CN109299915A - A kind of scaffold operational method - Google Patents
A kind of scaffold operational method Download PDFInfo
- Publication number
- CN109299915A CN109299915A CN201811043864.6A CN201811043864A CN109299915A CN 109299915 A CN109299915 A CN 109299915A CN 201811043864 A CN201811043864 A CN 201811043864A CN 109299915 A CN109299915 A CN 109299915A
- Authority
- CN
- China
- Prior art keywords
- scaffold
- state
- updated
- setting
- user
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The invention belongs to nuclear power station scaffolds to build technical field, and in particular to a kind of scaffold operational method;The purpose of the present invention is intended to research and develop the scaffold operation process method of power station equipment maintenance process, realizes effective management of scaffold process;It is very universal that scaffold is set up in power station or other factory's overhauls;Progress is set up in understanding, improves operating efficiency, controls security risk;The present invention specifies seven steps of scaffold operation process, and (1. in the works;2. setting up beginning;3. setting up completion;4. in use;5. dismountable;6. starting to remove;7. having removed).This seven steps implement the information feedback of operation progress respectively by " scaffold user " and " scaffold builds people " according to division of duty respectively.Timely learning scaffold, which is reached, by the information processing unit of organization internal, hand held mobile terminals equipment, printing device, bar code scan equipment builds progress.Carry out follow-up work in time.
Description
Technical field
The invention belongs to nuclear power station scaffolds to build technical field, and in particular to a kind of scaffold work flow controlling party
Method.
Background technique
The scaffold operation of maintenance process is the important prerequisite of many maintenance activities.
Traditional scaffold operation process, general only control start to set up, set up completion, remove, these stages.For
Stage definitions in the process are not clear enough, set up session information transmitting not in time.Scaffold user and scaffold is caused to build
The information communication of people, there are lag or mistakes, reduce setting up, use, removing efficiency for scaffold.Work delays progress increases
Add operating risk.
From going into operation to completion for maintenance activity, entire operation process has run through scaffold from starting to build, and completes to using
And the life cycle removed.It needs to be managed scaffold state description in this period, and passes through suitable data communication
Technology is orderly carried out convenient for each responsible department's operation in power station.It is therefore desirable to have the scaffold process approach of a clear and rational,
Keep scaffold operation process rationally efficient.
Summary of the invention
The purpose of the present invention is intended to research and develop the scaffold operation process method of power station equipment maintenance process, realizes scaffold stream
Effective management of journey.It is very universal that scaffold is set up in power station or other factory's overhauls.The reasonable of scaffold operational method can
It leans on, administrative staff can be allowed clearly to recognize responsibility, progress is set up in understanding, improves operating efficiency, controls security risk.
The technical scheme is that
A kind of scaffold work flow control method, comprising the following steps:
Step 1: scaffold user proposes that scaffold builds application by platform, software platform will be included in scaffold and take
The plan of building, state is " in the works " at this time;
Step 2: the personnel of setting up implement scaffold operation preparation, have go into operation operating condition when, in human-computer interface device
Input module scaffold job state is updated to " set up such as hand held mobile terminals equipment, computer terminal software platform
Start ";
It is finished Step 3: the personnel of setting up set up, scaffold job state is updated to " setting up completion ", and by tissue
The information processing unit in portion notifies other administrative staff and scaffold user that can check and accept and uses scaffold;
Step 4: scaffold user begins to use scaffold.By the information processing unit of organization internal, by scaffold
Job state is updated to " in use ";
Step 5: complete maintenance, when needing to remove scaffold, scaffold user by scaffold job state more
Newly it is " dismountable ";
Step 6: scaffold, which builds people, implements dismounting, and state is updated to " starting to remove ", after dismounting more by state
Newly it is " dismounting ";
Step 7: the transmitting of the above work state information, be by hand held mobile terminals equipment, barcode data barcode scanning and
Software kit carries out;Each operating personnel is set to know that real time job is in progress immediately, the timeliness for field operation control mentions
For guaranteeing.
The beneficial effects of the present invention are:
1, scaffold is effectively improved to build and service efficiency;
2, the problem of it is not clear enough for stage definitions in the process to solve, and sets up session information transmitting not in time;
3, job schedule is accelerated, operating risk is reduced;
Specific embodiment
Further it is situated between below with reference to embodiment to a kind of processing method of multiple tracks spectral measurement proposed by the present invention
It continues:
A kind of scaffold work flow control method, comprising the following steps:
Step 1: scaffold user proposes that scaffold builds application by platform, software platform will be included in scaffold and take
The plan of building, state is " in the works " at this time;
Step 2: the personnel of setting up implement scaffold operation preparation, have go into operation operating condition when, in human-computer interface device
Input module scaffold job state is updated to " set up such as hand held mobile terminals equipment, computer terminal software platform
Start ";
It is finished Step 3: the personnel of setting up set up, scaffold job state is updated to " setting up completion ", and by tissue
The information processing unit in portion notifies other administrative staff and scaffold user that can check and accept and uses scaffold;
Step 4: scaffold user begins to use scaffold.By the information processing unit of organization internal, by scaffold
Job state is updated to " in use ";
Step 5: complete maintenance, when needing to remove scaffold, scaffold user by scaffold job state more
Newly it is " dismountable ";
Step 6: scaffold, which builds people, implements dismounting, and state is updated to " starting to remove ", after dismounting more by state
Newly it is " dismounting ";
Step 7: the transmitting of the above work state information, be by hand held mobile terminals equipment, barcode data barcode scanning and
Software kit carries out;Each operating personnel is set to know that real time job is in progress immediately, the timeliness for field operation control mentions
For guaranteeing.
A kind of power station operation scaffold operational method of the present invention, and cooperate information software platform, scaffold is controlled from preparation
Build the process finally removed.
Scaffolding Standardization should include:
1., establish standardization effort stream;
Illustrate: as the standardization effort stream in power station, the operation process of scaffold can be clearly defined, each department
According to the definition of step, the current development condition of scaffold is clearly known.
2., each phase data source of clear operation;
Illustrate: to the sessions of scaffold, explicitly defining relevant data sources and management responsibility main body, make operation process
Clear and definite.
3., have suitable data communication network;
Illustrate: the communication network set up according to power station, in software application platform, Real-Time Sharing scaffolding Standard workflow
Information, each department carry out rapidly further work according to information.Realize the automatic management of operation.
The present invention specifies seven steps of scaffold operation process, and (1. in the works;2. setting up beginning;3. setting up completion;
4. in use;5. dismountable;6. starting to remove;7. having removed).
This seven steps, are implemented by " scaffold user " and " scaffold builds people " according to division of duty respectively respectively
The information of operation progress is fed back.
It is enough by the information processing unit of organization internal, hand held mobile terminals equipment, printing device, bar code scan equipment
Timely learning scaffold builds progress.Carry out follow-up work in time.
Specifically used and method of the invention.
Scaffold user proposes that scaffold builds application by platform.Software platform will be included in the scaffold plan of building.
State is " 1. in the works " at this time.
The personnel of setting up implement scaffold operation preparation.Have go into operation operating condition when, in the input of human-computer interface device
Scaffold job state is updated to that " 2. set up out such as hand held mobile terminals equipment, computer terminal software platform by module
Begin ".
The personnel of setting up, which set up, to be finished, and scaffold job state is updated to " 3. set up completion ", and passes through organization internal
Information processing unit notifies other administrative staff and scaffold user that can check and accept and uses scaffold.
Scaffold user begins to use scaffold.By the information processing unit of organization internal, by scaffold operation shape
State is updated to " in 4. uses ".
Maintenance is completed, when needing to remove scaffold, scaffold job state is updated to " 5. by scaffold user
It is dismountable ".
Scaffold builds people and implements dismounting, and state is updated to " 6. start to remove ", is updated to state after dismounting
" 7. have removed ".
The transmitting of the above work state information is by hand held mobile terminals equipment, barcode data barcode scanning and mating soft
Part carries out.Each operating personnel is set to know that real time job is in progress immediately, the timeliness for field operation control provides guarantee.
Claims (1)
1. a kind of scaffold operational method, it is characterised in that: the following steps are included:
Step 1: scaffold user proposes that scaffold builds application by platform, software platform will be included in scaffold and build meter
It draws, state is " in the works " at this time;
Step 2: the personnel of setting up implement scaffold operation preparation, have go into operation operating condition when, in the defeated of human-computer interface device
Enter module, such as hand held mobile terminals equipment, computer terminal software platform, scaffold job state is updated to " set up out
Begin ";
It is finished Step 3: the personnel of setting up set up, scaffold job state is updated to " setting up completion ", and pass through organization internal
Information processing unit notifies other administrative staff and scaffold user that can check and accept and uses scaffold;
Step 4: scaffold user begins to use scaffold.By the information processing unit of organization internal, by scaffold operation
State is updated to " in use ";
Step 5: when needing to remove scaffold, scaffold job state is updated to by scaffold user completing maintenance
" dismountable ";
Step 6: scaffold, which builds people, implements dismounting, and state is updated to " starting to remove ", is updated to state after dismounting
" dismounting ";
It is by hand held mobile terminals equipment, barcode data barcode scanning and mating Step 7: the transmitting of the above work state information
Software carries out;Each operating personnel is set to know that real time job is in progress immediately, the timeliness for field operation control provides guarantor
Card.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811043864.6A CN109299915A (en) | 2018-09-07 | 2018-09-07 | A kind of scaffold operational method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811043864.6A CN109299915A (en) | 2018-09-07 | 2018-09-07 | A kind of scaffold operational method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109299915A true CN109299915A (en) | 2019-02-01 |
Family
ID=65166353
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811043864.6A Pending CN109299915A (en) | 2018-09-07 | 2018-09-07 | A kind of scaffold operational method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109299915A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109919517A (en) * | 2019-03-28 | 2019-06-21 | 江苏核电有限公司 | A kind of power station equipment repair welds work flow control method |
CN109993325A (en) * | 2019-03-28 | 2019-07-09 | 江苏核电有限公司 | A kind of power station equipment maintenance heat retaining operation flow control method |
CN110009217A (en) * | 2019-03-28 | 2019-07-12 | 江苏核电有限公司 | A kind of maintenance process draining method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103065215A (en) * | 2012-12-19 | 2013-04-24 | 云南电力调度控制中心 | Power grid dispatching method |
CN107832963A (en) * | 2017-11-21 | 2018-03-23 | 上海筑想信息科技股份有限公司 | A kind of complete period fine fitment monitoring system for housing development |
CN108154308A (en) * | 2017-12-29 | 2018-06-12 | 广州供电局有限公司 | Power construction process management optimization method and system |
CN108614685A (en) * | 2018-04-28 | 2018-10-02 | 广东电网有限责任公司 | Distribution security control method and system |
-
2018
- 2018-09-07 CN CN201811043864.6A patent/CN109299915A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103065215A (en) * | 2012-12-19 | 2013-04-24 | 云南电力调度控制中心 | Power grid dispatching method |
CN107832963A (en) * | 2017-11-21 | 2018-03-23 | 上海筑想信息科技股份有限公司 | A kind of complete period fine fitment monitoring system for housing development |
CN108154308A (en) * | 2017-12-29 | 2018-06-12 | 广州供电局有限公司 | Power construction process management optimization method and system |
CN108614685A (en) * | 2018-04-28 | 2018-10-02 | 广东电网有限责任公司 | Distribution security control method and system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109919517A (en) * | 2019-03-28 | 2019-06-21 | 江苏核电有限公司 | A kind of power station equipment repair welds work flow control method |
CN109993325A (en) * | 2019-03-28 | 2019-07-09 | 江苏核电有限公司 | A kind of power station equipment maintenance heat retaining operation flow control method |
CN110009217A (en) * | 2019-03-28 | 2019-07-12 | 江苏核电有限公司 | A kind of maintenance process draining method |
CN109993325B (en) * | 2019-03-28 | 2021-11-30 | 江苏核电有限公司 | Power station equipment maintenance heat preservation operation flow control method |
CN109919517B (en) * | 2019-03-28 | 2021-11-30 | 江苏核电有限公司 | Power station equipment maintenance welding operation flow control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109299915A (en) | A kind of scaffold operational method | |
CN102880123B (en) | System and method for controlling production process of petrochemical enterprise on basis of manufacturing execution system (MES) workflow | |
CN109591857A (en) | Train and shunting route comprehensive safety inspection method and device based on CTC3.0 | |
CN107682220A (en) | Method for inspecting for power equipment | |
CN104700192A (en) | Aided intelligent management and control system for power transmission and transformation project and management and control method thereof | |
CN106160219B (en) | The monitoring method of remote forced monitoring system for transformer station switching operation | |
CN109345072A (en) | Dispatching method for distribution branch line scheduling scenario | |
CN109299855B (en) | Power information communication scheduling system and scheduling method thereof | |
CN104809663A (en) | Power professional technique service assurance surveillance system and method | |
CN110706363A (en) | Attendance scheduling system based on face recognition | |
CN101957615A (en) | Rhythm control system of clothing production line | |
CN107704934A (en) | Electric power equipment inspection system | |
CN111950846A (en) | Intelligent factory shift scheduling system | |
CN110349049B (en) | Automatic work permission system and method for distribution network overhaul | |
CN113361970B (en) | Virtual dispatcher system and dispatching method based on power intelligent dispatching engine | |
CN111331605A (en) | High-voltage operation robot system | |
CN106779100A (en) | A kind of elevator repair and maintenance handheld terminal and its application method | |
CN109919517B (en) | Power station equipment maintenance welding operation flow control method | |
CN110866708A (en) | Power grid dispatching management system and application method thereof | |
CN204680051U (en) | A kind of project of transmitting and converting electricity is constructed intelligent auxiliary tube Ore-controlling Role | |
CN113673903B (en) | Task management system for off-site nuclear emergency and control method thereof | |
CN110175709A (en) | A kind of self-optimizing production product plan and method based on information announcement | |
CN106936211A (en) | A kind of demand response end loads apparatus control method | |
CN109697252A (en) | A kind of artificial mill APP error code inquiry system of machine and its operating procedure | |
CN102456183A (en) | Project management method based on distributed monitoring technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190201 |