CN109165891A - A kind of aeronautical maintenance production scene material management system and its application method - Google Patents

A kind of aeronautical maintenance production scene material management system and its application method Download PDF

Info

Publication number
CN109165891A
CN109165891A CN201810848889.7A CN201810848889A CN109165891A CN 109165891 A CN109165891 A CN 109165891A CN 201810848889 A CN201810848889 A CN 201810848889A CN 109165891 A CN109165891 A CN 109165891A
Authority
CN
China
Prior art keywords
user
interface
information
management
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810848889.7A
Other languages
Chinese (zh)
Inventor
李珊珊
王纬国
姚旭成
李金猛
孙涛
李海澄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Run Wuhu Machinery Factory
Original Assignee
State Run Wuhu Machinery Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Run Wuhu Machinery Factory filed Critical State Run Wuhu Machinery Factory
Priority to CN201810848889.7A priority Critical patent/CN109165891A/en
Publication of CN109165891A publication Critical patent/CN109165891A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to material management system fields, specifically a kind of aeronautical maintenance production scene material management system and its application method, including data management module, with data management module cooperation for realizing the operation realization module tracked to the state for receiving material, the specific steps of which are as follows: (1) user logs in;(2) authentication;(3) inventory shows;(4) judge whether to close interface;(5) it manages;(6) judge user type;(7) handling of goods and materials;(8) material be put into/replace interface;(9) material is received;(10) material is put into, and/replacement/receives interface;(11) personnel information management interface;(12) it is put into material;(13) material is replaced;The present invention can achieve the preferable efficiency of management by accurately data management module, especially accurate inventory information, while receiving information to material and establish database and carrying out unified back-stage management, realize to the status tracking for receiving material.

Description

A kind of aeronautical maintenance production scene material management system and its application method
Technical field
The present invention relates to material management system field, specifically a kind of aeronautical maintenance production scene material management system and its Application method.
Background technique
In aeronautical maintenance field, the replacement demand of a large amount of parts involved in product repairing, therefore handling of goods and materials is a base Originally indispensable activity.Traditional production scene handling of goods and materials mode is full-time material clerk according to job card application by material It is dispatched into the part cabinet of production scene after unification storage, then voluntarily received on demand by maintenance personal, inventory is with electronics account side Formula receives personnel record by material clerk and respectively.There is live handling of goods and materials confusion, inventory information inaccuracy, material information in which The problem of can not tracking.Therefore, it is necessary to establish a kind of perfect aeronautical maintenance production scene material management system.
Chinese Patent Application No. discloses a kind of marine store management method for 201210499228.0, and this method is by object Expects pipe reason user's typing material information in computer management system is managed collectively, and when material is used, record receives letter Breath, while material request is carried out according to inventory information, the disadvantage is that material goes out to be put in storage by handling of goods and materials user's hand-kept, work as object When material receives that type is more, the amount of receiving is larger, the accuracy of data not can guarantee.
Chinese Patent Application No. discloses a kind of power domain warehouse material management system for 201610410334.5, this is System includes basic document module, inventory management module and neck material management module, can fast and efficiently be realized to power domain object Expect the management being put in storage out, the disadvantage is that not being managed using database to record is received, the material after receiving can not carry out shape State tracking.
Summary of the invention
To solve the above-mentioned problems, the present invention proposes a kind of aeronautical maintenance production scene material management system and its user Method.
A kind of aeronautical maintenance production scene material management system, including to material receive information establish database carry out unification The data management module of back-stage management, with data management module cooperation for realizing being tracked to the state for receiving material Module is realized in operation.
The data management module includes personnel's permission of the access right and logon information to regulation all types of user Management, the stock material management to record the material information of each storage groove in material cabinet, to record detailed material into letter The material entry/exit library detail management of breath.
Personnel's rights management includes sending user with charge free, for getting object for being put into material and replacing the material of material The material of material receives user, for getting material, being put into material and replacing material and can carry out to personal information database The handling of goods and materials user of management.
Personnel's rights management has the database for recording user login information to establish personal information data, described The log-on message of user include four personnel's work number, personnel's name, password, user type field contents, wherein user type Field contents be material send with charge free/material receives/handling of goods and materials.
There is record to put slot material information to establish the database of material information data for the stock material management, described Data-base recording include three slot number, title, figure number and quantity in stock field contents, bracket groove number is the number of each storage groove, The name of material stored in entitled slot, figure number are the material figure number stored in slot, and quantity in stock is the material number stored in the slot Amount.
The material entry/exit library detail management has record material disengaging information to establish materials handling detailed data Database, the data-base recording include slot number, personnel's work number, material figure number and operate three field contents of detail, wherein Operate detail field format are as follows: the time+action type+material quantity+name of material.
The operation realizes that module includes real for realizing the system operatio interface of system operatio and mutual cooperation function It is existing.
The system operatio interface includes for user entry personnel work number and modification logging user log-in interface, with dynamic Show inventory's display interface of the specifying information of material in each storage groove of material cabinet, to input the number or replacing that material is put into The material that the title of new material, figure number and number are inputted when material is put into/replaces interface, the object to input the number that material is received Material receives interface, is put into/replacement/with the material in the modification of personal information lane database, addition, deletion record and is received interface and people Member's information management interface.
The function realize include personal identity authentication, material information Dynamically Announce, rights management, material be put into, object Material replacement, material are received and personal information data base administration.
A kind of application method of aeronautical maintenance production scene material management system, the specific steps of which are as follows:
(1) user logs in: judging whether to exit the program, if exiting closing system;If not exiting entry personnel's work number and stepping on Land password;
(2) authentication: being proved to be successful and execute step (3), verifies unsuccessful execution (1);
(3) inventory shows: the material information of each storage groove of Dynamically Announce;
(4) judge whether to close interface: if closing interface executes step (1);If not closing interface, execute step (5);
(5) manage: selection needs the material storage groove operated, executes step (6);Personal information data base administration is selected, It executes step (7);
(6) judge user type: user sends user with charge free for material, executes step (8);User is that material receives user, is held Row step (9);User is handling of goods and materials user, is executed step (10);
(7) handling of goods and materials: judging whether user type is handling of goods and materials user, if so, executing step (11);If it is not, It executes step (3);
(8) material be put into/replace interface: material be put into execute step (12);It replaces material and executes step (13);
(9) receive material: the number of material is received in input, clicks confirmation, is executed step (3);
(10) material is put into, and/replacement/receives interface: material, which is put into, executes step (12);It replaces material and executes step (13); It receives material and executes step (9);
(11) personnel information management interface: deleting, addition user, and Modify password changes user right;
(12) be put into material: input is put into the number of material, clicks confirmation, executes step (3);
(13) it replaces material: inputting the title, figure number, number of new material, click confirmation, execute step (3).
The beneficial effects of the present invention are: the present invention can achieve preferable management effect by accurately data management module Rate, especially accurate inventory information, while information is received to material establish database and carrying out unified back-stage management, it realizes to neck With the status tracking of material;Material information is managed by the way of establishing database, need to only be filled in when feeding intake or lead material Respective numbers, inventory information are calculated by system background, ensure that the accuracy of inventory information;Material dynamic is carried out detailed Record, realizes the tracking to material state;System interface design is rationally, easy to operate;Personnel are believed in the form of database Breath, material information and operation detail are managed;It operates in detail with time+action type+material quantity+name of material shape Formula is recorded, while when replacing material, automatically recording two operation managing detailed catalogues, form is respectively as follows: time+taking-up+original Material quantity in stock+raw material title, time+is put into+new material quantity+new name of material, it is simple and clear when checking;Inventory shows boundary Material cabinet is copied in face, represents each storage groove with button, the title of material in each storage groove of Dynamically Announce, figure on button Number and quantity, convenient for search;System devises three kinds of user types: material sends user with charge free, material receives user and handling of goods and materials User, respectively correspond different permissions: material, which sends user with charge free, can be put into material and replacement material;Material, which receives user, can get object Material;Handling of goods and materials user can get material, be put into material and replacement material, and can carry out pipe to personal information database Reason.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is inventory's display interface schematic view of the front view of the invention.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below it is right The present invention is further described.
As shown in Figure 1, a kind of aeronautical maintenance production scene material management system, including information is received to material and establishes data Library carries out the data management module of unified back-stage management, with data management module cooperation for realizing to the state for receiving material Module is realized in the operation tracked.
The data management module includes personnel's permission of the access right and logon information to regulation all types of user Management, the stock material management to record the material information of each storage groove in material cabinet, to record detailed material into letter The material entry/exit library detail management of breath.
The present invention can achieve the preferable efficiency of management by accurately data management module, especially accurate inventory's letter Breath, while information is received to material establish database and carrying out unified back-stage management, it realizes to the status tracking for receiving material.
Personnel's rights management includes sending user with charge free, for getting object for being put into material and replacing the material of material The material of material receives user, for getting material, being put into material and replacing material and can carry out to personal information database The handling of goods and materials user of management.
Material information is managed by the way of establishing database, need to only fill in respective numbers when feeding intake or lead material, Inventory information is calculated by system background, ensure that the accuracy of inventory information.
Personnel's rights management has the database for recording user login information to establish personal information data, described The log-on message of user include four personnel's work number, personnel's name, password, user type field contents, wherein user type Field contents be material send with charge free/material receives/handling of goods and materials.
Detailed record has been carried out to material dynamic, has realized the tracking to material state;System interface design rationally, is grasped Make simple;Personal information, material information and operation detail are managed in the form of database;Operate detail in the time+ Action type+material quantity+name of material form is recorded, while when replacing material, automatically recording two operation details Information, form are respectively as follows: time+taking-up+raw material quantity in stock+raw material title, time+and are put into+new material quantity+new material Title, it is simple and clear when checking.
There is record to put slot material information to establish the database of material information data for the stock material management, described Data-base recording include three slot number, title, figure number and quantity in stock field contents, bracket groove number is the number of each storage groove, The name of material stored in entitled slot, figure number are the material figure number stored in slot, and quantity in stock is the material number stored in the slot Amount.
Inventory's display interface copies material cabinet, represents each storage groove with button, Dynamically Announce is respectively deposited on button The title, figure number and quantity of material in slot are put, convenient for searching;System devises three kinds of user types: material sends user, material with charge free User and handling of goods and materials user are received, respectively correspond different permissions: material, which sends user with charge free, can be put into material and replacement material;Object Material, which receives user, can get material;Handling of goods and materials user can get material, be put into material and replacement material, and can be to personnel Information database is managed.
The material entry/exit library detail management has record material disengaging information to establish materials handling detailed data Database, the data-base recording include slot number, personnel's work number, material figure number and operate three field contents of detail, wherein Operate detail field format are as follows: the time+action type+material quantity+name of material.
The format of the time are as follows: when year-month-day: point: the second.
The operation realizes that module includes real for realizing the system operatio interface of system operatio and mutual cooperation function It is existing.
The system operatio interface includes for user entry personnel work number and modification logging user log-in interface, with dynamic Show inventory's display interface of the specifying information of material in each storage groove of material cabinet, to input the number or replacing that material is put into The material that the title of new material, figure number and number are inputted when material is put into/replaces interface, the object to input the number that material is received Material receives interface, is put into/replacement/with the material in the modification of personal information lane database, addition, deletion record and is received interface and people Member's information management interface.
Specifying information of the inventory's display interface to material in each storage groove of Dynamically Announce material cabinet, by button 1, Name of material display box 2, material figure number display box 3 and material quantity display box 4 form, the corresponding storage groove of each button, The number of four kinds of controls is consistent with material cabinet storage slot number, meanwhile, there are personnel information management interface entrances in interface, supply Handling of goods and materials person user uses.
The function realize include personal identity authentication, material information Dynamically Announce, rights management, material be put into, object Material replacement, material are received and personal information data base administration.
The personal identity authentication is personnel's work number, modification logging and the personal information that will be inputted in user's log-in interface Whether every recorder employee's field, the content of password field compare in database, matched by input data with record To realize.
Material information Dynamically Announce is obtained in each storage groove by reading the record in material information database one by one Material information, and be shown in inventory's display interface will be read again operated after completing the operation of material entry/exit library every time The corresponding record of storage groove realizes that information dynamic updates.
Rights management opens different operation entries, material group according to the user type recorded in personal information database The open material of user is sent to be put into/replace permission, material receives the open material of user and receives permission, the open material of handling of goods and materials user / being put into/is received to replace and personal information data base administration permission.
Material is put into, material receives that function is similar, is all by the storage groove number and material information database of user's selection In every record slot field compare, find matching record after, read the numerical value of quantity in stock field in the record, add Or the material quantity of user's input is subtracted, quantity in stock field is written into the numerical value after calculating again.Meanwhile in materials handling detail Automatically a record is added in database, record respectively the slot number of this operation, personnel's work number of user, operation material figure number With operation detail, detail form is operated are as follows: the time+being put into/receives+name of material+material number.
Material replacement is by the slot field of the storage groove number and every record in material information database of user's selection It compares, after finding matching record, this record name, figure number, the content of quantity in stock field is substituted for the phase of user's input Information is answered, meanwhile, add two records, two record bracket grooves number, personnel's work number words automatically in materials handling detailed data library Section is the storage groove number and personnel's work number of this operation user's selection, and name field content is respectively the object of slot Central Plains storage Material figure number and the material figure number being newly put into, operation detail field content is respectively time+taking-up+raw material quantity in stock+raw material Title and time+be put into+new material quantity+new name of material.
Personal information data base administration realizes the change of personnel's permission, Ren Yuanmi by the operation to personal information database Frameshift alteration, addition user and deletion user.
A kind of application method of aeronautical maintenance production scene material management system, the specific steps of which are as follows:
(1) user logs in: judging whether to exit the program, if exiting closing system;If not exiting entry personnel's work number and stepping on Land password;
(2) authentication: being proved to be successful and execute step (3), verifies unsuccessful execution (1);
(3) inventory shows: the material information of each storage groove of Dynamically Announce;
(4) judge whether to close interface: if closing interface executes step (1);If not closing interface, execute step (5);
(5) manage: selection needs the material storage groove operated, executes step (6);Personal information data base administration is selected, It executes step (7);
(6) judge user type: user sends user with charge free for material, executes step (8);User is that material receives user, is held Row step (9);User is handling of goods and materials user, is executed step (10);
(7) handling of goods and materials: judging whether user type is handling of goods and materials user, if so, executing step (11);If it is not, It executes step (3);
(8) material be put into/replace interface: material be put into execute step (12);It replaces material and executes step (13);
(9) receive material: the number of material is received in input, clicks confirmation, is executed step (3);
(10) material is put into, and/replacement/receives interface: material, which is put into, executes step (12);It replaces material and executes step (13); It receives material and executes step (9);
(11) personnel information management interface: deleting, addition user, and Modify password changes user right;
(12) be put into material: input is put into the number of material, clicks confirmation, executes step (3);
(13) it replaces material: inputting the title, figure number, number of new material, click confirmation, execute step (3).
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and what is described in the above embodiment and the description is only the present invention Principle, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these variation and Improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent Object defines.

Claims (10)

1. a kind of aeronautical maintenance production scene material management system, it is characterised in that: data are established including receiving information to material Library carries out the data management module of unified back-stage management, with data management module cooperation for realizing to the state for receiving material Module is realized in the operation tracked.
2. a kind of aeronautical maintenance production scene material management system according to claim 1, it is characterised in that: the number According to management module include to regulation all types of user access right and logon information personnel's rights management, to record material The stock material management of the material information of each storage groove, the material entry/exit library to record detailed material into information are bright in cabinet Tubule reason.
3. a kind of aeronautical maintenance production scene material management system according to claim 1, it is characterised in that: the people Member's rights management includes sending user with charge free for being put into the material of material and replacement material, receiving use for getting the material of material Family, for getting material, being put into material and replacement material and can be to the handling of goods and materials that personal information database is managed User.
4. a kind of aeronautical maintenance production scene material management system according to claim 1, it is characterised in that: the people Member's rights management has record user login information to establish the database of personal information data, the log-on message of the user Including four personnel's work number, personnel's name, password, user type field contents, wherein user type field contents are material group Give/material receives/handling of goods and materials.
5. a kind of aeronautical maintenance production scene material management system according to claim 1, it is characterised in that: the object There is record to put slot material information to establish the database of material information data for material stock control, and the data-base recording includes Three slot number, title, figure number and quantity in stock field contents, bracket groove number are the number of each storage groove, are stored in entitled slot Name of material, figure number are the material figure number stored in slot, and quantity in stock is the material quantity stored in the slot.
6. a kind of aeronautical maintenance production scene material management system according to claim 1, it is characterised in that: the object Material entry/exit library detail management has record material disengaging information to establish the database of materials handling detailed data, the number It include slot number, personnel's work number, material figure number and operation three field contents of detail according to library record, wherein operation detail field format Are as follows: the time+action type+material quantity+name of material.
7. a kind of aeronautical maintenance production scene material management system according to claim 1, it is characterised in that: the behaviour Make to realize that module includes realizing for realizing the system operatio interface of system operatio and mutual cooperation function.
8. a kind of aeronautical maintenance production scene material management system according to claim 1, it is characterised in that: described is Operation interface of uniting includes respectively storing for user entry personnel work number and modification logging user log-in interface, with Dynamically Announce material cabinet Inventory's display interface of the specifying information of material in slot, to input number that material is put into or input new material when replacing material Title, figure number and number material be put into/replace interface, with input the material for the number that material is received receive interface, with Personal information lane database is modified, is added, the material of deletion record is put into/replacement/and receives interface and personnel information management interface.
9. a kind of aeronautical maintenance production scene material management system according to claim 1, it is characterised in that: the function Be able to achieve including personal identity authentication, material information Dynamically Announce, rights management, material are put into, material is replaced, material is received and Personal information data base administration.
10. utilizing a kind of user of aeronautical maintenance production scene material management system described in any one of any one of claims 1 to 99 Method, it is characterised in that: the specific steps of which are as follows:
(1) user logs in: judging whether to exit the program, if exiting closing system;If not exiting entry personnel's work number and logging in close Code;
(2) authentication: being proved to be successful and execute step (3), verifies unsuccessful execution (1);
(3) inventory shows: the material information of each storage groove of Dynamically Announce;
(4) judge whether to close interface: if closing interface executes step (1);If not closing interface, execute step (5);
(5) manage: selection needs the material storage groove operated, executes step (6);Personal information data base administration is selected, is executed Step (7);
(6) judge user type: user sends user with charge free for material, executes step (8);User is that material receives user, executes step Suddenly (9);User is handling of goods and materials user, is executed step (10);
(7) handling of goods and materials: judging whether user type is handling of goods and materials user, if so, executing step (11);If it is not, executing Step (3);
(8) material be put into/replace interface: material be put into execute step (12);It replaces material and executes step (13);
(9) receive material: the number of material is received in input, clicks confirmation, is executed step (3);
(10) material is put into, and/replacement/receives interface: material, which is put into, executes step (12);It replaces material and executes step (13);It receives Material executes step (9);
(11) personnel information management interface: deleting, addition user, and Modify password changes user right;
(12) be put into material: input is put into the number of material, clicks confirmation, executes step (3);
(13) it replaces material: inputting the title, figure number, number of new material, click confirmation, execute step (3).
CN201810848889.7A 2018-07-28 2018-07-28 A kind of aeronautical maintenance production scene material management system and its application method Pending CN109165891A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810848889.7A CN109165891A (en) 2018-07-28 2018-07-28 A kind of aeronautical maintenance production scene material management system and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810848889.7A CN109165891A (en) 2018-07-28 2018-07-28 A kind of aeronautical maintenance production scene material management system and its application method

Publications (1)

Publication Number Publication Date
CN109165891A true CN109165891A (en) 2019-01-08

Family

ID=64898620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810848889.7A Pending CN109165891A (en) 2018-07-28 2018-07-28 A kind of aeronautical maintenance production scene material management system and its application method

Country Status (1)

Country Link
CN (1) CN109165891A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110617819A (en) * 2019-10-17 2019-12-27 国营芜湖机械厂 Unmanned aerial vehicle terrain auxiliary navigation method based on ant colony algorithm path planning
CN111860892A (en) * 2020-07-22 2020-10-30 中国烟草总公司深圳市公司 Tobacco equipment replacement management system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1991876A (en) * 2005-12-30 2007-07-04 英业达股份有限公司 Material management method and system
CN103854147A (en) * 2012-11-29 2014-06-11 瀚科科技(大连)有限公司 Ship material management method
CN106096886A (en) * 2016-06-13 2016-11-09 国网山东省电力公司龙口市供电公司 Power domain warehouse material management system
CN106355339A (en) * 2016-08-31 2017-01-25 合肥市正捷智能科技有限公司 Purchase and warehouse output and input management system for office supplies
CN106446006A (en) * 2016-08-08 2017-02-22 扎赉诺尔煤业有限责任公司 Material management system
CN108241941A (en) * 2016-12-27 2018-07-03 天津四德科技有限公司 A kind of inventory management system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1991876A (en) * 2005-12-30 2007-07-04 英业达股份有限公司 Material management method and system
CN103854147A (en) * 2012-11-29 2014-06-11 瀚科科技(大连)有限公司 Ship material management method
CN106096886A (en) * 2016-06-13 2016-11-09 国网山东省电力公司龙口市供电公司 Power domain warehouse material management system
CN106446006A (en) * 2016-08-08 2017-02-22 扎赉诺尔煤业有限责任公司 Material management system
CN106355339A (en) * 2016-08-31 2017-01-25 合肥市正捷智能科技有限公司 Purchase and warehouse output and input management system for office supplies
CN108241941A (en) * 2016-12-27 2018-07-03 天津四德科技有限公司 A kind of inventory management system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110617819A (en) * 2019-10-17 2019-12-27 国营芜湖机械厂 Unmanned aerial vehicle terrain auxiliary navigation method based on ant colony algorithm path planning
CN110617819B (en) * 2019-10-17 2022-09-30 国营芜湖机械厂 Unmanned aerial vehicle terrain auxiliary navigation method based on ant colony algorithm path planning
CN111860892A (en) * 2020-07-22 2020-10-30 中国烟草总公司深圳市公司 Tobacco equipment replacement management system and method

Similar Documents

Publication Publication Date Title
US11004157B2 (en) XBRL-based intelligent financial cloud platform system, construction method and business implementation method thereof
Inmon et al. Corporate information factory
AU735365B2 (en) A method and apparatus for document management utilizing a messaging system
AU735182B2 (en) Task-based classification and analysis system
CN101552842B (en) Call center application data and interoperation architecture for a telecommunication service center
US20040199867A1 (en) Content management system for managing publishing content objects
CN102722507B (en) content asset manager
CN104992261A (en) Book information retrieving and consulting method and system
CN109165891A (en) A kind of aeronautical maintenance production scene material management system and its application method
Nagabhushana Data warehousing OLAP and data mining
CN112506892A (en) Index traceability management system based on metadata technology
KR102339897B1 (en) Method for providing business process management system based on automatic report generation
CN102722781A (en) Work file system
US20240046117A1 (en) System and method for facilitating flexible and hierarchical storage and management of knowledge
JP2016148907A (en) Attribute information management device, attribute information management method and computer program
Fritz Sustainable enterprise strategies for optimizing digital stewardship: a guide for libraries, archives, and museums
CN108108160A (en) A kind of personal device manages system
CN102567359A (en) Document management method capable of tracking document modifications
CN102609802A (en) Information interaction method of automatic container managing system and billboard production managing system
JP2017021553A (en) Attribute information management device, attribute information management method and computer program
CN111612438A (en) Subject group scientific research management system in laboratory
CN112819423A (en) Enterprise information management system based on big data
Wang et al. The steps and methodology of identifying master data from business processes
Murtadho Knowledge management application system implementation in global energy company: Opentext 9.7. 1 livelink global exploitation
CN113255879B (en) Deep learning labeling method, system, computer equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190108

RJ01 Rejection of invention patent application after publication