CN109094723A - A kind of hawse-pipe and anchor station fabrication and installation method - Google Patents
A kind of hawse-pipe and anchor station fabrication and installation method Download PDFInfo
- Publication number
- CN109094723A CN109094723A CN201811135404.6A CN201811135404A CN109094723A CN 109094723 A CN109094723 A CN 109094723A CN 201811135404 A CN201811135404 A CN 201811135404A CN 109094723 A CN109094723 A CN 109094723A
- Authority
- CN
- China
- Prior art keywords
- hawse
- anchor station
- line
- pipe
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B71/00—Designing vessels; Predicting their performance
Abstract
The invention discloses a kind of hawse-pipes and anchor station fabrication and installation method, by carrying out marking to the intersection intersected with outside plate and the first hookup wire for installing floor on hawse-pipe, first level line is marked in anchor station and the first costal line is marked, hull center line is marked above deck, second rib line and installation direction, the second horizontal line is marked on ship hull plate, third costal line and installation direction, in installation process, utilize the hawse-pipe, anchor station, deck and outside plate carry out the mode for being directed at each mark line, finally improve the installation accuracy of anchor system entirety, achieve the purpose that control installation accuracy, the installation method can reduce follow-up work, improve the working efficiency of shipbuilding entirety.
Description
Technical field
The present invention relates to shipbuilding technical field more particularly to a kind of hawse-pipes and anchor station fabrication and installation method.
Background technique
In the anchor system of large ship, be usually designed to the anchorage storage form solution of anchor station and anchor lip cast anchor collide it is outer
The problem of plate, anchor station structure is more complicated (size big, weight weight), needs to be attached to the installation of ship hull plate outer surface, wants to precision
Ask higher, and currently without a kind of method of installation accuracy of control well, so that work on the spot efficiency is low, installation essence
Spend poor, follow-up work increases, and also will affect and receives the normal operation that anchor puts anchor.
Summary of the invention
In order to overcome the shortcomings of the prior art, the present invention provides a kind of by carrying out installation essence to multiple fixing links
Spend the hawse-pipe and anchor station fabrication and installation method of control.
In order to solve the above-mentioned technical problems, the present invention provides a kind of hawse-pipes and anchor station fabrication and installation method, including with
Lower step:
S1, two sections of semi arch plates are taken, makes simple jig frame, the semi arch plate is placed on the moulding bed, by two sections
The extra surplus in two straight line sides of the semi arch plate carries out cutting removal, and outputs groove in side, by two sections described half
Arc plate, which closes up, is welded into hawse-pipe, and the intersection and bracket intersected with ship hull plate is marked on the side wall of the hawse-pipe
The first hookup wire, to the intersection and first hookup wire get first ocean punching point be marked;
S2, the second hookup wire that cross hairs and bracket are marked on the anchor station panel, according to the cross hairs mark
Installation direction out is got the second ocean punching point to second hookup wire and is marked, according to first hookup wire in the anchor
Floor is installed on deck plate, anchor station coaming plate is installed on the anchor station panel, and marks the first water on the anchor station coaming plate
Horizontal line and the first costal line are got third ocean punching point to first costal line and are marked, and erection welding is at anchor station;
S3, hull center line, second rib line and installation direction are marked above deck using deck opening sample, using outer
Plate opening sample marks the second horizontal line, third costal line and installation direction on the outer hull of the ship, opens up deck mounting hole and outer
Plate mounting hole, wherein the second rib line and the third costal line are accordingly aligned;
S4, hawse-pipe lifting is tilted into from the deck mounting hole, is stretched out from the outside plate mounting hole, until
The intersection is overlapped with the sideline of the outside plate mounting hole, and the anchor station is promoted from the lower section of the hawse-pipe, is nested into
On the hawse-pipe, it is directed at the first level line and two horizontal line, and be directed at first costal line and third rib cage
Line carries out erection welding;
S5, the anchor station panel is preheated, welding installation anchor lip.
Preferably, the simple jig frame is made in the step S1 are as follows: leading line is marked on the ground, along
The direction of the leading line is arranged several support shutterings, along horizontally arranged connecting plate between each support shuttering.
Preferably, in the step S2, conformal branch is set in the plane that the anchor station is in contact with ship hull plate
Fagging in the step S4, is removed the conformal support plate before the anchor station is inserted in the hawse-pipe.
Preferably, in the step S2, the floor is blocked using angular templet in the floor when installing
Between the anchor station panel.
Preferably, in the step S3, the reality of both the deck mounting hole and described outside plate mounting hole
Aperture lines expand 2mm than theoretical aperture lines outward.
Preferably, in the step S4, contact surface between hawse-pipe described in mowing and the anchor station, so that
The external port of the hawse-pipe and the anchor station panel are in the same plane.
Preferably, the installation direction includes stem, tail portion, suitable for reading and lower mouth four direction.
Hawse-pipe provided by the embodiment of the present invention and anchor station fabrication and installation method, compared with prior art, beneficial to effect
Fruit is: the present invention is by crossing to the intersection intersected with outside plate and the first hookup wire for installing floor on hawse-pipe
Label, first level line is marked in anchor station and the first costal line is marked, marks hull center line, the second rib above deck
Bone line and installation direction, mark the second horizontal line, third costal line and installation direction on ship hull plate, in installation process,
By the hawse-pipe, anchor station, deck and outside plate be aligned each mark line in the way of, it is whole to finally improve anchor system
Installation accuracy has achieved the purpose that control installation accuracy, which can reduce follow-up work, improves shipbuilding entirety
Working efficiency.
Detailed description of the invention
In order to illustrate more clearly of technical solution of the present invention, attached drawing needed in embodiment will be made below
Simply introduce, it should be apparent that, the accompanying drawings in the following description is only some embodiments of the present invention, general for this field
For logical technical staff, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the knot using the hawse-pipe of the preferred embodiment of the invention and the hawse-pipe of anchor station fabrication and installation method and anchor station
Structure schematic diagram.
B is to structural schematic diagram in Fig. 2 Fig. 1.
Fig. 3 is using the hawse-pipe of the preferred embodiment of the invention and the jig structure schematic diagram of anchor station fabrication and installation method.
Fig. 4 is another viewing angle constructions schematic diagram of Fig. 3.
The hawse-pipe of Fig. 5 application preferred embodiment of the invention and the hawse-pipe scribing line schematic diagram of anchor station fabrication and installation method.
The hawse-pipe of Fig. 6 application preferred embodiment of the invention and the outside plate scribing line schematic diagram of anchor station fabrication and installation method.
The hawse-pipe of Fig. 7 application preferred embodiment of the invention and the anchor station structural schematic diagram of anchor station fabrication and installation method.
In figure: 1. outside plates;2. deck;3. hawse-pipe;4. intersection;5. the first hookup wire;6. anchor station panel;7. anchor station is enclosed
Plate;8. floor;9. anchor lip;10. cross hairs;11. first level line;12. the first costal line;13. outside plate mounting hole;14. third
Costal line;15. support shuttering;16. connecting plate;17. conformal support plate;18. angular templet.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
As shown in Figures 1 to 7, the preferred embodiment of the invention provides a kind of hawse-pipe and anchor station fabrication and installation method,
The following steps are included:
S1, two sections of semi arch plates are taken, makes simple jig frame, the semi arch plate is placed on the moulding bed, by two sections
The extra surplus in two straight line sides of the semi arch plate carries out cutting removal, and outputs groove in side, by two sections described half
Arc plate, which closes up, is welded into hawse-pipe 3, marked on the side wall of the hawse-pipe 3 intersection 4 intersected with ship hull plate 1 and
First hookup wire 5 of bracket is got the first ocean punching point to the intersection 4 and first hookup wire 5 and is marked;
S2, the second hookup wire that cross hairs 10 and bracket are marked on the anchor station panel 6, according to the cross hairs 10
Installation direction is marked, the second ocean punching point is got to second hookup wire and is marked, according to first hookup wire 5 in institute
Installation floor 8 on anchor station panel 6 is stated, anchor station coaming plate 7 is installed on the anchor station panel 6, and is drawn on the anchor station coaming plate 7
First level line 11 and the first costal line 12 out are got third ocean punching point to first costal line 12 and are marked, assembly weldering
It is connected into anchor station;
S3, hull center line, second rib line and installation direction are marked on deck 2 using deck opening sample, used
Outside plate opening sample marks the second horizontal line, third costal line 14 and installation direction on ship hull plate 1, opens up deck mounting hole
With outside plate mounting hole 13, wherein the second rib line and the third costal line 14 are accordingly aligned;Wherein, on the deck 2
Second rib line and outside plate 1 on third costal line 14 it is corresponding, on installation direction on the deck 2 and the outside plate 1
Installation direction it is consistent;
S4, the hawse-pipe 3 lifting is tilted into from 2 mounting hole of deck, is stretched out from the outside plate mounting hole 13,
Until the intersection 4 is overlapped with the sideline of the outside plate mounting hole 13, the anchor station is pushed away from the lower section of the hawse-pipe 3
Into being nested on the hawse-pipe 3, be directed at the first level line 11 and two horizontal line, and be directed at first rib cage
Line 12 and third costal line 14 carry out erection welding;Wherein, on the first hookup wire 5 and the anchor station on the hawse-pipe 3
The corresponding connection of floor 8,
S5, the anchor station panel 6 is preheated, welding installation anchor lip 9.
Hawse-pipe and anchor station fabrication and installation method based on above-mentioned technical characteristic, by hawse-pipe 3 to 1 phase of outside plate
The intersection 4 of friendship and the first hookup wire 5 for installing floor 8 carry out marking, and 11 He of first level line is marked in anchor station
First costal line 12 is marked, and hull center line, second rib line and installation direction, ship hull plate 1 are marked on deck 2
On mark the second horizontal line, third costal line 14 and installation direction, in installation process, utilize the hawse-pipe 3, anchor station, first
Plate 2 and outside plate 1 carry out the mode for being directed at each mark line, finally improve the installation accuracy of anchor system entirety, have reached control
The purpose of installation accuracy, the installation method can reduce follow-up work, improve the working efficiency of shipbuilding entirety.
Further, the simple jig frame is made in the step S1 are as follows: mark leading line on the ground, lead along described
To the direction of line, several support shutterings 15 are set, along horizontally arranged connecting plate 16 between each support shuttering 15,
Specifically, left and right ends are respectively retracted 50mm setting support shuttering 15 in the 3 length direction distance range of hawse-pipe, in
Between the distance between the two neighboring support shuttering 15 be 800mm, the leading line includes horizontal line and center line, uses wood
Sample checks the accuracy of 15 internal orifice of support shuttering in blocking, and the connecting plate 16 is arranged along the direction of the center line 45
Degree and 90 degree at, the hawse-pipe 3 had both been consolidated, but also moulding bed cost of manufacture is lower.
Further, in the step S1, by after tire on semi arch plate, the semi arch plate is carried out checking whether change
Shape is welded after need to being corrected again if being deformed.
Further, in the step S2, conformal support is set in the plane that the anchor station is in contact with ship hull plate 1
Plate 17 in the step S4, is removed the conformal support plate 17 before the anchor station is inserted in the hawse-pipe 3, specifically,
The plane retraction 50mm contacted in the anchor station with the outside plate 1 plays interim reinforcement and makees plus the conformal support plate 17 of annular
With, avoid deformation of colliding in moving process, when the anchor station is inserted in be installed on the hawse-pipe 3 before by the conformal branch
Fagging 17 is removed, and the installation accuracy of the anchor station is further ensured.
Further, in the step S2, the floor 8 is blocked using angular templet 18 in the floor 8 when installing
Between the anchor station panel 6, during installing the floor 8, it should be noted that the thickness direction of the floor 8, utilizes
The angular templet 18 guarantees the installation accuracy of the floor 8 after welding.
Further, in the step S3, both 2 mounting hole of deck and described outside plate mounting hole 13 are actually opened
Mouth line expands 2mm than theoretical aperture lines outward, in order to which the assembly of the hawse-pipe 3 is installed.
Further, in the step S4, contact surface between hawse-pipe 3 and the anchor station described in mowing, so that institute
The external port for stating hawse-pipe 3 and the anchor station panel 6 in the same plane, are installed anchor lip 9 convenient for subsequent.
Further, the installation direction includes stem, tail portion, suitable for reading and lower mouth four direction, is convenient for the hawse-pipe 3
And anchor lip 9 is positioned.
Further, in the step S5, to the anchor station panel 6 preheating temperature setting 80-120 degrees Celsius it
Between.
In conclusion the hawse-pipe and anchor station fabrication and installation method of the embodiment of the present invention are to the hawse-pipe 3 and institute
It states anchor station installing and carrying out the precision controlling for being directed at scribing line on the outside plate 1, finally improves the installation accuracy of anchor system, mention
High working efficiency, avoids increasing excessive follow-up work.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;
And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and
Range.
Claims (7)
1. a kind of hawse-pipe and anchor station fabrication and installation method, which comprises the following steps:
S1, two sections of semi arch plates are taken, makes simple jig frame, the semi arch plate is placed on the moulding bed, described in two sections
The extra surplus in two straight line sides of semi arch plate carries out cutting removal, and outputs groove in side, by two sections of semi arches
Plate, which closes up, is welded into hawse-pipe, and the of the intersection and bracket intersected with ship hull plate is marked on the side wall of the hawse-pipe
One hookup wire is got the first ocean punching point to the intersection and first hookup wire and is marked;
S2, the second hookup wire that cross hairs and bracket are marked on the anchor station panel go out to pacify according to the cross hairs mark
Direction is filled, the second ocean punching point is got to second hookup wire and is marked, according to first hookup wire in the anchor station face
Floor is installed on plate, anchor station coaming plate is installed on the anchor station panel, and marks first level line on the anchor station coaming plate
With the first costal line, third ocean punching point is got to first costal line and is marked, erection welding is at anchor station;
S3, hull center line, second rib line and installation direction are marked above deck using deck opening sample, is opened using outside plate
Mouth sample marks the second horizontal line, third costal line and installation direction on the outer hull of the ship, opens up deck mounting hole and outside plate peace
Fill hole, wherein the second rib line and the third costal line are accordingly aligned;
S4, hawse-pipe lifting is tilted into from the deck mounting hole, is stretched out from the outside plate mounting hole, until described
Intersection is overlapped with the sideline of the outside plate mounting hole, and the anchor station is promoted from the lower section of the hawse-pipe, is nested into described
On hawse-pipe, it is directed at the first level line and two horizontal line, and be directed at first costal line and third costal line, into
Row erection welding;
S5, the anchor station panel is preheated, welding installation anchor lip.
2. hawse-pipe according to claim 1 and anchor station fabrication and installation method, which is characterized in that make in the step S1
Make the simple jig frame are as follows: mark leading line on the ground, several support shutterings are set along the direction of the leading line, respectively
Along horizontally arranged connecting plate between the support shuttering.
3. hawse-pipe according to claim 1 and anchor station fabrication and installation method, which is characterized in that in the step S2,
Plane that the anchor station is in contact with ship hull plate is arranged conformal support plate, in the step S4, is inserted in the anchor station described
The conformal support plate is removed before hawse-pipe.
4. hawse-pipe according to claim 4 and anchor station fabrication and installation method, which is characterized in that in the step S2,
The floor is blocked between the floor and the anchor station panel when installing using angular templet.
5. hawse-pipe according to claim 1 and anchor station fabrication and installation method, which is characterized in that in the step S3,
The actual aperture line of both the deck mounting hole and the outside plate mounting hole expands 2mm than theoretical aperture lines outward.
6. hawse-pipe according to claim 1 and anchor station fabrication and installation method, which is characterized in that in the step S4,
Contact surface between hawse-pipe described in mowing and the anchor station, so that the external port of the hawse-pipe and the anchor station panel are same
In one plane.
7. hawse-pipe according to claim 1 to 6 and anchor station fabrication and installation method, which is characterized in that the peace
Filling direction includes stem, tail portion, suitable for reading and lower mouth four direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811135404.6A CN109094723B (en) | 2018-09-28 | 2018-09-28 | Anchor chain cylinder and anchor platform manufacturing and mounting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811135404.6A CN109094723B (en) | 2018-09-28 | 2018-09-28 | Anchor chain cylinder and anchor platform manufacturing and mounting method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109094723A true CN109094723A (en) | 2018-12-28 |
CN109094723B CN109094723B (en) | 2020-02-07 |
Family
ID=64867422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811135404.6A Active CN109094723B (en) | 2018-09-28 | 2018-09-28 | Anchor chain cylinder and anchor platform manufacturing and mounting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109094723B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109501960A (en) * | 2018-12-29 | 2019-03-22 | 芜湖造船厂有限公司 | A kind of pre-assembled structure of anchor station and its assembly method |
CN110877682A (en) * | 2019-11-13 | 2020-03-13 | 沪东中华造船(集团)有限公司 | Ship unbalanced anchor lip preassembling process |
CN111532379A (en) * | 2020-04-28 | 2020-08-14 | 江苏扬子鑫福造船有限公司 | Ship anchor platform structure and machining method thereof |
CN112249262A (en) * | 2020-10-28 | 2021-01-22 | 上海外高桥造船有限公司 | Quick positioning method for ship anchor platform |
CN112407183A (en) * | 2020-11-26 | 2021-02-26 | 江南造船(集团)有限责任公司 | Lofting design method for hawse pipe and anchor platform |
CN112606970A (en) * | 2020-12-18 | 2021-04-06 | 武昌船舶重工集团有限公司 | Vertical alignment tool and ship rudder system alignment hoisting method |
CN113697036A (en) * | 2021-09-30 | 2021-11-26 | 广船国际有限公司 | Ship with anchor block |
CN113955039A (en) * | 2021-11-19 | 2022-01-21 | 沪东中华造船(集团)有限公司 | Method for controlling mounting precision of hawse pipe in total assembly stage |
CN113978658A (en) * | 2021-11-30 | 2022-01-28 | 沪东中华造船(集团)有限公司 | Method for accurately installing low-position toggle plate of liquid cargo tank of containment system |
CN113998072A (en) * | 2021-11-30 | 2022-02-01 | 沪东中华造船(集团)有限公司 | Manufacturing and mounting method of standard anchor platform |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1433924A (en) * | 2003-02-28 | 2003-08-06 | 渤海船舶重工有限责任公司 | Anchor lip and platform design technology for large grasp force anchor |
CN202226032U (en) * | 2011-08-12 | 2012-05-23 | 武昌造船厂集团有限公司 | Anchor platform with knee plate |
CN104071300A (en) * | 2014-07-11 | 2014-10-01 | 广州文冲船厂有限责任公司 | Installation method for integrated prefabrication of anchor platform and anchor mouth |
KR20150029876A (en) * | 2013-09-11 | 2015-03-19 | 삼성중공업 주식회사 | Structure and method of installing hawse pipe |
CN105644714A (en) * | 2015-12-21 | 2016-06-08 | 广船国际有限公司 | Manufacturing and installing method of anchor bed assembly |
-
2018
- 2018-09-28 CN CN201811135404.6A patent/CN109094723B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1433924A (en) * | 2003-02-28 | 2003-08-06 | 渤海船舶重工有限责任公司 | Anchor lip and platform design technology for large grasp force anchor |
CN202226032U (en) * | 2011-08-12 | 2012-05-23 | 武昌造船厂集团有限公司 | Anchor platform with knee plate |
KR20150029876A (en) * | 2013-09-11 | 2015-03-19 | 삼성중공업 주식회사 | Structure and method of installing hawse pipe |
CN104071300A (en) * | 2014-07-11 | 2014-10-01 | 广州文冲船厂有限责任公司 | Installation method for integrated prefabrication of anchor platform and anchor mouth |
CN105644714A (en) * | 2015-12-21 | 2016-06-08 | 广船国际有限公司 | Manufacturing and installing method of anchor bed assembly |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109501960B (en) * | 2018-12-29 | 2020-05-19 | 芜湖造船厂有限公司 | Anchor chock pre-assembly structure and assembling method thereof |
CN109501960A (en) * | 2018-12-29 | 2019-03-22 | 芜湖造船厂有限公司 | A kind of pre-assembled structure of anchor station and its assembly method |
CN110877682A (en) * | 2019-11-13 | 2020-03-13 | 沪东中华造船(集团)有限公司 | Ship unbalanced anchor lip preassembling process |
CN111532379A (en) * | 2020-04-28 | 2020-08-14 | 江苏扬子鑫福造船有限公司 | Ship anchor platform structure and machining method thereof |
WO2021218202A1 (en) * | 2020-04-28 | 2021-11-04 | 江苏扬子鑫福造船有限公司 | Anchor bed structure of ship and machining method therefor |
CN111532379B (en) * | 2020-04-28 | 2023-12-15 | 江苏扬子鑫福造船有限公司 | Ship anchor platform structure and processing method thereof |
CN112249262A (en) * | 2020-10-28 | 2021-01-22 | 上海外高桥造船有限公司 | Quick positioning method for ship anchor platform |
CN112249262B (en) * | 2020-10-28 | 2021-12-17 | 上海外高桥造船有限公司 | Quick positioning method for ship anchor platform |
CN112407183A (en) * | 2020-11-26 | 2021-02-26 | 江南造船(集团)有限责任公司 | Lofting design method for hawse pipe and anchor platform |
CN112606970B (en) * | 2020-12-18 | 2022-02-01 | 武昌船舶重工集团有限公司 | Vertical alignment tool and ship rudder system alignment hoisting method |
CN112606970A (en) * | 2020-12-18 | 2021-04-06 | 武昌船舶重工集团有限公司 | Vertical alignment tool and ship rudder system alignment hoisting method |
CN113697036A (en) * | 2021-09-30 | 2021-11-26 | 广船国际有限公司 | Ship with anchor block |
CN113955039A (en) * | 2021-11-19 | 2022-01-21 | 沪东中华造船(集团)有限公司 | Method for controlling mounting precision of hawse pipe in total assembly stage |
CN113998072A (en) * | 2021-11-30 | 2022-02-01 | 沪东中华造船(集团)有限公司 | Manufacturing and mounting method of standard anchor platform |
CN113978658A (en) * | 2021-11-30 | 2022-01-28 | 沪东中华造船(集团)有限公司 | Method for accurately installing low-position toggle plate of liquid cargo tank of containment system |
CN113998072B (en) * | 2021-11-30 | 2023-11-07 | 沪东中华造船(集团)有限公司 | Manufacturing and installing method of standard anchor platform |
Also Published As
Publication number | Publication date |
---|---|
CN109094723B (en) | 2020-02-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109094723A (en) | A kind of hawse-pipe and anchor station fabrication and installation method | |
CN110667801B (en) | Sectional manufacturing method for deck of dome of LNG ship | |
CN108103938B (en) | A kind of double deck module solid trial assembly method of large steel girder | |
CN105937302B (en) | A kind of application of curved wall template system in concreting | |
CN107700360B (en) | A kind of assembling method of truss bridge section | |
CN106906955A (en) | A kind of integral prefabricated reinforcing bar web frame of shear wall and its construction method | |
CN111287067A (en) | Manufacturing method for curved part of steel box arch unit | |
CN109334858A (en) | A kind of method that ship superstructure is built | |
CN110588884B (en) | High-precision allowance-free control process for large bow | |
CN105252158A (en) | Welding construction method for bottom plate of large storage tank | |
CN108360387A (en) | A kind of continuous just trusses sliding roadway arch steel bridge rapid constructing method | |
CN210316020U (en) | Section steel concrete composite structure | |
CN110130387A (en) | A kind of building technology of integrated form set cage | |
CN106882326A (en) | A kind of molten stainless steel freighter is segmented Quick carrying localization method | |
CN106184610A (en) | A kind of sternpost and tail fin installation method | |
CN109702387A (en) | A kind of stayed bridge pylon cable inner lining steel construction manufacturing method | |
CN107060205A (en) | A kind of many curve petal truss structures and its construction method | |
CN112550593B (en) | Method for quickly positioning reverse total assembly of double rudder systems | |
CN105129020A (en) | Method for installing dome on full-revolving propeller | |
CN212508349U (en) | Steel shed for supporting high-ground-pressure soft rock roadway | |
CN103225347A (en) | Multi-layer multi-way intersected large-scale super-thick plate node for super-high space and manufacturing method thereof | |
CN106958324A (en) | Large-diameter steel bar mesh and method for butting large-diameter steel bar mesh by using connecting rods | |
CN104908885B (en) | A kind of ship forecastle bulwark integral production method | |
CN107972806B (en) | Shape preserving method of hyperbolic outer plate and hyperbolic outer plate structure | |
CN105888286B (en) | A kind of method that groove profile collar extension plate moves up reinforcement Steel Tube Joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20181228 Assignee: GUANGZHOU WENCHONG SHIPYARD Co.,Ltd. Assignor: CSSC HUANGPU WENCHONG SHIPBUILDING Co.,Ltd. Contract record no.: X2021440000195 Denomination of invention: A manufacturing and installation method of anchor chain barrel and anchor platform Granted publication date: 20200207 License type: Common License Record date: 20211021 |
|
EE01 | Entry into force of recordation of patent licensing contract |