CN112598404A - Internet enterprise mobile office management method and system based on big data - Google Patents

Internet enterprise mobile office management method and system based on big data Download PDF

Info

Publication number
CN112598404A
CN112598404A CN202110161590.6A CN202110161590A CN112598404A CN 112598404 A CN112598404 A CN 112598404A CN 202110161590 A CN202110161590 A CN 202110161590A CN 112598404 A CN112598404 A CN 112598404A
Authority
CN
China
Prior art keywords
project
information
participant
person
obtaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110161590.6A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hui Zheng Guangzhou Enterprise Management Consulting Co ltd
Original Assignee
Hui Zheng Guangzhou Enterprise Management Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hui Zheng Guangzhou Enterprise Management Consulting Co ltd filed Critical Hui Zheng Guangzhou Enterprise Management Consulting Co ltd
Priority to CN202110161590.6A priority Critical patent/CN112598404A/en
Publication of CN112598404A publication Critical patent/CN112598404A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/30Authentication, i.e. establishing the identity or authorisation of security principals
    • G06F21/44Program or device authentication
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/04Network architectures or network communication protocols for network security for providing a confidential data exchange among entities communicating through data packet networks
    • H04L63/0428Network architectures or network communication protocols for network security for providing a confidential data exchange among entities communicating through data packet networks wherein the data content is protected, e.g. by encrypting or encapsulating the payload

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Security & Cryptography (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Signal Processing (AREA)
  • General Business, Economics & Management (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Computing Systems (AREA)
  • Software Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an internet enterprise mobile office management method and system based on big data, wherein the method comprises the following steps: obtaining first project information of an internet enterprise; acquiring information of project participants; acquiring respective existing project information of each project participant; inputting the first project information and the respective existing project information into a project management system for project allocation to obtain first project allocation information; acquiring the service processing capacity of each person of project participants; inputting the first project allocation information and the service processing capacity of each person into a project management system to perform project allocation adjustment, and acquiring second project allocation information; a first person in charge who obtains first project information; sending the second project allocation information to the first responsible person for project approval to obtain a first approval result; distributing the second project allocation information to project participants. The technical problem that the project completion progress is delayed due to the fact that the project of an enterprise cannot be efficiently and reasonably distributed in the prior art is solved.

Description

Internet enterprise mobile office management method and system based on big data
Technical Field
The invention relates to the technical field of mobile office management, in particular to an internet enterprise mobile office management method and system based on big data.
Background
The mobile office is a product of the communication industry and the IT industry which are developed at high speed at present, and the mobile office perfectly combines the convenience of the communication industry in communication, the scale of the communication industry on users, the maturity of the IT industry in software application and the abundance of business contents together, so that the mobile office becomes a new generation office mode after paperless office work and internet remote office work.
However, in the process of implementing the technical solution of the invention in the embodiments of the present application, the inventors of the present application find that the above-mentioned technology has at least the following technical problems:
because the existing mobile office mode focuses more on enabling office staff to get rid of the constraint of time and space, the attention to the actual project operation efficiency under the mobile office mode is reduced, and the project operation efficiency is not obviously changed.
Disclosure of Invention
The embodiment of the application provides the internet enterprise mobile office management method and system based on the big data, solves the technical problems that the existing enterprise projects cannot be efficiently and reasonably distributed and further project completion progress is delayed, and the enterprise projects are operated by the internet enterprise mobile office management system based on the internet enterprise mobile office management system, so that the enterprise projects are efficiently and reasonably distributed, waste of manpower and material resources is reduced, project operation efficiency is improved, and the technical effect that the projects are checked and accepted on schedule is ensured.
The embodiment of the application provides an internet enterprise mobile office management method based on big data, wherein the method is applied to an internet enterprise mobile office management system, and the method further comprises the following steps: obtaining first project information of an internet enterprise; acquiring project participant information according to the first project information, wherein the project participant information comprises a first participant, a second participant and an Nth participant; obtaining respective existing project information of each project participant according to the project participant information, wherein the respective existing project information comprises first existing project information, second existing project information and Nth existing project information, the first existing project information is an existing project of the first participant, and so on, and the Nth existing project information is an existing project of the Nth participant; inputting the first project information and the respective existing project information into a project management system for project distribution to obtain first project distribution information, wherein the project management system is included in the internet enterprise mobile office management system; acquiring the service processing capacity of each person of the project participants, wherein the service processing capacity of each person comprises the service capacity of a first participant, and the service capacity of a second participant is up to the service capacity of an Nth participant; inputting the first project allocation information and the service processing capacity of each person into the project management system to perform project allocation adjustment, and acquiring second project allocation information; a first person in charge for obtaining the first item information; sending the second project allocation information to the first responsible person for project approval to obtain a first approval result; and distributing the second project allocation information to project participants according to the first approval result.
On the other hand, the application also provides an internet enterprise mobile office management system based on big data, wherein the system comprises: a first obtaining unit: the first obtaining unit is used for obtaining first project information of an internet enterprise; a second obtaining unit: the second obtaining unit is used for obtaining project participant information according to the first project information, wherein the project participant information comprises a first participant, a second participant and an Nth participant; a third obtaining unit: the third obtaining unit is configured to obtain respective existing project information of each project participant according to the project participant information, where the respective existing project information includes first existing project information, second existing project information, and up to nth existing project information, where the first existing project information is an existing project of the first participant, and so on, and the nth existing project information is an existing project of the nth participant; a first input unit: the first input unit is used for inputting the first project information and the respective existing project information into a project management system for project distribution to obtain first project distribution information, wherein the project management system is included in the internet enterprise mobile office management system; a fourth obtaining unit: the fourth obtaining unit is used for obtaining the business processing capacity of each person of the project participants, wherein the business processing capacity of each person comprises the business capacity of the first participant, and the business capacity of the second participant is up to the business capacity of the Nth participant; a second input unit: the second input unit is used for inputting the first project allocation information and the service processing capacity of each person into the project management system to perform project allocation adjustment, and obtaining second project allocation information; a fifth obtaining unit: the fifth obtaining unit is used for obtaining a first person in charge of the first item information; a first transmission unit: the first sending unit is used for sending the second project allocation information to the first responsible person for project approval to obtain a first approval result; a first distribution unit: and the first distribution unit is used for distributing the second project distribution information to project participants according to the first approval result.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
the first project information is operated based on the internet enterprise mobile office management system, the first project information is distributed for the first time based on the first project information and the respective existing project information, secondary distribution is performed based on the service processing capacity of each person, and final approval is performed on the project distribution based on the relevant responsible person, so that efficient and reasonable project distribution information is obtained, the waste of manpower and material resources is reduced, and the technical effect of improving the operation efficiency of projects is achieved.
The foregoing description is only an overview of the technical solutions of the present application, and the present application can be implemented according to the content of the description in order to make the technical means of the present application more clearly understood, and the following detailed description of the present application is given in order to make the above and other objects, features, and advantages of the present application more clearly understandable.
Drawings
Fig. 1 is a schematic flowchart of a method for managing mobile offices in internet enterprises based on big data according to an embodiment of the present application;
fig. 2 is a schematic structural diagram of an internet enterprise mobile office management system based on big data according to an embodiment of the present application;
fig. 3 is a schematic structural diagram of an exemplary electronic device according to an embodiment of the present application.
Description of reference numerals: a first obtaining unit 11, a second obtaining unit 12, a third obtaining unit 13, a first input unit 14, a fourth obtaining unit 15, a second input unit 16, a fifth obtaining unit 17, a first sending unit 18, a first distributing unit 19, a bus 300, a receiver 301, a processor 302, a sender 303, a memory 304, a bus interface 305.
Detailed Description
The embodiment of the application provides the internet enterprise mobile office management method and system based on the big data, solves the technical problems that the existing enterprise projects cannot be efficiently and reasonably distributed and further project completion progress is delayed, and the enterprise projects are operated by the internet enterprise mobile office management system based on the internet enterprise mobile office management system, so that the enterprise projects are efficiently and reasonably distributed, waste of manpower and material resources is reduced, project operation efficiency is improved, and the technical effect that the projects are checked and accepted on schedule is ensured.
Hereinafter, example embodiments according to the present application will be described in detail with reference to the accompanying drawings. It should be apparent that the described embodiments are merely some embodiments of the present application and not all embodiments of the present application, and it should be understood that the present application is not limited to the example embodiments described herein.
Summary of the application
The mobile office is a product of the communication industry and the IT industry which are developed at high speed at present, and the mobile office perfectly combines the convenience of the communication industry in communication, the scale of the communication industry on users, the maturity of the IT industry in software application and the abundance of business contents together, so that the mobile office becomes a new generation office mode after paperless office work and internet remote office work. Because the existing mobile office mode focuses more on enabling office staff to get rid of the constraint of time and space, the attention to the actual project operation efficiency under the mobile office mode is reduced, and the project operation efficiency is not obviously changed.
In view of the above technical problems, the technical solution provided by the present application has the following general idea:
the embodiment of the application provides an internet enterprise mobile office management method based on big data, wherein the method is applied to an internet enterprise mobile office management system, and the method further comprises the following steps: obtaining first project information of an internet enterprise; acquiring project participant information according to the first project information, wherein the project participant information comprises a first participant, a second participant and an Nth participant; obtaining respective existing project information of each project participant according to the project participant information, wherein the respective existing project information comprises first existing project information, second existing project information and Nth existing project information, the first existing project information is an existing project of the first participant, and so on, and the Nth existing project information is an existing project of the Nth participant; inputting the first project information and the respective existing project information into a project management system for project distribution to obtain first project distribution information, wherein the project management system is included in the internet enterprise mobile office management system; acquiring the service processing capacity of each person of the project participants, wherein the service processing capacity of each person comprises the service capacity of a first participant, and the service capacity of a second participant is up to the service capacity of an Nth participant; inputting the first project allocation information and the service processing capacity of each person into the project management system to perform project allocation adjustment, and acquiring second project allocation information; a first person in charge for obtaining the first item information; sending the second project allocation information to the first responsible person for project approval to obtain a first approval result; and distributing the second project allocation information to project participants according to the first approval result.
For better understanding of the above technical solutions, the following detailed descriptions will be provided in conjunction with the drawings and the detailed description of the embodiments.
Example one
As shown in fig. 1, an embodiment of the present application provides an internet enterprise mobile office management method based on big data, where the method is applied to an internet enterprise mobile office management system, and the method further includes:
step S100: obtaining first project information of an internet enterprise;
specifically, "mobile office" can also be called "3A office", also called mobile OA, that is, an office worker can process any business related thing (Anything) at any time (Anytime) and any place (Anywhere), and is a product of the communication industry and IT industry developed at high speed at present, and IT combines the convenience of communication industry in communication, the scale on users, the maturity of IT industry in software application, and the abundance in business content perfectly, making IT a new generation office model following the paperless office and the internet remote office. The internet enterprise in a broad sense means an enterprise that provides services using a network platform based on computer network technology and thus obtains revenue. Through being based on big data, for the internet enterprise provides mobile office management system, has got rid of the traditional restriction that must do business on fixed place fixed equipment, provides very big facility to enterprise manager and commercial personage, provides brand-new thinking and direction for the information-based construction of enterprise and government. The first project information is a new project to be implemented by the internet enterprise, and the first project information is operated based on the internet enterprise mobile office management system, so that waste of manpower and material resources is reduced, and the operation efficiency of the project is improved.
Step S200: acquiring project participant information according to the first project information, wherein the project participant information comprises a first participant, a second participant and an Nth participant;
specifically, the internet company relates to each post, and specifically comprises a technical post, a product post, an operation post, a sales post, a design post, a functional post and the like, and a complete project needs to be closely cooperated with each post person from development to market, so that the project participant information comprises each post person, for example, the technical post person is responsible for writing codes, the product post person is responsible for raising demands, and the operation post person is responsible for product operation.
Step S300: obtaining respective existing project information of each project participant according to the project participant information, wherein the respective existing project information comprises first existing project information, second existing project information and Nth existing project information, the first existing project information is an existing project of the first participant, and so on, and the Nth existing project information is an existing project of the Nth participant;
specifically, when the first project information is assigned, the existing project information of each project participant can be obtained first, that is, the task on hand of the relevant participant is obtained first, the task amount is assigned comprehensively, if the assignment is performed without investigation, the operation of the first project information is affected, for example, if the task left on hand of each project participant is too many, the first project information cannot be immediately handed over, and the appropriate adjustment can be performed.
Step S400: inputting the first project information and the respective existing project information into a project management system for project distribution to obtain first project distribution information, wherein the project management system is included in the internet enterprise mobile office management system;
specifically, it is known that the first project information and the respective existing project information can be input into a project management system for project intelligent distribution, so that the first project distribution information can be efficiently and quickly obtained, and project distribution is performed based on the project management system, so that distribution efficiency is more efficient, distribution results are more accurate, and it is clear that the project management system is included in the internet enterprise mobile office management system and is a subsystem of the internet enterprise mobile office management system.
Step S500: acquiring the service processing capacity of each person of the project participants, wherein the service processing capacity of each person comprises the service capacity of a first participant, and the service capacity of a second participant is up to the service capacity of an Nth participant;
specifically, when the first item information is distributed to the relevant personnel, the business capability information of the relevant personnel is also required to be obtained, the judgment can be performed through information such as working experience, working result and working age of the relevant personnel, furthermore, the urgency degree of the first item information can be corrected, for example, if the first item information is required to be online, the first item can be distributed to the personnel with excellent business capability for processing, so as to ensure that the first item is online in due course.
Step S600: inputting the first project allocation information and the service processing capacity of each person into the project management system to perform project allocation adjustment, and acquiring second project allocation information;
specifically, the project allocation information obtained only by the first project information and the respective existing project information is not very accurate, and the first project allocation information and the respective business processing capabilities may be input to the project management system to be reallocated, that is, the first project allocation information may be appropriately adjusted, so that the reallocated project allocation information is more reasonable.
Step S700: a first person in charge for obtaining the first item information;
specifically, when a project is developed from an early stage to an online operation in a later stage, a general responsible person is required to perform general operation supervision so as to ensure that the whole operation process is smoothly performed, and the first responsible person is a general responsible person of the first project information and supervises and grasps the whole operation of the first project information.
Step S800: sending the second project allocation information to the first responsible person for project approval to obtain a first approval result;
step S900: and distributing the second project allocation information to project participants according to the first approval result.
Specifically, after the first project information is distributed for the second time, the second project distribution information can be sent to the first responsible person for project approval, and after the first responsible person approves the first project distribution information, the first project information can be executed according to the second project distribution information.
Further, the embodiment of the application further comprises:
step S1010: acquiring first connection process information according to the first project information;
step S1020: acquiring first key process information according to the first connection process information;
step S1030: obtaining a first descending order instruction;
step S1040: according to the first descending order instruction, carrying out descending order arrangement on the service processing capacity of each person to obtain a first service person, wherein the first service person is the person positioned at the head in the descending order arrangement;
step S1050: obtaining a first allocation instruction;
step S1060: and distributing the first key process information to the first business personnel according to the first distribution instruction.
Specifically, after the distribution information of the first project information is determined, the operation flow information of the first project information can be obtained, for example, the implementation of the "personal information health code" in epidemic situation prevention and control and production recovery realizes efficient personnel flow management, and can assist communities, enterprises, schools and the like to perform important work such as epidemic prevention management, epidemic situation control and the like. Before the 'personal information health code' project is generally popularized, the connection process of the project needs to be clarified, namely, the market research is firstly carried out on the project, including crowd research, regional research, virus infection research and the like, further, the project is started according to the research result, the product is further optimized according to the actual situation, and finally the project is put into service on line, and the like, so as to ensure the project to be smoothly carried out, the key processes in the project proceeding process can be obtained, such as the accurate investigation in the early stage, the product production in the middle stage or the product optimization in the later stage, meanwhile, the person with the strongest business capability of each process is respectively screened out from the participators of each project, and each key process is distributed to the person with the strongest business capability of each process, for example, for the market research flow, the people with the strongest market research ability and the strongest market acuity can be distributed to the market research flow; for the product production flow, the code base can be consolidated, the problem that the person with the strongest bug capability is distributed to the product production flow is solved, and the technical effect of improving the overall operation efficiency of the first project information is achieved by optimally configuring the human resources of each key flow in the operation process of the first project information.
Further, the embodiment of the application further comprises:
step S1110: constructing a VR project operation system according to the first project information, the project participant information and the second project distribution information, wherein the VR project operation system is contained in the Internet enterprise mobile office management system;
step S1120: acquiring front sub-item information and rear sub-item information of the first key process information;
step S1130: obtaining a first related project person of the front sub-project information according to the second project allocation information, and similarly, obtaining a second related project person of the rear sub-project information according to the second project allocation information;
step S1140: constructing a preposed sub-project operation system according to the preposed sub-project information and the first related project person, and constructing a postposition sub-project operation system according to the postposition sub-project information and the second related project person;
step S1150: uploading the front sub-project operation system and the rear sub-project operation system to the VR project operation system;
step S1160: and according to the VR project operation system, performing VR operation on the front sub project operation system and the rear sub project operation system in a front-to-rear connection mode by the first service personnel, the first related project personnel and the second related project personnel.
Specifically, in order to ensure efficient and orderly operation of the first project information, a VR project operation system can be further constructed according to the first project information, the project participant information and the second project allocation information, and the overall operation of the first project information is actually simulated based on the virtual VR project operation system, so that the project participants can master follow-up project progress in real time, the work efficiency is improved, blind work of each process staff is avoided, and the work efficiency is reduced. Meanwhile, front and rear sub-project information of a key process of the first project information can be obtained, ordered connection between the front sub-project and the first key process information and the rear sub-project is practically realized, in order to ensure the ordered connection, a front sub-project operation system can be constructed based on the front sub-project information and the first related project person, a rear sub-project operation system can be constructed based on the rear sub-project information and the second related project person, the front sub-project operation system and the rear sub-project operation system are uploaded to the VR project operation system to carry out ordered connection based on VR operation, for example, various unknown bugs occurring in the connection process can be communicated in real time based on the VR project operation system by the personnel participating in the connection operation, ensure that the bug is repaired in time, do not influence the progress of project, through based on VR project operation system, ensure that key flow links up in order, the ability of solving the problem is superior to traditional solution, reached real-time grasp and follow up the project progress, improve work efficiency, avoid each flow personnel blind work separately, reduce work efficiency's technological effect.
Further, the embodiment of the application further comprises:
step 1210: obtaining a first project file of the first project information;
step S1220: acquiring each process responsible person according to the first linking process information;
step S1230: acquiring first file acquisition permission information according to the first project file;
step S1240: attaching the first file acquisition permission information to each process responsible person to obtain a first file acquisition authentication instruction;
step S1250: and acquiring an authentication instruction according to the first file, and acquiring the first project file by each process responsible person.
Particularly, as mobile offices need to access internal networks of governments and enterprises through open wireless public networks and information is wirelessly transmitted in the air, the first problem of the use and popularization of the mobile offices is the security problem of the mobile offices, and today with increasingly serious network security threats, the security of a mobile office system is an important problem which cannot be ignored, especially the security transmission problem of confidential business documents. Therefore, security access authority can be set based on a first project file of the first project information, meanwhile, a responsible person of each connection process of the first project information can obtain the first project file, the set file security access authority is attached to each process responsible person, it is ensured that people except the responsible person of each process cannot obtain the first project file, the transmission security of the file is ensured, only when the responsible person of each process accesses and obtains the first project file, a file obtaining authentication instruction can be obtained, and then the first project file is obtained, and the technical effect of security transmission of the confidential files is achieved.
Further, the embodiment of the application further comprises:
step S1251: acquiring record information of the first project file;
step S1252: acquiring network IP information according to the acquisition record information;
step S1253: obtaining the authentication network IP information of each process responsible person;
step S1254: judging whether the acquired network IP information belongs to the authentication network IP information;
step S1255: if the acquired network IP information does not belong to the authentication network IP information, acquiring a first locking instruction;
step S1256: and according to the first locking instruction, intelligently locking the first project file.
Specifically, in order to further ensure the secure transmission of the first project file, an access record program may be implanted into the first project file, where the access record program may intelligently record a network IP that attempts to acquire the first project file, may find corresponding network IP information according to the acquisition record information, and may judge whether the acquired network IP information belongs to the authentication network IP information of each process person, if so, indicate that each process person is acquiring the first project file, and may allow acquisition; on the contrary, if the acquired network IP information does not belong to the authenticated network IP information of each process person, it indicates that a person other than each process person tries to acquire the first project file, and in order to ensure the security of the first project file, the first project file may be intelligently locked, that is, a layperson cannot acquire and open the first project file, and whether the acquisition permission of the confidential file is a set person is determined, so that the technical effect of providing dual security guarantee for the secure transmission of the first project file is achieved.
Further, the step S600 further includes inputting the first item allocation information and the service processing capabilities of the respective persons into the item management system to perform item allocation adjustment, and obtaining second item allocation information:
step S610: obtaining personal influence parameter information on the completion degree of the first project information according to the service processing capacity of each person;
step S620: obtaining a first calculation instruction;
step S630: inputting the first project distribution information and the personal influence parameter information into the project management system for weighted calculation according to the first calculation instruction;
step S640: and obtaining a weighted calculation result, wherein the weighted calculation result is second item distribution information.
Specifically, in order to further obtain the second item allocation information, it is also possible to obtain personal influence parameter information on the completion degree of the first item information according to the business processing capabilities of the respective persons, that is, the work capability of the respective persons has an influence on the completion degree of the first item information, and further, the stronger the work capability of the respective persons is, the smaller the influence on the completion degree of the first item information is, and further, the weighted calculation is performed on the first item allocation information and the personal influence parameter information, for example, the first item allocation information and the personal influence parameter information each occupy a weight value of 50%, and the total of the weights of the two constitutes the completion degree 1 of the first item information, and when the business capability of the respective persons is stronger, the influence on the completion degree of the first item information is smaller, it is possible to appropriately allocate more works to the persons with stronger business capabilities, the overall presentation is balanced, and similarly, the more people distribute the work, the more remuneration and the more work, the first project distribution information is adjusted based on the influence parameters of the personal working capacity on the completion degree of the first project information, and the technical effects that the distribution of the first project information is more efficient and reasonable, and the normal online operation of products is not delayed are achieved.
Further, the step S500 of obtaining the business processing capacity of each person of the project participant further includes:
step S510: obtaining the existing project operation result information of the project participants;
step S520: obtaining the popularity information of the operation project according to the operation result information of the existing project;
step S530: inputting the existing project operation achievement information and the operation project name information into a first training model for training;
step S540: and obtaining a first training result, wherein the first training result is the business processing capacity of each person of the project participant.
Specifically, in order to obtain the business processing capacity of each person of the project participator, the past project operation result of the project participator can be obtained, namely, a plurality of projects are operated, a plurality of projects are still followed, the popularity of the operated projects is low, whether audience groups are wide or not and the like, evaluating the personal business processing capability of the project participant, and training by inputting the existing project operation result information and the operation project name degree information into a first training model, wherein the first training model is a data training model, the data can be trained, in the embodiment of the application, the first training model is trained by using the identification information of the identified business processing capacity of each person, and the technical effect that the obtained training result, namely the business processing capacity of each person of the project participants is more accurate is achieved.
To sum up, the internet enterprise mobile office management method and system based on big data provided by the embodiment of the application have the following technical effects:
1. the first project information is operated based on the internet enterprise mobile office management system, the first project information is distributed for the first time based on the first project information and the respective existing project information, secondary distribution is performed based on the service processing capacity of each person, and final approval is performed on the project distribution based on the relevant responsible person, so that efficient and reasonable project distribution information is obtained, the waste of manpower and material resources is reduced, and the technical effect of improving the operation efficiency of projects is achieved.
2. The method has the advantages that through the optimized configuration of human resources on each key process in the operation process of the first project information, the overall operation efficiency of the first project information is improved, and through the VR-based project operation system, the key processes are ensured to be connected in order, the problem solving capability is superior to that of a traditional solving mode, the follow-up project progress can be mastered in real time, the working efficiency is improved, the blind work of each process worker is avoided, and the technical effect of reducing the working efficiency is achieved.
Example two
Based on the same inventive concept as the internet enterprise mobile office management method based on big data in the foregoing embodiment, the present invention further provides an internet enterprise mobile office management system based on big data, as shown in fig. 2, the system includes:
the first obtaining unit 11: the first obtaining unit 11 is configured to obtain first item information of an internet enterprise;
the second obtaining unit 12: the second obtaining unit 12 is configured to obtain project participant information according to the first project information, where the project participant information includes a first participant, a second participant, and up to an nth participant;
the third obtaining unit 13: the third obtaining unit 13 is configured to obtain respective existing project information of each project participant according to the project participant information, where the respective existing project information includes first existing project information, second existing project information, and up to nth existing project information, where the first existing project information is an existing project of the first participant, and so on, and the nth existing project information is an existing project of the nth participant;
first input unit 14: the first input unit 14 is configured to input the first project information and the respective existing project information into a project management system for project allocation, so as to obtain first project allocation information, where the project management system is included in the internet enterprise mobile office management system;
the fourth obtaining unit 15: the fourth obtaining unit 15 is configured to obtain service processing capabilities of each person of the project participants, where the service processing capabilities of each person include a first participant service capability, a second participant service capability, and a nth participant service capability;
second input unit 16: the second input unit 16 is configured to input the first item allocation information and the service processing capabilities of each person into the item management system to perform item allocation adjustment, so as to obtain second item allocation information;
the fifth obtaining unit 17: the fifth obtaining unit 17 is configured to obtain a first person in charge of the first item information;
the first transmission unit 18: the first sending unit 18 is configured to send the second item allocation information to the first responsible person for item approval, so as to obtain a first approval result;
first dispensing unit 19: the first distribution unit 19 is configured to distribute the second item distribution information to the item participants according to the first approval result.
Further, the system further comprises:
a sixth obtaining unit: the sixth obtaining unit is configured to obtain first join flow information according to the first item information;
a seventh obtaining unit: the seventh obtaining unit is configured to obtain first key process information according to the first join process information;
an eighth obtaining unit: the eighth obtaining unit is configured to obtain a first descending order instruction;
a first arranging unit: the first sequencing unit is used for carrying out descending sequencing on the service processing capacity of each person according to the first descending sequencing instruction to obtain a first service person, and the first service person is the person positioned at the head in the descending sequencing;
a ninth obtaining unit: the ninth obtaining unit is used for obtaining a first allocation instruction;
a first distribution unit: the first distribution unit is used for distributing the first key process information to the first business personnel according to the first distribution instruction.
Further, the system further comprises:
a first building unit: the first construction unit is used for constructing a VR project operation system according to the first project information, the project participant information and the second project allocation information, and the VR project operation system is contained in the Internet enterprise mobile office management system;
a tenth obtaining unit: the tenth obtaining unit is configured to obtain leading sub-item information and trailing sub-item information of the first key process information;
an eleventh obtaining unit: the eleventh obtaining unit is configured to obtain a first related event person of the front sub-event information according to the second event distribution information, and similarly, obtain a second related event person of the rear sub-event information according to the second event distribution information;
a second building element: the second construction unit is used for constructing a front sub-project operation system according to the front sub-project information and the first related project person, and constructing a rear sub-project operation system according to the rear sub-project information and the second related project person;
a first uploading unit: the first uploading unit is used for uploading the preposed sub-project operation system and the post-positioned sub-project operation system to the VR project operation system;
a first operation unit: the first operation unit is configured to perform VR operation on the front sub-project operation system and the rear sub-project operation system in tandem by the first service person, the first related project person, and the second related project person according to the VR project operation system.
Further, the system further comprises:
a twelfth obtaining unit: the twelfth obtaining unit is configured to obtain a first project file of the first project information;
a thirteenth obtaining unit: the thirteenth obtaining unit is configured to obtain each process person in charge according to the first linkage process information;
a fourteenth obtaining unit: the fourteenth obtaining unit is configured to obtain first file obtaining authority information according to the first project file;
a first additional unit: the first attaching unit is used for attaching the first file acquisition permission information to each process responsible person to obtain a first file acquisition authentication instruction;
a first acquisition unit: the first obtaining unit is used for obtaining an authentication instruction according to the first file, and the first project file is obtained by each process responsible person.
Further, the system further comprises:
a fifteenth obtaining unit: the fifteenth obtaining unit is configured to obtain the obtaining record information of the first project file;
a sixteenth obtaining unit: the sixteenth obtaining unit is configured to obtain network IP information according to the obtaining record information;
a seventeenth obtaining unit: the seventeenth obtaining unit is configured to obtain the authentication network IP information of each process principal;
a first judgment unit: the first judging unit is used for judging whether the acquired network IP information belongs to the authentication network IP information;
an eighteenth obtaining unit: the eighteenth obtaining unit is configured to obtain a first locking instruction if the obtained network IP information does not belong to the authentication network IP information;
a first locking unit: the first locking unit is used for intelligently locking the first project file according to the first locking instruction.
Further, the system further comprises:
a nineteenth obtaining unit: the nineteenth obtaining unit is used for obtaining the personal influence parameter information of the completion degree of the first project information according to the business processing capacity of each person;
a twentieth obtaining unit: the twentieth obtaining unit is configured to obtain a first computing instruction;
a third input unit: the third input unit is used for inputting the first project allocation information and the personal influence parameter information into the project management system for weighted calculation according to the first calculation instruction;
a twenty-first obtaining unit: the twenty-first obtaining unit is configured to obtain a weighted calculation result, where the weighted calculation result is second item allocation information.
Further, the system further comprises:
a twenty-second obtaining unit: the twenty-second obtaining unit is used for obtaining the existing project operation result information of the project participants;
a twenty-third obtaining unit: the twenty-third obtaining unit is used for obtaining the popularity information of the operation project according to the existing project operation achievement information;
a fourth input unit: the fourth input unit is used for inputting the existing project operation achievement information and the operation project naming degree information into a first training model for training;
a twenty-fourth obtaining unit: the twenty-fourth obtaining unit is configured to obtain a first training result, where the first training result is a business processing capability of each person of the project participant.
Various changes and specific examples of the internet enterprise mobile office management method based on big data in the first embodiment of fig. 1 are also applicable to the internet enterprise mobile office management system based on big data in the present embodiment, and through the foregoing detailed description of the internet enterprise mobile office management method based on big data, those skilled in the art can clearly know the implementation method of the internet enterprise mobile office management system based on big data in the present embodiment, so the detailed description is omitted again for brevity of the description.
EXAMPLE III
The electronic device of the embodiment of the present application is described below with reference to fig. 3.
Fig. 3 illustrates a schematic structural diagram of an electronic device according to an embodiment of the present application.
Based on the inventive concept of the big data based internet enterprise mobile office management method in the previous embodiment, the invention further provides a big data based internet enterprise mobile office management system, on which a computer program is stored, which when executed by a processor implements the steps of any one of the above-mentioned big data based internet enterprise mobile office management methods.
Where in fig. 3a bus architecture (represented by bus 300), bus 300 may include any number of interconnected buses and bridges, bus 300 linking together various circuits including one or more processors, represented by processor 302, and memory, represented by memory 304. The bus 300 may also link together various other circuits such as peripherals, voltage regulators, power management circuits, and the like, which are well known in the art, and therefore, will not be described any further herein. A bus interface 305 provides an interface between the bus 300 and the receiver 301 and transmitter 303. The receiver 301 and the transmitter 303 may be the same element, i.e., a transceiver, providing a means for communicating with various other apparatus over a transmission medium. The processor 302 is responsible for managing the bus 300 and general processing, and the memory 304 may be used for storing data used by the processor 302 in performing operations.
The embodiment of the application provides an internet enterprise mobile office management method based on big data, wherein the method is applied to an internet enterprise mobile office management system, and the method further comprises the following steps: obtaining first project information of an internet enterprise; acquiring project participant information according to the first project information, wherein the project participant information comprises a first participant, a second participant and an Nth participant; obtaining respective existing project information of each project participant according to the project participant information, wherein the respective existing project information comprises first existing project information, second existing project information and Nth existing project information, the first existing project information is an existing project of the first participant, and so on, and the Nth existing project information is an existing project of the Nth participant; inputting the first project information and the respective existing project information into a project management system for project distribution to obtain first project distribution information, wherein the project management system is included in the internet enterprise mobile office management system; acquiring the service processing capacity of each person of the project participants, wherein the service processing capacity of each person comprises the service capacity of a first participant, and the service capacity of a second participant is up to the service capacity of an Nth participant; inputting the first project allocation information and the service processing capacity of each person into the project management system to perform project allocation adjustment, and acquiring second project allocation information; a first person in charge for obtaining the first item information; sending the second project allocation information to the first responsible person for project approval to obtain a first approval result; and distributing the second project allocation information to project participants according to the first approval result.
As will be appreciated by one skilled in the art, embodiments of the present invention may be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
While preferred embodiments of the present invention have been described, additional variations and modifications in those embodiments may occur to those skilled in the art once they learn of the basic inventive concepts. Therefore, it is intended that the appended claims be interpreted as including preferred embodiments and all such alterations and modifications as fall within the scope of the invention.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (9)

1. An internet enterprise mobile office management method based on big data, wherein the method is applied to an internet enterprise mobile office management system, and the method further comprises the following steps:
obtaining first project information of an internet enterprise;
acquiring project participant information according to the first project information, wherein the project participant information comprises a first participant, a second participant and an Nth participant;
obtaining respective existing project information of each project participant according to the project participant information, wherein the respective existing project information comprises first existing project information, second existing project information and Nth existing project information, the first existing project information is an existing project of the first participant, and so on, and the Nth existing project information is an existing project of the Nth participant;
inputting the first project information and the respective existing project information into a project management system for project distribution to obtain first project distribution information, wherein the project management system is included in the internet enterprise mobile office management system;
acquiring the service processing capacity of each person of the project participants, wherein the service processing capacity of each person comprises the service capacity of a first participant, and the service capacity of a second participant is up to the service capacity of an Nth participant;
inputting the first project allocation information and the service processing capacity of each person into the project management system to perform project allocation adjustment, and acquiring second project allocation information;
a first person in charge for obtaining the first item information;
sending the second project allocation information to the first responsible person for project approval to obtain a first approval result;
and distributing the second project allocation information to project participants according to the first approval result.
2. The method of claim 1, wherein the method further comprises:
acquiring first connection process information according to the first project information;
acquiring first key process information according to the first connection process information;
obtaining a first descending order instruction;
according to the first descending order instruction, carrying out descending order arrangement on the service processing capacity of each person to obtain a first service person, wherein the first service person is the person positioned at the head in the descending order arrangement;
obtaining a first allocation instruction;
and distributing the first key process information to the first business personnel according to the first distribution instruction.
3. The method of claim 2, wherein the method further comprises:
constructing a VR project operation system according to the first project information, the project participant information and the second project distribution information, wherein the VR project operation system is contained in the Internet enterprise mobile office management system;
acquiring front sub-item information and rear sub-item information of the first key process information;
obtaining a first related project person of the front sub-project information according to the second project allocation information, and similarly, obtaining a second related project person of the rear sub-project information according to the second project allocation information;
constructing a preposed sub-project operation system according to the preposed sub-project information and the first related project person, and constructing a postposition sub-project operation system according to the postposition sub-project information and the second related project person;
uploading the front sub-project operation system and the rear sub-project operation system to the VR project operation system;
and according to the VR project operation system, performing VR operation on the front sub project operation system and the rear sub project operation system in a front-to-rear connection mode by the first service personnel, the first related project personnel and the second related project personnel.
4. The method of claim 3, wherein the method further comprises:
obtaining a first project file of the first project information;
acquiring each process responsible person according to the first linking process information;
acquiring first file acquisition permission information according to the first project file;
attaching the first file acquisition permission information to each process responsible person to obtain a first file acquisition authentication instruction;
and acquiring an authentication instruction according to the first file, and acquiring the first project file by each process responsible person.
5. The method of claim 4, wherein the method further comprises:
acquiring record information of the first project file;
acquiring network IP information according to the acquisition record information;
obtaining the authentication network IP information of each process responsible person;
judging whether the acquired network IP information belongs to the authentication network IP information;
if the acquired network IP information does not belong to the authentication network IP information, acquiring a first locking instruction;
and according to the first locking instruction, intelligently locking the first project file.
6. The method of claim 1, wherein said entering said first project allocation information and said individual business process capabilities into said project management system for project allocation adjustment to obtain second project allocation information, further comprises:
obtaining personal influence parameter information on the completion degree of the first project information according to the service processing capacity of each person;
obtaining a first calculation instruction;
inputting the first project distribution information and the personal influence parameter information into the project management system for weighted calculation according to the first calculation instruction;
and obtaining a weighted calculation result, wherein the weighted calculation result is second item distribution information.
7. The method of claim 1, wherein said obtaining individual business process capabilities of said project participants further comprises:
obtaining the existing project operation result information of the project participants;
obtaining the popularity information of the operation project according to the operation result information of the existing project;
inputting the existing project operation achievement information and the operation project name information into a first training model for training;
and obtaining a first training result, wherein the first training result is the business processing capacity of each person of the project participant.
8. An internet enterprise mobile office management system based on big data, wherein the system comprises:
a first obtaining unit: the first obtaining unit is used for obtaining first project information of an internet enterprise;
a second obtaining unit: the second obtaining unit is used for obtaining project participant information according to the first project information, wherein the project participant information comprises a first participant, a second participant and an Nth participant;
a third obtaining unit: the third obtaining unit is configured to obtain respective existing project information of each project participant according to the project participant information, where the respective existing project information includes first existing project information, second existing project information, and up to nth existing project information, where the first existing project information is an existing project of the first participant, and so on, and the nth existing project information is an existing project of the nth participant;
a first input unit: the first input unit is used for inputting the first project information and the respective existing project information into a project management system for project distribution to obtain first project distribution information, wherein the project management system is included in the internet enterprise mobile office management system;
a fourth obtaining unit: the fourth obtaining unit is used for obtaining the business processing capacity of each person of the project participants, wherein the business processing capacity of each person comprises the business capacity of the first participant, and the business capacity of the second participant is up to the business capacity of the Nth participant;
a second input unit: the second input unit is used for inputting the first project allocation information and the service processing capacity of each person into the project management system to perform project allocation adjustment, and obtaining second project allocation information;
a fifth obtaining unit: the fifth obtaining unit is used for obtaining a first person in charge of the first item information;
a first transmission unit: the first sending unit is used for sending the second project allocation information to the first responsible person for project approval to obtain a first approval result;
a first distribution unit: and the first distribution unit is used for distributing the second project distribution information to project participants according to the first approval result.
9. An internet enterprise mobile office management system based on big data, comprising a memory, a processor and a computer program stored on the memory and executable on the processor, wherein the processor implements the steps of the method according to any of claims 1-7 when executing the program.
CN202110161590.6A 2021-02-05 2021-02-05 Internet enterprise mobile office management method and system based on big data Pending CN112598404A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110161590.6A CN112598404A (en) 2021-02-05 2021-02-05 Internet enterprise mobile office management method and system based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110161590.6A CN112598404A (en) 2021-02-05 2021-02-05 Internet enterprise mobile office management method and system based on big data

Publications (1)

Publication Number Publication Date
CN112598404A true CN112598404A (en) 2021-04-02

Family

ID=75207780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110161590.6A Pending CN112598404A (en) 2021-02-05 2021-02-05 Internet enterprise mobile office management method and system based on big data

Country Status (1)

Country Link
CN (1) CN112598404A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114154954A (en) * 2021-11-25 2022-03-08 广州交投工程检测有限公司 Detection service management method and system based on task information flow tracking

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107506880A (en) * 2016-06-13 2017-12-22 中国移动通信集团江苏有限公司 A kind of dispatching method and device for filling dimension work order
CN109934433A (en) * 2017-12-15 2019-06-25 航天信息股份有限公司 A kind of personnel ability's appraisal procedure, device and cloud service platform
CN110163474A (en) * 2019-04-12 2019-08-23 平安普惠企业管理有限公司 A kind of method and apparatus of task distribution
CN110599125A (en) * 2019-09-05 2019-12-20 广东牵引信息科技有限公司 Dynamic list generation system and method for project management
CN111340401A (en) * 2020-03-27 2020-06-26 深圳市赤狐软件技术有限公司 Intelligent work task allocation method and device, computer equipment and storage medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107506880A (en) * 2016-06-13 2017-12-22 中国移动通信集团江苏有限公司 A kind of dispatching method and device for filling dimension work order
CN109934433A (en) * 2017-12-15 2019-06-25 航天信息股份有限公司 A kind of personnel ability's appraisal procedure, device and cloud service platform
CN110163474A (en) * 2019-04-12 2019-08-23 平安普惠企业管理有限公司 A kind of method and apparatus of task distribution
CN110599125A (en) * 2019-09-05 2019-12-20 广东牵引信息科技有限公司 Dynamic list generation system and method for project management
CN111340401A (en) * 2020-03-27 2020-06-26 深圳市赤狐软件技术有限公司 Intelligent work task allocation method and device, computer equipment and storage medium

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114154954A (en) * 2021-11-25 2022-03-08 广州交投工程检测有限公司 Detection service management method and system based on task information flow tracking

Similar Documents

Publication Publication Date Title
CN103684874B (en) Method and device for automatically distributing online customer service executives to conduct customer service
CN110084377A (en) Method and apparatus for constructing decision tree
US7580819B2 (en) Adaptive mission profiling
CN110309058A (en) Business end test method, device, computer installation and computer storage medium
CN106897861A (en) A kind of project management system
CN106649500A (en) Data verification method and system
CN112700781B (en) Voice interaction system based on artificial intelligence
CN103927167B (en) Functional-granularity highly-customizable system integration method
CN112016788A (en) Risk control strategy generation and risk control method and device and electronic equipment
CN109491642A (en) A kind of Requirements Modeling system and method based on scene, information data processing terminal
CN111754044A (en) Employee behavior auditing method, device, equipment and readable storage medium
CN112101577B (en) XGboost-based cross-sample federal learning and testing method, system, device and medium
CN112017042A (en) Resource quota determining method and device based on tweed distribution and electronic equipment
CN112598404A (en) Internet enterprise mobile office management method and system based on big data
WO2023024378A1 (en) Multi-agent model training method, apparatus, electronic device, storage medium and program product
Wang et al. Data-driven integrated home service staffing and capacity planning: stochastic optimization approaches
CN104166581B (en) A kind of virtual method towards increment manufacturing equipment
CN113128916A (en) Big data-based working platform task workload assessment method
CN109710958A (en) A kind of time limit for project risk simulation method and system based on simulation model
CN117077931A (en) Software development project progress and cost management and control method and system based on struggle value analysis and software function point splitting
CN116452165A (en) Talent information recommendation method, service system and storage medium
CN115577983A (en) Enterprise task matching method based on block chain, server and storage medium
CN113919736A (en) Block chain mutual salary evaluation management method, system and storage device thereof
CN117273163A (en) Federal learning system using data summary and method thereof
CN114943594A (en) Credit analysis method and device based on longitudinal federal learning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination