CN110175709A - A kind of self-optimizing production product plan and method based on information announcement - Google Patents

A kind of self-optimizing production product plan and method based on information announcement Download PDF

Info

Publication number
CN110175709A
CN110175709A CN201910395395.2A CN201910395395A CN110175709A CN 110175709 A CN110175709 A CN 110175709A CN 201910395395 A CN201910395395 A CN 201910395395A CN 110175709 A CN110175709 A CN 110175709A
Authority
CN
China
Prior art keywords
production
information
task
module
reward
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910395395.2A
Other languages
Chinese (zh)
Inventor
王渊
王亮
廖一星
綦云华
李贤�
肖开余
杨晓勇
刘薇
张有义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Jiangnan Aerospace Information Network Communication Co Ltd
Original Assignee
Guizhou Jiangnan Aerospace Information Network Communication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Jiangnan Aerospace Information Network Communication Co Ltd filed Critical Guizhou Jiangnan Aerospace Information Network Communication Co Ltd
Priority to CN201910395395.2A priority Critical patent/CN110175709A/en
Publication of CN110175709A publication Critical patent/CN110175709A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/105Human resources
    • G06Q10/1053Employment or hiring
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to manufacturing industry technical fields, and disclose a kind of self-optimizing production product plan based on information announcement, the system comprises production information processing module, reward management module, production task release module and production information evaluation modules, the production information processing module is used to extract the feature of different processes, the reward management module is used to calculate the reward of the secondary labour, and the production task release module is used to process task relevant information being published in system.The self-optimizing production product plan and method based on information announcement, by production task message processing module by Task-decomposing at different processes, different processes is being subjected to feature extraction through production information processing module, process task relevant information is published in system by production task release module later, and the reward of the secondary labour is temporarily saved by payroll administration module.

Description

A kind of self-optimizing production product plan and method based on information announcement
Technical field
The present invention relates to manufacturing industry technical field, it is specially a kind of based on information announcement self-optimizing production product plan and Method.
Background technique
Manufacturing industry refers to the mechanical industry epoch to manufacturing recourses, according to market demands, by manufacturing process, be converted into for The industry of huge tool, industrial goods and personal consumption product that people use and utilize, currently, manufacturing industry are the national warps in China One of mainstay of Ji, with the complication and diversification of manufacturing continuous development and production task, advanced scheduled production is The problem of must being faced as manufacturing industry.
When traditional advanced scheduled production is that scheduled production personnel receive production task, task is decomposed by certain algorithm, Then it is arranged to the different producers, the producer passively receives production task, still, letter of the scheduled production personnel to production factors The grasp of breath can not show a candle to actual producers, therefore, although existing scheduled production algorithm can scheduled production, production process execute In, often occur production plan because of many uncertain factors such as man-machine material method ring and modify repeatedly, so that the meaning of scheduled production Justice substantially reduces, to influence productivity.
Summary of the invention
In view of the deficiencies of the prior art, the self-optimizing production product plan that the present invention provides a kind of based on information announcement and Method, have improve scheduled production efficiency the advantages of, solve existing scheduled production algorithm can scheduled production, but production process execute In, often occur production plan because of many uncertain factors such as man-machine material method ring and modify repeatedly, so that the meaning of scheduled production Justice substantially reduces, thus the problem of influencing productivity.
The invention provides the following technical scheme: a kind of self-optimizing based on information announcement produces product plan, the system Including production information processing module, reward management module, production task release module and production information evaluation module, the production Message processing module is used to extract the feature of different processes, and the reward management module is used to calculate the reward of the secondary labour, The production task release module is used to for process task relevant information being published in system, and the production information evaluation module is used It is evaluated in the production to the producer.
A kind of self-optimizing production scheduled production method based on information announcement, includes the following steps:
Step S1: scheduled production personnel obtain production task plan;
Step S2: if production plan is resolved into arterial highway production process by production information processing module by scheduled production personnel, and Drawing, technological parameter and technic index are extracted to every procedure;
Step S3: later the production task release module in system by every procedure in the form of production task public It is issued in system, and carries information relevant to task, while the labour of production being recompensed in deposit reward management module;
Step S4: and then producers get production task amount by system login;
Step S5: scheduled production personnel arrangement producers production, delivered product;
Step S6: product is transported at quality inspection personnel, and quality inspection personnel is commented according to production product actual conditions in production information Valence module evaluates producers;
Step S7: last staff, which is provided by reward management module to direct labor, to recompense.
Preferably, every procedure is issued as production task and relevant information by production task release module in step s3, It include: technology characteristics parameter, available devices, single-piece reward, deadline, level of confidentiality, qualification, producers' evaluation index.
Preferably, product task amount has not been got in step s 4, then improves single-piece reward, and reduce assessment and refer to Mark.
Preferably, all task amounts are all assigned in step s 4, and product just can be carried out production.
Preferably, quality inspection personnel is according to production product actual conditions in the step s 7, in production information evaluation module to life Production personnel evaluate, and evaluation information feedback is added to system in the personal information of producers.
Be compared with the prior art, the present invention have it is following the utility model has the advantages that
The self-optimizing production product plan and method based on information announcement, will be appointed by production task message processing module Different processes is resolved into business, different processes is being carried out feature extraction through production information processing module, later production task Process task relevant information is published in system by release module, and the reward of the secondary labour is temporarily saved by payroll administration module Labor, the producer log in the system, and confirmation receives the production task that oneself can be done, and are produced, third party's quality inspection personnel or Producer's completion situation, typing producer's production information evaluation module are fed back by mechanism, and payroll administration module is provided to producers Reward, producers independently receive task by system, and system passes through the personal evaluation in production information evaluation module, to life The received task amount of production personnel controls, and avoids producers from overdue situation occur, therefore direct labor can be according to oneself The case where quantitative reception task, and process is split into multiple links, and every product for completing a link will be checked, The underproof situation of product is avoided to find in time, to improve the efficiency of scheduled production.
Detailed description of the invention
Fig. 1 is system diagram of the invention;
Fig. 2 is flow chart of the invention.
Specific embodiment
In order to enable the purposes, technical schemes and advantages of the embodiment of the present disclosure are clearer, below in conjunction with disclosure reality The technical solution of the embodiment of the present disclosure is clearly and completely described in the attached drawing for applying example.Obviously, described embodiment is A part of this disclosure embodiment, instead of all the embodiments.Based on described embodiment of the disclosure, this field is common Technical staff's every other embodiment obtained under the premise of being not necessarily to creative work, belongs to the model of disclosure protection It encloses.
Unless otherwise defined, the technical term or scientific term that the disclosure uses should be tool in disclosure fields The ordinary meaning for thering is the personage of general technical ability to be understood.The similar word meaning such as " comprising " or "comprising" used in the disclosure Point out that element or object before the existing word are covered the element for appearing in the word presented hereinafter or object and its be equal, without Exclude other elements or object." connection " either the similar word such as " connected " is not limited to physics or mechanical company It connects, can also include electrical connection, it is either direct or indirect.
In order to keep the following explanation of the embodiment of the present disclosure to understand and concise, known function and known portion is omitted in the disclosure The detailed description of part, so as not to unnecessarily obscure the concept of the present invention.
A kind of self-optimizing based on information announcement produces product plan referring to FIG. 1-2, and the system comprises production informations Processing module, reward management module, production task release module and production information evaluation module, the production information processing module For extracting the feature of different processes, the reward management module is used to calculate the reward of the secondary labour, the production task Release module is used to for process task relevant information being published in system, and the production information evaluation module is used for the producer's Production is evaluated.
The present invention passes through production task message processing module for Task-decomposing into different processes, handles through production information Different processes is carried out feature extraction by module, and process task relevant information is published in system by production task release module later On, and the reward of the secondary labour is temporarily saved by payroll administration module, the producer logs in the system, and confirmation receives oneself institute can be complete At production task, produced, third party's quality inspection personnel or mechanism feedback the producer complete situation, the typing producer produce letter Evaluation module is ceased, payroll administration module is provided to producers and recompensed, and producers independently receive task by system, and system By the personal evaluation in production information evaluation module, the received task amount of producers is controlled, producers are avoided There is overdue situation, thus direct labor can quantitative reception task according to their own situation, and process be split into it is multiple Link, every product for completing a link will be checked, avoid the underproof situation of product from finding in time, thus the row of raising The efficiency of production.
A kind of self-optimizing production scheduled production method based on information announcement, includes the following steps:
Step S1: scheduled production personnel obtain production task plan;
Step S2: if production plan is resolved into arterial highway production process by production information processing module by scheduled production personnel, and Drawing, technological parameter and technic index are extracted to every procedure, as production plan is resolved into A, B, C by production information processing module Three process;
Step S3: later the production task release module in system by every procedure in the form of production task public It is issued in system, and carries information relevant to task, while the labour of production being recompensed in deposit reward management module;
Step S4: and then producers get production task amount by system login, and production task release module is by A, B, C Three process carries out task publication as process, wherein also including per pass also comprising processing drawing, process parameter, technic index It is 2019/3/20 at the beginning of process, end time 2019/3/30, the reward of single-piece process: 20, for processing staff's Concerning security matters class requirement: open, processing qualification requirement: without, yield requirement: greater than be equal to 70%, overproof rate require: less than 10%, exceed the time limit completion rate: less than 15%, scrappage: less than 5%, and satisfactory producers are equal after system registration information It can be seen that the production task with reception scheduled production personnel publication;
For A process, existing first one, second one, the third one, Ding Yi tetra- have producers' situation of process A working ability such as Following table:
Name Concerning security matters grade Qualification Qualification rate Exceed the time limit completion rate Overproof rate Scrappage
First one It is open Nothing 90% 5% 11% 1%
Second one It is open Nothing 81% 7% 13% 3%
The third one It is open Nothing 87% 8% 7% 2%
Ding Yi It is open Nothing 92% 12% 9% 1%
Since the completion rate of exceeding the time limit of fourth one is excessively high, so A process task is invisible for fourth one;
First at sight of after process specifying information, thinks that oneself can complete 300 A processes at the appointed time, to system Application task;
Second at sight of after process specifying information, thinks that oneself can complete 200 A processes at the appointed time, to system Application task;
Third at sight of after process specifying information, thinks that oneself can complete 200 A processes at the appointed time, to system Application task;
Fourth one is unqualified so the task fourth one is invisible due to completion rate of exceeding the time limit;
There are also 300 A processes, nobody is received for scheduled production personnel discovery after confirmation, scheduled production personnel, then scheduled production personnel Single-piece remuneration is increased to 25, and the completion rate that will exceed the time limit is increased to 20%, hung up task is secondary;
Second at sight of after process specifying information, thinks that oneself can complete 300 A processes at the appointed time, then again Task 100 are claimed to system;
Fourth at sight of after process specifying information, remaining 200 tasks is confirmed and are received;
For B, C process with A process, after production task is assigned, to production time started, the production of scheduled production personnel arrangement Personnel produce;
Step S5: scheduled production personnel arrangement producers production, delivered product;
Step S6: product is transported at quality inspection personnel, and quality inspection personnel is commented according to production product actual conditions in production information Valence module evaluates producers, and after A process produces, product is sent to Quality Inspector and carries out quality inspection, quality inspection feelings to product Feedback is arrived production information evaluation module by condition;
Name Acceptance number Number of non-compliances Overproof number Exceed the time limit to count Scrap number
First one 295 5 0 0 0
Second one 290 10 0 0 0
The third one 200 0 0 0 0
Ding Yi 200 0 0 15 0
Since first one machined underproof 5 products, second one machined underproof 10 products, processing sum and and Number of non-compliances can be added in such product A process, since fourth one is exceeded the time limit 15 products, the processing sum of fourth one and the sum that exceeds the time limit Meeting class is called in the A process of the product, and after completing processing, production information evaluation module can recalculate qualification rate, exceed the time limit to complete The indexs such as rate, overproof rate, and these indexs will affect, the reception of the subsequent task of producers;
For B, C process with A process;
Step S7: last staff is provided to direct labor by reward management module and is recompensed, reward clearing, according to connecing Receipts task when unit price calculated;
Name Settle accounts formula Clearing value
First one 20*295 5900
Second one 20*290 5800
The third one 20*200 4000
Ding Yi 25*200 5000
If there is scrap for B process, the labour reward of the B process producer will also deduct the cost of A process;Such as There is scrap for C process in fruit, and the labour reward of the C process producer will also deduct the cost of A, B process.
In an alternative embodiment, in step s3 production task release module by every procedure be issued as production appoint Business and relevant information, comprising: technology characteristics parameter, available devices, single-piece reward, deadline, level of confidentiality, qualification, producers Evaluation index.
In an alternative embodiment, product task amount has not been got in step s 4, then improves single-piece reward, And reduce evaluation index.
In an alternative embodiment, all task amounts are all assigned in step s 4, and product just can be carried out production.
In an alternative embodiment, quality inspection personnel is believed according to production product actual conditions in production in the step s 7 Breath evaluation module evaluates producers, and evaluation information feedback is added to system in the personal information of producers.
Above embodiments are only exemplary embodiment of the present invention, are not used in the limitation present invention, protection scope of the present invention It is defined by the claims.Those skilled in the art can within the spirit and scope of the present invention make respectively the present invention Kind modification or equivalent replacement, this modification or equivalent replacement also should be regarded as being within the scope of the present invention.

Claims (6)

1. a kind of self-optimizing based on information announcement produces product plan, it is characterised in that: the system comprises at production information Module, reward management module, production task release module and production information evaluation module, the production information processing module is managed to use In the feature for extracting different processes, the reward management module is used to calculate the reward of the secondary labour, the production task hair Cloth module is used to for process task relevant information being published in system, and the production information evaluation module is for the life to the producer Production is evaluated.
2. a kind of self-optimizing based on information announcement produces scheduled production method, which comprises the steps of:
Step S1: scheduled production personnel obtain production task plan;
Step S2: if production plan is resolved into arterial highway production process by production information processing module by scheduled production personnel, and to every Procedure extracts drawing, technological parameter and technic index;
Step S3: later the production task release module in system by every procedure in the form of production task in public system Upper publication, and information relevant to task is carried, while the labour of production being recompensed in deposit reward management module;
Step S4: and then producers get production task amount by system login;
Step S5: scheduled production personnel arrangement producers production, delivered product;
Step S6: product is transported at quality inspection personnel, and quality inspection personnel evaluates mould according to production product actual conditions, in production information Block evaluates producers;
Step S7: last staff, which is provided by reward management module to direct labor, to recompense.
3. a kind of self-optimizing based on information announcement according to claim 2 produces scheduled production method, which is characterized in that in step Every procedure is issued as production task and relevant information by production task release module in rapid S3, comprising: technology characteristics parameter, can With equipment, single-piece reward, deadline, level of confidentiality, qualification, producers' evaluation index.
4. a kind of self-optimizing based on information announcement according to claim 2 produces scheduled production method, which is characterized in that in step Product task amount has not been got in rapid S4, then improves single-piece reward, and reduce evaluation index.
5. a kind of self-optimizing based on information announcement according to claim 2 produces scheduled production method, which is characterized in that in step All task amounts are all assigned in rapid S4, and product just can be carried out production.
6. a kind of self-optimizing based on information announcement according to claim 2 produces scheduled production method, which is characterized in that in step Quality inspection personnel is evaluated producers in production information evaluation module, will be commented according to production product actual conditions in rapid S7 Valence information feedback is added to system in the personal information of producers.
CN201910395395.2A 2019-05-13 2019-05-13 A kind of self-optimizing production product plan and method based on information announcement Pending CN110175709A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910395395.2A CN110175709A (en) 2019-05-13 2019-05-13 A kind of self-optimizing production product plan and method based on information announcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910395395.2A CN110175709A (en) 2019-05-13 2019-05-13 A kind of self-optimizing production product plan and method based on information announcement

Publications (1)

Publication Number Publication Date
CN110175709A true CN110175709A (en) 2019-08-27

Family

ID=67691030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910395395.2A Pending CN110175709A (en) 2019-05-13 2019-05-13 A kind of self-optimizing production product plan and method based on information announcement

Country Status (1)

Country Link
CN (1) CN110175709A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111191879A (en) * 2019-12-11 2020-05-22 中电普信(北京)科技发展有限公司 Comprehensive evaluation method and system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105741036A (en) * 2016-01-29 2016-07-06 苏州浙远自动化工程技术有限公司 Production scheduling system and method of smart factory of traditional Chinese medicines
CN106022714A (en) * 2016-05-10 2016-10-12 霍兵兵 APP-software-based employment management system and using method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105741036A (en) * 2016-01-29 2016-07-06 苏州浙远自动化工程技术有限公司 Production scheduling system and method of smart factory of traditional Chinese medicines
CN106022714A (en) * 2016-05-10 2016-10-12 霍兵兵 APP-software-based employment management system and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111191879A (en) * 2019-12-11 2020-05-22 中电普信(北京)科技发展有限公司 Comprehensive evaluation method and system
CN111191879B (en) * 2019-12-11 2023-05-12 中电普信(北京)科技发展有限公司 Comprehensive evaluation method and system

Similar Documents

Publication Publication Date Title
SG164355A1 (en) Automation system and method for a web-based implementation portal
CN106372944A (en) Data table-based product tracing method and system
CN105938600A (en) Customer complaint solving method based on B/S framework work order flow and customer complaint solving system thereof
CN106599214A (en) Method for performing task allocation based on enterprise organizational structure
CN106971254A (en) A kind of service monitoring system and method
CN103116822A (en) Steel-making manufacturing execution management system based on visualized heat tracking
CN111950846A (en) Intelligent factory shift scheduling system
CN110175709A (en) A kind of self-optimizing production product plan and method based on information announcement
CN110880090A (en) Aviation part manufacturing digital management system
CN110110935A (en) A kind of enterprise's production scheduling optimization system and implementation method based on CPN neural network
CN106651155A (en) Enterprise informatization management system
CN109299915A (en) A kind of scaffold operational method
CN113971526A (en) Automatic order dispatching method based on RPA robot
Jiao et al. Research and application of intelligent manufacturing system for precision assembly enterprise
CN103455013A (en) Intelligent electronic control system of garment production line and operation method thereof
CN102236836A (en) Network interaction and cooperation modeling
CN108960774A (en) A kind of propulsion project management method that novel computer system is integrated
CN111932067A (en) Green factory evaluation method based on analytic hierarchy process
CN101533491A (en) Method for realizing free circulation flow
CN111428949A (en) Workshop manufacturing management system and method
CN112381524A (en) Industry internal office management operation system based on artificial intelligence
Orrù et al. Production line optimization in an Engineering to Order Business (petrochemical industry) using Value-stream mapping method
CN202085188U (en) Energy monitoring device
CN114330995A (en) Forging-heat treatment process data processing method based on E-R relation model
CN206677076U (en) A kind of novel reinforcing steel bar bending machine operation device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190827