CN114154954A - Detection service management method and system based on task information flow tracking - Google Patents

Detection service management method and system based on task information flow tracking Download PDF

Info

Publication number
CN114154954A
CN114154954A CN202111414278.XA CN202111414278A CN114154954A CN 114154954 A CN114154954 A CN 114154954A CN 202111414278 A CN202111414278 A CN 202111414278A CN 114154954 A CN114154954 A CN 114154954A
Authority
CN
China
Prior art keywords
project
task
detection
obtaining
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111414278.XA
Other languages
Chinese (zh)
Inventor
吴夜南
杨永青
周海飞
廖金金
田金恒
王渭锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Communication Investment Engineering Inspection Co ltd
Original Assignee
Guangzhou Communication Investment Engineering Inspection Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Communication Investment Engineering Inspection Co ltd filed Critical Guangzhou Communication Investment Engineering Inspection Co ltd
Priority to CN202111414278.XA priority Critical patent/CN114154954A/en
Publication of CN114154954A publication Critical patent/CN114154954A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The application discloses a detection service management method and a system based on task information flow tracking, wherein the method comprises the following steps: obtaining a first project group member; the method comprises the steps of arranging a first project in a labor division mode to obtain a first project task set; obtaining a first task, and matching a first task person; constructing a project Gantt chart by taking the first execution time of the first project as a horizontal axis and the first task as a vertical axis; and acquiring a first task progress, and further managing the first task personnel to acquire a first management result. The problem of among the prior art relevant managers carry out the adaptability allotment management of participator, use equipment to the execution conditions of each detection project through experience, because lack accurate data foundation, lead to the management untimely, inaccurate, and then cause manpower, material resources wasting is solved, in addition, the detection project execution conditions are complicated changeable, and the work of each detection project of artificial overall management is complicated, the degree of difficulty is high, leads to the managerial efficiency low, has the unable technical problem who forms value maximize.

Description

Detection service management method and system based on task information flow tracking
Technical Field
The present application relates to the field of computer technologies, and in particular, to a method and a system for detecting service management based on task information flow tracking.
Background
In the current internet era of rapid development, everything interconnection has become a non-negligible term in various industries. At present, part of large-scale detection research institutions and detection units independently develop cloud detection service management systems so as to complete management and optimization of detection services more efficiently. Although in the actual research and development and use processes, the system consumes high research and development cost and has a long research and development period, the application of the cloud management system can bring significant help to the development and management of detection services. Therefore, developing a set of detection service management system suitable for small detection mechanisms is an optional development and implementation direction, and has important practical significance.
In the process of implementing the technical solution in the embodiment of the present application, the inventor of the present application finds that the above-mentioned technology has at least the following technical problems:
in the prior art, relevant managers carry out adaptive allocation management on participators and used equipment according to the execution conditions of all detection projects through experience, due to the fact that accurate data bases are lacked, allocation management is not timely and inaccurate, manpower and material resource waste is caused, in addition, the execution conditions of the detection projects are complex and variable, manual overall management of all detection projects is complex in work and high in difficulty, management efficiency is low, and the technical problem that value maximization cannot be achieved is solved.
Disclosure of Invention
The application aims at providing a detection service management method and system based on task information flow tracking, and the method and system are used for solving the technical problems that in the prior art, relevant managers carry out personnel participation and adaptive deployment management of used equipment on the execution condition of each detection project through experience, and due to the lack of accurate data basis, the deployment management is not timely and accurate, manpower and material resources are wasted, in addition, the execution condition of the detection project is complex and variable, the work of artificially managing each detection project is complex and difficult, the management efficiency is low, and the value maximization cannot be formed.
In view of the foregoing problems, embodiments of the present application provide a method and a system for detecting service management based on task information flow tracing.
In a first aspect, the present application provides a method for managing a detection service based on task information flow tracing, where the method is implemented by a system for managing a detection service based on task information flow tracing, and the method includes: obtaining a first project group member according to a first project; the method comprises the steps of performing division work arrangement on a first project to obtain a first project task set, wherein the first project task set comprises a plurality of tasks; obtaining a first task according to the first project task set; matching a first task person based on the first task and the first project team member, wherein the first task person comprises one or more persons; taking the first execution time of the first project as a horizontal axis and the first task as a vertical axis to construct a project Gantt chart; obtaining a first task progress according to the project Gantt chart; and managing the first task personnel according to the first task progress to obtain a first management result.
In another aspect, the present application further provides a detection service management system based on task information flow tracing, configured to execute the detection service management method based on task information flow tracing according to the first aspect, where the system includes: a first obtaining unit: the first obtaining unit is used for obtaining a first project group member according to a first project; a second obtaining unit: the second obtaining unit is used for performing division work arrangement on a first project to obtain a first project task set, wherein the first project task set comprises a plurality of tasks; a third obtaining unit: the third obtaining unit is used for obtaining a first task according to the first project task set; a first matching unit: the first matching unit is used for matching first task personnel according to the first task and the first project group member, wherein the first task personnel comprises one or more personnel; a first building unit: the first construction unit is used for constructing a project Gantt chart by taking the first execution time of the first project as a horizontal axis and the first task as a vertical axis; a fourth obtaining unit: the fourth obtaining unit is used for obtaining a first task progress according to the project Gantt chart; a fifth obtaining unit: the fifth obtaining unit is configured to manage the first task person according to the first task progress, and obtain a first management result.
In a third aspect, an embodiment of the present application further provides a detection service management system based on task information flow tracing, including a memory, a processor, and a computer program stored on the memory and executable on the processor, where the processor implements the steps of the method according to the first aspect when executing the program.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
1. obtaining a first project group member according to a first project; the method comprises the steps of performing division work arrangement on a first project to obtain a first project task set, wherein the first project task set comprises a plurality of tasks; obtaining a first task according to the first project task set; matching a first task person based on the first task and the first project team member, wherein the first task person comprises one or more persons; taking the first execution time of the first project as a horizontal axis and the first task as a vertical axis to construct a project Gantt chart; obtaining a first task progress according to the project Gantt chart; and managing the first task personnel according to the first task progress to obtain a first management result. A detection project is divided into a plurality of small tasks through personalized analysis, corresponding executive personnel and instrument equipment are matched for each task, the actual execution condition of each task is checked and recorded in real time, the execution progress of the corresponding task is determined, the actual execution progress of the task is compared with the execution condition of the corresponding task plan, the specific execution condition of each task is managed through modes of allocating personnel or equipment and the like, and the execution of the whole detection project is further planned. The method achieves the technical goals that based on specific data, each task in the detection project is intelligently allocated and managed in real time, the management mode is simplified, the management efficiency is improved, the high-efficiency and high-quality execution of the whole detection project is further ensured, and the value maximization is realized.
2. Corresponding equipment allocation management is performed on the first task in a targeted manner based on the actual execution condition of the first task, so that the technical effect of ensuring efficient, reasonable and ordered execution of the corresponding tasks is achieved.
3. The corresponding detection result is uploaded to the detection service management system based on the task information flow tracking by the detector, and the first project detection report is finally obtained intelligently through the inspection of the corresponding technician and the confirmation of the responsible person in the first project, so that the intelligent generation of the detection report is realized, and the technical effect of improving the working efficiency is improved.
4. Through role and the identity based on detecting project members, the system is intelligent to match corresponding authorities, and each user can reasonably allocate and set the first project within the authority range, so that the intelligent degree of the system is improved, convenience is brought to efficient execution of the project, and the technical effects of improving the completion quality and the completion efficiency of the whole project are achieved.
5. The first project log is automatically generated by the system, and related system data are provided for subsequent project backtracking, project examination and check and the like, so that the system utilization rate is improved, and the technical effects of improving the detection service management efficiency and the management quality are finally achieved.
The foregoing description is only an overview of the technical solutions of the present application, and the present application can be implemented according to the content of the description in order to make the technical means of the present application more clearly understood, and the following detailed description of the present application is given in order to make the above and other objects, features, and advantages of the present application more clearly understandable.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only exemplary, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts.
Fig. 1 is a schematic flowchart illustrating a method for detecting service management based on task information flow tracing according to an embodiment of the present application;
fig. 2 is a schematic flowchart illustrating a process of obtaining a second management result in a method for detecting service management based on task information flow tracking according to an embodiment of the present application;
fig. 3 is a schematic flowchart illustrating a process of obtaining a first management result in a method for detecting service management based on task information flow tracking according to an embodiment of the present application;
fig. 4 is a schematic flowchart illustrating a process of obtaining a third management result in a method for detecting service management based on task information flow tracking according to an embodiment of the present application;
fig. 5 is a schematic structural diagram of a detection service management system based on task information flow tracing according to an embodiment of the present application;
fig. 6 is a schematic structural diagram of an exemplary electronic device according to an embodiment of the present application.
Description of reference numerals:
a first obtaining unit 11, a second obtaining unit 12, a third obtaining unit 13, a first matching unit 14, a first constructing unit 15, a fourth obtaining unit 16, a fifth obtaining unit 17, a bus 300, a receiver 301, a processor 302, a transmitter 303, a memory 304, and a bus interface 305.
Detailed Description
The embodiment of the application provides a detection service management method and system based on task information flow tracking, and solves the technical problems that in the prior art, relevant managers carry out personnel participation and equipment use adaptive allocation management on execution conditions of detection projects through experience, allocation management is not timely and accurate due to the lack of accurate data bases, manpower and material resources are wasted, in addition, the execution conditions of the detection projects are complex and changeable, manual overall management of the detection projects is complex, difficulty is high, management efficiency is low, and value maximization cannot be achieved. A detection project is divided into a plurality of small tasks through personalized analysis, corresponding executive personnel and instrument equipment are matched for each task, the actual execution condition of each task is checked and recorded in real time, the execution progress of the corresponding task is determined, the actual execution progress of the task is compared with the execution condition of the corresponding task plan, the specific execution condition of each task is managed through modes of allocating personnel or equipment and the like, and the execution of the whole detection project is further planned. The method achieves the technical goals that based on specific data, each task in the detection project is intelligently allocated and managed in real time, the management mode is simplified, the management efficiency is improved, the high-efficiency and high-quality execution of the whole detection project is further ensured, and the value maximization is realized.
In the following, the technical solutions in the embodiments of the present application will be clearly and completely described with reference to the accompanying drawings, and it is to be understood that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments of the present application, and it should be understood that the present application is not limited by the example embodiments described herein. All other embodiments, which can be derived by a person skilled in the art from the embodiments of the present application without making any creative effort, shall fall within the protection scope of the present application. It should be further noted that, for the convenience of description, only some but not all of the elements relevant to the present application are shown in the drawings.
Summary of the application
In the current internet era of rapid development, everything interconnection has become a non-negligible term in various industries. At present, part of large-scale detection research institutions and detection units independently develop cloud detection service management systems so as to complete management and optimization of detection services more efficiently. Although in the actual research and development and use processes, the system consumes high research and development cost and has a long research and development period, the application of the cloud management system can bring significant help to the development and management of detection services. Therefore, developing a set of detection service management system suitable for small detection mechanisms is an optional development and implementation direction, and has important practical significance.
In the prior art, relevant managers carry out adaptive allocation management on participators and used equipment according to the execution conditions of all detection projects through experience, due to the fact that accurate data bases are lacked, allocation management is not timely and inaccurate, manpower and material resource waste is caused, in addition, the execution conditions of the detection projects are complex and variable, manual overall management of all detection projects is complex in work and high in difficulty, management efficiency is low, and the technical problem that value maximization cannot be achieved is solved.
In view of the above technical problems, the technical solution provided by the present application has the following general idea:
the application provides a detection service management method based on task information flow tracking, which is applied to a detection service management system based on task information flow tracking, wherein the method comprises the following steps: obtaining a first project group member according to a first project; the method comprises the steps of performing division work arrangement on a first project to obtain a first project task set, wherein the first project task set comprises a plurality of tasks; obtaining a first task according to the first project task set; matching a first task person based on the first task and the first project team member, wherein the first task person comprises one or more persons; taking the first execution time of the first project as a horizontal axis and the first task as a vertical axis to construct a project Gantt chart; obtaining a first task progress according to the project Gantt chart; and managing the first task personnel according to the first task progress to obtain a first management result.
Having thus described the general principles of the present application, various non-limiting embodiments thereof will now be described in detail with reference to the accompanying drawings.
Example one
Referring to fig. 1, an embodiment of the present application provides a method for managing a detection service based on task information flow tracing, where the method is applied to a system for managing a detection service based on task information flow tracing, and the method specifically includes the following steps:
step S100: acquiring a first project group member according to the first project;
specifically, the detection service management method based on task information flow tracking is applied to the detection service management system based on task information flow tracking, a detection project can be divided into a plurality of small tasks through personalized analysis, corresponding executive personnel and instrument equipment are matched for each task, the actual execution condition of each task is checked and recorded in real time, the execution progress of the corresponding task is determined, the actual execution progress of the task is compared with the execution condition of the corresponding task plan, the specific execution condition of each task is managed through modes of allocating personnel or equipment and the like, and the execution of the whole detection project is further planned. The first item refers to a detection service received by a corresponding detection mechanism or a detection company. For example, if a certain detection mechanism receives a detection item for detecting a batch of special fabric performance indexes and requests to issue a corresponding detection report, the formulation of a relevant execution scheme in the corresponding service, the detection of the indexes to be detected, the issuance of the detection report, and the like all belong to the corresponding detection item. Correspondingly, the first project group member comprises all the employees participating in the corresponding detection project.
By analyzing the first project, a corresponding project execution scheme is formulated on the basis of determining the customer requirements, and then the executive personnel corresponding to each link in the project execution process is determined, so that the first project group member is obtained, and the technical effect of preparing for specific execution of the project is achieved.
Step S200: the method comprises the steps of performing division work arrangement on a first project to obtain a first project task set, wherein the first project task set comprises a plurality of tasks;
specifically, a corresponding detection scheme is formulated for a customer requirement detection target in the first project, wherein the detection scheme comprises detection indexes, personnel allocation corresponding to each detection index, detection time of each index, detection sequence of each index, instrument and equipment required for detection of each index and the like, so that the first project is divided into a plurality of subtasks, and all the subtasks form the first project task set. Wherein the first set of project tasks includes a plurality of tasks. For example, a project execution scheme makes tasks, detects tasks, issues reports after detection, and the like, wherein the detection tasks are multiple detection tasks, and corresponding personnel division and equipment configuration arrangement are performed based on multi-party analysis of detection quantity, detection speed, equipment required for detection, and the like of each detection task, so that each small task is reasonably and efficiently developed, and the technical effect of ensuring the ordered execution of the whole project is achieved.
Step S300: obtaining a first task according to the first project task set;
specifically, the first project task set includes a plurality of project execution tasks, for detecting a project, index detection in the project is the most basic and important module, and in a detection project, indexes to be detected may include a plurality of indexes, and first, a small project task is established for a certain index to be detected in the first project, that is, the first task. For example, a special fabric detection project comprises a wear resistance test on a fabric to be detected, so that a small task group can be established based on the wear resistance of the fabric. The whole project is divided into smaller and easier-to-manage detailed work which is convenient for the presentation of a final detection report, so that the execution sequence of each task is formulated, one task is further intelligently managed, and the high-efficiency execution of the whole project is finally realized.
Step S400: matching a first task person based on the first task and the first project team member, wherein the first task person comprises one or more persons;
specifically, the first task is a part of work tasks in the first project, the first project group member includes all participating persons of the first project group, and the corresponding persons are intelligently matched based on actual execution requirements of the first task, so as to form the first task person. Wherein the first task person comprises one or more project team members. In addition, the system intelligent matching comprises an analysis basis of information such as the adequacy field or direction of each member of the project group, the difficulty degree of corresponding tasks and the like. For example, in a certain detection project group, if a certain member excels in data analysis, the member can be designated to analyze each detection result; if a certain member is familiar with the detection test of the radiation protection performance of the fabric, the member can be intelligently allocated to execute the radiation protection performance task of the fabric; if the moisture permeability of the fabric is required to be detected, the detection is long in time consumption, and then personnel and equipment can be properly distributed and carried out simultaneously, so that the testing efficiency is improved, and the progress of the whole project is prevented from being influenced.
Through comprehensive analysis of actual conditions based on tasks and project group members, the system is intelligentized into task executors with reasonable and appropriate task matching, thereby achieving the technical effects of personnel allocation with higher personalized degree and ensuring the smooth specific execution process of each task.
Step S500: taking the first execution time of the first project as a horizontal axis and the first task as a vertical axis to construct a project Gantt chart;
specifically, the item gantt chart is a graph that plots progress of each task in the first item over item time based on the execution status of the first item, with the entire item execution time as a horizontal axis and each small task divided into the first item as a vertical axis. The project Gantt chart comprises the progress of each task link in the corresponding detection project along with time, and the starting time and the ending time of each task in the whole project are different, so that the execution time is also different. For example, task a in the project starts to execute after task B ends, and task C and task a simultaneously execute. The technical effects of monitoring the execution condition of each task in the project in real time and visually observing the execution progress of each task are achieved by drawing and constructing the project Gantt chart.
Step S600: obtaining a first task progress according to the project Gantt chart;
specifically, according to the project gantt chart, the time corresponding to the first task starting to be executed and the current total completion amount of the first task in the first project can be observed and obtained, and the completion degree of the first task, that is, the first task progress, can be obtained by calculation in combination with the current time information and the task total amount information. For example, the thermal resistance of a certain fabric is tested for 20 times under specific conditions, a Gantt chart of a thermal resistance test task is analyzed, it can be determined that the thermal resistance value is tested from the beginning of the test of the fabric for 2 days and is tested for 8 times in total, then the thermal resistance test task is completed by 40% through calculation, and the average execution efficiency of the thermal resistance test task is 4 times/day. Through the project Gantt chart, the technical effect of observing and detecting the execution progress of each task in the project in real time and intuitively is achieved.
Step S700: and managing the first task personnel according to the first task progress to obtain a first management result.
Specifically, after the project Gantt chart is observed, the first task progress is calculated, and then the first task is subjected to corresponding deployment management in a targeted manner based on the actual execution condition of the first task. Further, the task execution scheme after the system is intelligently deployed is the first management result. A detection project is divided into a plurality of small tasks through personalized analysis, corresponding executive personnel and instrument equipment are matched for each task, the actual execution condition of each task is checked and recorded in real time, the execution progress of the corresponding task is determined, the actual execution progress of the task is compared with the execution condition of the corresponding task plan, the specific execution condition of each task is managed through modes of allocating personnel or equipment and the like, and the execution of the whole detection project is further planned. The method achieves the technical goals that based on specific data, each task in the detection project is intelligently allocated and managed in real time, the management mode is simplified, the management efficiency is improved, the high-efficiency and high-quality execution of the whole detection project is further ensured, and the value maximization is realized.
Further, as shown in fig. 2, the embodiment of the present application further includes step S800:
step S810: constructing an instrument equipment library;
step S820: configuring first task equipment according to the first task and the instrument equipment library;
step S830: and managing the first task equipment according to the first task progress to obtain a second management result.
Specifically, the instrument and equipment library is an instrument and equipment information library constructed based on existing instrument and equipment information of a corresponding detection mechanism or a detection company. The instrument and equipment library comprises related information such as equipment names, equipment purposes and equipment quantity. Based on the task condition after detecting the project division, the system intelligently matches in the instrument equipment library, thereby forming the first task equipment. Furthermore, real-time execution progress observation is carried out on the basis of the corresponding small tasks in the project Gantt chart, when the current task execution efficiency is observed to be too low, the current task execution speed is continued, adverse effects are generated on other follow-up tasks, and therefore the whole project execution is influenced, and the system intelligently carries out corresponding configuration and allocation on the task. For example, when the current task execution efficiency is too low, the usage amount of the relevant equipment can be increased, and the multiple equipment simultaneously execute the tasks to improve the whole task execution efficiency; the current task execution efficiency is too high, the usage amount of related equipment can be reduced, and related instrument equipment is provided for the execution of tasks in other projects. And obtaining a corresponding task execution scheme which is the second management result after the number of the devices of the task is subjected to targeted regulation and control.
Corresponding equipment allocation management is performed on the first task in a targeted manner based on the actual execution condition of the first task, so that the technical effect of ensuring efficient, reasonable and ordered execution of the corresponding tasks is achieved.
Further, as shown in fig. 3, step S700 in this embodiment of the present application further includes:
step S710: according to a three-point estimation method, carrying out task planning duration estimation on the first task to obtain a first optimistic estimation, a first most probable estimation and a first pessimistic estimation of the first task;
step S720: calculating a first plan expected value and a first plan variance of the first task according to the first optimistic estimate, the first most probable estimate and the first pessimistic estimate;
step S730: constructing a first probability density function according to the first plan expected value and the first plan variance;
step S740: according to the first probability density function, simulating to obtain a first planned time length of the first task;
step S750: obtaining a first management target according to the first planned time length and the first task progress;
step S760: and managing the first task personnel according to the first management target to obtain a first management result.
Specifically, the three-point estimation method is to perform comprehensive evaluation on the specific execution difficulty, complexity, time consumption, and the like of the first task based on the actual situation of the first task, so as to determine the shortest time, the maximum probability time, and the longest time for executing the first task, which are the first optimistic estimation, the first most probable estimation, and the first pessimistic estimation of the first task. Further, based on the estimation result of the three-point estimation method, an expected value and a variance of the first task execution duration are calculated, and the expected value and the variance are the first planned expected value and the first planned variance. Further, a normal distribution based on the first plan expected value and the first plan variance is determined, so that a first probability density function corresponding to the first task execution duration is determined. And finally, simulating and generating a group of random task plan completion time length data through the first probability density function, and calculating an average value, namely the first plan time length of the first task.
Whether the current execution of the first task needs to be managed and controlled or not is determined by comparing the first plan time length with the first task progress, and the progress control of the first task is correspondingly carried out in a personnel increase and decrease mode, so that the technical effect of intelligently managing and controlling each task executive in a project is achieved.
Further, step S750 in the embodiment of the present application further includes:
step S751: obtaining a first plan daily average detection quantity according to the first plan time length;
step S752: obtaining a first actual daily average detection quantity according to the first task progress;
step S753: judging whether the first actual daily average detection quantity meets the first planned daily average detection quantity;
step S754: and when the first actual daily average detection amount does not meet the first planned daily average detection amount, obtaining a first management target, wherein the first management target comprises a first speed-up target and a first speed-down target.
Specifically, the total workload information in the tasks is determined by analyzing the first tasks, and the first planned daily average detection amount of the first tasks is calculated by combining the first planned time length. And similarly, calculating to obtain a first actual daily average detection quantity of the first task based on the project Gantt chart. And further comparing the first actual daily average detection quantity with the first planned daily average detection quantity, and when the first actual daily average detection quantity is not equal to the first planned daily average detection quantity, correspondingly obtaining a first management target by the system. Wherein the first management objective includes a first speed-up objective and a first speed-down objective. That is to say, when the first actual daily average detected quantity is smaller than the first planned daily average detected quantity, it indicates that the current execution efficiency of the first task is too low, and in order to avoid affecting the execution of subsequent tasks, the execution efficiency of the tasks should be improved by intelligently regulating and controlling the corresponding execution schemes; when the first actual daily average detection quantity is larger than the first planned daily average detection quantity, the current execution efficiency of the first task is very high, and in order to save manpower and equipment resources, the corresponding execution scheme should be intelligently regulated and controlled, so that the task execution efficiency is reduced, the execution of subsequent tasks is not influenced, and the technical effect of saving resources is achieved.
Further, step S100 in the embodiment of the present application further includes:
step S110: obtaining a first project principal according to the first project;
step S120: obtaining a first project technician according to the first project;
step S130: analyzing the first project to obtain a first project detection index set;
step S140: matching and obtaining a first project inspector according to the first project inspection index set, wherein the first project inspector comprises a plurality of inspectors;
step S150: and forming the first project group member according to the first project principal, the first project technician and the first project inspector.
Specifically, according to the first project and the corresponding project requirement, a responsible person, a technician and a detector of the first project are allocated, namely the responsible person, the technician and the detector of the first project. And determining an index set to be detected, namely the first project detection index set, by the first project inspector after the first project analysis, and obtaining the inspector through reverse matching. Wherein the first item inspector comprises a plurality of inspectors. Finally, the first project principal, the first project technician, and the first project inspector collectively comprise the first project team member. According to the actual conditions of the project, the members of the corresponding project group are matched in a personalized manner, and the effects of dividing labor, cooperating and promoting the project execution in order are achieved.
Further, step S130 in the embodiment of the present application further includes:
step S131: obtaining a first item detection result set according to the first item detection index set;
step S132: generating the first item detection report based on the first set of item detection results.
Specifically, detection index information of a first project is formulated according to user detection requirements, so that the first project detection index set is formed. And performing a detection test on each index in the first item detection index set through the first item inspector to obtain a detection result corresponding to each index, so as to obtain the first item detection result set. And finally, uploading the detection result data of each index to the detection service management system based on task information flow tracking by each inspector, and after the first project technician in the first project group member checks and confirms, automatically generating a corresponding detection report, namely the first project detection report, by the system after the first project supervisor checks and confirms. Wherein the first item detection report is a detection report finally handed to a client.
The corresponding detection result is uploaded to the detection service management system based on the task information flow tracking by the detector, and the first project detection report is finally obtained intelligently through the inspection of the corresponding technician and the confirmation of the responsible person in the first project, so that the intelligent generation of the detection report is realized, and the technical effect of improving the working efficiency is improved.
Further, as shown in fig. 4, the embodiment of the present application further includes step S900:
step S910: acquiring login information of a first project group member;
step S920: acquiring the identity of a first project group member according to the login information of the first project group member;
step S930: acquiring a first project group member authority according to the first project group member identity;
step S940: and according to the group member authority of the first project, performing management operation on the first project to obtain a third management result.
Specifically, the detection service management system based on task information flow tracking is provided with a user side, and all project participants can log in personal accounts through an electronic equipment terminal to perform online circulation and confirmation of related work. The first project group member login information refers to recorded information of all participating personnel in the first project logging in the system to perform related work. According to the login information of the first project group member, the management terminal of the detection service management system based on task information flow tracking can inquire the identity information of the current login personnel, and the identity information is the identity of the first project group member. Wherein the first project group membership comprises a first project principal, a first project technician, and a first project inspector. And matching the corresponding system authority for the system management staff based on the identity of the other party.
The first project principal has advanced authorities of newly adding instrument equipment, automatically putting each equipment in and out of the instrument equipment library, allocating each task equipment and personnel in the first project, monitoring each task execution progress in the first project in real time and the like; the first project technician has middle-level permissions of making a detection scheme, checking a detection process and a result and the like; the first project inspector has common rights of uploading detection result data, downloading file data such as a preset detection standard in a system and the like. In addition, all system users can set the color, the style, the message reminding mode and the like of the user side interface according to personal preference. And the first project group member generates a corresponding third management result after performing related setting operation on the first project according to the own authority.
Through role and the identity based on detecting project members, the system is intelligent to match corresponding authorities, and each user can reasonably allocate and set the first project within the authority range, so that the intelligent degree of the system is improved, convenience is brought to efficient execution of the project, and the technical effects of improving the completion quality and the completion efficiency of the whole project are achieved.
Further, step S940 in the embodiment of the present application further includes:
step S941: acquiring a first project group member operation record according to the first project group member operation condition;
step S942: and generating a first project log according to the operation record of the first project group member.
Specifically, after the first project group member performs the related setting operation on the first project according to the own authority, the detection service management system based on task information flow tracking automatically generates the corresponding user operation record information, which includes specific information such as an operation user name, an identity, an operation type, and operation time. Finally, the operation records of all the first project group members form the first project log. In addition, the manager of the detection service management system based on task information flow tracking and the corresponding first project responsible person can view the first project log in real time.
The first project log is automatically generated by the system, and related system data are provided for subsequent project backtracking, project examination and check and the like, so that the system utilization rate is improved, and the technical effects of improving the detection service management efficiency and the management quality are finally achieved.
To sum up, the method for detecting service management based on task information flow tracking provided by the embodiment of the present application has the following technical effects:
1. obtaining a first project group member according to a first project; the method comprises the steps of performing division work arrangement on a first project to obtain a first project task set, wherein the first project task set comprises a plurality of tasks; obtaining a first task according to the first project task set; matching a first task person based on the first task and the first project team member, wherein the first task person comprises one or more persons; taking the first execution time of the first project as a horizontal axis and the first task as a vertical axis to construct a project Gantt chart; obtaining a first task progress according to the project Gantt chart; and managing the first task personnel according to the first task progress to obtain a first management result. A detection project is divided into a plurality of small tasks through personalized analysis, corresponding executive personnel and instrument equipment are matched for each task, the actual execution condition of each task is checked and recorded in real time, the execution progress of the corresponding task is determined, the actual execution progress of the task is compared with the execution condition of the corresponding task plan, the specific execution condition of each task is managed through modes of allocating personnel or equipment and the like, and the execution of the whole detection project is further planned. The method achieves the technical goals that based on specific data, each task in the detection project is intelligently allocated and managed in real time, the management mode is simplified, the management efficiency is improved, the high-efficiency and high-quality execution of the whole detection project is further ensured, and the value maximization is realized.
2. Corresponding equipment allocation management is performed on the first task in a targeted manner based on the actual execution condition of the first task, so that the technical effect of ensuring efficient, reasonable and ordered execution of the corresponding tasks is achieved.
3. The corresponding detection result is uploaded to the detection service management system based on the task information flow tracking by the detector, and the first project detection report is finally obtained intelligently through the inspection of the corresponding technician and the confirmation of the responsible person in the first project, so that the intelligent generation of the detection report is realized, and the technical effect of improving the working efficiency is improved.
4. Through role and the identity based on detecting project members, the system is intelligent to match corresponding authorities, and each user can reasonably allocate and set the first project within the authority range, so that the intelligent degree of the system is improved, convenience is brought to efficient execution of the project, and the technical effects of improving the completion quality and the completion efficiency of the whole project are achieved.
5. The first project log is automatically generated by the system, and related system data are provided for subsequent project backtracking, project examination and check and the like, so that the system utilization rate is improved, and the technical effects of improving the detection service management efficiency and the management quality are finally achieved.
Example two
Based on the same inventive concept as the method for managing detection service based on task information flow tracing in the foregoing embodiment, the present invention further provides a system for managing detection service based on task information flow tracing, please refer to fig. 5, where the system includes:
a first obtaining unit 11, where the first obtaining unit 11 is configured to obtain a first item group member according to a first item;
a second obtaining unit 12, where the second obtaining unit 12 is configured to perform division and arrangement on a first project to obtain a first project task set, where the first project task set includes a plurality of tasks;
a third obtaining unit 13, where the third obtaining unit 13 is configured to obtain a first task according to the first project task set;
a first matching unit 14, wherein the first matching unit 14 is configured to match a first task person according to the first task and the first project group member, and the first task person includes one or more persons;
a first constructing unit 15, where the first constructing unit 15 is configured to construct a project gantt chart by taking the first execution time of the first project as a horizontal axis and the first task as a vertical axis;
a fourth obtaining unit 16, where the fourth obtaining unit 16 is configured to obtain a first task progress according to the project gantt chart;
a fifth obtaining unit 17, where the fifth obtaining unit 17 is configured to manage the first task person according to the first task progress, and obtain a first management result.
Further, the system further comprises:
a second construction unit for constructing an instrument device library;
the first configuration unit is used for configuring first task equipment according to the first task and the instrument equipment library;
a sixth obtaining unit, configured to manage the first task device according to the first task progress, and obtain a second management result.
Further, the system further comprises:
a seventh obtaining unit, configured to perform task planning duration estimation on the first task according to a three-point estimation method, and obtain a first optimistic estimation, a first most probable estimation, and a first pessimistic estimation of the first task;
an eighth obtaining unit, configured to calculate and obtain a first planned expected value and a first planned variance of the first task according to the first optimistic estimate, the first most probable estimate, and the first pessimistic estimate;
a third constructing unit, configured to construct a first probability density function according to the first planned expected value and the first planned variance;
a ninth obtaining unit, configured to obtain, by simulation, a first planned duration of the first task according to the first probability density function;
a tenth obtaining unit, configured to obtain a first management target according to the first scheduled time length and the first task progress;
an eleventh obtaining unit, configured to manage the first task person according to the first management target, and obtain a first management result.
Further, the system further comprises:
a twelfth obtaining unit, configured to obtain a first planned daily average detection amount according to the first planned time length;
a thirteenth obtaining unit, configured to obtain a first actual daily average detection amount according to the first task progress;
the first judging unit is used for judging whether the first actual daily average detection quantity meets the first planned daily average detection quantity or not;
a fourteenth obtaining unit, configured to obtain a first management target when the first actual daily average detected amount does not satisfy the first planned daily average detected amount, where the first management target includes a first speed-up target and a first speed-down target.
Further, the system further comprises:
a fifteenth obtaining unit, configured to obtain a first project principal according to the first project;
a sixteenth obtaining unit, configured to obtain a first project technician according to the first project;
a seventeenth obtaining unit, configured to analyze the first item to obtain a first item detection index set;
an eighteenth obtaining unit, configured to obtain, by matching, a first item inspector according to the first item detection index set, where the first item inspector includes multiple inspectors;
a first composition unit to compose the first project team member based on the first project principal, the first project technician, and the first project inspector.
Further, the system further comprises:
a nineteenth obtaining unit, configured to obtain a first item detection result set according to the first item detection index set;
a first generating unit to generate the first item detection report based on the first item detection result set.
Further, the system further comprises:
a twentieth obtaining unit, configured to obtain first project group member login information;
a twenty-first obtaining unit, configured to obtain a first project group member identity according to the first project group member login information;
a twenty-second obtaining unit, configured to obtain a first project group member permission according to the first project group member identity;
a twenty-third obtaining unit, configured to perform a management operation on the first item according to the first item group member permission, and obtain a third management result.
Further, the system further comprises:
a twenty-fourth obtaining unit, configured to obtain an operation record of the first project group member according to the operation condition of the first project group member;
and the second generating unit is used for generating a first project log according to the operation record of the first project group member.
In the present specification, each embodiment is described in a progressive manner, and the focus of the description of each embodiment is different from that of other embodiments, the detection service management method based on task information flow tracing in the first embodiment of fig. 1 and the specific example are also applicable to the detection service management system based on task information flow tracing in the present embodiment, and through the foregoing detailed description of the detection service management method based on task information flow tracing, those skilled in the art can clearly know the detection service management system based on task information flow tracing in the present embodiment, so for the brevity of the description, detailed description is not repeated here. The device disclosed by the embodiment corresponds to the method disclosed by the embodiment, so that the description is simple, and the relevant points can be referred to the method part for description.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Exemplary electronic device
The electronic apparatus of the embodiment of the present application is described below with reference to fig. 6.
Fig. 6 illustrates a schematic structural diagram of an electronic device according to an embodiment of the present application.
Based on the inventive concept of a method for managing detection services based on task information flow tracing as described in the previous embodiments, the present invention further provides a system for managing detection services based on task information flow tracing, wherein the system comprises a computer program stored thereon, and the computer program, when executed by a processor, implements the steps of any one of the methods for managing detection services based on task information flow tracing as described above.
Where in fig. 6 a bus architecture (represented by bus 300), bus 300 may include any number of interconnected buses and bridges, bus 300 linking together various circuits including one or more processors, represented by processor 302, and memory, represented by memory 304. The bus 300 may also link together various other circuits such as peripherals, voltage regulators, power management circuits, and the like, which are well known in the art, and therefore, will not be described any further herein. A bus interface 305 provides an interface between the bus 300 and the receiver 301 and transmitter 303. The receiver 301 and the transmitter 303 may be the same element, i.e., a transceiver, providing a means for communicating with various other apparatus over a transmission medium.
The processor 302 is responsible for managing the bus 300 and general processing, and the memory 304 may be used for storing data used by the processor 302 in performing operations.
The application provides a detection service management method based on task information flow tracking, which is applied to a detection service management system based on task information flow tracking, wherein the method comprises the following steps: obtaining a first project group member according to a first project; the method comprises the steps of performing division work arrangement on a first project to obtain a first project task set, wherein the first project task set comprises a plurality of tasks; obtaining a first task according to the first project task set; matching a first task person based on the first task and the first project team member, wherein the first task person comprises one or more persons; taking the first execution time of the first project as a horizontal axis and the first task as a vertical axis to construct a project Gantt chart; obtaining a first task progress according to the project Gantt chart; and managing the first task personnel according to the first task progress to obtain a first management result. The problem of among the prior art relevant managers carry out the adaptability allotment management of participator, use equipment to the execution conditions of each detection project through experience, because lack accurate data foundation, lead to allotment management untimely, inaccurate, and then cause manpower, material resources wasting is solved, in addition, the detection project execution conditions are complicated changeable, and the work of each detection project of artificial overall management is complicated, the degree of difficulty is high, leads to the managerial efficiency low, has the unable technical problem who forms value maximize. A detection project is divided into a plurality of small tasks through personalized analysis, corresponding executive personnel and instrument equipment are matched for each task, the actual execution condition of each task is checked and recorded in real time, the execution progress of the corresponding task is determined, the actual execution progress of the task is compared with the execution condition of the corresponding task plan, the specific execution condition of each task is managed through modes of allocating personnel or equipment and the like, and the execution of the whole detection project is further planned. The method achieves the technical goals that based on specific data, each task in the detection project is intelligently allocated and managed in real time, the management mode is simplified, the management efficiency is improved, the high-efficiency and high-quality execution of the whole detection project is further ensured, and the value maximization is realized.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, apparatus, or computer program product. Accordingly, the present application may take the form of an entirely software embodiment, an entirely hardware embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present application is in the form of a computer program product that may be embodied on one or more computer-usable storage media having computer-usable program code embodied therewith. And such computer-usable storage media include, but are not limited to: various media capable of storing program codes, such as a usb disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk Memory, a Compact Disc Read-Only Memory (CD-ROM), and an optical Memory.
The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems) and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create a system for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including an instruction system which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks. While preferred embodiments of the present invention have been described, additional variations and modifications in those embodiments may occur to those skilled in the art once they learn of the basic inventive concepts. Therefore, it is intended that the appended claims be interpreted as including preferred embodiments and all such alterations and modifications as fall within the scope of the invention.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (10)

1. A detection service management method based on task information flow tracking is characterized in that the method is applied to a detection service management system based on task information flow tracking, and the method comprises the following steps:
acquiring a first project group member according to the first project;
the method comprises the steps of performing division work arrangement on a first project to obtain a first project task set, wherein the first project task set comprises a plurality of tasks;
obtaining a first task according to the first project task set;
matching a first task person based on the first task and the first project team member, wherein the first task person comprises one or more persons;
taking the first execution time of the first project as a horizontal axis and the first task as a vertical axis to construct a project Gantt chart;
obtaining a first task progress according to the project Gantt chart;
and managing the first task personnel according to the first task progress to obtain a first management result.
2. The method of claim 1, wherein the method further comprises:
constructing an instrument equipment library;
configuring first task equipment according to the first task and the instrument equipment library;
and managing the first task equipment according to the first task progress to obtain a second management result.
3. The method of claim 1, wherein said managing the first task person according to the first task progress to obtain a first management result comprises:
according to a three-point estimation method, carrying out task planning duration estimation on the first task to obtain a first optimistic estimation, a first most probable estimation and a first pessimistic estimation of the first task;
calculating a first plan expected value and a first plan variance of the first task according to the first optimistic estimate, the first most probable estimate and the first pessimistic estimate;
constructing a first probability density function according to the first plan expected value and the first plan variance;
according to the first probability density function, simulating to obtain a first planned time length of the first task;
obtaining a first management target according to the first planned time length and the first task progress;
and managing the first task personnel according to the first management target to obtain a first management result.
4. The method of claim 3, wherein obtaining a first management objective based on the first scheduled time period and the first task schedule comprises:
obtaining a first plan daily average detection quantity according to the first plan time length;
obtaining a first actual daily average detection quantity according to the first task progress;
judging whether the first actual daily average detection quantity meets the first planned daily average detection quantity;
and when the first actual daily average detection amount does not meet the first planned daily average detection amount, obtaining a first management target, wherein the first management target comprises a first speed-up target and a first speed-down target.
5. The method of claim 1, wherein said obtaining a first project team member based on said first project comprises:
obtaining a first project principal according to the first project;
obtaining a first project technician according to the first project;
analyzing the first project to obtain a first project detection index set;
matching and obtaining a first project inspector according to the first project inspection index set, wherein the first project inspector comprises a plurality of inspectors;
and forming the first project group member according to the first project principal, the first project technician and the first project inspector.
6. The method of claim 5, wherein said analyzing said first item to obtain a first item detection index set, further comprising:
obtaining a first item detection result set according to the first item detection index set;
generating the first item detection report based on the first set of item detection results.
7. The method of claim 1, wherein the method further comprises:
acquiring login information of a first project group member;
acquiring the identity of a first project group member according to the login information of the first project group member;
acquiring a first project group member authority according to the first project group member identity;
and according to the group member authority of the first project, performing management operation on the first project to obtain a third management result.
8. The method of claim 7, wherein said performing a management operation on said first item in accordance with said first item group membership rights comprises:
acquiring a first project group member operation record according to the first project group member operation condition;
and generating a first project log according to the operation record of the first project group member.
9. A system for managing detection traffic based on task information flow tracing, the system comprising:
a first obtaining unit: the first obtaining unit is used for obtaining a first project group member according to a first project;
a second obtaining unit: the second obtaining unit is used for performing division work arrangement on a first project to obtain a first project task set, wherein the first project task set comprises a plurality of tasks;
a third obtaining unit: the third obtaining unit is used for obtaining a first task according to the first project task set;
a first matching unit: the first matching unit is used for matching first task personnel according to the first task and the first project group member, wherein the first task personnel comprises one or more personnel;
a first building unit: the first construction unit is used for constructing a project Gantt chart by taking the first execution time of the first project as a horizontal axis and the first task as a vertical axis;
a fourth obtaining unit: the fourth obtaining unit is used for obtaining a first task progress according to the project Gantt chart;
a fifth obtaining unit: the fifth obtaining unit is configured to manage the first task person according to the first task progress, and obtain a first management result.
10. A system for detecting traffic management based on task information flow tracing, comprising a memory, a processor and a computer program stored on the memory and executable on the processor, wherein the processor executes the program to implement the steps of the method according to any one of claims 1 to 8.
CN202111414278.XA 2021-11-25 2021-11-25 Detection service management method and system based on task information flow tracking Pending CN114154954A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111414278.XA CN114154954A (en) 2021-11-25 2021-11-25 Detection service management method and system based on task information flow tracking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111414278.XA CN114154954A (en) 2021-11-25 2021-11-25 Detection service management method and system based on task information flow tracking

Publications (1)

Publication Number Publication Date
CN114154954A true CN114154954A (en) 2022-03-08

Family

ID=80457636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111414278.XA Pending CN114154954A (en) 2021-11-25 2021-11-25 Detection service management method and system based on task information flow tracking

Country Status (1)

Country Link
CN (1) CN114154954A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114358658A (en) * 2022-03-10 2022-04-15 广东粤海集团企业服务有限公司 Working group data processing method and system
CN114418471A (en) * 2022-03-31 2022-04-29 广州平云小匠科技有限公司 Intelligent planning and visual management method and system for work orders

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109903009A (en) * 2019-01-31 2019-06-18 平安科技(深圳)有限公司 Data flow tracking propulsion method and system based on substep driving
CN111598419A (en) * 2020-04-30 2020-08-28 国网浙江省电力有限公司台州供电公司 Power grid construction management and control method based on Internet and intelligent infrastructure platform system
CN112598404A (en) * 2021-02-05 2021-04-02 汇正(广州)企业管理咨询有限公司 Internet enterprise mobile office management method and system based on big data

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109903009A (en) * 2019-01-31 2019-06-18 平安科技(深圳)有限公司 Data flow tracking propulsion method and system based on substep driving
CN111598419A (en) * 2020-04-30 2020-08-28 国网浙江省电力有限公司台州供电公司 Power grid construction management and control method based on Internet and intelligent infrastructure platform system
CN112598404A (en) * 2021-02-05 2021-04-02 汇正(广州)企业管理咨询有限公司 Internet enterprise mobile office management method and system based on big data

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李彦霖: "桥梁施工管理三维可视化信息系统的研究与实现", 《中国优秀博硕士学位论文全文数据库(硕士) 工程科技Ⅱ辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114358658A (en) * 2022-03-10 2022-04-15 广东粤海集团企业服务有限公司 Working group data processing method and system
CN114418471A (en) * 2022-03-31 2022-04-29 广州平云小匠科技有限公司 Intelligent planning and visual management method and system for work orders

Similar Documents

Publication Publication Date Title
US8639553B1 (en) Predictive growth burn rate in development pipeline
CN114154954A (en) Detection service management method and system based on task information flow tracking
Xie et al. An integrated decision support system for ERP implementation in small and medium sized enterprises
US20110302090A1 (en) Determining a Critical Path in Statistical Project Management
Blyth et al. A novel multiple linear regression model for forecasting S‐curves
CN111563703B (en) Project management system, project management method, computer device, and computer-readable storage medium
CN111966585A (en) Test task execution method, device, equipment and system
CN111199493A (en) Arrearage risk identification method based on customer payment information and credit investigation information
Zou et al. An agent-based model for crowdsourcing systems
Bendavid et al. Developing an optimal appointment scheduling for systems with rigid standby time under pre-determined quality of service
CN117350640A (en) Project progress management method and system
Liu A coordinated scheduling system for customer orders scheduling problem in job shop environments
CN116775477A (en) Software testing progress determining method and device
Rus et al. Systematically combining process simulation and empirical data in support of decision analysis in software development
CN116523244A (en) Testing manpower risk early warning method based on outsourcing resources
Bamfo-Agyei et al. Measuring labour productivity in labour intensive works on the road construction in Ghana
Mootanah Developing an integrated risk and value management framework for construction project management
CN114358658B (en) Working group data processing method and system
CN108876048A (en) The predictor method and device of enterprise's personnel recruitment Service Efficiency on schedule
Molokanova Earned Value Method in Public Project Monitoring
RU2697938C1 (en) Method for automated control of labour resources based on simulation modelling
CN117670040A (en) Evaluation method and device for engineering consultation economic index and electronic equipment
Mikailu et al. An efficient resource selection and allocation in cloud computing using artificial nutrients distribution model
Eusebio GEMS: Green Expert Monitoring System Through Cloud Services
Runje et al. Simulation modelling of a company providing two qualitatively different services to market

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220308