CN102609802A - Information interaction method of automatic container managing system and billboard production managing system - Google Patents
Information interaction method of automatic container managing system and billboard production managing system Download PDFInfo
- Publication number
- CN102609802A CN102609802A CN2011104436887A CN201110443688A CN102609802A CN 102609802 A CN102609802 A CN 102609802A CN 2011104436887 A CN2011104436887 A CN 2011104436887A CN 201110443688 A CN201110443688 A CN 201110443688A CN 102609802 A CN102609802 A CN 102609802A
- Authority
- CN
- China
- Prior art keywords
- information
- counter
- management system
- robotization
- planning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
The invention relates to an information interaction method of an automatic container managing system and a billboard production managing system. In the invention, the information interaction method comprises the steps of order receiving, order editing, order output, operation feedback information monitoring, operation feedback information reading, operation feedback information emitting, operation feedback information output and the like in the order information interaction aspect, and comprises the steps of container planning triggering identification, container planning information reading, container planning information emitting, container planning information output and the like in the container information interaction aspect. The method disclosed by the invention effectively ensures the information interaction between the billboard production managing system and the automatic container managing system.
Description
Technical field
The invention belongs to spacecraft information system management field, mainly accomplish the information interaction of large automatic counter management system and billboard production management system.
Background technology
Because increasing the weight of day by day of model task, the storage space of storehouse and management mode can not satisfy the requirement of task to storage condition far away.For hardware facility problems such as solving material storage environment poor stability, search inconvenience, material selection efficient is low and the goods yard utilization factor is low, general assembly and environmental engineering portion storehouse have been introduced the robotization counter.
The introduction of robotization counter has improved selection efficient, standard material access specification property, the limited space of storehouse has obtained effective utilization, confidentiality, the security of material are guaranteed.But in the search procedure of material, still mixed a large amount of manually-operateds, what make material deposits, extracts not accurate enough, possibly have deviation.The robotization counter is except that access section, ventilating opening, and entire body seals, and has ensured the storage environment of material.But make the storehouse personnel can not get information about the deposit position of material in the robotization counter simultaneously, be unfavorable for searching and troubleshooting.
The billboard production management system is concentrated the management of accomplishing all materials in the whole satellite assembly development process; Not only be responsible for star with instrument, mechanism, pipe valve, coated material, securing member, keeping, allocation function, also be in charge of the auxiliary materials of instrument, frock and the generation used in whole total process of assembling directly under part, nonmetallic materials.And the robotization counter is mainly used in the material storage; Though the robotization counter can be realized the storage administration of material under the control of robotization counter management system; But because the inventory data of robotization goods is kept in the management system local data base; Be independent of outside the billboard data, can't utilize the billboard production management system that robotization counter management system is controlled with mutual, cause going out exist on convenience, uniform data property and the sharing that warehouse-in waits operation certain not enough.For bringing into play robotization counter management system advantage to a greater extent; Promote the store management whole capability; Need set up robotization counter management system and billboard production management system information interactive method, realize effective transmission of information between billboard production management system and the robotization counter.
Summary of the invention
The objective of the invention is through setting up robotization counter management system and billboard production management system information interacting method; Realize the information interaction of billboard production management system and robotization counter management system; Accomplish of the control of billboard production management system to operations such as the outbound of robotization counter, warehouse-in, inquiries; When the advantage that has made full use of the robotization counter improves stock ability,, improve the integral level of store management for store management provides reliable, detailed statistical data analysis.
Description of drawings
Fig. 1 is the sequence information exchange method implementation procedure synoptic diagram of mentioning among the present invention.
Fig. 2 is the counter planning information exchange method implementation procedure synoptic diagram of mentioning among the present invention.
Embodiment
The billboard production management system is the system of B/S framework; Robotization counter management system is the system of C/S framework; Two systems independently dispose; From the demand of handling of goods and materials, between billboard production management system and robotization counter management system, need to accomplish two big category informations alternately: sequence information and counter planning information alternately.Triggering by the billboard production management system alternately of sequence information wherein, and the counter planning information is by robotization counter management system triggers, the realization of the two has very big difference.
In the implementation procedure of sequence information exchange method, realize through following technical scheme:
Step 1, order receives: receive the materiel warehouse-in, the outbound sequence information that generate in the billboard production management system;
Step 2, the order editor: order contents, form, coded system to receiving are edited.Aspect content; The order contents that generates in the billboard production management system comprises multiple information such as order number, material code name, model, title, quantity, payment unit, warehouse-in people, handler; And identifiable information comprises information such as O/No., code name in the robotization counter management system; Therefore; Not only to generate O/No. information, also will carry out screening, reject the content that in robotization counter management system, can't read original information in the order according to the order contents that generates in the billboard production management system; On form; In the billboard production management system in the title of sequence information item, identifier and the robotization counter management system distinguished name claim and identifier and inconsistent; Therefore; Need accomplish the adjustment of item of information form according to original order, to guarantee that automated management system can be to information Recognition; On coded system; The sequence information that generates in the billboard production management system adopts the Unicode coding, and the identifiable information coded format is a machine code in the robotization counter management system, therefore; Need change the coded format of sequence information, be translated into the machine code language;
Step 3, order output: the sequence information after will editing outputs under the robotization counter management system specified message read path.It is the AOD.TXT file that a file is arranged in the external information interactive interface of robotization counter management system appointment, in order to store the sequence information that the outside is imported into, therefore, need information be input in this document;
Step 4, operational feedback information is monitored.Feedback information to the operation of robotization counter is monitored.It is the AOUP.TXT file that a file is arranged in the external information interactive interface of robotization counter management system appointment; In order to the status information after the storage operation execution; Robotization counter management system can be written to the execution result feedback information of operating in the AOUP.TXT file after the robotization counter completes successfully associative operation; Utilize operational feedback information monitor method to change the information content in this document and monitor, variation and the content change big or small according to monitoring file canned data amount determine whether reading of the information of carrying out;
Step 5, operational feedback information reads: the AOUP.TXT file content in the external information interactive interface of robotization counter management system appointment reads;
Step 6, operational feedback information editing: content, form, coded system to the operational feedback information that reads are edited.In terms of content, obtain information such as the order number of order in the billboard production management system, stock number through information such as the O/No. in the feedback information, code names, so that in the billboard production management system, match correct information record; On form; In the billboard production management system in the title of sequence information item, identifier and the robotization counter management system distinguished name claim and identifier and inconsistent; Therefore; Need to accomplish the adjustment of item of information form, to guarantee that the billboard production management system can be to information Recognition according to the operational feedback information that reads; On coded system, change information into the Unicode coded system by the coded system of machine code;
Step 7, feedback information output: the information that will pass through behind the editor is exported to the information updating method in the billboard production management system, so that the renewal of completion information in the billboard production management system.
In the implementation procedure of counter planning information exchange method, realize through following technical scheme:
Step 1, counter planning triggers identification: the robotization counter planning information trigger action in the billboard production management system is upgraded in identification synchronously, determines whether to carry out reading of counter planning information through the identification to trigger action;
Step 2, the counter planning information reads: read information such as counter planning under the robotization counter management system, goods yard planning;
Step 3, counter planning information editor: the planning information to the counter that reads is edited, and comprises the information editing of content, form, three aspects of coding, the step 6 of editor's form contingent order information interacting method implementation procedure;
Step 4, the output of counter planning information: the counter planning information after will editing is exported to the billboard production management system, with completion renewal to robotization counter planning information in the billboard production management system.
Through robotization counter management system and billboard production management system information interacting method, realized the information interaction of robotization counter management system and billboard production management system, effectively robotization counter management system is included in the existing stock control system.When guaranteeing billboard production management system each item function; Given full play to the advantage of robotization counter in handling of goods and materials; Increased the space availability ratio of storehouse; Improved material selection efficient, strengthened the confidentiality of material storage and, promoted the standardization of storehouse handling of goods and materials on the whole greatly the protectiveness of material.
Claims (1)
1. billboard production management system and robotization counter management system exchange method, wherein the billboard production management system realizes management, handling of goods and materials are carried out in the plant working planning management in the research and production activity, operation; Robotization counter management system realizes the operational management to the robotization counter, and said exchange method comprises material sequence information exchange method and counter planning information exchange method; Wherein said material sequence information exchange method comprises following performing step:
Step 1, order receives: receive the materiel warehouse-in, the outbound sequence information that generate in the billboard production management system;
Step 2, the order editor: content, form, coded system to the sequence information that receives are edited, to satisfy the identification demand of robotization counter management system;
Step 3, order output: the sequence information after will editing is input under the robotization counter management system specified message read path;
Step 4, operational feedback information is monitored: the feedback information to the operation of robotization counter is monitored, and judges whether the robotization counter has accomplished the operation that order relates to, and whether decision carries out reading of information according to snoop results;
Step 5, operational feedback information reads: the operational feedback information that robotization counter management system is returned reads;
Step 6, operational feedback information editing: content, form, coded system to the operational feedback information that reads are edited, to satisfy the identification demand of billboard production management system;
Step 7, feedback information output: the information that will pass through behind the editor is exported to the information updating method in the billboard production management system, so that the renewal of completion information in the billboard production management system.
Said counter planning information exchange method comprises following performing step:
Step 1, counter planning triggers identification: the trigger action of the robotization counter planning information in the billboard production management system is upgraded in identification synchronously;
Step 2, the counter planning information reads: read information such as counter planning under the robotization counter management system, goods yard planning;
Step 3, counter planning information editor: the planning information to the counter that reads is edited, and comprises the information editing of content, form, three aspects of coding;
Step 4, the output of counter planning information: the counter planning information after will editing is exported to the billboard production management system, so that in the billboard production management system, accomplish the renewal to robotization counter planning information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110443688.7A CN102609802B (en) | 2011-12-27 | 2011-12-27 | Information interaction method of automatic container managing system and billboard production managing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110443688.7A CN102609802B (en) | 2011-12-27 | 2011-12-27 | Information interaction method of automatic container managing system and billboard production managing system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102609802A true CN102609802A (en) | 2012-07-25 |
CN102609802B CN102609802B (en) | 2015-04-08 |
Family
ID=46527154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110443688.7A Active CN102609802B (en) | 2011-12-27 | 2011-12-27 | Information interaction method of automatic container managing system and billboard production managing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102609802B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103345584A (en) * | 2013-07-11 | 2013-10-09 | 南京晨光集团有限责任公司 | Method for assessing processing propriety of assembly production problems of spacecraft |
CN104966358A (en) * | 2015-06-17 | 2015-10-07 | 北京京东尚科信息技术有限公司 | Automatic storage type automatic pickup cabinet distribution method, device and system |
CN106570247A (en) * | 2016-11-02 | 2017-04-19 | 佛山市龙眼智能制造科技有限公司 | Method for determining design parameters of packing belt |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1801200A (en) * | 2005-01-08 | 2006-07-12 | 鸿富锦精密工业(深圳)有限公司 | Order form goods providing system and method |
CN101159052A (en) * | 2007-11-23 | 2008-04-09 | 金蝶软件(中国)有限公司 | Reading board data processing method and reading board application integrating system |
CN201946033U (en) * | 2011-01-07 | 2011-08-24 | 深圳市今天国际物流技术股份有限公司 | Warehouse management system |
-
2011
- 2011-12-27 CN CN201110443688.7A patent/CN102609802B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1801200A (en) * | 2005-01-08 | 2006-07-12 | 鸿富锦精密工业(深圳)有限公司 | Order form goods providing system and method |
CN101159052A (en) * | 2007-11-23 | 2008-04-09 | 金蝶软件(中国)有限公司 | Reading board data processing method and reading board application integrating system |
CN201946033U (en) * | 2011-01-07 | 2011-08-24 | 深圳市今天国际物流技术股份有限公司 | Warehouse management system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103345584A (en) * | 2013-07-11 | 2013-10-09 | 南京晨光集团有限责任公司 | Method for assessing processing propriety of assembly production problems of spacecraft |
CN103345584B (en) * | 2013-07-11 | 2016-04-20 | 南京晨光集团有限责任公司 | The method of assessment spacecraft production issue handling priority |
CN104966358A (en) * | 2015-06-17 | 2015-10-07 | 北京京东尚科信息技术有限公司 | Automatic storage type automatic pickup cabinet distribution method, device and system |
CN106570247A (en) * | 2016-11-02 | 2017-04-19 | 佛山市龙眼智能制造科技有限公司 | Method for determining design parameters of packing belt |
CN106570247B (en) * | 2016-11-02 | 2019-08-09 | 广东包庄科技有限公司 | A kind of method of determining strap design parameter |
Also Published As
Publication number | Publication date |
---|---|
CN102609802B (en) | 2015-04-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lin et al. | An innovative machine learning model for supply chain management | |
CN101059695B (en) | Programmatic access to controller construct and variable names | |
US11004157B2 (en) | XBRL-based intelligent financial cloud platform system, construction method and business implementation method thereof | |
US8086649B1 (en) | Incremental association of metadata to production data | |
Chen et al. | Development of an agent-based system for manufacturing control and coordination with ontology and RFID technology | |
AU2005203516A1 (en) | RFID enabled information systems utilizing a business application | |
Sahara et al. | Real-time data integration of an internet-of-things-based smart warehouse: a case study | |
CN101789092A (en) | System and method of business process management method collaborative work | |
CN103810563A (en) | RFID based electric power asset entire life-cycle management system | |
Tonelli et al. | Cyber-physical systems (CPS) in supply chain management: from foundations to practical implementation | |
Vermeulen | Practical Data Science: A Guide to Building the Technology Stack for Turning Data Lakes into Business Assets | |
D'Amours et al. | Forest value chain optimization and sustainability | |
Zaychenko et al. | Digital logistics transformation: implementing the Internet of Things (IoT) | |
CN102609802A (en) | Information interaction method of automatic container managing system and billboard production managing system | |
CN116187915A (en) | Warehouse management method, device, equipment and storage medium | |
CN116774977A (en) | Design method of coal mine industrial Internet of things development platform based on low codes | |
CN103150164B (en) | The quick SOWF framework method that a kind of transaction rules drives | |
Pradhan et al. | A Novel IIoT Based ERP-PLM System for MSME of Indian Market | |
Yue et al. | A smart manufacturing compliance architecture of electronic batch recording system (eBRS) for life sciences industry | |
CN117591079A (en) | Design construction method of enterprise-level integrated operation management system | |
CN201974852U (en) | Financial voucher generating system | |
Rabelo et al. | Business intelligence support for supply chain management | |
CN114971547A (en) | Component product level borrowing analysis method and system | |
CN102708201B (en) | Mass data collection method based on RFID (Radio Frequency Identification Devices) reader-writer | |
Xiong et al. | The framework of information collection and data management for mass customization furniture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |