CN102456183A - Project management method based on distributed monitoring technology - Google Patents

Project management method based on distributed monitoring technology Download PDF

Info

Publication number
CN102456183A
CN102456183A CN2010105240376A CN201010524037A CN102456183A CN 102456183 A CN102456183 A CN 102456183A CN 2010105240376 A CN2010105240376 A CN 2010105240376A CN 201010524037 A CN201010524037 A CN 201010524037A CN 102456183 A CN102456183 A CN 102456183A
Authority
CN
China
Prior art keywords
project
risk
management
management method
supervision
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105240376A
Other languages
Chinese (zh)
Inventor
李骁淳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhenjiang Yction Software Co Ltd
Original Assignee
Zhenjiang Yction Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhenjiang Yction Software Co Ltd filed Critical Zhenjiang Yction Software Co Ltd
Priority to CN2010105240376A priority Critical patent/CN102456183A/en
Publication of CN102456183A publication Critical patent/CN102456183A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a project management method based on a distributed monitoring technology, which is characterized by comprising the following steps of: saving client communication information into a database through a requirement development and management component; calling a project plan management component; according to client requirements, establishing a project plan, and establishing corresponding project contracts; evaluating project risks through a risk management component; and then, supervising and controlling the whole project by a project supervision and control component. The project management method provided by the invention mainly realizes the management of the project plan, project supervision and control, project configuration, project purchasing, project contracts, project risks and other fields in a software development process. In the invention, by the management of the fields, the whole project execution process is controlled, so that the project execution efficiency and final quality are improved, and the project failure risk is reduced.

Description

A kind of project management method based on the distributed monitoring technology
Technical field
The present invention relates to a kind of project management method, especially a kind of system that manages to the implementation of enterprise's routine item based on the distributed monitoring technology.
Background technology
A kind of project management method based on the distributed monitoring technology; It comes down to an enterprise information management software; Enterprise information management software can be achieved the management process of enterprise on computer system, the data that enterprise produces in management process are carried out centralized stores, convenient search and statistics; Reduce handling cost, improved the efficiency of management.
Yet the project management process that present software enterprise generally adopts mainly comprises: project is formulated, steps such as the project implementation; The enterprise that has imports QA (quality control officer) and carries out tracking and testing in project implementation process, but these conventional project management processes only relate to the part of whole project implementation process, does not really relate to all relevant flow processs; For some factors; Such as risk profile and analysis, project purchasing, project configuration etc. are not controlled and are managed; Increase the risk that project proves an abortion, reduced the quality of the project implementation.
A kind of project implementation course management system of the present invention will be saved in database with the information of customer communication through demand development management assembly, call the project plan management assembly, formulate the project scheduling according to customer demand, formulate corresponding project contract.After risk management component evaluates project risk, whole project is exercised supervision and control by project supervision and Control Component.Can hold and make a strategic decision the implementation progress of project, make that the management for project implementation process becomes more meticulous more.The conventional project management system no longer is adapted to current most project implementation flow process.
Summary of the invention
The objective of the invention is to: to the deficiency of current project implementation management system, propose the system that a kind of overall monitor and management project are carried out, this system can realize the general management to project implementation process, reaches the purpose of quantitative management project implementation process.
In order to reach above purpose, the present invention includes following assembly:
Client operating software---be used for carrying out mutual software terminal system with client;
Database---be used for storage system to want data recorded information.
More than two assemblies form by following each widget:
Client operating software is made up of following assembly:
Client end interface---be used for carrying out the mutual of input and output with the user of system;
MDAC---in order to the data of accessing database;
The project plan management assembly---formulate the project scheduling in order to the project manager, the project scheduling comprises the project essential information, the scheduling of project, and project team member etc., this module can be made intelligent early-warning to the project scheduling;
Project supervision and Control Component---whole project is exercised supervision and control in order to the project manager, comprise progress monitoring, scheduling of resource etc.;
Project purchasing and contract management assembly---in order to management procurement information and the contract information relevant with project;
The risk management assembly---, avoid risk according to the forecasting risk in real time of project implementation situation in order to the project manager, and risk, this module that processing takes place comprise a risk identification appearance, anticipation and diagnosis risk automatically;
Demand development management assembly---the demand in order to project is managed, and comprises following the trail of the customer communication note;
Database consists of the following components:
Person chart---record enterprise staff basic data;
Repertory--the essential information of-record formulation project comprises Contract NO Contract_ID field, corresponding relevant with project procurement contract at least; Employee number User_ID field, corresponding relevant project manager with project;
Contracts card---contract of record information;
The user uses step to be:
Step 1: use client operating software, newly-built some personal informations comprise personnel's job number, name, and sex or the like, client operating software will be called MDAC and personnel's essential information be saved in the person chart of database;
Step 2: use client operating software, through demand development management assembly, calling MDAC will be saved in the information of customer communication in the repertory of database; Afterwards, call the project plan management assembly, formulate the project scheduling, comprise the project essential information, the scheduling of project, project team member etc., calling MDAC again will be saved in the repertory of database with the project essential information;
Step 3: use client operating software, through project purchasing and contract management assembly, manage procurement information and the contract information relevant with project, calling MDAC will be saved in the contracts card of database with the project contract information; Call the risk management assembly again, reason is avoided risk according to the forecasting risk in real time of project implementation situation, and handles the risk that takes place, and this module comprises a risk identification appearance, automatically anticipation and diagnosis risk;
Step 4: use client operating software, call project supervision and Control Component, whole project is exercised supervision and controls, comprise progress monitoring, scheduling of resource etc.;
The present invention mainly realizes the project scheduling in the software development process, project supervision and control, project configuration, project purchasing and project contract, the management in fields such as project risk.The present invention realizes whole project implementation process is controlled through the management to above field, makes the execution efficient and the final mass of project be improved, and the risk of project failure simultaneously is reduced.
Embodiment
Embodiment one
With .Net Framework 3.5 is platform; Adopt the C/S framework; Use Microsoft VisualStudio 2008 SDKs to develop software; Use database management tools SqlServer2005 special-purpose on the market, the needed database of the system that sets up adopts WPF as the interface development technology.Concrete mode is:
Client operating software is made up of following assembly:
Client operating software----is used for carrying out mutual software terminal system with client;
Database---be used for storage system to want data recorded information.
More than two assemblies form by following each widget:
Client operating software is made up of following assembly:
Client end interface---be used for carrying out the mutual of input and output with the user of system;
MDAC---in order to the data of accessing database;
The project plan management assembly---formulate the project scheduling in order to the project manager, the project scheduling comprises the project essential information, the scheduling of project, and project team member etc., this module can be made intelligent early-warning to the project scheduling;
Project supervision and Control Component---whole project is exercised supervision and control in order to the project manager, comprise progress monitoring, scheduling of resource etc.;
Project purchasing and contract management assembly---in order to management procurement information and the contract information relevant with project;
The risk management assembly---, avoid risk according to the forecasting risk in real time of project implementation situation in order to the project manager, and handle the risk that takes place, this module comprises a risk identification appearance, automatically anticipation and diagnosis risk;
Demand development management assembly---the demand in order to project is managed, and comprises following the trail of the customer communication note;
Database consists of the following components:
Person chart---record enterprise staff basic data;
Repertory--the essential information of-record formulation project comprises Contract NO Contract_ID field, corresponding relevant with project procurement contract at least; Employee number User_ID field, corresponding relevant project manager with project;
Contracts card---contract of record information;
The user uses step to be:
Step 1: use client operating software, newly-built some personal informations comprise personnel's job number, name, and sex or the like, client operating software will be called MDAC and personnel's essential information be saved in the person chart of database;
Step 2: use client operating software, through demand development management assembly, calling MDAC will be saved in the information of customer communication in the repertory of database; Afterwards, call the project plan management assembly, formulate the project scheduling, comprise the project essential information, the scheduling of project, project team member etc., calling MDAC again will be saved in the repertory of database with the project essential information;
Step 3: use client operating software, through project purchasing and contract management assembly, manage procurement information and the contract information relevant with project, calling MDAC will be saved in the contracts card of database with the project contract information; Call the risk management assembly again, reason is avoided risk according to the forecasting risk in real time of project implementation situation, and handles the risk that takes place, and this module comprises a risk identification appearance, automatically anticipation and diagnosis risk;
Step 4: use client operating software, call project supervision and Control Component, whole project is exercised supervision and controls, comprise progress monitoring, scheduling of resource etc.;
Except that the foregoing description, the present invention can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of requirement of the present invention.

Claims (4)

1. project management method based on distributed monitoring technology; It is characterized in that to be saved in database with the information of customer communication through demand development management assembly; Call the project plan management assembly, formulate the project scheduling, formulate corresponding project contract according to customer demand; After risk management component evaluates project risk, whole project is exercised supervision and control by project supervision and Control Component.
2. according to the said a kind of project management method of claim 1, it is characterized in that: can make the intelligent early-warning prompting to the project process and the plan of user's formulation based on the distributed monitoring technology.
3. according to the said a kind of project management method of claim 1 based on the distributed monitoring technology; It is characterized in that: contain the risk management assembly;, avoid risk according to the forecasting risk in real time of project implementation situation in order to the project manager, and handle the risk that takes place; This module comprises a risk identification appearance, automatically anticipation and diagnosis risk.
4. according to the said a kind of project management method of claim 1, it is characterized in that: contain project supervision and Control Component, whole project is exercised supervision and control, comprise progress monitoring, scheduling of resource etc. in order to the project manager based on distributed monitoring technology.
CN2010105240376A 2010-10-29 2010-10-29 Project management method based on distributed monitoring technology Pending CN102456183A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105240376A CN102456183A (en) 2010-10-29 2010-10-29 Project management method based on distributed monitoring technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105240376A CN102456183A (en) 2010-10-29 2010-10-29 Project management method based on distributed monitoring technology

Publications (1)

Publication Number Publication Date
CN102456183A true CN102456183A (en) 2012-05-16

Family

ID=46039351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105240376A Pending CN102456183A (en) 2010-10-29 2010-10-29 Project management method based on distributed monitoring technology

Country Status (1)

Country Link
CN (1) CN102456183A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104112174A (en) * 2013-04-17 2014-10-22 中广核工程有限公司 Project regulating and controlling method and system of nuclear power plant
CN109903009A (en) * 2019-01-31 2019-06-18 平安科技(深圳)有限公司 Data flow tracking propulsion method and system based on substep driving

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101339629A (en) * 2007-07-05 2009-01-07 镇江雅迅软件有限责任公司 Software development procedure administrative system
CN101699487A (en) * 2009-11-19 2010-04-28 上海交通大学 Networking cooperative information system participated by suppliers and method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101339629A (en) * 2007-07-05 2009-01-07 镇江雅迅软件有限责任公司 Software development procedure administrative system
CN101699487A (en) * 2009-11-19 2010-04-28 上海交通大学 Networking cooperative information system participated by suppliers and method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104112174A (en) * 2013-04-17 2014-10-22 中广核工程有限公司 Project regulating and controlling method and system of nuclear power plant
CN109903009A (en) * 2019-01-31 2019-06-18 平安科技(深圳)有限公司 Data flow tracking propulsion method and system based on substep driving

Similar Documents

Publication Publication Date Title
CN105354762B (en) Power customer service work order identification and distribution system and method
CN104361445B (en) Labour's real-time management system and management method
CN108764610B (en) Standard process engineering project construction management method based on big data and storage medium
CN106156902A (en) Real estate marketing management system
CN107909241A (en) Dispatching method, device, equipment and the readable storage medium storing program for executing of agricultural machinery key element
CN102300011A (en) Automated mechanism for populating and maintaining data structures in queueless contact center
CN109146375A (en) Power grid material Management System and method
CN107392425A (en) A kind of the tobacco business project implementation SOP management method and system
CN107133803A (en) Supply chain management method based on customer relation management
CN102456175A (en) Software development process management method
CN102456183A (en) Project management method based on distributed monitoring technology
CN109974740B (en) Mobile communication network agent maintenance path planning method
CN108198609B (en) Staff ordering method based on hospital logistics transport system
CN113452852A (en) Method and device for regulating and controlling number of outbound calls of machine, electronic equipment and storage medium
CN110580582A (en) Foreign trade comprehensive service management system and method based on emerging industry
CN110336852A (en) A method of automatic competition for orders, execution work order based on mobile phone of attending to anything else
CN115953063B (en) Method and device for tracking performance management
CN111325430A (en) Mobile collaborative information management platform
Khurana et al. A Review on Risk Management Framework for large scale scrum
CN107679738A (en) A kind of achievement display systems and methods of exhibiting based on game mode
CN109214620A (en) The creation method and interprise's intensive management plateform system of interprise's intensive management platform
CN115511460A (en) Human resource management system based on network platform
CN112613857A (en) Manpower resource management system based on artificial intelligence
CN117371870A (en) Evaluation method and device for operator digital transformation strategy multiple disc
Sun Design and Implementation of Enterprise Management Service Platform Based on Fuzzy Clustering Algorithm

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120516