CN116523244A - Testing manpower risk early warning method based on outsourcing resources - Google Patents

Testing manpower risk early warning method based on outsourcing resources Download PDF

Info

Publication number
CN116523244A
CN116523244A CN202310497594.0A CN202310497594A CN116523244A CN 116523244 A CN116523244 A CN 116523244A CN 202310497594 A CN202310497594 A CN 202310497594A CN 116523244 A CN116523244 A CN 116523244A
Authority
CN
China
Prior art keywords
existing
test
project
testing
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310497594.0A
Other languages
Chinese (zh)
Inventor
谢庭红
袁平
梁艳美
黄博
王资
李炎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Sanxiang Bank Co Ltd
Original Assignee
Hunan Sanxiang Bank Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Sanxiang Bank Co Ltd filed Critical Hunan Sanxiang Bank Co Ltd
Priority to CN202310497594.0A priority Critical patent/CN116523244A/en
Publication of CN116523244A publication Critical patent/CN116523244A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

The invention discloses a testing manpower risk early warning method based on outsourcing resources, which relates to the technical field of Internet, acquires existing testing project information, acquires testing progress data of existing testing personnel and residual time of the existing testing project, evaluates testing efficiency of the existing testing personnel in corresponding projects according to the testing progress data of the existing testing personnel, calculates whether the existing testing project has risks which cannot be completed, evaluates whether the existing testing personnel have the efficiency according to the existing testing progress, evaluates whether the testing personnel can complete the testing project on time according to the residual time of the testing project, sends early warning information if the risks which cannot complete the testing project exist, and matches the number of the required outsourcing testing personnel, thereby realizing the effect that whether the number of the testing personnel meets the requirements of testing tasks according to the testing task progress.

Description

Testing manpower risk early warning method based on outsourcing resources
Technical Field
The invention relates to the technical field of Internet, in particular to a testing manpower risk early warning method based on outsourcing resources.
Background
In the process of project, the software testing link is important, the software of the project is tested by software testers, errors in the project software are found, engineers are informed to repair the error content in the software project, in the actual working process, because the number of testers of a company is limited, the testers need to be subjected to advanced scheduling, the current and subsequent planned saturation conditions of each tester lack of automatic reminding functions, a large amount of data are needed to be relied on for calculation and analysis, the input workload is expected according to the current workload outsourcing and the subsequent planned requirements, calculation rules and formulas are set, and the system automatically pops up human risk early warning broadcast through calculation. The manager evaluates whether the testers can meet the expected progress of the test task or not in advance according to the needs, when the existing testers cannot meet the progress of the test task, the number of the testers is required to be obtained in advance, and the outsourcing of the test work is carried out according to the number of the testers required, so that a testing manpower risk early warning method based on outsourcing resources is developed for solving the problem.
Disclosure of Invention
The invention aims to provide a testing manpower risk early warning method based on outsourcing resources, which aims to solve the problems that the number of existing testing personnel is large, the testing items cannot be integrally controlled from the macroscopic view, and the outsourcing testing personnel cannot be reasonably arranged to participate in the testing items.
The invention provides a testing manpower risk early warning method based on outsourcing resources, which comprises the following steps of;
the method comprises the steps that a server side obtains existing test project information, project information to be tested, existing tester data and outsourcing team testable person data;
collecting the test progress data of the existing testers and the remaining time of the existing test projects, and evaluating the test efficiency of the existing testers in the corresponding projects according to the test progress data of the existing testers;
and calculating whether the existing test project has an incomplete risk according to the residual time of the test project and the testing efficiency of the existing tester in the corresponding project, and if the existing test project has the incomplete risk, matching outsourcing human resources to perform the corresponding test project test.
Further, the server side obtains the existing test project information, the project information to be tested, the existing tester data and the outsourcing team testable personnel data, including;
the method comprises the steps that communication connection is established between a server side and a user side, and the server side obtains existing test item information and item information to be tested from the user side;
the server side acquires the existing tester data and outsourcing team testable personnel data in real time through the client side;
and the server terminal performs data screening on the acquired existing test project information, the project information to be tested, the existing tester data and the outsourcing team testable personnel data to finish data storage.
Further, collecting the test progress data of the existing testers and the remaining time of the existing test projects, and evaluating the test efficiency of the existing testers in the corresponding projects according to the test progress data of the existing testers, wherein the test efficiency comprises the following steps of;
collecting existing test personnel test progress data and existing test project residual time, wherein the existing test personnel test progress data comprises existing test project test time and existing test project completion workload;
dividing the existing test project completion workload by the existing test project test time to obtain the existing test project test progress speed;
and counting the number of testers in the existing test project, dividing the speed of the progress of the existing test project by the number of testers summarized by the existing test project, and obtaining the test efficiency of the existing testers in the corresponding project.
Further, according to the remaining time of the test item and the testing efficiency of the existing testers in the corresponding item, calculating whether the existing test item has an incomplete risk, and if the existing test item has an incomplete risk, matching outsourcing human resources to perform corresponding test item testing, wherein the steps include;
calculating the time required by the existing tester to complete the existing test task according to the sequencing efficiency of the existing tester in the corresponding project;
data comparison is carried out on the time required by the existing test task and the test project residual time, if the time required by the existing test task is larger than the test project residual time, the test project residual time is matched with the existing test personnel in the corresponding project test efficiency, and the required test personnel number is obtained;
and acquiring the data of the testable personnel of the outsourcing team, and matching the data of the testable personnel of the outsourcing team with the required number of the testable personnel to obtain the number of the testable personnel.
Further, if the existing test items have the risk of being unable to be completed, matching outsourcing human resources to test the corresponding test items, including;
if the risk of the existing test item cannot be completed, risk early warning information is generated;
the risk early warning information generates primary early warning information, secondary early warning information and tertiary early warning information according to a preset time period;
and sending the risk early warning information to mobile terminal equipment held by the user.
The beneficial effects of the invention are as follows: the invention provides a testing manpower risk early warning method based on outsourcing resources, which relates to the technical field of Internet, and aims at the problems that in the existing software research and development process, the number of testing items is large, the number of testing personnel is large, the use is carried out on a scheduling scene of the testing personnel and the testing items, the existing testing item information is acquired, the testing progress data of the existing testing personnel and the residual time of the existing testing items are acquired, the testing efficiency of the existing testing personnel in the corresponding items is estimated according to the testing progress data of the existing testing personnel, whether the risk of the existing testing items cannot be completed is calculated, whether the testing personnel can complete the testing items on time is estimated according to the residual time of the testing items is estimated, early warning information is sent out and the number of the required outsourcing testing personnel is matched.
Drawings
In order to more clearly illustrate the technical solution of the present invention, the drawings that are needed in the embodiments will be briefly described below, and it will be obvious to those skilled in the art that other drawings can be obtained from these drawings without inventive effort.
Fig. 1 is a flow chart diagram of a testing human risk early warning method based on outsourcing resources according to an embodiment of the present invention.
Fig. 2 is a schematic diagram of a frame of a testing human risk early warning method based on outsourcing resources in an actual use scenario according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the technical solutions of the present invention will be clearly and completely described below with reference to specific embodiments of the present invention and corresponding drawings. It will be apparent that the described embodiments are only some, but not all, embodiments of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention. The following describes in detail the technical solutions provided by the embodiments of the present invention with reference to the accompanying drawings.
Referring to fig. 1 and 2, the present invention provides a testing manpower risk early warning method based on outsourcing resources, which includes;
the method comprises the steps that a server side obtains existing test project information, project information to be tested, existing tester data and outsourcing team testable person data;
the method comprises the steps that existing test project information is input through a client of a user, a server side obtains the existing test project information, to-be-tested project information, existing tester data and outsourcing team testable personnel data from the client of the user, and the existing test project information, to-be-tested project information, the existing tester data and the outsourcing team testable personnel data are key data in the method and are used for evaluating whether subsequent test projects can be successfully completed.
Collecting the test progress data of the existing testers and the remaining time of the existing test projects, and evaluating the test efficiency of the existing testers in the corresponding projects according to the test progress data of the existing testers;
according to the method, firstly, the test efficiency of the existing test personnel is estimated according to the test progress of the existing test project, for example, the existing test project A is completed 40 percent, the time is 12 days, the number of the personnel participating in the test is 6, and then the test efficiency of the 6 personnel participating in the test is estimated and calculated to obtain the test efficiency of a single person in the corresponding project.
And calculating whether the existing test project has an incomplete risk according to the residual time of the test project and the testing efficiency of the existing tester in the corresponding project, and if the existing test project has the incomplete risk, matching outsourcing human resources to perform the corresponding test project test.
By evaluating the efficiency of the existing testers according to the existing test progress, evaluating whether the testers can complete the test projects on time according to the remaining time of the test projects, sending early warning information if the risk of being unable to complete the test projects exists, and matching the number of the required outsourcing testers, the effect that whether the number of the testers meets the test task requirement is evaluated according to the test task progress is achieved, and the problems that the number of the existing testers is large, the overall control of the test projects cannot be carried out from the macroscopic view, and the outsourcing testers cannot be reasonably arranged to participate in the test projects are solved.
Specifically, the server side acquires the existing test project information, the project information to be tested, the existing tester data and the outsourcing team testable personnel data, including;
the method comprises the steps that communication connection is established between a server side and a user side, and the server side obtains existing test item information and item information to be tested from the user side;
the server side acquires the existing tester data and outsourcing team testable personnel data in real time through the client side;
and the server terminal performs data screening on the acquired existing test project information, the project information to be tested, the existing tester data and the outsourcing team testable personnel data to finish data storage.
Specifically, collecting the test progress data of the existing testers and the remaining time of the existing test projects, and evaluating the test efficiency of the existing testers in the corresponding projects according to the test progress data of the existing testers, wherein the test efficiency comprises the following steps of;
collecting existing test personnel test progress data and existing test project residual time, wherein the existing test personnel test progress data comprises existing test project test time and existing test project completion workload;
dividing the existing test project completion workload by the existing test project test time to obtain the existing test project test progress speed;
and counting the number of testers in the existing test project, dividing the speed of the progress of the existing test project by the number of testers summarized by the existing test project, and obtaining the test efficiency of the existing testers in the corresponding project.
Specifically, according to the remaining time of the test item and the testing efficiency of the existing testers in the corresponding item, calculating whether the existing test item has an incomplete risk, and if the existing test item has an incomplete risk, matching outsourcing human resources to perform corresponding test item testing, wherein the steps include;
calculating the time required by the existing tester to complete the existing test task according to the sequencing efficiency of the existing tester in the corresponding project;
data comparison is carried out on the time required by the existing test task and the test project residual time, if the time required by the existing test task is larger than the test project residual time, the test project residual time is matched with the existing test personnel in the corresponding project test efficiency, and the required test personnel number is obtained;
and acquiring the data of the testable personnel of the outsourcing team, and matching the data of the testable personnel of the outsourcing team with the required number of the testable personnel to obtain the number of the testable personnel.
Specifically, if the existing test items have the risk of being unable to be completed, matching outsourcing human resources to test the corresponding test items, including;
if the risk of the existing test item cannot be completed, risk early warning information is generated;
the risk early warning information generates primary early warning information, secondary early warning information and tertiary early warning information according to a preset time period;
and sending the risk early warning information to mobile terminal equipment held by the user.
According to the method for testing human risk early warning based on the outsourcing resources, the server side acquires the existing test project information, the project information to be tested, the existing test personnel data and the outsourcing team testable personnel data, acquires the existing test personnel test progress data and the existing test project remaining time, evaluates the test efficiency of the existing test personnel in the corresponding project according to the existing test personnel test progress data, calculates whether the risk of incomplete completion of the existing test project exists according to the test project remaining time and the test efficiency of the existing test personnel in the corresponding project, and matches the outsourcing human resources to perform the corresponding test project test if the risk of incomplete completion exists in the existing test project. By evaluating the efficiency of the existing testers according to the existing test progress, evaluating whether the testers can complete the test items on time according to the remaining time of the test items, if the risk that the test items cannot be completed exists, sending out early warning information, and matching the number of the required outsourcing testers, the problems that the number of the existing testers is large, the test items cannot be integrally controlled from the macroscopic scale, and the outsourcing testers cannot be reasonably arranged to participate in the test items are solved.
It will be apparent to those skilled in the art that the techniques of embodiments of the present invention may be implemented in software plus a necessary general purpose hardware platform. Based on such understanding, the technical solutions in the embodiments of the present invention may be embodied in essence or what contributes to the prior art in the form of a software product, which may be stored in a storage medium, such as a ROM/RAM, a magnetic disk, an optical disk, etc., including several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the method described in the embodiments or some parts of the embodiments of the present invention. The embodiments of the present invention described above do not limit the scope of the present invention.

Claims (5)

1. The method for testing the human risk early warning based on the outsourcing resource is characterized by comprising the following steps of;
the method comprises the steps that a server side obtains existing test project information, project information to be tested, existing tester data and outsourcing team testable person data;
collecting the test progress data of the existing testers and the remaining time of the existing test projects, and evaluating the test efficiency of the existing testers in the corresponding projects according to the test progress data of the existing testers;
and calculating whether the existing test project has an incomplete risk according to the residual time of the test project and the testing efficiency of the existing tester in the corresponding project, and if the existing test project has the incomplete risk, matching outsourcing human resources to perform the corresponding test project test.
2. The outsourcing resource-based testing human risk early warning method of claim 1, wherein the server side obtains existing testing project information, project information to be tested, existing tester data and outsourcing team testable person data, comprising;
the method comprises the steps that communication connection is established between a server side and a user side, and the server side obtains existing test item information and item information to be tested from the user side;
the server side acquires the existing tester data and outsourcing team testable personnel data in real time through the client side;
and the server terminal performs data screening on the acquired existing test project information, the project information to be tested, the existing tester data and the outsourcing team testable personnel data to finish data storage.
3. The outsourcing resource-based testing manpower risk early warning method of claim 1, wherein the steps of collecting the existing tester testing progress data and the existing testing project remaining time, and evaluating the testing efficiency of the existing tester in the corresponding project according to the existing tester testing progress data comprise the steps of;
collecting existing test personnel test progress data and existing test project residual time, wherein the existing test personnel test progress data comprises existing test project test time and existing test project completion workload;
dividing the existing test project completion workload by the existing test project test time to obtain the existing test project test progress speed;
and counting the number of testers in the existing test project, dividing the speed of the progress of the existing test project by the number of testers summarized by the existing test project, and obtaining the test efficiency of the existing testers in the corresponding project.
4. The outsourcing resource-based testing manpower risk early warning method of claim 1, wherein according to the testing project remaining time and the testing efficiency of the existing testers in the corresponding projects, calculating whether the existing testing project has an incomplete risk, and if the existing testing project has an incomplete risk, matching the outsourcing manpower resource to perform the corresponding testing project test, including;
calculating the time required by the existing tester to complete the existing test task according to the sequencing efficiency of the existing tester in the corresponding project;
data comparison is carried out on the time required by the existing test task and the test project residual time, if the time required by the existing test task is larger than the test project residual time, the test project residual time is matched with the existing test personnel in the corresponding project test efficiency, and the required test personnel number is obtained;
and acquiring the data of the testable personnel of the outsourcing team, and matching the data of the testable personnel of the outsourcing team with the required number of the testable personnel to obtain the number of the testable personnel.
5. The outsourcing resource-based testing human risk early warning method of claim 1, wherein if the existing testing items have an incomplete risk, matching the outsourcing human resources to perform corresponding testing item testing, comprising;
if the risk of the existing test item cannot be completed, risk early warning information is generated;
the risk early warning information generates primary early warning information, secondary early warning information and tertiary early warning information according to a preset time period;
and sending the risk early warning information to mobile terminal equipment held by the user.
CN202310497594.0A 2023-05-05 2023-05-05 Testing manpower risk early warning method based on outsourcing resources Pending CN116523244A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310497594.0A CN116523244A (en) 2023-05-05 2023-05-05 Testing manpower risk early warning method based on outsourcing resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310497594.0A CN116523244A (en) 2023-05-05 2023-05-05 Testing manpower risk early warning method based on outsourcing resources

Publications (1)

Publication Number Publication Date
CN116523244A true CN116523244A (en) 2023-08-01

Family

ID=87389950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310497594.0A Pending CN116523244A (en) 2023-05-05 2023-05-05 Testing manpower risk early warning method based on outsourcing resources

Country Status (1)

Country Link
CN (1) CN116523244A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117829561A (en) * 2024-03-06 2024-04-05 贵州黔聚龙科技有限公司 Construction state self-analysis-based high-standard farmland constructor distribution method and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117829561A (en) * 2024-03-06 2024-04-05 贵州黔聚龙科技有限公司 Construction state self-analysis-based high-standard farmland constructor distribution method and system

Similar Documents

Publication Publication Date Title
CN106294120B (en) Method, apparatus and computer program product for testing code
US20160086121A1 (en) Providing Gamification Analytics in an Enterprise Environment
CN116523244A (en) Testing manpower risk early warning method based on outsourcing resources
US20050278301A1 (en) System and method for determining an optimized process configuration
CN116091185A (en) Customer loss early warning method and device
CN113592439B (en) Software project flow management system and method
Cirkovic et al. Preferential attachment with reciprocity: properties and estimation
CN110825466B (en) Program jamming processing method and jamming processing device
CN111399394A (en) Operation training system, method and device for communication satellite
US20140351416A1 (en) Characterizing Statistical Time-Bounded Incident Management Systems
CN114610615A (en) Project test processing method, device, equipment and storage medium
CN111897725B (en) Automatic test method, medium, equipment and system for middle platform service
CN116415385A (en) Fan joint debugging simulation method and device, server and computer storage medium
KR101808953B1 (en) Quality assurance server through plurality of end user and method of application program
CN113344708A (en) Large-scale system production and exercise application evaluation method and system
Sinovčić et al. How to improve software development process using mathematical models for quality prediction and elements of six sigma methodology
KR20180035515A (en) Method for verifying a performance of clients and servers for smart ternimal
CN111883240A (en) Methodology evaluation system for medical examination
US20070203684A1 (en) Apparatus, and associated method, for assessing viability of communication system arrangement transformation
Thompson et al. Software process maturity (SPM) and the information systems developer
CN106201885A (en) Processor automatic test approach and device are captured in Face datection comparison
CN117331841A (en) Interface testing method and device, electronic equipment and storage medium
Hribar et al. First time right in AXE using one track and stream line development
CN111708438A (en) Human resource emergency management VR panoramic experience system and experience method thereof
CN116881134A (en) Method, system, terminal equipment and storage medium for constructing replicable test capability

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination