CN208056658U - Aerial for industrialized building makes building machine - Google Patents

Aerial for industrialized building makes building machine Download PDF

Info

Publication number
CN208056658U
CN208056658U CN201820525705.9U CN201820525705U CN208056658U CN 208056658 U CN208056658 U CN 208056658U CN 201820525705 U CN201820525705 U CN 201820525705U CN 208056658 U CN208056658 U CN 208056658U
Authority
CN
China
Prior art keywords
crossbeam
standard knot
construction
workshop
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820525705.9U
Other languages
Chinese (zh)
Inventor
钟萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhong Qing Grand Assembly Building Co Ltd
Original Assignee
Zhong Qing Grand Assembly Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhong Qing Grand Assembly Building Co Ltd filed Critical Zhong Qing Grand Assembly Building Co Ltd
Priority to CN201820525705.9U priority Critical patent/CN208056658U/en
Application granted granted Critical
Publication of CN208056658U publication Critical patent/CN208056658U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Building machine being made for the aerial of industrialized building the utility model is related to a kind of, belongs to construction special equipment field.The bolt collar of the standard knot bottom high-strength bolt pre-buried with basis is attached;Workshop column is attached with standard knot by high-strength bolt;Hydraulicefficiency elevation structure is bolted and is fixed on the column of workshop;The outer body panel of construction is bolted with workshop column to be integrated;Crossbeam I and crossbeam II are connected and fixed by high-strength bolt and workshop column;Crane Rail is fixed on crossbeam II;End promotes driving and intermediate installation driving is mounted on Crane Rail, is fixed with driving retaining mechanism;Standard knot lifting appliance is mounted on the outer bottom for choosing crossbeam of workshop column.Fast hoisting can be met, precise positioning, Multi-station synchronous construction, while realizing construction outrigger integration with floor synchronization lifting improves construction precision, speed, and computer automation control is all realized in the assembling and disassembling of integral device, construction safety, efficient.

Description

Aerial for industrialized building makes building machine
Technical field
Building machine being made for the aerial of industrialized building the utility model is related to a kind of, belongs to construction special equipment neck Domain.
Background technology
China grows with the continuous development of assembled architecture at present, and assembly precision and efficiency of assembling requirement are higher and higher, Traditional tower crane equipment is low in the presence of promotion speed, is influenced by weather, and construction position stability is poor, precision is low, while by place Influence can not achieve more tower cranes while construct, and cause construction surface coverage area small, the slow problem of construction speed;By assembled The larger limitation of prefabricated components monomer weight, ordinary tower sling heavy load and can not meet requirement;The assembling and disassembling expense of construction outrigger When laborious, working at height the problems such as there are larger security risks.
Utility model content
The utility model making building in order to overcome drawbacks described above, its purpose is to provide a kind of for the aerial of industrialized building Machine can meet fast hoisting, precise positioning, Multi-station synchronous construction, and be protected from weather influences, while realize construction outrigger Integration improves construction precision, speed with floor synchronization lifting, and computer automation control is all realized in the assembling and disassembling of integral device System, it is construction safety, efficient.
To achieve the goals above, the utility model uses following technical solution:
It is a kind of to make building machine, the bolt collar of standard knot bottom and basic pre-buried high-strength spiral shell for the aerial of industrialized building Bolt is attached;
Workshop column is attached with standard knot by high-strength bolt;
Hydraulicefficiency elevation structure is bolted and is fixed on the column of workshop;
The outer body panel of construction is bolted with workshop column to be integrated;
Crossbeam I and crossbeam II are connected and fixed by high-strength bolt and workshop column;
Crane Rail is fixed on crossbeam II;
End promotes driving and intermediate installation driving is mounted on Crane Rail, is fixed with driving retaining mechanism;
Standard knot lifting appliance is mounted on the outer bottom for choosing crossbeam of workshop column.
Further, intelligence control system, which is mounted on, constructs on outer body panel.
Further, roofing lightweight steel construction installs the top of factory in the air.
Further, the quantity that end promotes driving is 2.
Its construction method:
A, the installation of first standard knot:Upright post basic construction is carried out in advance, and the bolt collar of standard knot bottom and basis are pre- The high-strength bolt buried is reliably connected;
B, the ground installation in aerial workshop:Plane carries out aerial shop assembled on first standard knot, first stands workshop Column is attached with standard knot by high-strength bolt;Hydraulicefficiency elevation structure, which is bolted, to be fixed on the column of workshop;Construction Outer body panel and workshop column are bolted be integrated after, then carry out the installation of crossbeam I and crossbeam II, crossbeam I and crossbeam II is connected and fixed by high-strength bolt and workshop column;Crane Rail is fixed on the crossbeam II of workshop both sides, then by left and right each 1 The end in portion promotes driving, intermediate installation is driven a vehicle, and installation is in orbit, is fixed with driving retaining mechanism;Standard knot lifting is set It is standby to choose crossbeam bottom mounted on the outer of workshop column;Intelligence control system, which is mounted on, constructs on outer body panel;The light steel knot of roofing is most After install;
C, aerial workshop rises overally:First pass through standard knot lifting appliance is lifted to standard knot filler by standard knot in advance It sets, controlling hydraulicefficiency elevation structure by intelligence control system synchronizes the standard knot height that constant speed rises 1.2 times, then by filler The standard knot set is inserted and saves bolt with following standard and fixes, and after fixation, hydraulic pressure is controlled by intelligence control system The aerial workshop superstructure of elevating mechanism is synchronized to decline and is connected and fixed with the standard knot of filling, completes primary jacking;It repeats above-mentioned Step carries out can be achieved to jack again;
D, tower body attachment arm is installed:Top lifting height is more than that tower body attachment arm one end is mounted on aerial workshop bottom after 21 meters On the standard knot in portion, the other end is attached to building supporting member, after every 18 meters increase together.
Further, each workshop column is respectively equipped with one group of standard knot lifting appliance.
Further, the dismounting after the completion of constructing:The crossbeam at all tops of aerial workshop top is passed through into chain block hand After dynamic dismounting, then by end promotion traveling crane to ground, end is then promoted into driving and centre installs driving and is moved to two After side outrigger platform position is fixed, realize that control hydraulicefficiency elevation structure first increases 0.2 standard by intelligence control system Section height, then removes a standard knot, standard knot pull-out is fixed on standard knot filling position, all columns, which synchronize, to be pulled out Afterwards, control hydraulicefficiency elevation structure declines a standard knot height again, and the standard knot of pull-out is sent to by standard knot lifting appliance Primary decline is completed on ground;It repeats the above steps, realizes and repeat to decline, eventually drop to ground and carry out overall pulling down.
The beneficial effects of the utility model:
1, the utility model realizes the fast hoisting and precise locating function of construction site component and raw material, while real The now integration of construction outrigger and architecture storey synchronization lifting function, exempt traditional construction outrigger, have automation Fast Installation And the characteristics of dismounting
2, the utility model greatly reduces cost of labor, shortens the duration;
3, the utility model has applied widely, improves working security, has accurate, efficient, the degree of automation The features such as high.
4, the utility model can greatly reduce artificial and scaffold use, shorten the construction period of whole building, especially It is applicable in and is built with novel fabricated.
5, the utility model realizes factory normalization production, combines diversity, can be customized according to different facades Production, it is applied widely.
Description of the drawings
Fig. 1 is the facade outline drawing of the utility model;
Fig. 2 is the front view of the utility model;
Fig. 3 is the side view of the utility model;
Fig. 4 is the vertical view of the utility model;
Fig. 5 is the aerial workshop facade outline drawing of the utility model;
Fig. 6 is the aerial workshop front view of the utility model;
Fig. 7 is the aerial workshop side view of the utility model.
Specific implementation mode
The utility model is described in detail below in conjunction with the accompanying drawings:
It is a kind of to make building machine for the aerial of industrialized building, the bolt collar of 1 bottom of standard knot with it is basic pre-buried high-strength Bolt is attached;
Workshop column 2 is attached with standard knot 1 by high-strength bolt;
Hydraulicefficiency elevation structure 3 is bolted and is fixed on workshop column 2;
Outer body panel 4 of constructing is bolted with workshop column 2 to be integrated;
Crossbeam I 5 and crossbeam II 6 are connected and fixed by high-strength bolt and workshop column 2;
Crane Rail 7 is fixed on crossbeam II 6;
End promotion driving 8 and intermediate installation driving 9 are mounted on Crane Rail 7, are fixed with driving retaining mechanism;
Standard knot lifting appliance 10 is mounted on the outer bottom for choosing crossbeam 11 of workshop column 2.
Intelligence control system 12, which is mounted on, constructs on outer body panel 4.
Roofing lightweight steel construction 14 installs the top of factory in the air.
The quantity that end promotes driving 8 is 2.
Its construction method:
A, the installation of first standard knot 1:Upright post basic construction, bolt collar and the basis of 1 bottom of standard knot are carried out in advance Pre-buried high-strength bolt is reliably connected;
B, the ground installation in aerial workshop:Plane carries out aerial shop assembled on first standard knot 1, first stands workshop Column 2 is attached with standard knot 1 by high-strength bolt;Hydraulicefficiency elevation structure 3, which is bolted, to be fixed on workshop column 2; The outer body panel 4 of construction and workshop column 2 are bolted after being integrated, then carry out the installation of crossbeam I 5 and crossbeam II 6, crossbeam I 5 and crossbeam II 6 be connected and fixed by high-strength bolt and workshop column 2;Crane Rail 7 is fixed on the crossbeam II 6 of workshop both sides On, then each 1 end in left and right is promoted and drives a vehicle 8, intermediate 9 installation of installation driving in orbit, it is carried out with driving retaining mechanism It is fixed;Standard knot lifting appliance 10 chooses 11 bottom of crossbeam mounted on the outer of workshop column 2;Intelligence control system 12 is mounted on construction On outer body panel 4;Roofing lightweight steel construction 14 is finally installed;
C, aerial workshop rises overally:Standard knot is lifted to standard knot filling by the pre- standard knot lifting appliance 10 that first passes through Position 13 controls hydraulicefficiency elevation structure 3 by intelligence control system 12 and synchronizes the standard knot height that constant speed rises 1.2 times, then The standard knot of filling position 13 is inserted and saves bolt with following standard and is fixed, after fixation, passes through intelligent control system 12 control 3 aerial workshop superstructure of hydraulicefficiency elevation structure of system synchronizes to decline to be connected and fixed with the standard knot of filling, is completed primary Jacking;It repeats the above steps and can be achieved jacking again;
D, tower body attachment arm is installed:Top lifting height is more than that tower body attachment arm one end is mounted on aerial workshop bottom after 21 meters On the standard knot in portion, the other end is attached to building supporting member, after every 18 meters increase together.
Each workshop column 2 is respectively equipped with one group of standard knot lifting appliance 10.
Dismounting after the completion of construction:By the crossbeam at all tops of aerial workshop top by chain block manual removal after, Driving 8 is promoted by end to hang to ground, end promotion driving 8 and intermediate installation driving 9 are then moved to both sides overhanging again After position of platform is fixed, realize that control hydraulicefficiency elevation structure 3 first increases 0.2 standard knot height by intelligence control system 12 Then degree removes a standard knot, standard knot pull-out is fixed on standard knot filling position 13, after all columns synchronize pull-out, Control hydraulicefficiency elevation structure 3 declines a standard knot height again, and the standard knot of pull-out is sent to by standard knot lifting appliance 10 Primary decline is completed on ground;It repeats the above steps, realizes and repeat to decline, eventually drop to ground and carry out overall pulling down.

Claims (4)

1. a kind of making building machine for the aerial of industrialized building, it is characterised in that:Standard knot(1)The bolt collar of bottom and basis Pre-buried high-strength bolt is attached;
Workshop column(2)With standard knot(1)It is attached by high-strength bolt;
Hydraulicefficiency elevation structure(3)It is bolted and is fixed on workshop column(2)On;
The outer body panel of construction(4)With workshop column(2)It is bolted and is integrated;
Crossbeam I(5)With crossbeam II(6)Pass through high-strength bolt and workshop column(2)It is connected and fixed;
Crane Rail(7)It is fixed on crossbeam II(6)On;
End promotes driving(8)With centre installation driving(9)Mounted on Crane Rail(7)On, consolidated with driving retaining mechanism It is fixed;
Standard knot lifting appliance(10)Mounted on workshop column(2)Outer choose crossbeam(11)Bottom.
2. according to claim 1 make building machine for the aerial of industrialized building, it is characterised in that:Intelligence control system (12)Mounted on outer body panel of constructing(4)On.
3. according to claim 1 make building machine for the aerial of industrialized building, it is characterised in that:Roofing lightweight steel construction (14)The top of factory in the air is installed.
4. according to claim 1 make building machine for the aerial of industrialized building, it is characterised in that:End promotes driving (8)Quantity be 2.
CN201820525705.9U 2018-04-13 2018-04-13 Aerial for industrialized building makes building machine Expired - Fee Related CN208056658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820525705.9U CN208056658U (en) 2018-04-13 2018-04-13 Aerial for industrialized building makes building machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820525705.9U CN208056658U (en) 2018-04-13 2018-04-13 Aerial for industrialized building makes building machine

Publications (1)

Publication Number Publication Date
CN208056658U true CN208056658U (en) 2018-11-06

Family

ID=63986154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820525705.9U Expired - Fee Related CN208056658U (en) 2018-04-13 2018-04-13 Aerial for industrialized building makes building machine

Country Status (1)

Country Link
CN (1) CN208056658U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265991A (en) * 2018-04-13 2018-07-10 中清大装配式建筑有限公司 Aerial for industrialized building makes building machine and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265991A (en) * 2018-04-13 2018-07-10 中清大装配式建筑有限公司 Aerial for industrialized building makes building machine and its construction method

Similar Documents

Publication Publication Date Title
CN110027992B (en) Automatic jacking and positioning device and method for standard section of tower crane
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN101284628B (en) Hoisting method for framework of large tonnage pressing machine
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN110745714B (en) Self-lifting installation method of hoisting tower system
CN208056658U (en) Aerial for industrialized building makes building machine
CN108265991A (en) Aerial for industrialized building makes building machine and its construction method
CN100526197C (en) Bottom lifting tower crane
CN220723383U (en) Adjusting mechanism for tower crane wall-attached supporting platform
CN101818829B (en) Construction method of cross-valley overhead pipeline
CN201786011U (en) Lifting variable-size construction operating platform
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN201635390U (en) Automatic formwork supporting machine for high-rise building elevator shaft construction
CN219031629U (en) Lifting equipment for indoor plate installation
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN203319589U (en) Hoisting machine for installing air hose
CN201074167Y (en) Indoor light movable crane
CN205170321U (en) Lifting platform
CN202449760U (en) Container portal crane with rails
CN201619965U (en) Climbing lift
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN206800201U (en) The compound Hanging basket on front support of single cable plane
CN215626381U (en) Hoisting and positioning tool for ultra-long steel truss
CN218668451U (en) Hanging basket for high-altitude auxiliary installation of aluminum plate
CN203960748U (en) Steel bridge king-tower closes up uses auxiliary body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181106