CN109903009A - Data flow tracking propulsion method and system based on substep driving - Google Patents

Data flow tracking propulsion method and system based on substep driving Download PDF

Info

Publication number
CN109903009A
CN109903009A CN201910099185.9A CN201910099185A CN109903009A CN 109903009 A CN109903009 A CN 109903009A CN 201910099185 A CN201910099185 A CN 201910099185A CN 109903009 A CN109903009 A CN 109903009A
Authority
CN
China
Prior art keywords
task
link
magnitude
order
data flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910099185.9A
Other languages
Chinese (zh)
Inventor
刘洪钢
罗斌
魏尧东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Technology Shenzhen Co Ltd
Original Assignee
Ping An Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Technology Shenzhen Co Ltd filed Critical Ping An Technology Shenzhen Co Ltd
Priority to CN201910099185.9A priority Critical patent/CN109903009A/en
Publication of CN109903009A publication Critical patent/CN109903009A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to technical field of data processing, provide a kind of data flow tracking propulsion method based on substep driving, the processing links and the order of magnitude task in each link that method includes the affiliated project task of determining data flow;Role, the specific Position Responsibility personnel of the order of magnitude task in each link of the affiliated project task of role's alignment processing data flow and each link are distributed for the order of magnitude task in each link and each link;Determine the processing sequence of the order of magnitude task in each link and each link, and establish the processing progress monitoring item of the order of magnitude task in each link and each link, when upper one link/order of magnitude Task Progress reaches 100%, task automatic flow to its adjacent next link/order of magnitude task.Using the above-mentioned data flow tracking propulsion method improved project way to manage based on substep driving, working efficiency is improved, and improves task and flows through the fluency in journey.

Description

Data flow tracking propulsion method and system based on substep driving
Technical field
The present invention relates to technical field of data processing, more specifically, be related to it is a kind of based on substep driving data flow with Track propulsion method, system, device and computer readable storage medium.
Background technique
With the development of social progress and technology, people are followed up using the method for project management system more and more Management progress.In this case, most of project management system is the follow-up based on project task at present, by single task Different step is distinguished, is submitted to next role by hand after the completion of corresponding step process, is using task as the follow-up of core point Analysis method.
However, found in the research and practice to the prior art, it is existing using task as the follow-up analysis method of core There are following problems: not can avoid the defect manually managed, leads to the human control and intervention that occur not applying, and artificial Circulation caused by forgeing, delaying is stagnated, and human intervention and the processing time of circulation are limited even by certain work rules, Uncertainty brought by the human factor during project scheduling management can not fundamentally be solved.
Therefore, it needs a kind of using task as the follow-up analysis method of core.
Summary of the invention
In view of the above problems, the present invention is improved project way to manage, improves working efficiency, and improves task and flow through Fluency in journey provides a kind of data flow tracking propulsion method based on substep driving, system, device and computer-readable deposits Storage media.
According to an aspect of the invention, there is provided a kind of data flow based on substep driving tracks propulsion method, including Following steps: S110: the processing links and the order of magnitude task in each link for determining the affiliated project task of data flow; S120: role is distributed for the order of magnitude task in each link and each link, the affiliated project of role's alignment processing data flow is appointed The specific Position Responsibility personnel of each link and the order of magnitude task in each link in business;S130: each link and each is determined The processing sequence of order of magnitude task in link, and establish the processing of order of magnitude task in each link and each link into Degree monitoring item;Wherein, when upper one link/order of magnitude Task Progress reaches 100%, task automatic flow to its it is adjacent under One link/order of magnitude task.
In one of the embodiments, the method also includes: when task enter a new link/order of magnitude task When, alert notification is issued to remind corresponding link/order of magnitude task role personnel to handle;When task enter one it is new When link/order of magnitude task, start the link/order of magnitude task Schedule monitoring item, starts Schedule monitoring;When task into When entering a new link/order of magnitude task, starts the link/order of magnitude task time limit monitoring item, start time limit prison Control.
The method also includes: systems to start link/order of magnitude task Schedule monitoring in one of the embodiments, Item judges the processing progress of Position Responsibility personnel by keyword.
In one of the embodiments, the method also includes: be in each link and each link in the step s 120 When order of magnitude task distributes role, configuration system manager role, system manager carry out each link and each link first In order of magnitude task role and the role under task right distribution.
In one of the embodiments, the method also includes: pass through the promotion of item affiliated project of table display data stream appoint The progress msg of business.
According to another aspect of the present invention, a kind of data flow tracking propulsion system based on substep driving is provided, comprising: First step unit, the order of magnitude task in processing links and each link for determining the affiliated project task of data flow; Role's allocation unit, for distributing role, role's alignment processing data for the order of magnitude task in each link and each link The specific Position Responsibility personnel of each link and the order of magnitude task in each link in project task belonging to flowing;Task promotes single Member for determining the processing sequence of the order of magnitude task in each link and each link, and establishes each link and each link In the processing progress of order of magnitude task monitor item, when a upper link/order of magnitude Task Progress reaches 100%, task Automatic flow is to its adjacent next link/order of magnitude task.
First step unit includes: that project task obtains module in one of the embodiments, for obtaining appointing for project Business information;Project task division module, for project task to be obtained to the mission bit stream for the project that module obtains according to processing ring Order of magnitude task in section and each link is divided.
Role's allocation unit includes: organizational structure management module in one of the embodiments, for establishing organizational structure With employee information corresponding relationship;Role's task management module, organizational structure for being established according to organizational structure management module and Employee information corresponding relationship, by the Position Responsibility of employee with it is bright in each link in the affiliated project task of data flow and each link Thin project task is corresponding.
According to another aspect of the present invention, a kind of electronic device, comprising: memory, processor and be stored in memory In and the computer program that can run on a processor, processor realize above-mentioned based on substep driving when executing computer program Data flow tracks the step in propulsion method.
According to another aspect of the present invention, a kind of computer readable storage medium, the computer-readable recording medium storage There is computer program, computer program includes the program for first step, the program for role's distribution, for task propulsion Program, above-mentioned computer program realized when being executed by processor it is above-mentioned based on substep driving data flow tracking propulsion method in The step of.
It can be right using above-mentioned data flow tracking propulsion method, system, electronic device and storage medium based on substep driving The affiliated project task of the data flow for needing to circulate is managed automatically, and task is avoided to flow through the interruption in journey.Task substep drives Role and personnel dynamic, that related management personnel can be showed to see that task is detained by report convenient for follow-up, analysis and are closed Note;The automatic flow of task tracks, and guarantees the lasting follow-up of task, avoid some part it is artificial forget cause task suspension or It interrupts, improves the trackability of task;Complete task substep driving, automatic flow track system, improve automation, reduce people To manage and intervening, the efficiency of management is improved.
To the accomplishment of the foregoing and related purposes, one or more aspects of the present invention include be particularly described below and The feature particularly pointed out in claim.Certain illustrative aspects of the invention is described in detail in the following description and the annexed drawings. However, these aspects indicate only usable some of the various ways in the principles of the present invention.In addition, of the invention It is intended to include all such aspects and their equivalent.
Detailed description of the invention
By reference to the following description in conjunction with the accompanying drawings and the contents of the claims, and with to it is of the invention more comprehensively Understand, other objects and results of the present invention will be more clearly understood and understood.In the accompanying drawings:
Fig. 1 shows the flow chart of the data flow tracking propulsion method according to an embodiment of the present invention based on substep driving;
The box signal for the data flow tracking propulsion system based on substep driving that Fig. 2 shows according to an embodiment of the present invention Figure;
Fig. 3 shows the block diagram of first step unit according to an embodiment of the present invention;
Fig. 4 shows the block diagram of role's allocation unit according to an embodiment of the present invention;
Fig. 5 shows the block diagram of electronic device according to an embodiment of the present invention.
Identical label indicates similar or corresponding feature or function in all the appended drawings.
Specific embodiment
In the following description, for purposes of illustration, it in order to provide the comprehensive understanding to one or more embodiments, explains Many details are stated.It may be evident, however, that these embodiments can also be realized without these specific details. In other examples, one or more embodiments for ease of description, well known structure and equipment are shown in block form an.
Data flow provided by the invention based on substep driving tracks propulsion method, the substep comprising the affiliated task of data flow Drive, automatically track system, convenient for the efficient circulation of task, effective management role follow up manually driving cause delay, stagnate, in The tasks such as disconnected circulate unsmooth.
In the present invention, the affiliated project task of data flow is general concept, refers to the information flow for needing trace analysis, does not have In specific generation, refers to;Order of magnitude task refers to specific data line, refers to the specific data line of a certain item.Link is a data Processing stage specific one by one in project task treatment process belonging to flowing, each ring of each affiliated project task of data flow There is specific order of magnitude task that can just be advanced to the link only when the order of magnitude task completion of a link under section Next link, the propulsion of such link link in succession completes the iterative method of the project task.
Below in the specific embodiment of the invention, realized by cloud server and client terminal, it is therein At least one of client terminal, including computer, mobile phone, tablet computer and printer;Client terminal by Internet with Cloud server is connected, and Internet is stored data in the project management database of cloud server.
In addition, management method of the present invention when stating specific embodiment can pass through existing project pipe Science and engineering tool (TSM, Gantt Chart, PERT etc.) is realized.
Hereinafter, specific embodiments of the present invention will be described in detail with reference to the accompanying drawings.
Fig. 1 shows the data flow according to an embodiment of the present invention based on substep driving and tracks propulsion method;This method can The case where promoting suitable for the affiliated project task tracking of data flow, this method can track propulsion system by project task to hold Row, and the system can be realized by software/hardware mode, and can be integrated in Project Management Information System.
As shown in Figure 1, the data flow based on substep driving shown in the present embodiment tracks propulsion method, including walk as follows It is rapid: S110: the processing links and the order of magnitude task in each link for determining the affiliated project task of data flow;S120: being each Order of magnitude task in link and each link distributes role, each link in the affiliated project task of role's alignment processing data flow And the specific Position Responsibility personnel of the order of magnitude task in each link;S130: it determines bright in each link and each link The processing sequence of thin project task, and the processing progress monitoring item of the order of magnitude task in each link and each link is established, When upper one link/order of magnitude Task Progress reaches 100%, task automatic flow to its adjacent next link/detail item Mesh task.
Specifically, S110: determine that the processing links of the affiliated project task of data flow and the order of magnitude in each link are appointed Business;Pass through the order of magnitude task in the processing links and link of the affiliated project task of input equipment input traffic, input Equipment, the equipment for being directed to computer input data and information, such as: keyboard, mouse are camera, scanner, light pen, hand-written Input board or speech input device etc..
For different management projects, the link of corresponding project task is also not quite similar.In the present embodiment, according to Management project, the attribute identified project, and the corresponding affiliated project task of data flow is determined according to the correspondence of its attribute rule Link, corresponding order of magnitude task is then determined according to the link of the affiliated project task of data flow.
After system receives the project information of user's input, its title and category determining data stream institute are determined according to project information Belong to the processing links of project task, such as: progress link divides, and budget link divides and quality is tested and link is commented to divide;Then The order of magnitude in link is generated according to processing links.Illustratively, budget items link, for example it is divided into sales budget, production The orders of magnitude such as budget, procurement budget, equipment budget, manpower budget.
In addition, can also be needed to distinguish the corresponding link of definition, link according to the processing of project for order of magnitude task Match with role, role matches corresponding with the task of link.It can be said that the processing ring of project task affiliated for data flow The division in link in section, order of magnitude task, order of magnitude task, definition be not it is unified, need according to data flow The complexity of affiliated project task and the allocation processing of corresponding Position Responsibility personnel flexibly divide, as long as being capable of a latch closure one Ring goes down the step-by-step propulsion of the affiliated project task of the data flow.
After the detail task in the processing links and link that the affiliated project task of data flow has been determined, process proceeds to Step S120: role, item belonging to role's alignment processing data flow are distributed for the order of magnitude task in each link and each link The specific Position Responsibility personnel of each link and the order of magnitude task in each link in mesh task.
Initially set up organizational structure and employee information corresponding relationship;Then by item belonging to the Position Responsibility of employee and data flow Order of magnitude task in mesh task in each link and each link is corresponding.Administrative staff's information first, determines destination item Corresponding personal information, that is to say, that Position Responsibility and employee information are established into corresponding relationship.Illustratively, personal information can wrap Name, gender, post, contact method and affiliated tissue etc. are included, provides and simultaneously maintenance personnel is searched with the tree structure of organisational level Information, wherein including being associated between personnel and organizational structure, the information of personnel can be added or deleted under linked groups, Or personnel are moved under specified tissue;The association between Position Responsibility and personal information is provided, then by employee information Divide group according to Position Responsibility, that is to say, that the role of the identical employee of Position Responsibility in a management system be it is identical, it is same It may include one or multiple employees under role.
The information of group includes group name, personnel.Wherein, Position Responsibility personnel access data flow according to its Permission Levels Object in affiliated project task handles link/order of magnitude in the affiliated project task of data flow;Illustratively, For example, for the project of system research and development, it is real according to the industry standard and management of project management during entire Project-developing It tramples, can be by the role definition during Project-developing, network analysis, exploitation, test, UAT (User Acceptance Test, user acceptance/acceptable test).
Or say, in distribution role's link of management system can configure system manager role, system manager into The distribution of row role and permission, only systematic administrator has the maintenance of information permission of all personnel, and common user only has Check permission.
And under each Position Responsibility, different projects can be distinguished according to progress or urgency level to be processed It showing, i.e., the font color of item is corresponding with the development of projects degree of the item, such as: pending item is shown as yellow Color, and the item display green being disposed, the item of abnormal conditions are displayed in red, deleted item shows black.It is logical The difference of color is crossed, the user under Position Responsibility can be made to have intuitive judgement to the item of required processing.
After the specific Position Responsibility personnel of the specific order of magnitude task of determination, process proceeds to step S130: determining each The processing sequence of order of magnitude task in link and each link, and establish the order of magnitude in each link and each link and appoint The processing progress of business monitors item, when upper one link/order of magnitude Task Progress reaches 100%, task automatic flow to its close to Next link/order of magnitude task.
In step s 130, when task enters a new link/order of magnitude task, system issues alert notification, Corresponding link/order of magnitude task role personnel are reminded to handle.After starting Schedule monitoring/time limit monitoring, system is pressed Corresponding role personnel are reminded to handle corresponding link/order of magnitude task according to scheduled warning rule.
For example, the rule may include, if corresponding link/order of magnitude task is not handled, in agreement When the processing time is more than half, level-one prompting is carried out;When the processing time of agreement only remaining one, second level prompting is carried out;In agreement When handling time arrival, three-level prompting is carried out;After exceeding the time limit, remind daily primary (exceeding the time limit to remind).Specific alerting pattern Setting, can be arranged different alerting patterns according to the grade of prompting, for example, when reaching the degree of three-level prompting, system meeting It is arranged and sends reminder message to the related management personnel of role personnel.
In step s 130, when task enters a new link/order of magnitude task, system starts the link/bright The Schedule monitoring item of thin project task, starts Schedule monitoring.User can pass through click or other what operation realization links Detail task is transferred, and then checks the processing progress of the detail task in each link and each link.And project process monitors It can be shown in the way of monitoring item, more be bonded the habit of management project and user.
Illustratively, difference displaying can be carried out according to progress to monitoring item, starts (1%), mid-term for example, providing (50%), latter stage (90%) and (100%) four node of completion and four colors, such as red, orange, blue and green processing Progress status is shown.It can be with the progress of intuitive judgment project by status color.Corresponding role personnel start to process corresponding ring Section/order of magnitude task, Schedule monitoring item carry out progress label according to completeness, until reaching 100% display green.
During Schedule monitoring, the processing progress of Position Responsibility personnel can also be judged by processing keyword, Such as in the affiliated project task of the data flow of system development, module title, the module serial number that developer can be needed to complete Or module number is as the keyword for judging processing progress.
In step s 130, when task enters a new link/order of magnitude task, system starts the link/bright The time limit of thin project task monitors item, starts time limit monitoring.Time limit monitoring can be by carrying out the time limit of order of magnitude task Time limit monitors item and shows, slide the time limit progress node of order of magnitude can to the left or to the right automatically in X direction, this is bright The progress display of thin project on transverse axis, facilitates user to check corresponding item according to the specific stage, it is straight to can be convenient user The information checked needed for the viewing user of sight;Corresponding role personnel start to process corresponding link/order of magnitude task, time limit prison Control item is marked according to time schedule, until reaching the expected time limit, i.e. time limit progress node slides into the rightmost side.
On the other hand pass through the progress msg of the affiliated project task of the promotion of item table display data stream;Related management people Member is obtained by promotion of item table is detained role and angle corresponding to the affiliated order of magnitude task of data flow, order of magnitude task The corresponding specific Position Responsibility personnel of color;Related management personnel take specific Position Responsibility personnel and supervise measure.
That is the progress situation of the affiliated project task of data flow is shown by promotion of item table and gives related management personnel, Related management personnel see task be detained relative role and personnel after, can take other measures to promote promote project into Journey, this processing mode can be convenient for follow-up, analysis and the concern of the affiliated project task of data flow;As an example, promotion of item Report may include following content: detailed data stream affiliated project task, development progress, test person liable, is surveyed at exploitation person liable Examination progress, task status, early warning situation color identifier etc..
In one embodiment of the invention, promotion of item table can exist for the form of Gantt chart.Gantt chart is to illustrate Sequence and the duration that specific project is represented by effort scale and time scale, intuitively show when plan carries out, Progress and desired comparison, understand the residual correlation role and personnel of project convenient for related management personnel, evaluation work progress, To take corresponding measures to promote.
When upper link Task Progress reaches 100%, task automatic flow reminds corresponding link role to next link Personnel are handled.It for the label of Schedule monitoring item, can be counted according to the processing step of order of magnitude task, if place All steps have been managed, has been considered as and reaches 100%, then automatic flow to next link;If untreated is all steps, not up to 100%, then it is continually maintained in this link.Specific progress value can be according to the step quantity completed and the step for needing to complete The percentage of rapid total quantity determines.For example, a certain order of magnitude task needs five processing steps, corresponding Position Responsibility Personnel's value completes the first two steps, then schedule is 40%.
For needing the Schedule monitoring of the certain contents of responsible person's craft typing of corresponding role, then can by typing into The numerical value of degree is to determine whether reach 100%, if reaching 100%, automatic flow to next link, if not up to 100%, It is continually maintained in this link.
Generally speaking, the present invention is based on the data flows of substep driving to track propulsion method, and the substep comprising task drives, certainly The efficient circulation of task may be implemented in motion tracking system.
In the specific embodiment of the present invention, data flow tracks the further first step unit of propulsion system, angle Color allocation unit and task propulsion unit.
Fig. 2 shows the logical constructions of the data flow tracking propulsion system based on substep driving.
As shown in Fig. 2, the data flow tracking propulsion system provided in this embodiment based on substep driving includes: first step Unit 210, the order of magnitude task in processing links and each link for determining the affiliated project task of data flow;Role point With unit 220, for distributing role, role's alignment processing data flow institute for the order of magnitude task in each link and each link Belong to the specific Position Responsibility personnel of each link and the order of magnitude task in each link in project task;Task propulsion unit 230, for determining the processing sequence of the order of magnitude task in each link and each link, and establish each link and each link In the processing progress of order of magnitude task monitor item, when upper one link/order of magnitude Task Progress reaches 100%, task from Its adjacent next link/order of magnitude task is arrived in dynamic circulation.
Fig. 3 shows the first step of the data flow tracking propulsion system according to an embodiment of the present invention based on substep driving The logical construction of unit.
As shown in figure 3, first step unit 210 includes that project task obtains module 211 and project task division module 212。
Wherein, project task obtains the mission bit stream that module 211 is used to obtain project;Pass through input equipment input traffic Then the processing links of affiliated project task and the order of magnitude task in link obtain module 211 using project task and obtain Take the affiliated project task information of required data flow;Input equipment, the equipment for being directed to computer input data and information, example Such as: keyboard, mouse, camera, scanner, light pen, writing input board or speech input device etc..Specific acquisition modes can With in typing Project contract specific requirement clause and its time limit.
Project task division module 212 is used for the mission bit stream of project according to the detail in processing links and each link Project task is divided.For different management projects, the link of the corresponding affiliated project task of data flow also phase not to the utmost Together.In the present embodiment, according to management project, the attribute identified project, and determined accordingly according to the correspondence of its attribute rule Project task link, corresponding order of magnitude task is then determined according to the link of project task.
That is, first step unit 210 obtains module 211 and project task division module 212 by project task Realize the determination of the processing links and the order of magnitude task in each link of the affiliated project task of data flow.
Fig. 4 shows the structure of role's allocation unit of the data flow tracking propulsion system based on substep driving.
As shown in figure 4, role's allocation unit 220 includes organizational structure management module 221 and role's task management module 222;Organizational structure management module 221, for establishing organizational structure and employee information corresponding relationship;Organizational structure management module 221, it can be by the corresponding setting of the information of employee and company, department, teams and groups, post information;Role's task management module 222, For by the Position Responsibility of employee and each link in the affiliated project task of data flow and the order of magnitude task phase in each link It is corresponding.
That is at the beginning of the affiliated project task tracking of a data flow promotes, it is necessary first to by the affiliated project of data flow Assessment of tasks defines role, then corresponds to Role Users when operating specific order of magnitude task data row, can only operate Link under oneself this role, causes to change to order of magnitude task, continues into next link.
During task substep drives, if the relevant all Position Responsibility personnel of the affiliated project task of data flow Project task/order of magnitude the task to match under one's name can be handled according to the permission of oneself, then task can be good Circulation is gone down;Even if providing number of the ground based on substep driving according to the present invention in the presence of temporarily forgeing, exceeding the time limit, delay situation Propulsion method is tracked according to stream, system also provides system alert in the case where each processing starts, exceeds the time limit.This task it is automatic Circulation tracking, guarantees the lasting follow-up of task, avoids the artificial forgetting of some part from leading to task suspension or interruption, improves task Trackability.
And in role's task management module 222, priority assignation link includes increasing role, authority distribution, role assignment And permission inquires four submodules, wherein increasing role is the name information saying setting authority distribution and needing;And authority distribution is It says and permission is allocated to the increased role of institute, role assignment is to say to give user's assigned role, and user possesses the operation of the role Permission, permission inquiry are to say that the authority information distributed can be inquired according to role's title or user's name.
Generally speaking, role's allocation unit 220 passes through organizational structure management module 221 and role's task management module 222 It realizes and distributes role for the order of magnitude task in each link and each link, the affiliated project of role's alignment processing data flow is appointed The specific Position Responsibility personnel of each link and the order of magnitude task in each link in business.
In conclusion the data flow tracking propulsion system based on substep driving realizes the driving of task branch and task Automatically tracking is spread, wherein task substep drives, and related management personnel can be showed to see task by report (Gantt chart) The role and personnel of delay, convenient for follow-up, analysis and concern;The automatic flow of task tracks, and guarantees the lasting follow-up of task, keeps away The artificial forgetting for exempting from some part leads to task suspension or interruption, improves the trackability of task.
Fig. 5 shows the block diagram of electronic device according to an embodiment of the present invention.
Embodiment electronic device 70 shown in Fig. 5, including memory 72, processor 71 and be stored in memory 72 And the computer program 73 that can be run on processor 71, processor are realized above-mentioned based on substep driving when executing computer program Data flow tracking propulsion method in step;Computer program 73 can store in such as memory 72, such calculating Machine program 73 including but not limited to operating system, one or more application program, other program modules and program data, this It may include the realization of network environment in each of a little examples or certain combination.
Computer program 73 usually executes function and/or method in embodiment described in the invention.Processor 71 is logical The program that operation is stored in system storage 72 is crossed, thereby executing various functions and data processing.
Such as: the data flow provided by the invention based on substep driving tracks propulsion method, comprising: determines belonging to data flow Order of magnitude task in the processing links of project task and each link;Appoint for the order of magnitude in each link and each link Business distribution role, each link and the order of magnitude task in each link in the affiliated project task of role's alignment processing data flow Specific Position Responsibility personnel;It determines the processing sequence of the order of magnitude task in each link and each link, and establishes each link And the processing progress of the order of magnitude task in each link monitors item, when upper one link/order of magnitude Task Progress reaches 100%, task automatic flow to its adjacent next link/order of magnitude task.
Memory therein can be flash memory, hard disk, multimedia card, card-type memory, magnetic storage, disk and CD One or more combinations.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program.
In one embodiment, the present invention also provides a kind of computer readable storage medium, the computer-readable storage mediums Matter is stored with computer program, and computer program includes the program for first step, the program for role's distribution, for appointing The program that business promotes, above-mentioned computer program realize the above-mentioned data flow tracking propulsion based on substep driving when being executed by processor Step in method;Wherein, storage medium above-mentioned can be magnetic disk, CD, read-only memory (Read-Only Memory, ROM) etc. non-volatile memory mediums or random access memory (Random Access Memory, RAM) etc..
The data flow tracking according to the present invention based on substep driving is described in an illustrative manner above with reference to Fig. 1 to Fig. 5 Propulsion method, system, device and computer readable storage medium.It will be understood by those skilled in the art, however, that for above-mentioned Data flow tracking propulsion method, system, device and the computer readable storage medium based on substep driving proposed is invented, also Various improvement can be made on the basis of not departing from the content of present invention.Therefore, protection scope of the present invention should be by appended The content of claims determines.

Claims (10)

1. a kind of data flow based on substep driving tracks propulsion method, which comprises the steps of:
S110: the processing links and the order of magnitude task in each link for determining the affiliated project task of data flow;
S120: role, data described in role's alignment processing are distributed for the order of magnitude task in each link and each link The specific Position Responsibility personnel of each link and the order of magnitude task in each link in project task belonging to flowing;
S130: determining the processing sequence of the order of magnitude task in each link and each link, and establishes each link and each ring The processing progress of order of magnitude task in section monitors item;Wherein, when upper one link/order of magnitude Task Progress reaches 100% When, task automatic flow to its adjacent next link/order of magnitude task.
2. the data flow as described in claim 1 based on substep driving tracks propulsion method, which is characterized in that
When task enters a new link/order of magnitude task, alert notification is issued to remind corresponding link/order of magnitude Task role personnel are handled;
When task enters a new link/order of magnitude task, start the link/order of magnitude task Schedule monitoring Item starts Schedule monitoring;
When task enters a new link/order of magnitude task, start the monitoring of the link/order of magnitude task time limit Item starts time limit monitoring.
3. the data flow as claimed in claim 2 based on substep driving tracks propulsion method, which is characterized in that described in starting After link/order of magnitude task Schedule monitoring item, the processing progress of Position Responsibility personnel is judged by keyword.
4. the data flow as described in claim 1 based on substep driving tracks propulsion method, which is characterized in that in the step In S120, when being the order of magnitude task distribution role in each link and each link, system manager role, institute are configured first It states system manager and carries out task right under the role and the role of the order of magnitude task in each link and each link Distribution.
5. the data flow based on substep driving as described in claim 3 or 4 tracks propulsion method, which is characterized in that further include:
S140: pass through the progress msg of the affiliated project task of promotion of item table display data stream.
6. a kind of data flow based on substep driving tracks propulsion system characterized by comprising
First step unit, the order of magnitude in processing links and each link for determining the affiliated project task of data flow are appointed Business;
Role's allocation unit, for distributing role for the order of magnitude task in each link and each link, the role is corresponding Handle the specific Position Responsibility people of each link and the order of magnitude task in each link in the affiliated project task of the data flow Member;
Task propulsion unit for determining the processing sequence of the order of magnitude task in each link and each link, and is established each The processing progress of order of magnitude task in link and each link monitors item, when a upper link/order of magnitude Task Progress Reach 100%, task automatic flow to its adjacent next link/order of magnitude task.
7. the data flow as claimed in claim 6 based on substep driving tracks propulsion system, which is characterized in that the project point Walking unit includes:
Project task obtains module, for obtaining the mission bit stream of the affiliated project of data flow;
Project task division module, for the project task to be obtained to the mission bit stream for the project that module obtains according to processing ring Order of magnitude task in section and each link is divided.
8. the data flow as claimed in claim 6 based on substep driving tracks propulsion system, which is characterized in that the role point Include: with unit
Organizational structure management module, for establishing organizational structure and employee information corresponding relationship;
Role's task management module, the organizational structure and employee information for being established according to the organizational structure management module are corresponding Relationship, by the Position Responsibility of employee and each link in the affiliated project task of data flow and the order of magnitude task phase in each link It is corresponding.
9. a kind of electronic device, comprising: memory, processor and storage are in the memory and can be on the processor The computer program of operation, the processor are realized according to any one of claims 1 to 5 when executing the computer program Step in data flow tracking propulsion method based on substep driving.
10. a kind of computer readable storage medium, which has computer program, the computer Program includes the program for first step, the program for role's distribution, the program promoted for task, above-mentioned computer journey It is realized when sequence is executed by processor in the data flow propulsion method according to any one of claims 1 to 5 based on substep driving The step of.
CN201910099185.9A 2019-01-31 2019-01-31 Data flow tracking propulsion method and system based on substep driving Pending CN109903009A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910099185.9A CN109903009A (en) 2019-01-31 2019-01-31 Data flow tracking propulsion method and system based on substep driving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910099185.9A CN109903009A (en) 2019-01-31 2019-01-31 Data flow tracking propulsion method and system based on substep driving

Publications (1)

Publication Number Publication Date
CN109903009A true CN109903009A (en) 2019-06-18

Family

ID=66944553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910099185.9A Pending CN109903009A (en) 2019-01-31 2019-01-31 Data flow tracking propulsion method and system based on substep driving

Country Status (1)

Country Link
CN (1) CN109903009A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112433794A (en) * 2020-11-20 2021-03-02 金蝶云科技有限公司 Method for controlling service progress of ERP system and related equipment
CN114154954A (en) * 2021-11-25 2022-03-08 广州交投工程检测有限公司 Detection service management method and system based on task information flow tracking

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102456183A (en) * 2010-10-29 2012-05-16 镇江雅迅软件有限责任公司 Project management method based on distributed monitoring technology
CN107341643A (en) * 2016-04-29 2017-11-10 泰康保险集团股份有限公司 Visual flow methods of exhibiting and system
CN108038669A (en) * 2017-12-25 2018-05-15 泰康保险集团股份有限公司 Collocation method, device, equipment and the storage medium of rights management mechanism
CN108197904A (en) * 2018-02-05 2018-06-22 网易(杭州)网络有限公司 Monitoring method, the device and system of project task
CN108921502A (en) * 2018-06-12 2018-11-30 广东电网有限责任公司 A kind of Project Process tracking and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102456183A (en) * 2010-10-29 2012-05-16 镇江雅迅软件有限责任公司 Project management method based on distributed monitoring technology
CN107341643A (en) * 2016-04-29 2017-11-10 泰康保险集团股份有限公司 Visual flow methods of exhibiting and system
CN108038669A (en) * 2017-12-25 2018-05-15 泰康保险集团股份有限公司 Collocation method, device, equipment and the storage medium of rights management mechanism
CN108197904A (en) * 2018-02-05 2018-06-22 网易(杭州)网络有限公司 Monitoring method, the device and system of project task
CN108921502A (en) * 2018-06-12 2018-11-30 广东电网有限责任公司 A kind of Project Process tracking and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112433794A (en) * 2020-11-20 2021-03-02 金蝶云科技有限公司 Method for controlling service progress of ERP system and related equipment
CN114154954A (en) * 2021-11-25 2022-03-08 广州交投工程检测有限公司 Detection service management method and system based on task information flow tracking

Similar Documents

Publication Publication Date Title
Shrivastava et al. The strategic management of technological innovations: A review and a model
Robinson How design engineers spend their time: Job content and task satisfaction
US20090006173A1 (en) Method and apparatus for identifying and using historical work patterns to build/use high-performance project teams subject to constraints
US20110295656A1 (en) System and method for providing balanced scorecard based on a business intelligence server
US20050267887A1 (en) Computerized systems and methods for managing relationships
US11580477B2 (en) Method and system for managing research and development in an enterprise
Lorenz et al. Applying user stories for a customer-driven industry 4.0 transformation
Phillips et al. Forecast quality improvement with Action Research: A success story at PharmaCo
CN109903009A (en) Data flow tracking propulsion method and system based on substep driving
KR20090011146A (en) System and method for risk management and estimation in information technology project
US20020055832A1 (en) Structured system for the planning, integration, analysis and management of new product development on a real-time, enterprise-wide basis
CN114443779A (en) Data resource management method and system based on data directory
Ershadi et al. A framework for conceptualising the organisational communications of a project management office
Varshney et al. Predicting and recommending skills in the social enterprise
Elzamly et al. Managing software project risks (Design Phase) with proposed fuzzy regression analysis techniques with fuzzy concepts
US8620702B2 (en) Method and system for research and development management in an enterprise
Barcelo-Valenzuela et al. An IT service management methodology for an electoral public institution
Durugbo et al. Managing integrated information flow for industrial service partnerships: a case study of aerospace firms
US8311862B2 (en) Organizational design approach to transition cost assessment for business transformation
Abidi Performance management in supply chains: Applications to humanitarian and commercial supply chains
Rodger et al. A petri net pareto iso 31000 workflow process decision making approach for supply chain risk trigger inventory decisions in government organizations
Aleksic et al. Time and Company Management in Cases of Fake News within the Automotive Industry
Langer et al. Use of smart technologies in large infrastructure and energy projects
Ezeonwumelu et al. Development of swim lane workflow process map for sales and inventory workflow management information system: A case study of petrospan integrated services, Eket, Akwa Ibom State, Nigeria
Saadi et al. Functional and social team dynamics in industrial settings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination