CN109630193A - Subway Tunnel service channel excavates the administering method for water burst phenomenon occur - Google Patents

Subway Tunnel service channel excavates the administering method for water burst phenomenon occur Download PDF

Info

Publication number
CN109630193A
CN109630193A CN201910026615.4A CN201910026615A CN109630193A CN 109630193 A CN109630193 A CN 109630193A CN 201910026615 A CN201910026615 A CN 201910026615A CN 109630193 A CN109630193 A CN 109630193A
Authority
CN
China
Prior art keywords
service channel
tunnel
administering method
water burst
excavates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910026615.4A
Other languages
Chinese (zh)
Inventor
李海
王刚
赵仁勇
刘后华
姜玉
骆小芳
李焕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201910026615.4A priority Critical patent/CN109630193A/en
Publication of CN109630193A publication Critical patent/CN109630193A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The administering method for water burst phenomenon occur is excavated the invention discloses a kind of Subway Tunnel service channel, comprising: one, leak drainage: in the top jet concrete layer of service channel;Drainage tube is set in the two sides of service channel and dewatering well, the end facing water of drainage tube are connected to the inside of service channel, the water outlet of drainage tube is connected to the inside of dewatering well;Two, service channel is filled: by the inside for excavating molding service channel and hole using sandbag pile;Three, section of jurisdiction supporting: main tunnel duct piece is supported in steel pipe inner supporting is arranged in the main tunnel at service channel both ends;Four, grouting and reinforcing slip casting in ground and tunnel: is carried out to the periphery soil body in the main tunnel of service channel and service channel both ends by the way of the sleeve valve barrel grouting of ground in ground;Main tunnel internal in service channel both ends carries out grouting behind shaft or drift lining reinforcing to main tunnel duct piece.The present invention can quickly and effectively complete infiltration water collision processing work, guarantee that shield smoothly receives.

Description

Subway Tunnel service channel excavates the administering method for water burst phenomenon occur
Technical field
The present invention relates to Subway Tunnel service channel excavation construction technology field more particularly to a kind of contact of Subway Tunnel are logical Excavate the administering method for water burst phenomenon occur in road.
Background technique
At present to guarantee that Freezing Method for Cross-passage Construction section section of jurisdiction and contact excavation face are impermeable, mainly to utilize mixing pile machine distich Network channel section reinforced, slip casting and polyurethane etc. are filled, New Austrian Tunneling Method construction or push bench process excavation construction, freezing are reinforced, The technical measures such as precipitation guarantee the safety of construction, but in the construction process often because a variety of causes will lead to slip casting, precipitation etc. Measure failure, so that risk is brought, without preferable processing method under the conditions of service channel long-time strand water burst.
Summary of the invention
For above-mentioned there are problem, the present invention is intended to provide there is water burst phenomenon in a kind of Subway Tunnel service channel excavation Administering method can be completed quickly and effectively percolating water and block processing work, guarantee that shield smoothly receives.
The present invention realize above-mentioned purpose the technical solution adopted is that: it is existing that water burst occurs in a kind of Subway Tunnel service channel excavation The administering method of elephant, the administering method include:
One, leak drains:
In the top jet concrete layer of service channel;
Drainage tube and dewatering well are set in the two sides of service channel, it is logical that the end facing water of the drainage tube is connected to the contact The inside in road, the water outlet of the drainage tube are connected to the inside of the dewatering well;
Two, service channel is filled:
By the inside for excavating molding service channel and hole using sandbag pile;
Three, section of jurisdiction supporting:
Main tunnel duct piece is supported in steel pipe inner supporting is arranged in the main tunnel at service channel both ends;
Four, slip casting in ground and tunnel:
In ground to the periphery soil in the main tunnel of service channel and service channel both ends by the way of the sleeve valve barrel grouting of ground Body carries out grouting and reinforcing;
Main tunnel internal in service channel both ends carries out grouting behind shaft or drift lining reinforcing to main tunnel duct piece.
In some embodiments, in service channel digging process, using setting advanced spy at the pump house of service channel Water burst phenomenon is observed in hole, also, implements the administering method when there is water burst phenomenon.
In some embodiments, the end facing water of the drainage tube is enclosed with strainer.
In some embodiments, the drainage tube progress leak drainage is arranged in the first side of Yu Suoshu service channel, Closure processing is carried out to second side of the service channel, first side and described second side are the excavation of the service channel The left and right sides in face.
In some embodiments, the steel pipe inner supporting is rice font inner support, 15 meters of models of the service channel of adjusting the distance The main tunnel duct piece of every ring in enclosing is arranged the rice font inner support and carries out section of jurisdiction support, each rice font inner support it is each A steel pipe stabilizer blade is support on the inner surface of the main tunnel duct piece of same ring.
In some embodiments, the precipitation of the phased out drainage tube draws during the ground sleeve valve barrel grouting Stream.
In some embodiments, when carrying out grouting behind shaft or drift lining reinforcing to the main tunnel duct piece, to the cross in same main tunnel Section two sides symmetrically carry out slip casting.
In some embodiments, grouting pressure is less than or equal to 0.2Mpa.
In some embodiments, the administering method further include to main tunnel duct piece carry out section of jurisdiction convergence monitoring, and according to Section of jurisdiction convergence monitoring situation is determined the position for the main tunnel duct piece of soil erosion occur, and then cooperates and infused using ground mini-valve tube Slurry carries out grouting and reinforcing to the position.
In some embodiments, synchronous to implement the leak drainage, service channel filling, the section of jurisdiction supporting, institute State slip casting in ground and tunnel.
A kind of Subway Tunnel service channel of the present invention excavates the method for the improvement of water burst phenomenon occur, excavates and protects in service channel Comprehensive after barrier failure to be drained using leak, concrete measures such as slip casting, section of jurisdiction supporting etc. are answered in service channel filling, ground and tunnel Anxious disposal method has blocked leakage water route chamber etc. well, can quickly handle, and further increases, and reduces the shadow to surface subsidence It rings, quickly and effectively completes infiltration water collision and handle work, guarantee the safety of service channel and tunnel, save shield-tunneling construction work Phase reduces the expense that percolating water causes subsequent processing.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 shows Subway Tunnel service channel according to an embodiment of the present invention and excavates the administering method for water burst phenomenon occur The exemplary structure schematic diagram with water spot position.
The administering method for water burst phenomenon occur is excavated Fig. 2 shows Subway Tunnel service channel according to an embodiment of the present invention Sandbag back-pressure range exemplary structure schematic diagram.
Specific embodiment
Illustrate embodiments of the present invention below by way of specific specific example, those skilled in the art can be by this specification Other advantages and efficacy of the present invention can be easily understood for disclosed content.The present invention can also pass through in addition different specific realities The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints and application, without departing from Various modifications or alterations are carried out under spirit of the invention.
The present invention is described in detail in the following with reference to the drawings and specific embodiments.
The present invention is applied to water burst phenomenon occur in Subway Tunnel service channel digging process, is drained, is got in touch with by leak The concrete measures such as slip casting, section of jurisdiction supporting ensure tunnel and service channel safety in channel filling, ground and tunnel.
Existing service channel reinforcement technique may be because that various problems lead to the measures failure such as service channel reinforcing, the present invention Subway Tunnel service channel excavate and the administering method of water burst phenomenon occur, long-time strand is gushed in service channel digging process Under the conditions of water, specific processing method is provided, shield is smoothly appeared by taking various emergency measure to ensure.
To solve the water burst scene in existing service channel digging process, the embodiment of the invention provides a kind of Subway Tunnels Service channel excavates the administering method for water burst phenomenon occur, which mainly includes following measures:
(1), leak drains:
In the top jet concrete layer of service channel;
Drainage tube is set in the two sides of service channel and dewatering well, the end facing water of drainage tube are connected to the interior of service channel The water outlet in portion, drainage tube is connected to the inside of dewatering well;
(2), service channel is filled:
By the inside for excavating molding service channel and hole using sandbag pile;
(3), section of jurisdiction supporting:
Main tunnel duct piece is supported in steel pipe inner supporting is arranged in the main tunnel at service channel both ends;
(4), slip casting in ground and tunnel:
In ground to the periphery soil in the main tunnel of service channel and service channel both ends by the way of the sleeve valve barrel grouting of ground Body carries out grouting and reinforcing;
Main tunnel internal in service channel both ends carries out grouting behind shaft or drift lining reinforcing to main tunnel duct piece.
Infiltration water collision processing work can quickly and effectively be completed using the administering method of above-described embodiment, guarantee shield Smoothly receive.
Specifically, referring to Fig. 1 and Fig. 2, wherein it is logical that Fig. 1 shows Subway Tunnel contact according to an embodiment of the present invention Road excavates the exemplary structure schematic diagram with water spot position for the administering method of water burst phenomenon occur, and Fig. 2 shows according to this hair The Subway Tunnel service channel of bright embodiment excavates the exemplary knot for the sandbag back-pressure range of administering method of water burst phenomenon occur Structure schematic diagram.
Before service channel excavation safeguard failure is embodied in service channel pump house excavation, further to verify precipitation And water level conditions at pump house, advanced inspecting hole is set at pump house 11, about 2.4 meters of 111 depth of inspecting hole, discovery has clear water exudation, such as Shown in Fig. 1, so as to judge that water burst phenomenon occurs in existing service channel.
When finding water burst phenomenon occur in existing service channel digging process, following emergency plan is taken:
1, issue water burst drains:
After the concrete layer 101 of the top jet 25cm thickness of service channel 10, emergency disposal, water flow is substantially achieved control System only has a small amount of water to flow out, to reduce soil erosion, is further blocked to water flow, to right side flowing water in 11 two sides of pump house It is blocked, left side takes an embedded φ 80mm steel pipe as drainage tube (not showing drainage tube in figure), by meeting for drainage tube Water end (W.E.) wraps up double-deck 60 mesh filter screens and is simultaneously connected in service channel, drains to the water burst in service channel 10, ground into One step increases dewatering well (not showing dewatering well in figure), so that the water outlet of drainage tube is connected in dewatering well, to reduce head Pressure, wherein carrying out precipitation to underground structure using drainage tube and dewatering well is the prior art, is not gone to live in the household of one's in-laws on getting married herein.
2, sandbag fills the service channel excavated:
Then inside entire service channel and hole is managed by the way of sandbag pile at service channel and portal Piece carries out back-pressure, as shown in Fig. 2, close to the high about 3m of 12 heap of sandbag at service channel.
3, section of jurisdiction supporting;
The main tunnel duct piece in the main tunnel 13 at 10 both ends of service channel is supported and back-pressure specifically leads to contact The main tunnel duct piece of every ring near road 10 within the scope of about 15 meters forms rice font inner support using the steel pipe of 4 φ 100mm, prevents Main tunnel duct piece further deforms.Wherein, each steel pipe stabilizer blade of each meter of font inner support is support on the main tunneltron of same ring The inner surface of piece.
4, surface grout injection;
Ground sleeve valve barrel grouting is reinforced, and according to section of jurisdiction convergence monitoring situation, is existed outside the left line tunnel duct piece of preliminary judgement Certain soil erosion calls 3 grouting equipments, to the main tunnel in two sides (such as left side tunnel by the way of the sleeve valve barrel grouting of ground then Road 172-215 ring, right side tunnel 195-210 ring) the periphery soil body reinforced, phased out drainage tube drop during consolidation grouting Water is until the wholly off precipitation of surface precipitation well.Surface grout injection drilling sum about 36, (partial hole is drilled into one to slip casting hole count about 24 Depthkeeping degree has slurries to emerge), grouting amount: 71.8 tons of cement, waterglass: 31.9 tons.
5, the slip casting of segment inside tunnel;
Grouting behind shaft or drift lining is carried out using main tunnel duct piece (such as left side tunnel 170-220 ring) of the slip casting in hole to water burst position to add Gu enhancing the stability in tunnel itself to constrain segment deformation.The left and right sides in each main tunnel is symmetrically infused when slip casting Slurry, grouting pressure are no more than 0.2MPa, and grouting parameter is adjusted according to monitoring situation.To the non-principal main tunnel duct piece in water burst side Also slip casting (such as the main tunnel 170-212 ring in right side) in hole is carried out, grouting amount: 41.8 tons of cement, waterglass: 1.6 tons;Water burst side master Tunnel duct piece grouting amount: 188 tons of cement, 17 tons of waterglass.
6, continue precipitation.
During slip casting, the main tunnel duct piece behind soil body is detected, includes surface subsidence and tunnel convergence prison It surveys, increases section of jurisdiction convergence point in the main tunnel in water burst side (such as left side tunnel), increase monitoring and make an inspection tour frequency.Ground monitoring point is tired Meter settling amount maximum of points D5-8 is -26.6mm (before the measuring point water burst cumulative settling amount: -25.3mm), and section of jurisdiction level is received in hole Holding back a cumulant maximum value is -18mm, and convergence is basicly stable in surface subsidence and hole.Geology is used after completing above-mentioned measure Two methods of radar method detection, earthquake effect method are to left threaded list road 160-195 ring, behind to the right line 107-202 endless tube piece soil body It is detected.Detection result shows left and right line 170-220 endless tube piece behind abnormal disappearance.
Subway Tunnel service channel of the invention excavate occur water burst phenomenon administering method use to main tunnel duct piece into Row section of jurisdiction convergence monitoring, and according to section of jurisdiction convergence monitoring situation, determine the position for the main tunnel duct piece of soil erosion occur, in turn Cooperation carries out grouting and reinforcing to the position using ground sleeve valve barrel grouting.Also, it can synchronize and implement above-mentioned leak drainage, contact is led to The safeguards such as slip casting in road filling, section of jurisdiction supporting, ground and tunnel.
A kind of Subway Tunnel service channel of the present invention excavates the method for the improvement of water burst phenomenon occur, excavates and protects in service channel Comprehensive after barrier failure to be drained using leak, concrete measures such as slip casting, section of jurisdiction supporting etc. are answered in service channel filling, ground and tunnel Anxious disposal method has blocked leakage water route chamber etc. well, can quickly handle, and further increases, and reduces the shadow to surface subsidence It rings, quickly and effectively completes infiltration water collision and handle work, guarantee the safety of service channel and tunnel, save shield-tunneling construction work Phase reduces the expense that percolating water causes subsequent processing.
It should be noted that this specification structure depicted in this specification institute accompanying drawings, ratio, size etc., only to cooperate The bright revealed content of book is not intended to limit the invention enforceable limit so that those skilled in the art understands and reads Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not It influences still fall in disclosed technology contents under the effect of present invention can be generated and the purpose that can reach and obtain In the range of capable of covering.Meanwhile it is cited such as "upper", "lower", "left", "right", " centre " and " one " in this specification Term is merely convenient to being illustrated for narration, rather than to limit the scope of the invention, the change of relativeness or tune It is whole, under the content of no substantial changes in technology, when being also considered as the enforceable scope of the present invention.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, though So the present invention has been disclosed as a preferred embodiment, and however, it is not intended to limit the invention, any technology people for being familiar with this profession Member, in the range of not departing from technical solution of the present invention, when the technology contents using the disclosure above make a little change or repair Decorations are the equivalent embodiment of equivalent variations, but anything that does not depart from the technical scheme of the invention content, technology according to the present invention are real Matter any simple modification, equivalent change and modification to the above embodiments, still fall within the range of technical solution of the present invention It is interior.

Claims (10)

1. a kind of Subway Tunnel service channel excavates the administering method for water burst phenomenon occur, which is characterized in that the administering method Include:
One, leak drains:
In the top jet concrete layer of service channel;
Drainage tube is set in the two sides of service channel and dewatering well, the end facing water of the drainage tube are connected to the service channel Inside, the water outlet of the drainage tube are connected to the inside of the dewatering well;
Two, service channel is filled:
By the inside for excavating molding service channel and hole using sandbag pile;
Three, section of jurisdiction supporting:
Main tunnel duct piece is supported in steel pipe inner supporting is arranged in the main tunnel at service channel both ends;
Four, slip casting in ground and tunnel:
In ground by the way of the sleeve valve barrel grouting of ground to the periphery soil body in the main tunnel of service channel and service channel both ends into Row grouting and reinforcing;
Main tunnel internal in service channel both ends carries out grouting behind shaft or drift lining reinforcing to main tunnel duct piece.
2. Subway Tunnel service channel as described in claim 1 excavates the administering method for water burst phenomenon occur, it is characterised in that: In service channel digging process, water burst phenomenon is observed using advanced inspecting hole is set at the pump house of service channel, also, Occur implementing the administering method when water burst phenomenon.
3. Subway Tunnel service channel as described in claim 1 excavates the administering method for water burst phenomenon occur, it is characterised in that: The end facing water of the drainage tube is enclosed with strainer.
4. Subway Tunnel service channel as described in claim 1 excavates the administering method for water burst phenomenon occur, it is characterised in that: The drainage tube is set in the first side of the service channel and carries out the leak drainage, to second side of the service channel into Row closure processing, first side and described second side are the left and right sides of the excavation face of the service channel.
5. Subway Tunnel service channel as described in claim 1 excavates the administering method for water burst phenomenon occur, it is characterised in that: The steel pipe inner supporting is rice font inner support, the main tunnel duct piece setting of the every ring adjusted the distance within the scope of 15 meters of the service channel The rice font inner support carries out section of jurisdiction support, and each steel pipe stabilizer blade of each rice font inner support is support on same ring master The inner surface of tunnel duct piece.
6. Subway Tunnel service channel as described in claim 1 excavates the administering method for water burst phenomenon occur, it is characterised in that: The precipitation drainage of the phased out drainage tube during ground sleeve valve barrel grouting.
7. Subway Tunnel service channel as described in claim 1 excavates the administering method for water burst phenomenon occur, it is characterised in that: When carrying out grouting behind shaft or drift lining reinforcing to the main tunnel duct piece, slip casting is symmetrically carried out to the cross section two sides in same main tunnel.
8. Subway Tunnel service channel as claimed in claim 7 excavates the administering method for water burst phenomenon occur, it is characterised in that: Grouting pressure is less than or equal to 0.2Mpa.
9. Subway Tunnel service channel as described in claim 1 excavates the administering method for water burst phenomenon occur, it is characterised in that: The administering method further includes carrying out section of jurisdiction convergence monitoring to main tunnel duct piece, and according to section of jurisdiction convergence monitoring situation, determine The position of the main tunnel duct piece of existing soil erosion, and then cooperate and grouting and reinforcing is carried out to the position using ground sleeve valve barrel grouting.
10. Subway Tunnel service channel as described in claim 1 excavates the administering method for water burst phenomenon occur, feature exists In: slip casting in the synchronization implementation leak drainage, service channel filling, the section of jurisdiction supporting, the ground and tunnel.
CN201910026615.4A 2019-01-11 2019-01-11 Subway Tunnel service channel excavates the administering method for water burst phenomenon occur Pending CN109630193A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910026615.4A CN109630193A (en) 2019-01-11 2019-01-11 Subway Tunnel service channel excavates the administering method for water burst phenomenon occur

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910026615.4A CN109630193A (en) 2019-01-11 2019-01-11 Subway Tunnel service channel excavates the administering method for water burst phenomenon occur

Publications (1)

Publication Number Publication Date
CN109630193A true CN109630193A (en) 2019-04-16

Family

ID=66060583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910026615.4A Pending CN109630193A (en) 2019-01-11 2019-01-11 Subway Tunnel service channel excavates the administering method for water burst phenomenon occur

Country Status (1)

Country Link
CN (1) CN109630193A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110925018A (en) * 2019-12-02 2020-03-27 河南科技大学 Pump room construction method and pump room construction dewatering system in tunnel connection channel
CN110985120A (en) * 2019-12-31 2020-04-10 中铁十六局集团北京轨道交通工程建设有限公司 Precipitation construction method and system for tunnel connection channel of fractured clay layer
CN111946351A (en) * 2020-07-13 2020-11-17 济南轨道交通集团有限公司 Rapid excavation method for contact channel of hard rock stratum of rail transit
CN112228091A (en) * 2020-12-14 2021-01-15 北京建工土木工程有限公司 Bottom sealing method for mechanical construction vertical shaft in tunnel

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1916362A (en) * 2006-09-04 2007-02-21 上海隧道工程股份有限公司 Construction method for tunnel contact passage in shield section of underground railway
CN102155241A (en) * 2011-05-10 2011-08-17 广州市城市规划勘测设计研究院 Karst grouting reinforcement water-stop constructing method
CN102287198A (en) * 2011-07-23 2011-12-21 中铁十二局集团有限公司 Construction method for river-crossing shield tunnel crushed stratum communication channel
CN102619522A (en) * 2012-03-20 2012-08-01 天津城建隧道股份有限公司 Construction method for subway contact passage
CN103032073A (en) * 2012-12-08 2013-04-10 中铁十二局集团有限公司 Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method
CN103306683A (en) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 Construction method for comprehensive precipitation in hole in deep-buried tunnel excavation process
CN105714764A (en) * 2015-12-08 2016-06-29 中国铁建大桥工程局集团有限公司 Tunnel ground deep-hole sleeve valve tube grouting construction method
CN106050266A (en) * 2016-07-22 2016-10-26 中铁建大桥工程局集团第五工程有限公司 Construction method for undermining connected channel between shield sections in water-rich sand cobble stratum tunnel
CN106593470A (en) * 2016-12-08 2017-04-26 中铁第勘察设计院集团有限公司 High-permeability water-rich sand shield terminal reinforcing system and construction method thereof
CN106948833A (en) * 2017-04-05 2017-07-14 宁波大学 Pin-connected panel service channel structure and its construction method
CN107227961A (en) * 2017-06-29 2017-10-03 中铁十二局集团有限公司 Heavy caliber dewatering well construction method in metro built by mining method hole
CN206874285U (en) * 2017-04-20 2018-01-12 中国电建集团铁路建设有限公司 The anti-collapse and water burst safety-door device of shield service channel excavation construction
CN107605507A (en) * 2017-10-13 2018-01-19 中山大学 Service channel shield-tunneling construction receives structure and construction method
CN107740699A (en) * 2017-09-01 2018-02-27 北京中煤矿山工程有限公司 The method that ground pours construction freezing method Metro Connection Passage concrete structure

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1916362A (en) * 2006-09-04 2007-02-21 上海隧道工程股份有限公司 Construction method for tunnel contact passage in shield section of underground railway
CN102155241A (en) * 2011-05-10 2011-08-17 广州市城市规划勘测设计研究院 Karst grouting reinforcement water-stop constructing method
CN102287198A (en) * 2011-07-23 2011-12-21 中铁十二局集团有限公司 Construction method for river-crossing shield tunnel crushed stratum communication channel
CN102619522A (en) * 2012-03-20 2012-08-01 天津城建隧道股份有限公司 Construction method for subway contact passage
CN103032073A (en) * 2012-12-08 2013-04-10 中铁十二局集团有限公司 Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method
CN103306683A (en) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 Construction method for comprehensive precipitation in hole in deep-buried tunnel excavation process
CN105714764A (en) * 2015-12-08 2016-06-29 中国铁建大桥工程局集团有限公司 Tunnel ground deep-hole sleeve valve tube grouting construction method
CN106050266A (en) * 2016-07-22 2016-10-26 中铁建大桥工程局集团第五工程有限公司 Construction method for undermining connected channel between shield sections in water-rich sand cobble stratum tunnel
CN106593470A (en) * 2016-12-08 2017-04-26 中铁第勘察设计院集团有限公司 High-permeability water-rich sand shield terminal reinforcing system and construction method thereof
CN106948833A (en) * 2017-04-05 2017-07-14 宁波大学 Pin-connected panel service channel structure and its construction method
CN206874285U (en) * 2017-04-20 2018-01-12 中国电建集团铁路建设有限公司 The anti-collapse and water burst safety-door device of shield service channel excavation construction
CN107227961A (en) * 2017-06-29 2017-10-03 中铁十二局集团有限公司 Heavy caliber dewatering well construction method in metro built by mining method hole
CN107740699A (en) * 2017-09-01 2018-02-27 北京中煤矿山工程有限公司 The method that ground pours construction freezing method Metro Connection Passage concrete structure
CN107605507A (en) * 2017-10-13 2018-01-19 中山大学 Service channel shield-tunneling construction receives structure and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
詹涛: "复合地层盾构隧道联络通道涌水处置方案研究", 《铁道标准设计》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110925018A (en) * 2019-12-02 2020-03-27 河南科技大学 Pump room construction method and pump room construction dewatering system in tunnel connection channel
CN110925018B (en) * 2019-12-02 2021-06-25 河南科技大学 Pump room construction method and pump room construction dewatering system in tunnel connection channel
CN110985120A (en) * 2019-12-31 2020-04-10 中铁十六局集团北京轨道交通工程建设有限公司 Precipitation construction method and system for tunnel connection channel of fractured clay layer
CN111946351A (en) * 2020-07-13 2020-11-17 济南轨道交通集团有限公司 Rapid excavation method for contact channel of hard rock stratum of rail transit
CN112228091A (en) * 2020-12-14 2021-01-15 北京建工土木工程有限公司 Bottom sealing method for mechanical construction vertical shaft in tunnel
CN112228091B (en) * 2020-12-14 2021-03-12 北京建工土木工程有限公司 Bottom sealing method for mechanical construction vertical shaft in tunnel

Similar Documents

Publication Publication Date Title
CN109630193A (en) Subway Tunnel service channel excavates the administering method for water burst phenomenon occur
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN108643935A (en) The construction method in tunnel under rich water shallow embedding geology
CN106014201B (en) A kind of outer release hole safe construction technique of tunnel grouting curtain
CN110685714B (en) Micro-step reserved core soil construction structure and method for shallow-buried bias tunnel under phyllite geology
CN107762533A (en) A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN105715296A (en) Blowing sand backfill and grouting construction method of tunnel crossing coal mine goaf
CN104532821A (en) Extra-large karst cave bottom treatment construction method
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN107725056A (en) One kind passes through silly stratum tunnel loopful quick grouting construction method in advance
CN102296621B (en) Construction method of ground sectional water-stop curtain
CN107859145A (en) A kind of drainpipe is plugged into construction method under water
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN110130936A (en) It dashes forward in a kind of shield tunneling process and meets the construction method of untreated solution cavity or crack
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN109441482A (en) A kind of cup type pre-pouring grout reinforcement means of tunneling boring curtain-grouting
CN104533451A (en) Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock
CN110259490A (en) A kind of Underground Subway Station construction method
CN110847929B (en) Tunnel portal section pre-reinforcing and excavating construction method based on partition blasting
CN110821500B (en) Large-section tunnel excavation and support construction method for penetrating through earth-rock boundary stratum
CN108005662B (en) A kind of processing method of underground water seal cave depot storage cavern area geology crushed zone
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
CN111560964B (en) Construction method of rear anti-seepage system of foundation pit
CN108277815A (en) The cofferdam structure and its construction method constructed for water intaking header structure in river
CN116816389A (en) Tunnel water-rich karst collapse cavity treatment method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416

RJ01 Rejection of invention patent application after publication