In order to practice above-mentioned construction method, technical solution provided by the invention are as follows: dash forward in a kind of shield tunneling process Meet the construction method in untreated solution cavity or crack, it is characterised in that specifically includes the following steps:
(1) 6~12 screw thread injected holes are reserved in every endless tube on piece, and are added in the prefabricated section of jurisdiction for solution cavity development location Strong reinforcement of segment;
(2) before shield begins to pass molten soil cave development stratum, existed using weighing apparatus shield mud and bentonite allotment specific gravity control 1.30~1.35g/cm3, thick mud of the viscosity control in 35~40s;
(3) guarantee that shield is normally tunneled in molten soil cave development location, and monitor the unearthed situation of shield support pressure, soil outlet And surface subsidence, support pressure are 0.2bar bigger than soil pressure at the top of cutterhead, when shield support pressure plunges or earth volume is bright out It is aobvious to reduce, it can determine whether prominent chance solution cavity or lava crack, should stop tunneling immediately;
(4) after stopping driving, pass through the thick mud of allotment in gate valve Xiang Tucang injection step (2) on shield soil bulkhead immediately Slurry guarantees that Tu Cang maintains normal soil pressure, and shield continues to tunnel later, and assembled using section of jurisdiction progress prefabricated in step (1), directly After restoring normal and other situations without exception to shield support pressure, shield continues to apply using conventional section of jurisdiction according to conventional driving Work;
(5) it after native storehouse decompression region prefabricated pipe section assembly is completed in step (4), for the section of jurisdiction in the region, uses Water drilling is being drilled by reserving screw thread injected hole bore detecting solution cavity or lava crack position to outside section of jurisdiction on prefabricated pipe section It is such as without exception in the process, then judge that the position without solution cavity or crack, carries out closure processing for drilling;In boring procedure in case of Water burst situation judges that there are solution cavity or crack in the position, installs non-return valve in hole location immediately, prepares slip casting;
(6) simultaneously, 2~3 water level holes are laid in the corresponding ground areas in native storehouse decompression position, and encrypt laying sedimentation Monitoring point;
(7) it is carried out at slip casting by all drilling positions being connected to solution cavity or crack of water burst situation judgement in step (5) Reason, grouting serous fluid are the polyurethane injection slurry of aqueous polyurethane and oiliness polyurethane according to the quality of 2:1 than mixed preparing, note Pressure control is starched within 0.4MPa;
(8) 6~8 hours are stood after the completion of polyurethane slip casting in step (7), with solution cavity or is split using water drilling for all The slip casting hole location bore expanded hole of gap connection, and embedded sleeve valve steel pipe;Such as embedded sleeve valve steel pipe still has drainage, continues to inject water For the double slurries of mud-waterglass to no drainage, grouting pressure is 0.4~0.6MPa, and filling pressure eventually is 1MPa;
(9) by water level hole and settlement monitoring point pre-buried in step (6) to Ground Subsidence Monitoring, in sedimentation large area Grouting and reinforcing is carried out to more than scar 1.5~3m soil layer using WSS bored grouting machine, later period solution cavity crack is avoided to develop again, Cause tunnel and ground security risk.
The present invention preferably technical solution: the multiple screw thread injected holes reserved on prefabricated pipe section in the step (1) are equidistant The diameter of distribution, each screw thread injected hole is 40~70mm, and prepares matched slip casting port lid.
The present invention preferably technical solution: the thick mud in the step (2) is specifically to be formed by following material allocation:
The present invention preferably technical solution: in the thrust control of molten soil cave development location shield driving in the step (3) In 500~720T, driving speed is 40~50mm/min, and cutter head torque is 500~700MNm, and cutterhead revolving speed is 1.0~1.5r/ min。
The present invention preferably technical solution: the drilling depth of detection solution cavity or lava crack in the step (5) is pipe Outer 1.5~the 3m of piece, aperture are 25~35mm.
The present invention preferably technical solution: its slurries total weight is added in the polyurethane injection slurry in the step (7) 10%~12.5% diesel oil;When grouting pressure increases suddenly, slip casting injection rate is reduced suddenly during slip casting, can determine that molten The processing of hole crack is completed.
The present invention preferably technical solution: using water drilling bore expanded hole diameter for 50mm in the step (8), valve steel pipe of tucking inside the sleeve Diameter is 42mm~48mm, and the pre-buried length of sleeve valve steel pipe is 2~3m;The double slurries of its cement-sodium silicate use common 42.5 silicon Acid salt cement is formed according to the ratio of mud mixing of 1.5:1, then with Baume degrees be 36~40 waterglass according to 1:1 volume Than being injected using slip casting machine, after slurries injection is completed, sleeve valve steel pipe is rinsed, the operation of later period tunnel can be used to track note Slurry processing.
The present invention preferably technical solution: WSS bored grouting is to pour into thick mud in step (4) in the step (9) After slurry and step (7) injection polyurethane, then by surface drilling progress WSS slip casting, grouting serous fluid is using ratio of mud 1.5:1's Cement slurry, during slip casting the grouting pressure of incipient stage be 0, continue 2.5h after, terminate grouting pressure be 0.6~ 1.0MPa, and during slip casting, tunnel internal monitoring is carried out, prevents section of jurisdiction from deforming.
Beneficial effects of the present invention:
(1) bentonitic content in simulated mud is improved in the present invention, and a small amount of weighing apparatus shield mud is added, and weighing apparatus shield mud is a kind of It using inorganic clay as main material, reacts to form a kind of highly viscous thixotropic slurry with tackifier by modified, have good Workability and adhesiveness, this way makes mud be not easy to be diluted in water to take away, improves the specific gravity and viscosity of mud, improves The performance of mud makes mud be more suitable for solution cavity filling.
It (2), being capable of accurate judgement shield crossing molten soil cave development stratum according to the pressure change of shield Tu Cang in the present invention Solution cavity or crack whether are encountered in the process, reduce shield in the construction risk for passing through molten soil cave stratum.
(3) it selects to be filled solution cavity with thick mud in the present invention, optimizes construction process, it is prominent to shorten processing The time for the untreated solution cavity met, for shield, in molten soil cave, developmentally belt construction provides excellent technical guarantee, reduces shield Structure solution cavity development region driving risk, in addition, mud is to being subsequently implanted into polyurethane and cement slurry plays and excludes sundries Effect reduces the difficulty of subsequent construction, provides convenience for subsequent construction.
(4) by installing non-return valve on section of jurisdiction as the standard for judging solution cavity pre-processing effect, if inverse in the present invention Only valve has water to gush out, then demonstrates the need for carrying out subsequent processing, provide the basis of accurate judgement for subsequent construction.
(5) by injection aqueous polyurethane and oiliness polyurethane and the mixed liquor that a small amount of diesel oil is added in the present invention, to fill out Solution cavity is filled, two kinds of polyurethane are adequately utilized can expand rapidly after encountering water, and foaming consolidates integral characteristic, energy Achieve the effect that further to fill solution cavity, and sealing purpose can be reached.In addition, thick mud has filled solution cavity and then injection Polyurethane keeps polyurethane consolidation integral, to block the crack connecting in stratum with solution cavity, prevents the mud injected originally Gush out, makes the better effect for filling solution cavity.
(6) it drills in tunnel in the present invention, pre-buried steel mini-valve tube can be by pre- if later period discovery tunnel leaks The mini-valve tube buried carries out slip casting, further fills solution cavity, keeps the stabilization of geological conditions around tunnel, and this method can not only reach The effect and purpose of leak stopping, and to repair tunnel during later period operation, guarantee that tunnel quality provides convenience;If the later period transports During battalion, discovery tunnel is leaked, or even sedimentation is excessive, can be handled by pre-buried steel mini-valve tube, guarantees The safety of tunnel internal driving.
(7) present invention is corresponding to solution cavity or crack after pouring into thick mud, injecting polyurethane, then through surface drilling Ground location carries out WSS slip casting, prevents solution cavity crack from developing again, can not only reach the mesh for being further ensured that tunnel quality , moreover it is possible to the safety for guaranteeing the localized ground structures prevents surface collapse, reduces the threat to ground structures.
Construction technology of the present invention is simple, and construction globality is stronger.Using thick mud conditioning solution cavity, again by injecting poly- ammonia Ester, pre-buried steel sleeve valve barrel grouting blocking solution cavity crack or channel, tie surface WSS construction carry out stratum consolidation, effective solution Shield prominent the problem of meeting untreated solution cavity, guarantees the Forming Quality in tunnel and the safety and stability of above ground structure, effectively drop Low shield passes through the risk of solution cavity developmentally band.
Detailed description of the invention
Fig. 1 is that prefabricated pipe section reserves injected hole expanded view in the present invention;
Fig. 2, which is that shield driving is prominent in the present invention, meets solution cavity schematic diagram.
In figure: 1-shield tunnel, 2-solution cavities, 3-solution cavity cracks, 4-rock stratum, 5-WSS slip casting fill areas, 6-layers of sand And miscellaneous fill, 7-prefabricated pipe sections, 8-steel mini-valve tubes, 9-exploration holes, the reserved screw thread injected hole of 10-prefabricated pipe sections, 11-holes for hoist.
Specific embodiment
Below with reference to embodiment, the present invention is further described.
Embodiment is for Guangzhou Underground shield section, which uses shield construction, the left wire length in section 1098.87m, the right wire length 1099.188m in section, the earthing buried depth of running tunnel vault is about 7.5m~13.8m, and route buried depth is about For 13.5~19.8m.It is mainly Delta of the Pearl River alluvial-proluvial plain landforms along the section, landform is relatively flat, ground elevation About 6.0~10.0m, the 4th is alluvial deposit, layer of sand development.There are<3-1>Extra-fine sand,<3-2>in the stratum that the section is mainly passed through Medium coarse sand,<3-3>gravelly sand,<4N-1>silty clay (stream modeling~soft modeling),<4N-2>silty clay (plastic),<4-2B>Muddy Bottoms Soil,<5C-1A>limestone residual soil native (soft modeling), the micro- weathered stratum of<9C-2>limestone and soil cave, solution cavity.It is applied early period in shield-tunneling construction During work, encryption, which is mended, surveys the hole 5m/, and discovery is shown in hole rate up to 22%;The molten soil cave hole height disclosed is up to 14.5m, is distributed Below tunnel.Specific aim measure is taken into solution cavity position and tunnel relation statistic of classification;To the molten soil cave injecting treatment of announcement;It is molten It is detected after soil cave processing, it is ensured that processing quality;But since solution cavity is developed, untreated solution cavity is still encountered in tunneling process Or crack.
For untreated solution cavity or crack is still encountered in the project under construction tunneling process, using the construction in the present invention Method is constructed, specifically includes the following steps:
(1) it is mended according to section and surveys discovery, it is 330m or so which, which passes through molten soil cave development zone length, therefore early period counts Draw prefabricated 220 ring of section of jurisdiction for increasing screw thread injected hole;Slip casting bore dia is 50mm, and every endless tube on piece increases by 8 screw thread injected holes, Eight screw thread injected holes are equally distributed on the section of jurisdiction A1, A2, A3, B, C in tunnel, are added original hole for hoist, are shared 12 Reserved slip casting hole location, distribution are corresponding in different points;
(2) before passing through solution cavity development stratum, thick mud is prepared.According to current stratum characteristic, mud viscosity is determined It controls in 35~40s, specific gravity control is in 1.30~1.35g/cm3.By test of many times, determine to improve swelling in simulated mud The content of soil, and a small amount of weighing apparatus shield mud is added, increase the viscosity of mud, mud is made to be not easy to be diluted in water to take away, improves mud The specific gravity and viscosity of slurry make mud be more suitable for solution cavity filling.The specific proportion of thick mud see the table below:
(3) in passing through molten soil cave development stratum, the thrust that shield machine normally tunnels is 550~720T, and driving speed is 30~40mm/min, cutter head torque are generally 550~700MNm, and cutterhead revolving speed is 1.0~1.5r/min, and muddy water storehouse pressure is 1.4~1.5bar.It spells in shield pick to 527 rings, when cutterhead is located at 533 ring, support pressure is reduced to 0.8bar, and soil suddenly Storehouse pressure is still on a declining curve, to guarantee support pressure, slowly reduces driving speed, into shutdown state of pressure keeping.
(4) mud is allowed to fill out by thick mud prefabricated in gate valve Xiang Tucang injection step (2) on shield soil bulkhead immediately The solution cavity encountered or lava crack are filled, guarantees that Tu Cang maintains normal soil pressure;After support pressure rises to normal condition, shield is extensive Multiple driving, and assembly is carried out using special section of jurisdiction prefabricated in step (1).
(5) after the completion of the pick of 533 ring of tunnel is spelled, using water drilling by the reserved injected holes of 532 to 534 endless tube piece points to Drill 2~3m, aperture 30mm outside section of jurisdiction, by bore detecting in 532 rings, 2 points of 533 endless tube pieces, the drilling of 10 points There is water burst phenomenon, the drilling of remaining point is normal, therefore installs non-return valve in the drilling of water burst immediately, and completes remaining just The borehole sealing of normal point.
(6) project management department takes timely measure, and 3 water level holes, monitoring ground are arranged on 532 rings to the ground of 534 ring positions It is lauched wastage, and encrypts the control of ground settlement point, 2h carries out a ground monitoring.
(7) observation discovery non-return valve water burst is serious, and water burst pressure is larger, and has mud to gush out, and to guarantee tunnel quality, opens Begin to inject polyurethane mixed liquor by check valve position.Polyurethane mixed liquor is by aqueous polyurethane and oiliness polyurethane according to 2:1 Ratio mix, and the diesel oil of mixed liquor gross mass 10% is added, is injected using hydraulic double-liquid grouting pump, pressure control System is within 0.4Mpa.It injects after 1h, discovery non-return valve pours in water pressure reduction, persistently injects 2h, and discovery has a large amount of foaming Particle is flowed out from non-return valve, stops injection polyurethane.
(8) the expanding drilling of water drilling is used in, the drilling of 10 points at 2 points of 532 rings and 533 endless tube pieces, it is expanding to 50mm, weight Newly be drilled into bottom hole, the sleeve valve steel pipe that installation diameter is 42mm~48mm, as shown in Fig. 2, the pre-buried length of sleeve valve steel pipe be 2~ 3m;Later period discovery is as having drainage at sleeve valve steel pipe, to guarantee tunnel quality, starts slip casting by reserved steel mini-valve tube, Slurry material uses common 42.5 portland cement, forms according to the ratio of mud mixing of 1.5:1, is then 36~40 with Baume degrees Waterglass according to 1:1 volume ratio inject, grouting pressure be 0.4~0.6MPa, eventually fill pressure be 1MPa, each Duan Junda of deep hole To design final pressure, and stablize 10 minutes, after slip casting, clean steel mini-valve tube, the operation of later period tunnel can be used to tracking grouting Processing.
(9) since the overlying regions are the main line of communication, traffic is more, to guarantee ground traffic safety, in the region Carry out WSS grouting and reinforcing.Since 533 ring position buried depth of tunnel is 12.3m, scar depth is 10.5m-10.7m, therefore, WSS note Starch bar bottom far from ground 10.5m locate, using cement slurry progress grouting and reinforcing, ratio of mud 1.5:1.Incipient stage, grouting pressure Almost 0, after continuing 2.5h, terminates grouting pressure and reach 0.8MPa.During slip casting, personnel is arranged to carry out tunnel internal prison It surveys, prevents section of jurisdiction from deforming.Grouting pressure is controlled, drilling rod is slowly promoted, guarantees that ground monitoring is no different with tunnel internal monitoring Often.
It uses to dash forward in the shield tunneling process in the present invention in above-mentioned project under construction and meets the construction method of untreated solution cavity Afterwards, it helps shield smoothly to pass through solution cavity developmentally band, ensure that the quality in molding tunnel, provided and tried hard to keep for tunnel holing through Barrier.
The above, only one embodiment of the present of invention, the description thereof is more specific and detailed, but can not therefore manage Solution is limitation of the scope of the invention.It should be pointed out that for those of ordinary skill in the art, not departing from this hair Under the premise of bright design, various modifications and improvements can be made, and these are all within the scope of protection of the present invention.Therefore, this hair It is bright that the scope of protection shall be subject to the appended claims.

Claims (8)

1. dashing forward in a kind of shield tunneling process meets the construction method of untreated solution cavity or crack, it is characterised in that specifically include following Step:
(1) 6~12 screw thread injected holes, and reinforced pipe are reserved in every endless tube on piece in the prefabricated section of jurisdiction for solution cavity development location Piece arrangement of reinforcement;
(2) before shield begins to pass molten soil cave development stratum, using weighing apparatus shield mud and bentonite allotment specific gravity control 1.30~ 1.35g/cm3, thick mud of the viscosity control in 35~40s;
(3) guarantee that shield is normally tunneled in molten soil cave development location, and monitor the unearthed situation of shield support pressure, soil outlet and ground Face sedimentation, support pressure are 0.2bar bigger than soil pressure at the top of cutterhead, when shield support pressure plunges or earth volume obviously subtracts out It is few, it can determine whether prominent chance solution cavity or lava crack, should stop tunneling immediately;
(4) after stopping driving, pass through the thick mud deployed in gate valve Xiang Tucang injection step (2) on shield soil bulkhead immediately, Guaranteeing that Tu Cang maintains normal soil pressure, shield continues to tunnel later, and carries out assembly using section of jurisdiction prefabricated in step (1), until After shield support pressure restores normal and other situations without exception, shield continues to construct using conventional section of jurisdiction according to conventional driving;
(5) after native storehouse decompression region prefabricated pipe section assembly is completed in step (4), for the section of jurisdiction in the region, using water drilling By reserving screw thread injected hole bore detecting solution cavity or lava crack position to outside section of jurisdiction on prefabricated pipe section, in boring procedure In as without exception, then judge that the position without solution cavity or crack, carries out closure processing for drilling;Such as water burst in boring procedure Situation judges that there are solution cavity or crack in the position, installs non-return valve in hole location immediately, prepares slip casting;
(6) simultaneously, 2~3 water level holes are laid in the corresponding ground areas in native storehouse decompression position, and encrypt laying settlement monitoring Point;
(7) injecting treatment is carried out by all drilling positions being connected to solution cavity or crack of water burst situation judgement in step (5), Grouting serous fluid is the polyurethane injection slurry of aqueous polyurethane and oiliness polyurethane according to the quality of 2:1 than mixed preparing, slip casting pressure Power controls within 0.4MPa;
(8) 6~8 hours are stood after the completion of polyurethane slip casting in step (7), is connected for all with solution cavity or crack using water drilling Logical slip casting hole location bore expanded hole, and embedded sleeve valve steel pipe;Such as embedded sleeve valve steel pipe still has drainage, continues to inject cement- For the double slurries of waterglass to no drainage, grouting pressure is 0.4~0.6MPa, and filling pressure eventually is 1MPa;
(9) Ground Subsidence Monitoring is used in sedimentation large area by water level hole and settlement monitoring point pre-buried in step (6) WSS bored grouting machine carries out grouting and reinforcing to more than scar 1.5~3m soil layer, avoids later period solution cavity crack from developing again, causes Tunnel and ground security risk.
2. dashing forward in a kind of shield tunneling process according to claim 1 meets the construction method of untreated solution cavity or crack, Be characterized in that: multiple reserved screw thread injected holes of prefabricated pipe section are equally spaced in the step (1), each screw thread injected hole it is straight Diameter is 40~70mm, and prepares matched slip casting port lid.
3. dashing forward in a kind of shield tunneling process according to claim 1 meets the construction method of untreated solution cavity or crack, Be characterized in that: the thick mud in the step (2) is specifically to be formed by following material allocation:
4. dashing forward in a kind of shield tunneling process according to claim 1 meets the construction method of untreated solution cavity or crack, It is characterized in that: being controlled in the thrust of molten soil cave development location shield driving in 500~720T, driving speed in the step (3) For 40~50mm/min, cutter head torque is 500~700MNm, and cutterhead revolving speed is 1.0~1.5r/min.
5. dashing forward in a kind of shield tunneling process according to claim 1 meets the construction method of untreated solution cavity or crack, Be characterized in that: the drilling depth of detection solution cavity or lava crack in the step (5) is 1.5~3m outside section of jurisdiction, aperture 25 ~35mm.
6. dashing forward in a kind of shield tunneling process according to claim 1 meets the construction method of untreated solution cavity or crack, It is characterized in that: the diesel oil of its slurries total weight 10%~12.5% being added in the polyurethane injection slurry in the step (7);It is infusing When grouting pressure increases suddenly, slip casting injection rate is reduced suddenly during slurry, the processing completion of solution cavity crack can determine that.
7. dashing forward in a kind of shield tunneling process according to claim 1 meets the construction method of untreated solution cavity or crack, It is characterized in that: using water drilling bore expanded hole diameter for 50mm in the step (8), sleeve valve diameter of steel tube is 42mm~48mm, sleeve The pre-buried length of valve steel pipe is 2~3m;The double slurries of its cement-sodium silicate use common 42.5 portland cement, according to 1.5:1's Ratio of mud mixing forms, and the waterglass for being then 36~40 with Baume degrees is injected according to the volume ratio of 1:1 using slip casting machine, slurries After injection is completed, sleeve valve steel pipe is rinsed, the operation of later period tunnel can be used to tracking grouting processing.
8. dashing forward in a kind of shield tunneling process according to claim 1 meets the construction method of untreated solution cavity or crack, Be characterized in that: WSS bored grouting is that thick mud and step (7) injection polyurethane are poured into step (4) in the step (9) Afterwards, then by surface drilling WSS slip casting is carried out, grouting serous fluid uses the cement slurry of ratio of mud 1.5:1, opens during slip casting The grouting pressure in stage beginning is 0, and after continuing 2.5h, termination grouting pressure is 0.6~1.0MPa, and during slip casting, is carried out Tunnel internal monitoring, prevents section of jurisdiction from deforming.
CN201910489570.4A 2019-06-06 2019-06-06 Construction method for sudden encountering untreated karst cave or crack in shield tunneling process Active CN110130936B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910489570.4A CN110130936B (en) 2019-06-06 2019-06-06 Construction method for sudden encountering untreated karst cave or crack in shield tunneling process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910489570.4A CN110130936B (en) 2019-06-06 2019-06-06 Construction method for sudden encountering untreated karst cave or crack in shield tunneling process

Publications (2)

Publication Number Publication Date
CN110130936A true CN110130936A (en) 2019-08-16
CN110130936B CN110130936B (en) 2020-08-07

Family

ID=67580502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910489570.4A Active CN110130936B (en) 2019-06-06 2019-06-06 Construction method for sudden encountering untreated karst cave or crack in shield tunneling process

Country Status (1)

Country Link
CN (1) CN110130936B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031812A (en) * 2020-08-28 2020-12-04 浙大城市学院 Drainage positioning grouting pipe piece and construction method thereof
CN113266377A (en) * 2021-06-21 2021-08-17 中铁十二局集团有限公司 Construction method for filling karst cave by using shield machine advanced grouting pipe
CN113417644A (en) * 2021-05-31 2021-09-21 中铁十六局集团北京轨道交通工程建设有限公司 Karst cave detection method in shield construction process
CN115262554A (en) * 2022-07-08 2022-11-01 东华理工大学 Structure for emergency rescue of dam and using method
CN116066154A (en) * 2023-03-24 2023-05-05 北京城建集团有限责任公司 Active regulation and control method for deformation of shield tunnel

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103254394A (en) * 2013-05-24 2013-08-21 淄博德信联邦化学工业有限公司 Polyurethane grouting water-plugging reinforcement material and preparation method thereof
CN103274650A (en) * 2013-06-17 2013-09-04 长沙理工大学 Injecting paste material for plugging water in tunnel of high-pressure karst area rich in water and preparation method of injecting paste material
CN103912003A (en) * 2013-12-31 2014-07-09 中国人民解放军63653部队 Method for conveniently and rapidly blocking stratum flowing water and pores
CN105332719A (en) * 2015-08-10 2016-02-17 江苏鼎达建筑新技术有限公司 Cement-polyurethane composite grouting process capable of blocking water fast
CN105736004A (en) * 2016-03-11 2016-07-06 广州轨道交通建设监理有限公司 Balanced shield mud air-pressure cabin opening pressure maintaining and wall protecting construction method for shield tunneling
CN106050185A (en) * 2016-05-13 2016-10-26 山东科技大学 Method for preventing and controlling water inrush channels generated by faults of coal mining floors
CN107060786A (en) * 2017-06-19 2017-08-18 湖南大学 A kind of Shield Construction Method Used method that groups of building are worn under karst region
CN107446114A (en) * 2017-08-25 2017-12-08 中国地质大学(北京) A kind of polyurethane injecting paste material and preparation method thereof
CN108484058A (en) * 2018-06-12 2018-09-04 山东大学 A kind of anti-dispersion plugging material of dynamic water and preparation method thereof
CN208717931U (en) * 2018-08-17 2019-04-09 南京大学(苏州)高新技术研究院 For blocking the grouting device of leakage in engineering construction
CN109736842A (en) * 2019-01-10 2019-05-10 中铁隧道集团二处有限公司 The construction method in foundation-free residential house area is passed through in a kind of slurry shield reduction disturbance
CN109824336A (en) * 2019-04-11 2019-05-31 山西浩博瑞新材料有限公司 One kind being based on inorganic silicate composite consolidation material and its preparation process

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103254394A (en) * 2013-05-24 2013-08-21 淄博德信联邦化学工业有限公司 Polyurethane grouting water-plugging reinforcement material and preparation method thereof
CN103274650A (en) * 2013-06-17 2013-09-04 长沙理工大学 Injecting paste material for plugging water in tunnel of high-pressure karst area rich in water and preparation method of injecting paste material
CN103912003A (en) * 2013-12-31 2014-07-09 中国人民解放军63653部队 Method for conveniently and rapidly blocking stratum flowing water and pores
CN105332719A (en) * 2015-08-10 2016-02-17 江苏鼎达建筑新技术有限公司 Cement-polyurethane composite grouting process capable of blocking water fast
CN105736004A (en) * 2016-03-11 2016-07-06 广州轨道交通建设监理有限公司 Balanced shield mud air-pressure cabin opening pressure maintaining and wall protecting construction method for shield tunneling
CN106050185A (en) * 2016-05-13 2016-10-26 山东科技大学 Method for preventing and controlling water inrush channels generated by faults of coal mining floors
CN107060786A (en) * 2017-06-19 2017-08-18 湖南大学 A kind of Shield Construction Method Used method that groups of building are worn under karst region
CN107446114A (en) * 2017-08-25 2017-12-08 中国地质大学(北京) A kind of polyurethane injecting paste material and preparation method thereof
CN108484058A (en) * 2018-06-12 2018-09-04 山东大学 A kind of anti-dispersion plugging material of dynamic water and preparation method thereof
CN208717931U (en) * 2018-08-17 2019-04-09 南京大学(苏州)高新技术研究院 For blocking the grouting device of leakage in engineering construction
CN109736842A (en) * 2019-01-10 2019-05-10 中铁隧道集团二处有限公司 The construction method in foundation-free residential house area is passed through in a kind of slurry shield reduction disturbance
CN109824336A (en) * 2019-04-11 2019-05-31 山西浩博瑞新材料有限公司 One kind being based on inorganic silicate composite consolidation material and its preparation process

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031812A (en) * 2020-08-28 2020-12-04 浙大城市学院 Drainage positioning grouting pipe piece and construction method thereof
CN113417644A (en) * 2021-05-31 2021-09-21 中铁十六局集团北京轨道交通工程建设有限公司 Karst cave detection method in shield construction process
CN113417644B (en) * 2021-05-31 2024-04-30 中铁十六局集团北京轨道交通工程建设有限公司 Karst cave detection method in shield construction process
CN113266377A (en) * 2021-06-21 2021-08-17 中铁十二局集团有限公司 Construction method for filling karst cave by using shield machine advanced grouting pipe
CN115262554A (en) * 2022-07-08 2022-11-01 东华理工大学 Structure for emergency rescue of dam and using method
CN115262554B (en) * 2022-07-08 2023-11-10 东华理工大学 Structure for dam emergency rescue and use method
CN116066154A (en) * 2023-03-24 2023-05-05 北京城建集团有限责任公司 Active regulation and control method for deformation of shield tunnel

Also Published As

Publication number Publication date
CN110130936B (en) 2020-08-07

Similar Documents

Publication Publication Date Title
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
CN110130936A (en) It dashes forward in a kind of shield tunneling process and meets the construction method of untreated solution cavity or crack
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN109881694A (en) A kind of constructing structure blocked for foundation pit substrate Sand and method
CN110359921A (en) Wear the construction method of building in a kind of shield short distance side
CN106437726B (en) Shallow-depth-excavation tunnel crosses ground fissure crushed zone construction method
CN111119940B (en) Grouting construction treatment method
CN108240234A (en) A kind of Along Railway underlies coal mine gob Grouting method
CN107842374B (en) The novel inert slurry of shield and combination grouting process for upper soft lower hard water rich strata
CN106761782A (en) A kind of tunneling construction method for wearing operation tunnel under shield in rich water powder land floor
CN107725056A (en) One kind passes through silly stratum tunnel loopful quick grouting construction method in advance
CN105484269B (en) Foundation pit enclosure structure seepage prevention and treatment construction method under blasting condition
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN109024641A (en) Triple tube double-liquid rotary spray is used for the construction method of deep basal pit leak stopping
CN109681236A (en) Big cross section water-rich sand layer shield driving synchronous grouting method
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN105155541A (en) Double-slurry closing construction method for sump
CN107938649A (en) A kind of solution cavity foundation reinforcement method
CN108005662B (en) A kind of processing method of underground water seal cave depot storage cavern area geology crushed zone
CN109630193A (en) Subway Tunnel service channel excavates the administering method for water burst phenomenon occur
CN105971638A (en) Application of WSS construction method in shield tool changing reinforcement of water-rich sand layer
CN110685272A (en) Method for treating soft foundation settlement overrun by utilizing inclined-hole cloth bag pile
CN107227744B (en) A kind of construction method of gushing water shear-zone leak stopping

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant