CN102456183A - Project management method based on distributed monitoring technology - Google Patents
Project management method based on distributed monitoring technology Download PDFInfo
- Publication number
- CN102456183A CN102456183A CN2010105240376A CN201010524037A CN102456183A CN 102456183 A CN102456183 A CN 102456183A CN 2010105240376 A CN2010105240376 A CN 2010105240376A CN 201010524037 A CN201010524037 A CN 201010524037A CN 102456183 A CN102456183 A CN 102456183A
- Authority
- CN
- China
- Prior art keywords
- project
- risk
- management
- management method
- supervision
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to a project management method based on a distributed monitoring technology, which is characterized by comprising the following steps of: saving client communication information into a database through a requirement development and management component; calling a project plan management component; according to client requirements, establishing a project plan, and establishing corresponding project contracts; evaluating project risks through a risk management component; and then, supervising and controlling the whole project by a project supervision and control component. The project management method provided by the invention mainly realizes the management of the project plan, project supervision and control, project configuration, project purchasing, project contracts, project risks and other fields in a software development process. In the invention, by the management of the fields, the whole project execution process is controlled, so that the project execution efficiency and final quality are improved, and the project failure risk is reduced.
Description
Technical field
The present invention relates to a kind of project management method, especially a kind of system that manages to the implementation of enterprise's routine item based on the distributed monitoring technology.
Background technology
A kind of project management method based on the distributed monitoring technology; It comes down to an enterprise information management software; Enterprise information management software can be achieved the management process of enterprise on computer system, the data that enterprise produces in management process are carried out centralized stores, convenient search and statistics; Reduce handling cost, improved the efficiency of management.
Yet the project management process that present software enterprise generally adopts mainly comprises: project is formulated, steps such as the project implementation; The enterprise that has imports QA (quality control officer) and carries out tracking and testing in project implementation process, but these conventional project management processes only relate to the part of whole project implementation process, does not really relate to all relevant flow processs; For some factors; Such as risk profile and analysis, project purchasing, project configuration etc. are not controlled and are managed; Increase the risk that project proves an abortion, reduced the quality of the project implementation.
A kind of project implementation course management system of the present invention will be saved in database with the information of customer communication through demand development management assembly, call the project plan management assembly, formulate the project scheduling according to customer demand, formulate corresponding project contract.After risk management component evaluates project risk, whole project is exercised supervision and control by project supervision and Control Component.Can hold and make a strategic decision the implementation progress of project, make that the management for project implementation process becomes more meticulous more.The conventional project management system no longer is adapted to current most project implementation flow process.
Summary of the invention
The objective of the invention is to: to the deficiency of current project implementation management system, propose the system that a kind of overall monitor and management project are carried out, this system can realize the general management to project implementation process, reaches the purpose of quantitative management project implementation process.
In order to reach above purpose, the present invention includes following assembly:
Client operating software---be used for carrying out mutual software terminal system with client;
Database---be used for storage system to want data recorded information.
More than two assemblies form by following each widget:
Client operating software is made up of following assembly:
Client end interface---be used for carrying out the mutual of input and output with the user of system;
MDAC---in order to the data of accessing database;
The project plan management assembly---formulate the project scheduling in order to the project manager, the project scheduling comprises the project essential information, the scheduling of project, and project team member etc., this module can be made intelligent early-warning to the project scheduling;
Project supervision and Control Component---whole project is exercised supervision and control in order to the project manager, comprise progress monitoring, scheduling of resource etc.;
Project purchasing and contract management assembly---in order to management procurement information and the contract information relevant with project;
The risk management assembly---, avoid risk according to the forecasting risk in real time of project implementation situation in order to the project manager, and risk, this module that processing takes place comprise a risk identification appearance, anticipation and diagnosis risk automatically;
Demand development management assembly---the demand in order to project is managed, and comprises following the trail of the customer communication note;
Database consists of the following components:
Person chart---record enterprise staff basic data;
Repertory--the essential information of-record formulation project comprises Contract NO Contract_ID field, corresponding relevant with project procurement contract at least; Employee number User_ID field, corresponding relevant project manager with project;
Contracts card---contract of record information;
The user uses step to be:
Step 1: use client operating software, newly-built some personal informations comprise personnel's job number, name, and sex or the like, client operating software will be called MDAC and personnel's essential information be saved in the person chart of database;
Step 2: use client operating software, through demand development management assembly, calling MDAC will be saved in the information of customer communication in the repertory of database; Afterwards, call the project plan management assembly, formulate the project scheduling, comprise the project essential information, the scheduling of project, project team member etc., calling MDAC again will be saved in the repertory of database with the project essential information;
Step 3: use client operating software, through project purchasing and contract management assembly, manage procurement information and the contract information relevant with project, calling MDAC will be saved in the contracts card of database with the project contract information; Call the risk management assembly again, reason is avoided risk according to the forecasting risk in real time of project implementation situation, and handles the risk that takes place, and this module comprises a risk identification appearance, automatically anticipation and diagnosis risk;
Step 4: use client operating software, call project supervision and Control Component, whole project is exercised supervision and controls, comprise progress monitoring, scheduling of resource etc.;
The present invention mainly realizes the project scheduling in the software development process, project supervision and control, project configuration, project purchasing and project contract, the management in fields such as project risk.The present invention realizes whole project implementation process is controlled through the management to above field, makes the execution efficient and the final mass of project be improved, and the risk of project failure simultaneously is reduced.
Embodiment
Embodiment one
With .Net Framework 3.5 is platform; Adopt the C/S framework; Use Microsoft VisualStudio 2008 SDKs to develop software; Use database management tools SqlServer2005 special-purpose on the market, the needed database of the system that sets up adopts WPF as the interface development technology.Concrete mode is:
Client operating software is made up of following assembly:
Client operating software----is used for carrying out mutual software terminal system with client;
Database---be used for storage system to want data recorded information.
More than two assemblies form by following each widget:
Client operating software is made up of following assembly:
Client end interface---be used for carrying out the mutual of input and output with the user of system;
MDAC---in order to the data of accessing database;
The project plan management assembly---formulate the project scheduling in order to the project manager, the project scheduling comprises the project essential information, the scheduling of project, and project team member etc., this module can be made intelligent early-warning to the project scheduling;
Project supervision and Control Component---whole project is exercised supervision and control in order to the project manager, comprise progress monitoring, scheduling of resource etc.;
Project purchasing and contract management assembly---in order to management procurement information and the contract information relevant with project;
The risk management assembly---, avoid risk according to the forecasting risk in real time of project implementation situation in order to the project manager, and handle the risk that takes place, this module comprises a risk identification appearance, automatically anticipation and diagnosis risk;
Demand development management assembly---the demand in order to project is managed, and comprises following the trail of the customer communication note;
Database consists of the following components:
Person chart---record enterprise staff basic data;
Repertory--the essential information of-record formulation project comprises Contract NO Contract_ID field, corresponding relevant with project procurement contract at least; Employee number User_ID field, corresponding relevant project manager with project;
Contracts card---contract of record information;
The user uses step to be:
Step 1: use client operating software, newly-built some personal informations comprise personnel's job number, name, and sex or the like, client operating software will be called MDAC and personnel's essential information be saved in the person chart of database;
Step 2: use client operating software, through demand development management assembly, calling MDAC will be saved in the information of customer communication in the repertory of database; Afterwards, call the project plan management assembly, formulate the project scheduling, comprise the project essential information, the scheduling of project, project team member etc., calling MDAC again will be saved in the repertory of database with the project essential information;
Step 3: use client operating software, through project purchasing and contract management assembly, manage procurement information and the contract information relevant with project, calling MDAC will be saved in the contracts card of database with the project contract information; Call the risk management assembly again, reason is avoided risk according to the forecasting risk in real time of project implementation situation, and handles the risk that takes place, and this module comprises a risk identification appearance, automatically anticipation and diagnosis risk;
Step 4: use client operating software, call project supervision and Control Component, whole project is exercised supervision and controls, comprise progress monitoring, scheduling of resource etc.;
Except that the foregoing description, the present invention can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of requirement of the present invention.
Claims (4)
1. project management method based on distributed monitoring technology; It is characterized in that to be saved in database with the information of customer communication through demand development management assembly; Call the project plan management assembly, formulate the project scheduling, formulate corresponding project contract according to customer demand; After risk management component evaluates project risk, whole project is exercised supervision and control by project supervision and Control Component.
2. according to the said a kind of project management method of claim 1, it is characterized in that: can make the intelligent early-warning prompting to the project process and the plan of user's formulation based on the distributed monitoring technology.
3. according to the said a kind of project management method of claim 1 based on the distributed monitoring technology; It is characterized in that: contain the risk management assembly;, avoid risk according to the forecasting risk in real time of project implementation situation in order to the project manager, and handle the risk that takes place; This module comprises a risk identification appearance, automatically anticipation and diagnosis risk.
4. according to the said a kind of project management method of claim 1, it is characterized in that: contain project supervision and Control Component, whole project is exercised supervision and control, comprise progress monitoring, scheduling of resource etc. in order to the project manager based on distributed monitoring technology.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105240376A CN102456183A (en) | 2010-10-29 | 2010-10-29 | Project management method based on distributed monitoring technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105240376A CN102456183A (en) | 2010-10-29 | 2010-10-29 | Project management method based on distributed monitoring technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102456183A true CN102456183A (en) | 2012-05-16 |
Family
ID=46039351
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105240376A Pending CN102456183A (en) | 2010-10-29 | 2010-10-29 | Project management method based on distributed monitoring technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102456183A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104112174A (en) * | 2013-04-17 | 2014-10-22 | 中广核工程有限公司 | Project regulating and controlling method and system of nuclear power plant |
CN109903009A (en) * | 2019-01-31 | 2019-06-18 | 平安科技(深圳)有限公司 | Data flow tracking propulsion method and system based on substep driving |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101339629A (en) * | 2007-07-05 | 2009-01-07 | 镇江雅迅软件有限责任公司 | Software development procedure administrative system |
CN101699487A (en) * | 2009-11-19 | 2010-04-28 | 上海交通大学 | Networking cooperative information system participated by suppliers and method thereof |
-
2010
- 2010-10-29 CN CN2010105240376A patent/CN102456183A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101339629A (en) * | 2007-07-05 | 2009-01-07 | 镇江雅迅软件有限责任公司 | Software development procedure administrative system |
CN101699487A (en) * | 2009-11-19 | 2010-04-28 | 上海交通大学 | Networking cooperative information system participated by suppliers and method thereof |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104112174A (en) * | 2013-04-17 | 2014-10-22 | 中广核工程有限公司 | Project regulating and controlling method and system of nuclear power plant |
CN109903009A (en) * | 2019-01-31 | 2019-06-18 | 平安科技(深圳)有限公司 | Data flow tracking propulsion method and system based on substep driving |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105354762B (en) | Power customer service work order identification and distribution system and method | |
CN104361445B (en) | Labour's real-time management system and management method | |
CN108764610B (en) | Standard process engineering project construction management method based on big data and storage medium | |
CN106156902A (en) | Real estate marketing management system | |
CN107909241A (en) | Dispatching method, device, equipment and the readable storage medium storing program for executing of agricultural machinery key element | |
CN102300011A (en) | Automated mechanism for populating and maintaining data structures in queueless contact center | |
CN109146375A (en) | Power grid material Management System and method | |
CN107392425A (en) | A kind of the tobacco business project implementation SOP management method and system | |
CN107133803A (en) | Supply chain management method based on customer relation management | |
CN102456175A (en) | Software development process management method | |
CN102456183A (en) | Project management method based on distributed monitoring technology | |
CN109974740B (en) | Mobile communication network agent maintenance path planning method | |
CN108198609B (en) | Staff ordering method based on hospital logistics transport system | |
CN113452852A (en) | Method and device for regulating and controlling number of outbound calls of machine, electronic equipment and storage medium | |
CN110580582A (en) | Foreign trade comprehensive service management system and method based on emerging industry | |
CN110336852A (en) | A method of automatic competition for orders, execution work order based on mobile phone of attending to anything else | |
CN115953063B (en) | Method and device for tracking performance management | |
CN111325430A (en) | Mobile collaborative information management platform | |
Khurana et al. | A Review on Risk Management Framework for large scale scrum | |
CN107679738A (en) | A kind of achievement display systems and methods of exhibiting based on game mode | |
CN109214620A (en) | The creation method and interprise's intensive management plateform system of interprise's intensive management platform | |
CN115511460A (en) | Human resource management system based on network platform | |
CN112613857A (en) | Manpower resource management system based on artificial intelligence | |
CN117371870A (en) | Evaluation method and device for operator digital transformation strategy multiple disc | |
Sun | Design and Implementation of Enterprise Management Service Platform Based on Fuzzy Clustering Algorithm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120516 |