CN109993325A - A kind of power station equipment maintenance heat retaining operation flow control method - Google Patents

A kind of power station equipment maintenance heat retaining operation flow control method Download PDF

Info

Publication number
CN109993325A
CN109993325A CN201910245791.7A CN201910245791A CN109993325A CN 109993325 A CN109993325 A CN 109993325A CN 201910245791 A CN201910245791 A CN 201910245791A CN 109993325 A CN109993325 A CN 109993325A
Authority
CN
China
Prior art keywords
power station
station equipment
heat retaining
retaining operation
operation status
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910245791.7A
Other languages
Chinese (zh)
Other versions
CN109993325B (en
Inventor
洪伟
徐霞军
崔勇
杨二加
张琦
崔晓光
贾智辉
郭贞荣
罗文兵
侯耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nuclear Power Corp
Original Assignee
Jiangsu Nuclear Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nuclear Power Corp filed Critical Jiangsu Nuclear Power Corp
Priority to CN201910245791.7A priority Critical patent/CN109993325B/en
Publication of CN109993325A publication Critical patent/CN109993325A/en
Application granted granted Critical
Publication of CN109993325B publication Critical patent/CN109993325B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Telephonic Communication Services (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention belongs to power station or shop equipment maintenance technique fields, a kind of power station or shop equipment maintenance heat retaining operation flow control method are specifically disclosed, this method is as follows: step (1) passes through terminal or cat scanner bar code, power station equipment heat retaining operation status data information is obtained, data input is carried out;Step (2) judges whether head office database networks;Step (3) is according to the head office database of above-mentioned steps (2) networking judging result, judge the logicality of power station equipment heat retaining operation status data, change power station equipment heat retaining operation state if logically true, and continues to execute step (4);Power station equipment heat retaining operation job state after step (4) judgement change, head office database is written into power station equipment heat retaining operation state after change, it shows power station equipment heat retaining operation state simultaneously, and power station equipment heat retaining operation status information is pushed to terminal or computer.Method of the invention is rationally reliable, improves operating efficiency, controls security risk.

Description

A kind of power station equipment maintenance heat retaining operation flow control method
Technical field
The invention belongs to power station or shop equipment maintenance technique fields, and in particular to a kind of power station or shop equipment maintenance are protected Warm work flow control method.
Background technique
Insulation of equipment is to reduce equipment mechanism surface reduction heat to distribute, and the equipment of lifting means mechanism heating agent efficiency is important Affiliated facility.In maintenance of equipment, due to the presence of insulation of equipment, need implement heat preservation remove and installation, can implement and Complete maintenance of equipment operation process.
During power station or shop equipment maintenance activity, the dismounting and installation of heat preservation are important prerequisite and necessary Completion mark.In this maintenance of equipment in the integral heat insulation dismounting period, the dismounting state to heat preservation is needed to be managed description, And by suitable data communication technology, equipment operation process easy to repair is orderly carried out.
Traditional power station or shop equipment repair heat retaining operation process, and general only control starts to remove, returns and install into the stage. Not clear enough for stage definitions in the process, sessions information is transmitted not in time.Artificial, the phone feedback that falls behind simultaneously and Data statistics mode causes the information communication that maintenance of equipment personnel use and heat preservation dismounts people to there is lag or mistake, reduces guarantor Temperature dismounting, using, return dress efficiency.Work delays progress.
Therefore, it is urgent to provide a kind of power station or the process approach of shop equipment maintenance heat retaining operation, set power station or factory Standby maintenance insulating process management can rationally efficiently.
Summary of the invention
The purpose of the present invention is to provide a kind of power stations or shop equipment to repair heat retaining operation flow control method, this method It is rationally reliable, operating efficiency is improved, security risk is controlled.
Realize the technical solution of the object of the invention: a kind of power station equipment maintenance heat retaining operation flow control method, this method Specifically includes the following steps: step (1) by terminal or cat scanner bar code, obtain power station equipment heat retaining operation status number it is believed that Breath carries out data input;Step (2) judges whether head office database networks;Step (3) is according to general headquarters' numbers of above-mentioned steps (2) According to library networking judging result, judges the logicality of power station equipment heat retaining operation status data, change power station if logically true Insulation of equipment job state, and continue to execute step (4);Power station equipment heat retaining operation operation shape after step (4) judgement change Power station equipment heat retaining operation state after change is written head office database, while showing power station equipment heat retaining operation state by state, And power station equipment heat retaining operation status information is pushed to terminal or computer.
Specific step is as follows for the step (1): head office database is arranged in step (1.1), for saving power station equipment Heat retaining operation status data information;Step (1.2) inquires heat retaining operation letter from the head office database in above-mentioned steps (1.1) Breath, and the bill of assignment with scanning bar code is printed by printing function;Step (1.3) is total by terminal or computer connection Portion's database obtains power station equipment heat retaining operation status data information according to the scanning bar code in above-mentioned steps (1.2).
Power station equipment heat retaining operation status data information in the step (1.1) includes in the works, removes and start, tear open Except complete, in maintenance of equipment, dress can be returned, start back to fill, time install into.
Fixed terminal machine, hand-held mobile terminal and intra-company's computer in the step (1.3) pass through intranet Network connects head office database, and according to the scanning bar code in above-mentioned steps (1.2), obtains power station equipment heat retaining operation status data Information;Personal external computer connects head office database by virtual network VPN with mobile terminal of mobile telephone, and according to above-mentioned steps (1.2) the scanning bar code in obtains power station equipment heat retaining operation status data information.
Specific step is as follows for the step (2): if head office database can not network, power station equipment being kept the temperature and is made Industry state changes data and is stored in local terminal, then judges whether head office database networks;If head office database is networked, then electricity is inquired Station equipment heat retaining operation state, judges the logicality of power station equipment heat retaining operation status data.
Specific step is as follows for the step (3): step (3.1) is if power station equipment heat retaining operation status data is patrolled Property mistake is collected, the data in head office database are just deleted, and exits power station equipment maintenance heat retaining operation process;Step (3.2) is such as The logicality of fruit power station equipment heat retaining operation status data is correct, but does not change power station equipment heat preservation, just exits power station equipment Repair heat retaining operation process;Step (3.3) is if the logicality of power station equipment heat retaining operation status data is correct, it is necessary to change Power station equipment heat retaining operation state, and continue to execute step (4).
The logicality of power station equipment heat retaining operation status data in the step (3) refers to that meet following rule suitable Sequence, be sequentially followed successively by the works, remove start, removes completions, in maintenance of equipment, dress can be returned, start back to fill, time installed into.
Specific step is as follows for the step (4): step (4.1) is if make power station equipment maintenance heat preservation industry after changing State meets one of three kinds of situations, then changes job state, and general headquarters are written in the power station equipment heat retaining operation state after change Database, while showing power station equipment heat retaining operation state, and by power station equipment heat retaining operation status information be pushed to terminal and It is shown in computer, and exits power station equipment maintenance heat retaining operation process;Step (4.2) is if make power station equipment maintenance after changing Heat preservation industry state is " return and install into ", makees power station equipment maintenance heat preservation, then makees power station equipment maintenance heat retaining operation state and do not change, And exit power station equipment maintenance heat retaining operation process.
Three kinds of situations in the step (4.1) include: that the power station equipment maintenance heat preservation industry state of making after changing is to open Begin back to fill unqualified, or power station equipment maintenance heat preservation industry state of making after changing is not " return install into ", or the electricity after changing Station equipment maintenance heat preservation industry state belongs to other job states.
Power station equipment heat retaining operation status information is pushed to fixed end by internal network in the step (4.1) It is shown in terminal, hand-held mobile terminal and intra-company's computer;Power station equipment heat retaining operation status information is passed through into virtual network VPN is pushed in personal external computer and mobile terminal of mobile telephone and shows.
The beneficial technical effect of the present invention lies in: the management process of the work organization of method of the invention is friendly, is easy to grasp Make, by field operation process and safety control standed, shortens Job readiness and tissue time, improve work efficiency.This hair Bright method establishes standardization effort stream, and it is clear that each step standardized language ease in use carries out heat retaining operation process Definition, according to the definition of step, clearly knows heat retaining operation development condition.The sessions of the heat preservation of method of the invention, it is bright It determines justice relevant data sources and management responsibility main body, makes operation process clear and definite.Method of the invention in operation process, Intercommunication is communicated by the in house software in power station, understands heat preservation dismounting state in real time.The communication network set up according to power station, in software Application platform, Real-Time Sharing keep the temperature standardization effort stream information, carry out further work rapidly according to information, realize oneself of operation Dynamicization management.Method of the invention through the secondary overhaul of nuclear power station and nearly two cycles of operation practice have shown that, introducing power station After heat retaining operation management method, heat preservation disassembly efficiency is effectively improved.Method of the invention may be directly applied to each class factory Field operation, improve heat preservation dismounting planned and efficiency, directly creation economic benefit.
Detailed description of the invention
Fig. 1 is the flow chart that a kind of power station equipment provided by the present invention repairs heat retaining operation flow control method;
Fig. 2 is the stream provided by the present invention that power station equipment heat retaining operation status data information is obtained by head office database Cheng Tu;
Fig. 3 is the rule ordering figure of judgement power station equipment heat retaining operation status data provided by the present invention.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and examples.
As shown in Figure 1, a kind of power station equipment provided by the present invention repairs heat retaining operation flow control method, this method tool Body the following steps are included:
Step (1) is obtained power station equipment heat retaining operation status data information, is counted by terminal or cat scanner bar code According to input;Specific step is as follows for step (1):
As shown in Fig. 2, head office database is arranged in step (1.1), for saving power station equipment heat retaining operation status number it is believed that Breath.
As shown in figure 3, power station equipment heat retaining operation status data information include seven: in the works, remove start, removed At in, maintenance of equipment, dress can be returned, start back to fill (acceptance or rejection), return and install into.
Step (1.2) inquires heat retaining operation information from the head office database in above-mentioned steps (1.1), and passes through printing Function prints bill of assignment, and each task has individual unique encodings, and shows the corresponding scanning bar code of unique encodings.
Step (1.3) connects head office database by terminal or computer, according to the scanning bar code in above-mentioned steps (1.2), Obtain power station equipment heat retaining operation status data information;Specific step is as follows for step (1.3):
Fixed terminal machine connects head office database by internal network with hand-held mobile terminal, and according to above-mentioned steps (1.2) the scanning bar code in obtains power station equipment heat retaining operation status data information.Personal external computer passes through virtual network VPN connection head office database, and according to the scanning bar code in above-mentioned steps (1.2), obtain power station equipment heat retaining operation status number It is believed that breath.Intra-company's computer connects head office database by internal network, and according to the scan stripes in above-mentioned steps (1.2) Code obtains power station equipment heat retaining operation data state info.Mobile terminal of mobile telephone passes through virtual network VPN connection general headquarters data Library, and according to the scanning bar code in above-mentioned steps (1.2), obtain power station equipment heat retaining operation status data information.
Above-mentioned internal network is 4G network.Mobile Server provides 4G network and work Intranet by privately owned authentication protocol The access channel of environment.Information Mobile Service is interacted by direction agency service with intranet server, is mentioned for the access of 4G network For double shield.Mobile application Technical Architecture: the integrated application of mobile platform uses Hybrid mixed developing mode, and a set of code can Dispose IOS, Android several operation systems.Database: version oracle 12.2.0.1.0.Application server: Win server 2016 memory 4G.Client computer: Win7 professional version/10 enterprise version of win.
Step (2) judges whether head office database networks;Specific step is as follows for step (2):
If head office database can not network, power station equipment heat retaining operation state is changed into data and is stored in local terminal, Judge whether head office database networks again;If head office database is networked, then power station equipment heat retaining operation state is inquired, judges power station The logicality of insulation of equipment job state data.
Step (3) judges power station equipment heat retaining operation shape according to the head office database of above-mentioned steps (2) networking judging result The logicality of state data changes power station equipment heat retaining operation state if logically true, and continues to execute step (4);Step (3) specific step is as follows:
Step (3.1) judges whether the logicality of power station equipment heat retaining operation status data meets the rule ordering of Fig. 3, i.e., Sequence be followed successively by power station equipment heat retaining operation in the works, remove start, removes completion, in maintenance of equipment, dress can be returned, start back to fill (acceptance or rejection), return install into.If the logicality mistake of power station equipment heat retaining operation status data, general headquarters' number is just deleted According to the data in library, and exit power station equipment maintenance heat retaining operation process.
Step (3.2) is if the logicality of power station equipment heat retaining operation status data is correct, but does not change power station equipment Power station equipment maintenance heat retaining operation process is just exited in heat preservation.
Step (3.3) is if the logicality of power station equipment heat retaining operation status data is correct, it is necessary to change power station equipment Heat retaining operation state, and continue to execute step (4).
Power station equipment heat retaining operation job state after step (4) judgement change, the power station equipment after change is kept the temperature and is made Head office database is written in industry state, while showing power station equipment heat retaining operation state, and power station equipment heat retaining operation state is believed Breath is pushed to terminal or computer;Specific step is as follows for step (4):
Step (4.1) is if the power station equipment maintenance heat preservation industry state after changing meets one of following three kinds of situations, just It can change job state, and head office database be written into the power station equipment heat retaining operation state after change, while showing power station Insulation of equipment job state, and by power station equipment heat retaining operation status information by network push to shown in Fig. 2 fixed Terminating machine hand-held mobile terminal, personal external computer, shows in intra-company's computer, and exits power station equipment maintenance heat preservation and make Industry process.
Three kinds of above-mentioned situations include: change after make power station equipment maintenance heat preservation industry state be start back to fill it is unqualified, Or the power station equipment maintenance heat preservation industry state of making after changing is not " return and install into ", or the power station equipment after change repairs heat preservation Industry state belongs to other job states.
Power station equipment heat retaining operation status information is pushed to fixed terminal machine, hand-held mobile terminal by internal network It is shown in intra-company's computer;Power station equipment heat retaining operation status information is pushed to outside individual by virtual network VPN It is shown in computer and mobile terminal of mobile telephone.
The internal network is the internal network in above-mentioned steps (1.3).
Step (4.2) makees power station equipment if the power station equipment maintenance heat preservation industry state of making after changing is " return and install into " Maintenance heat preservation is then made power station equipment maintenance heat retaining operation state and is not changed, and exits power station equipment maintenance heat retaining operation process.
The management process of the work organization of the method for the present invention is friendly, easily operated.By field operation process and security control Standardization is shortened Job readiness and tissue time, is improved work efficiency.The invention may be directly applied to showing for each class factory Field operation improves the planned and efficiency of heat preservation dismounting, directly creation economic benefit.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modification, deletion Partial Jobs normalization step, equivalent replacement and improvement etc., should be included within mind and principle Within protection scope of the present invention.The present invention is explained in detail above in conjunction with drawings and examples, but the present invention is not It is limited to above-described embodiment, within the knowledge of a person skilled in the art, ancestor of the present invention can also be not being departed from Various changes can be made under the premise of purport.The content being not described in detail in the present invention can use the prior art.

Claims (10)

1. a kind of power station equipment repairs heat retaining operation flow control method, which is characterized in that this method specifically includes the following steps:
Step (1) obtains power station equipment heat retaining operation status data information by terminal or cat scanner bar code, and it is defeated to carry out data Enter;
Step (2) judges whether head office database networks;
Step (3) judges power station equipment heat retaining operation status number according to the head office database of above-mentioned steps (2) networking judging result According to logicality, change power station equipment heat retaining operation state if logically true, and continue to execute step (4);
Power station equipment heat retaining operation job state after step (4) judgement change, by the power station equipment heat retaining operation shape after change Head office database is written in state, while showing power station equipment heat retaining operation state, and power station equipment heat retaining operation status information is pushed away Give terminal or computer.
2. a kind of power station equipment according to claim 1 repairs heat retaining operation flow control method, it is characterised in that: described The step of (1) specific step is as follows:
Head office database is arranged in step (1.1), for saving power station equipment heat retaining operation status data information;
Step (1.2) inquires heat retaining operation information from the head office database in above-mentioned steps (1.1), and passes through printing function Print the bill of assignment with scanning bar code;
Step (1.3) connects head office database by terminal or computer, according to the scanning bar code in above-mentioned steps (1.2), obtains Power station equipment heat retaining operation status data information.
3. a kind of power station equipment according to claim 2 repairs heat retaining operation flow control method, it is characterised in that: described The step of (1.1) in power station equipment heat retaining operation status data information include in the works, remove start, remove completion, equipment In maintenance, can return dress, start back dress, return install into.
4. a kind of power station equipment according to claim 3 repairs heat retaining operation flow control method, it is characterised in that: described The step of (1.3) in fixed terminal machine, hand-held mobile terminal with intra-company's computer general headquarters' number is connected by internal network According to library, and according to the scanning bar code in above-mentioned steps (1.2), power station equipment heat retaining operation status data information is obtained;It is personal outer Portion's computer connects head office database by virtual network VPN with mobile terminal of mobile telephone, and according to the scanning in above-mentioned steps (1.2) Bar code obtains power station equipment heat retaining operation status data information.
5. a kind of power station equipment according to claim 4 repairs heat retaining operation flow control method, it is characterised in that: described The step of (2) specific step is as follows: if head office database can not network, power station equipment heat retaining operation state is changed into number According to deposit local terminal, then judge whether head office database networks;If head office database is networked, then inquires power station equipment heat preservation and make Industry state judges the logicality of power station equipment heat retaining operation status data.
6. a kind of power station equipment according to claim 5 repairs heat retaining operation flow control method, it is characterised in that: described The step of (3) specific step is as follows:
Step (3.1) if power station equipment heat retaining operation status data logicality mistake, just delete head office database in number According to, and exit power station equipment maintenance heat retaining operation process;
Step (3.2) does not change power station equipment heat preservation if the logicality of power station equipment heat retaining operation status data is correct, Just exit power station equipment maintenance heat retaining operation process;
Step (3.3) is if the logicality of power station equipment heat retaining operation status data is correct, it is necessary to change power station equipment heat preservation Job state, and continue to execute step (4).
7. a kind of power station equipment according to claim 6 repairs heat retaining operation flow control method, it is characterised in that: described The step of (3) in the logicality of power station equipment heat retaining operation status data refer to and meet following rule ordering, be sequentially followed successively by In the works, remove start, removes completions, in maintenance of equipment, dress can be returned, start back to fill, time installed into.
8. a kind of power station equipment according to claim 7 repairs heat retaining operation flow control method, it is characterised in that: described The step of (4) specific step is as follows:
Step (4.1) changes operation if the power station equipment maintenance heat preservation industry state of making after changing meets one of three kinds of situations State, and head office database is written into the power station equipment heat retaining operation state after change, while showing power station equipment heat retaining operation State, and power station equipment heat retaining operation status information is pushed in terminal and computer and is shown, and exits power station equipment maintenance and protects Warm work flow;
Step (4.2) makees power station equipment maintenance if the power station equipment maintenance heat preservation industry state of making after changing is " return and install into " Heat preservation is then made power station equipment maintenance heat retaining operation state and is not changed, and exits power station equipment maintenance heat retaining operation process.
9. a kind of power station equipment according to claim 8 repairs heat retaining operation flow control method, it is characterised in that: described The step of (4.1) in three kinds of situations include: change after make power station equipment maintenance heat preservation industry state be start back to fill it is unqualified, Or the power station equipment maintenance heat preservation industry state of making after changing is not " return and install into ", or the power station equipment after change repairs heat preservation Industry state belongs to other job states.
10. a kind of power station equipment according to claim 9 repairs heat retaining operation flow control method, it is characterised in that: institute Power station equipment heat retaining operation status information is pushed to fixed terminal machine by internal network in the step of stating (4.1), is held It is shown in mobile terminal and intra-company's computer;Power station equipment heat retaining operation status information is pushed to by virtual network VPN It is shown in personal external computer and mobile terminal of mobile telephone.
CN201910245791.7A 2019-03-28 2019-03-28 Power station equipment maintenance heat preservation operation flow control method Active CN109993325B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910245791.7A CN109993325B (en) 2019-03-28 2019-03-28 Power station equipment maintenance heat preservation operation flow control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910245791.7A CN109993325B (en) 2019-03-28 2019-03-28 Power station equipment maintenance heat preservation operation flow control method

Publications (2)

Publication Number Publication Date
CN109993325A true CN109993325A (en) 2019-07-09
CN109993325B CN109993325B (en) 2021-11-30

Family

ID=67131857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910245791.7A Active CN109993325B (en) 2019-03-28 2019-03-28 Power station equipment maintenance heat preservation operation flow control method

Country Status (1)

Country Link
CN (1) CN109993325B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030154115A1 (en) * 1999-09-17 2003-08-14 International Business Machine Corporation Method, system, and program for processing a job in an event driven workflow environment
CN104636868A (en) * 2015-02-03 2015-05-20 成都海光核电技术服务有限公司 Application management system for nuclear power station equipment maintenance information and application method thereof
CN106557986A (en) * 2015-09-25 2017-04-05 成都鼎桥通信技术有限公司 A kind of photovoltaic plant plant maintenance method
CN106586753A (en) * 2017-01-24 2017-04-26 南京新蓝摩显示技术有限公司 Intelligent handling system and method for elevator failure repair
CN107506835A (en) * 2017-07-06 2017-12-22 北京万相融通科技股份有限公司 A kind of station facilities maintenance management method and its system
CN109299915A (en) * 2018-09-07 2019-02-01 江苏核电有限公司 A kind of scaffold operational method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030154115A1 (en) * 1999-09-17 2003-08-14 International Business Machine Corporation Method, system, and program for processing a job in an event driven workflow environment
CN104636868A (en) * 2015-02-03 2015-05-20 成都海光核电技术服务有限公司 Application management system for nuclear power station equipment maintenance information and application method thereof
CN106557986A (en) * 2015-09-25 2017-04-05 成都鼎桥通信技术有限公司 A kind of photovoltaic plant plant maintenance method
CN106586753A (en) * 2017-01-24 2017-04-26 南京新蓝摩显示技术有限公司 Intelligent handling system and method for elevator failure repair
CN107506835A (en) * 2017-07-06 2017-12-22 北京万相融通科技股份有限公司 A kind of station facilities maintenance management method and its system
CN109299915A (en) * 2018-09-07 2019-02-01 江苏核电有限公司 A kind of scaffold operational method

Also Published As

Publication number Publication date
CN109993325B (en) 2021-11-30

Similar Documents

Publication Publication Date Title
CN201750442U (en) Laboratory-instrument sharing system
CN109034659A (en) A kind of grid dispatching management system
CN111027932A (en) Safety management method for intelligent work ticket
CN201947061U (en) Distribution network dispatching intelligent anti-mistake and real-time management system
CN106160219B (en) The monitoring method of remote forced monitoring system for transformer station switching operation
CN109086895A (en) A kind of operation management system and method for heating ventilation air-conditioning system
CN104700192A (en) Aided intelligent management and control system for power transmission and transformation project and management and control method thereof
CN112054599B (en) Wind farm safety management system and method
CN106022730A (en) Movable cooperative working platform system based on wind power generation operation maintenance and operation method thereof
CN110138092A (en) Transformer substation sequence control system and method with regulation main website Security Checking function
CN101344995A (en) Cooperated discharging system for air station departure flight
CN109034425A (en) Substation secondary device maintenance safety managing and control system and method based on Internet of Things
CN104076767B (en) Railway signal equipment overhauling control system and method
CN107798489A (en) A kind of electric network operation site safety management method based on wechat platform
CN109034431A (en) A kind of predetermined management method of highly effective and safe meeting room and system
CN110706363A (en) Attendance scheduling system based on face recognition
CN111598411A (en) Intelligent safety control system for operation site of transformer substation
CN109034404A (en) A kind of thermal power plant's multi-person synergy examination and repair system based on AR glasses, method and a kind of AR glasses
CN108875990A (en) A kind of on-the-spot meeting intelligence building processing method and system
CN106447157A (en) Product testing and supervision method and monitoring system thereof
CN107977718A (en) Substation equipment maintaining method and system based on BIM models
CN111445610B (en) System for managing work ticket isolation key
CN106296134A (en) A kind of method for processing business supporting two-layer Flow driving mechanism and workbench thereof
CN212627319U (en) System for wind-powered electricity generation field safety control
CN109993325A (en) A kind of power station equipment maintenance heat retaining operation flow control method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant