CN109743005A - The installation method of photovoltaic bracket - Google Patents
The installation method of photovoltaic bracket Download PDFInfo
- Publication number
- CN109743005A CN109743005A CN201910021526.0A CN201910021526A CN109743005A CN 109743005 A CN109743005 A CN 109743005A CN 201910021526 A CN201910021526 A CN 201910021526A CN 109743005 A CN109743005 A CN 109743005A
- Authority
- CN
- China
- Prior art keywords
- photovoltaic bracket
- cant beam
- purlin
- installation method
- pile foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Abstract
The invention discloses a kind of installation methods of photovoltaic bracket, including step 1: pile foundation construction;Step 2: front column is mounted in pile foundation;Step 3: cant beam and front column being assembled, purlin and rear column are assembled on cant beam;Step 4: cant beam and purlin being lifted, so that rear column is vertical, rear column is fixed in pile foundation.The installation method of photovoltaic bracket of the invention mounting purlines before propping cant beam, compared to traditional installation method, the process built scaffold and climb scaffold is omitted, simplifies the installation steps of photovoltaic bracket, shortens the construction period of photovoltaic bracket and reduce construction cost.
Description
Technical field
The present invention relates to engineering construction field more particularly to a kind of installation methods of efficient photovoltaic bracket.
Background technique
Photovoltaic bracket is mainly used for carrying photovoltaic battery panel and its matched relevant device, mainly includes pile foundation, basis branch
Frame and purlin three parts.Pile foundation is generally concrete pipe base, is perfused in advance by construction personnel according to construction drawing ground on the scene
It completes, remains for the built-in fitting for installing column in pile foundation in advance.Base rack mainly includes front column, rear column and cant beam, sometimes
It waits and also sets up bearing diagonal etc. for enhancing the component of base rack;Wherein the height of front column is less than the height of rear column, cant beam
Both ends be separately connected front column and rear column to keep tilting, purlin is horizontal to be mounted on cant beam.
In general, about 18 meters of the width of a photovoltaic bracket (length that the width of photovoltaic bracket is equal to purlin), needs
Will about six be spaced each other uniform base rack, horizontal horizontal on six base racks of more purlins.Purlin along
Cant beam is evenly arranged, therefore different purlin height is different, and the purlin of highest point is about 2.3 meters.
The installation method of photovoltaic bracket is in the prior art: casting pile foundation first, secondly installation foundation bracket, is finally installed
Purlin.The defect of this installation method is that the purlin of eminence is already higher than the height of construction worker, and worker must configure foot hand
Frame could complete whole purlin installations, and building scaffold and climbing scaffold influences construction efficiency very big, seriously constrain
The construction speed of photovoltaic bracket installing engineering.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of installation methods of efficient photovoltaic bracket, and traditional peace is omitted
The scaffold used in dress method.
In order to solve the above technical problems, the technical solution adopted by the present invention are as follows: a kind of installation method of photovoltaic bracket, including
Following steps:
Step 1: pile foundation construction;Generally concrete pipe base directly pinpoints construction in advance according to drawing, answers in pile foundation
Remain for installing the built-in fitting of column in advance;
Step 2: front column is mounted in pile foundation;
Step 3: cant beam and front column being assembled, purlin and rear column are assembled on cant beam;In this stage, cant beam is laid flat
On the ground, scaffold is not necessarily to when mounting purlines;
Step 4: cant beam and purlin being lifted, so that rear column is vertical, rear column is fixed in pile foundation.
If photovoltaic bracket is provided with bearing diagonal, installation method if includes step 5: bearing diagonal is installed to cant beam and rear vertical
On column.
It is sometimes by manually carrying out, in order to reduce the labour of worker that step 4, which lifts entire cant beam and the operation of purlin,
Intensity can be located at the purlin of eminence by leading assembled part in step 3, and the remaining purlin without using scaffold installation is in step
Assembling is completed in rapid 5.
In installation method of the invention, step 2-5 is carried out as unit of teams and groups and stays a people after completing step 2-4
Or part crewmember carries out step 5, remaining crewmember carries out the step 2-4 of next photovoltaic bracket.
The utility model has the advantages that the installation method of photovoltaic bracket of the invention mounting purlines before propping cant beam, compared to tradition
Installation method, be omitted build scaffold and climb scaffold process, simplify the installation steps of photovoltaic bracket, shorten
The construction period of photovoltaic bracket simultaneously reduces construction cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of 1 photovoltaic bracket of embodiment.
Fig. 2 is the installation process figure (one) of 1 photovoltaic bracket of embodiment.
Fig. 3 be 1 photovoltaic bracket of embodiment installation process figure (secondly).
Wherein: 1, pile foundation;2, purlin;3, front column;4, rear column;5, cant beam;6, bearing diagonal.
Specific embodiment
Invention is further described in detail With reference to embodiment.
Embodiment 1
As shown in Figure 1, photovoltaic bracket to be mounted needed for the present embodiment includes pile foundation 1, base rack and purlin 2, wherein
Base rack includes front column 3, rear column 4, cant beam 5 and bearing diagonal 6;Specific installation steps are as follows:
Step 1: pile foundation 1 is constructed;Pile foundation 1 is concrete pipe base 1, pinpoints construction in advance according to drawing, should reserve in pile foundation 1
For installing the built-in fitting of column;
Step 2: front column 3 is mounted in pile foundation 1;
Step 3: as shown in Fig. 2, cant beam 5 and front column 3 are assembled, purlin 2 and rear column 4 being assembled on cant beam 5;?
This stage, cant beam 5 are laid flat on the ground, and scaffold is not necessarily to when mounting purlines 2;
Step 4: as shown in figure 3, manually lift cant beam 5 and purlin 2, so that rear column 4 is vertical, rear column 4 is fixed
In pile foundation 1;
Step 5: will be in the installation to cant beam 5 and rear column 4 of bearing diagonal 6.
3 height of photovoltaic bracket front column of the present embodiment is 412mm, and 4 height of rear column is 2093mm, and 5 length of cant beam is
4200mm, 2 length of purlin are 18390mm;One photovoltaic bracket includes six base racks and five purlins 2, six basis branch
Frame is arranged in juxtaposition, and the distance between adjacent base rack is 3400mm.
All concrete pipe bases 1 are constructed completion in advance, and the installation of base rack and purlin 2 is grasped as unit of teams and groups
Make.One teams and groups, 9 construction workers, step 2-4 are shared out the work and help one another progress by whole crewmembers, stayed after completing a worker into
Row step 5, remaining crewmember carry out the step 2-4 of next photovoltaic bracket, with all photovoltaic brackets of this cycle installation.
The installation method of the photovoltaic bracket of the present embodiment is without using scaffold, the teams and groups comprising 9 construction workers
14 brackets can be installed for one day;As a comparison, if similarly construction teams and groups can only be pacified using traditional installation method one day
Fill 6 brackets;The construction efficiency of photovoltaic bracket can be improved about 2.3 times by the installation method of the photovoltaic bracket of the present embodiment,
Significantly shorten the construction period of photovoltaic bracket.
Although embodiments of the present invention are illustrated in specification, these embodiments are intended only as prompting,
It should not limit protection scope of the present invention.It is equal that various omission, substitution, and alteration are carried out without departing from the spirit and scope of the present invention
It should be included within the scope of the present invention.
Claims (4)
1. a kind of installation method of photovoltaic bracket, it is characterised in that include the following steps:
Step 1: pile foundation construction;
Step 2: front column is mounted in pile foundation;
Step 3: cant beam and front column being assembled, purlin and rear column are assembled on cant beam;
Step 4: cant beam and purlin being lifted, so that rear column is vertical, rear column is fixed in pile foundation.
2. the installation method of ground photovoltaic bracket according to claim 1, it is characterised in that:
Further include step 5: bearing diagonal is installed to cant beam and rear column.
3. the installation method of ground photovoltaic bracket according to claim 2, it is characterised in that: assembling in advance in step 3
Part is located at the purlin of eminence, and remaining purlin is completed to assemble in steps of 5.
4. the installation method of ground photovoltaic bracket according to claim 3, it is characterised in that: walked as unit of teams and groups
Rapid 2-5 stays a people or part crewmember to carry out step 5 after completing step 2-4, and remaining crewmember carries out next
The step 2-4 of photovoltaic bracket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910021526.0A CN109743005A (en) | 2019-01-10 | 2019-01-10 | The installation method of photovoltaic bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910021526.0A CN109743005A (en) | 2019-01-10 | 2019-01-10 | The installation method of photovoltaic bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109743005A true CN109743005A (en) | 2019-05-10 |
Family
ID=66364282
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910021526.0A Pending CN109743005A (en) | 2019-01-10 | 2019-01-10 | The installation method of photovoltaic bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109743005A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110661480A (en) * | 2019-11-15 | 2020-01-07 | 上海宝冶集团有限公司 | Mountain region photovoltaic support system and installation method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104967398A (en) * | 2015-07-03 | 2015-10-07 | 上海电力设计院有限公司 | Photovoltaic power generation support mounting structure and photovoltaic power generation support construction method |
CN105384070A (en) * | 2015-12-11 | 2016-03-09 | 中国一冶集团有限公司 | Method for mounting photovoltaic panel |
JP2017017937A (en) * | 2015-07-06 | 2017-01-19 | 梅岡 美喜男 | Cradle for installation of solar battery module |
CN108093979A (en) * | 2017-12-20 | 2018-06-01 | 广西建工集团第五建筑工程有限责任公司 | Method for installing and constructing photovoltaic power generation body of light-agricultural combined greenhouse |
-
2019
- 2019-01-10 CN CN201910021526.0A patent/CN109743005A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104967398A (en) * | 2015-07-03 | 2015-10-07 | 上海电力设计院有限公司 | Photovoltaic power generation support mounting structure and photovoltaic power generation support construction method |
JP2017017937A (en) * | 2015-07-06 | 2017-01-19 | 梅岡 美喜男 | Cradle for installation of solar battery module |
CN105384070A (en) * | 2015-12-11 | 2016-03-09 | 中国一冶集团有限公司 | Method for mounting photovoltaic panel |
CN108093979A (en) * | 2017-12-20 | 2018-06-01 | 广西建工集团第五建筑工程有限责任公司 | Method for installing and constructing photovoltaic power generation body of light-agricultural combined greenhouse |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110661480A (en) * | 2019-11-15 | 2020-01-07 | 上海宝冶集团有限公司 | Mountain region photovoltaic support system and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105569358A (en) | Construction method of special-shaped curved surface roof with large span and multiple curvatures | |
CN107902545B (en) | Horse way air pipe hoisting construction device and construction method | |
CN205171975U (en) | Tuber pipe mounting platform based on BIM technique | |
CN109057365A (en) | A kind of Node In Large-span Pipe Truss roof truss air translation installation method | |
CN104264999A (en) | Large roof grid structure assembling and installing method | |
CN105484502A (en) | Combination installation method for steel structure roofing purlins and support bars of industrial factory building | |
CN212926981U (en) | I-steel support of encorbelmenting bears hanging flower basket device | |
CN109743005A (en) | The installation method of photovoltaic bracket | |
CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
CN203794440U (en) | Assembled roofing color plate lifting frame | |
CN206753085U (en) | A kind of sliding platform for being used to install high-altitude wire frame steel construction | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN104131706A (en) | Vertical steel bar two-layer connecting structure of concrete framework structure and construction method of vertical steel bar two-layer connecting structure | |
CN103615118A (en) | Lifting installation method of large arch structure | |
CN105952130A (en) | Suspension platform for constructing eave part of building and installation method thereof | |
CN205693609U (en) | Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed | |
CN112227694B (en) | Integrated climbing frame system and assembling method thereof | |
CN103741793A (en) | Circulatory inverted assembling method for spatial pipe rack pre-assembly | |
CN204081433U (en) | Steel structural roof liner profiled sheet construction Special-purpose hanger basket support | |
CN210563326U (en) | Overhead unit type overhead sliding splicing operation platform | |
CN114837308A (en) | Assembly type building component connecting mechanism and connecting method thereof | |
CN113323153A (en) | Bending-twisting aluminum alloy structure in existing complex space and construction method | |
CN208056658U (en) | Aerial for industrialized building makes building machine | |
CN214531588U (en) | Decorate engineering with automatic solar protection devices | |
CN105978454B (en) | Ground photovoltaic bracket and photovoltaic module suspension rack device and application method are installed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190510 |