CN106882326A - A kind of molten stainless steel freighter is segmented Quick carrying localization method - Google Patents
A kind of molten stainless steel freighter is segmented Quick carrying localization method Download PDFInfo
- Publication number
- CN106882326A CN106882326A CN201710158866.9A CN201710158866A CN106882326A CN 106882326 A CN106882326 A CN 106882326A CN 201710158866 A CN201710158866 A CN 201710158866A CN 106882326 A CN106882326 A CN 106882326A
- Authority
- CN
- China
- Prior art keywords
- segmentation
- carrying
- code
- quick
- segmented
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B71/00—Designing vessels; Predicting their performance
Abstract
The present invention relates to a kind of molten stainless steel freighter segmentation Quick carrying localization method, including step 1, segmentation Quick carrying code is installed;Step 2, segmentation Quick carrying positioning support is installed;Step 3, segmentation Quick carrying positioning is strengthened installing;Step 4, is transported to building berth and is simulated carrying and pre-modified after segmentation application;Step 5, Anti-inclining steel wire rope is installed before segment carrying lifting;Step 6, segmental hoisting is in place;Step 7, split fix precision measure;Step 8, the loose car constraint of segmentation Quick carrying positioning;Step 9, crane pine hook.Building berth operation is moved forward in sectional making workshop and completed by the inventive method by the principle of " operation reach, work high above the ground lower are completed ", and work high above the ground is advanced into lower completes, and improves operating efficiency, reduces loop wheel machine holding time;Lifting is reduced simultaneously and carries code installation, shorten the building berth segmental hoisting time (being reduced to 1 day/segmentation), while installing various carrying codes before application is segmented, reduce follow-up work high above the ground.
Description
Technical field
The present invention relates to shipbuilding, and in particular to a kind of molten stainless steel freighter is segmented Quick carrying localization method.
Background technology
Building berth/dock segment carrying is used as the great building course of shipbuilding, and the medium and small size shipyards loop wheel machine crane capacity is general
All over relatively low, it is impossible to lifted after realizing total group of large-scale complete cross section, only lifted one by one by single split.It is guarantor during segmental hoisting
Card is smoothly lifted in place, and the live welding equipment of palpus draws code to coordinate segmental hoisting temporarily.To ensure safety after segmental hoisting, before crane pine hook
Constraint weldering must be burnt to segmentation and a large amount of code plates are fixed, portion increases temporary support to be fixed, and prevents segmentation from toppling over.
In the prior art, due to segmental hoisting workload greatly (by taking 13000DWT molten stainless steel freighters as an example, segmental hoisting
Number of times is 84 times), it is less efficient to carry out segmental hoisting one by one, and the average lifting time is 2 days/segmentation, and loop wheel machine holding time is more long,
Kinetic energy expense is larger.By lifting time effects, ship building berth construction period will be lengthened, about 6 months segmental hoisting cycle, ship ship
Platform construction period about 8 months, serious restriction shipbuilding efficiency influences follow-up outfitting debugging.
Also, scene welding equipment during segmental hoisting draws the frocks such as code influence operating efficiency, increases loop wheel machine holding time,
And many places are related to work high above the ground, there is potential safety hazard.Being that safety is fixed after topside, groove type wall split fix must install pipe
Deng reinforcement, Site Welding amount is larger, and armature quantity is larger, and production cost is higher.
Meanwhile, restricted two phase stainless steel material characteristicses (can not contact carbon steel and water containing salinity, ferrite content will meet
30-70%), molten stainless steel cargo hold face should as far as possible less or avoid welding equipment code plate, code sheet material matter also be two phase stainless steel, cost compared with
It is high.
The content of the invention
In view of this, it is necessary to for above-mentioned problem, there is provided a kind of molten stainless steel freighter segmentation Quick carrying positioning side
Method.
To achieve the above object, the present invention takes following technical scheme:
Molten stainless steel freighter of the invention is segmented Quick carrying localization method, including:
Step 1, segmentation Quick carrying code is installed:Bottom, topside be segmented inner bottom plating, on install carry code;
Step 2, segmentation Quick carrying positioning support is installed:In the topside sectional making stage, positioning is installed in topside segmentation
Support base and support pipe;
Step 3, segmentation Quick carrying positioning is strengthened installing:The corrugated bulkhead sectional making stage, in corrugated bulkhead segmentation
Guarantor's type stiffening device is set;
Step 4, is transported to building berth and is simulated carrying and pre-modified after segmentation application:Segmental hoisting front simulation calculates adjacent point
It is intersegmental to close up a mouthful data, and line mowing in ground is carried out to segment folding mouthful surplus, it is to avoid the mowing operation of hoisting process high-altitude;
Step 5, overturning-preventing steel wire rope is installed before segment carrying lifting:Before corrugated bulkhead segmentation, the lifting of topside segment carrying,
The installation steel wire rope suitable for reading of the suitable for reading and topside segmentation being segmented in laterally disposed corrugated bulkhead respectively;
Step 6, segmental hoisting is in place:According to segmental hoisting order, the segmentation of lifting corrugated bulkhead and topside are segmented, and combine
The carrying code installed on inner bottom plating, is carried out by the way of steel wire rope with cucurbit to the corrugated bulkhead segmentation or topside segmentation that lift
Drawing sets, and makes each segmentation quick in place and fixed;
Step 7, split fix precision measure:Lifting split fix in place is accurately measured, is adjusted;
Step 8, the loose car constraint of segmentation Quick carrying positioning:According to segmental hoisting order and segmental structure feature, formulate about
Beam welds welding position and weld length, fixed code plate installation site and quantity and determines auxiliary mould position, and scene is fast
The fixed welding of speed, installation;
Step 9, crane pine hook.
Specifically, step 1 is segmented in fast carrying code installation, in bottom, topside sectional making stage on segmentation inner bottom plating
The installation of carrying code is completed, segmentation entirety enters application canopy after completion carries out sanding application.
Further, the carrying code includes locating piece, spacing code, draws code, wherein, the locating piece is along corrugated bulkhead point
Section loading position arrangement;The spacing code is arranged along segment folding mouthful;It is described to draw code carrying the conjunction of segmentation according to segmented shape
Hold together to stitch both sides arrangement.
It is preferred that the drawing two-sided continuous welded and installed of code, locating piece end spot welding installation;The locating piece can be with
Drawing code is also served as, when locating piece also serves as drawing code, the continuous welded and installed of the two-sided palpus of locating piece.
Further, during the positioning support of step 2 segmentation Quick carrying is installed, according to segmental hoisting order, in topside segmentation
Lower section on the outside of weight center of gravity sets positioning support base and installs pipe support.
Further, during step 3 segmentation Quick carrying positioning is strengthened installing, the mouth suitable for reading, lower of corrugated bulkhead segmentation is set
Guarantor's type stiffening device, guarantor's type stiffening device includes channel member, is welded on the piece of stainless steel at channel member two ends, two stainless steels
Block outer end is fixedly mounted in the mouth of corrugated bulkhead.
Further, Anti-inclining steel wire rope is installed before the lifting of step 5 segment carrying, steel wire rope is installed in corrugated bulkhead point
On guarantor's type stiffening device of section setting suitable for reading, reduce and draw code to install.
Further, it is transported to building berth after step 4 segmentation application to be simulated in carrying and pre-modified, is simulated by software and counted
Calculate or manual calculation adjacent sectional between close up a mouthful data, it is determined that close up mouthful mowing surplus and around, above-below direction structure pair
Misalignment is connect, surplus mowing and structure dislocation adjustment are carried out in advance.
Further, each corrugated bulkhead segmentation includes the segmentation of transverse groove type bulkhead, longitudinal corrugated bulkhead segmentation.
Further, the previous segmental hoisting of tanker lifts latter segmentation again in place and after crane pine hook, tanker the
The lifting of one segmentation and the loose car constraint order of Quick carrying positioning are:
Step a, horizontal corrugated bulkhead segmentation one is lifted in place, and the loose car constraint of Quick carrying positioning;
Step b, longitudinal corrugated bulkhead segmentation one is lifted into the left side of horizontal corrugated bulkhead segmentation one, and Quick carrying is positioned
Loose car constraint;
Step c, longitudinal corrugated bulkhead segmentation two is lifted into the right side of horizontal corrugated bulkhead segmentation one, and Quick carrying is positioned
Loose car constraint;
Step d, respectively lifts in place the topside that horizontal corrugated bulkhead is segmented a two ends, and Quick carrying positioning pine respectively
Car is constrained.
Beneficial effects of the present invention are:
The present invention presses the principle of " operation reach, work high above the ground lower are completed ", will carry code and install, supports and support base peace
Dress work is moved forward in sectional making workshop and completed, and work high above the ground is advanced into ground completes, and improves operating efficiency, reduces loop wheel machine
Holding time, reduction are carried and install, instruct workman, clearly constraint weldering construction location and welding quantity.Realize 1, specification simultaneously
The installation number and installation site of Quick carrying code;2nd, the opportunity that will carry code installation shifts to an earlier date, it is to avoid is installed during segmental hoisting and taken
Code is carried, increases the loop wheel machine lifting time;3rd, reduce steel wire rope and draw code installation number, reduce production cost;4th, using steel wire rope and calabash
The fixed form of reed, is fast and effectively positioned and is fixed to segmentation, it is to avoid strengthen frock using traditional pipe or channel-section steel etc.,
Welding job is reduced, production cost is reduced;5th, the fixed constraint scheme after clear and definite segmental hoisting positioning, reduces the lifting time, protects
Barrier job safety.
Brief description of the drawings
Fig. 1 is corrugated bulkhead segmentation Quick carrying positioning schematic diagram;
Fig. 2 is topside segmentation Quick carrying positioning schematic diagram;
Fig. 3 is guarantor's type stiffening device structural representation;
Fig. 4 is that molten stainless steel freighter of the present invention is segmented Quick carrying localization method segmental hoisting schematic diagram;
Fig. 5 is that the segmental hoisting of molten stainless steel freighter first of the present invention is positioned and loose car constraint schematic diagram.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with the embodiment of the present invention, to this hair
Bright technical scheme is made further clearly and completely to describe.It should be noted that described embodiment is only the present invention one
Section Example, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not doing
Go out the every other embodiment obtained under the premise of creative work, belong to the scope of protection of the invention.
It is to be appreciated that term " on ", D score, "front", "rear", "left", "right", " level ", " top ", " interior " etc. indicate
Orientation or position relationship be based on orientation shown in the drawings or position relationship, be for only for ease of description the present invention and simplification retouch
State, rather than indicate imply signified device or element must have specific orientation, with specific azimuth configuration and operation,
Therefore it is not considered as limiting the invention.
Term " first ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that indicating or implying relatively important
Property or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", " second ", " the 3rd " feature can
To express or implicitly include one or more this feature.In the description of the invention, unless otherwise indicated, " one group "
It is meant that two or more.
Embodiment 1, referring to figs. 1 to Fig. 5, molten stainless steel freighter of the invention is segmented Quick carrying localization method, including:
Step 1, segmentation Quick carrying code is installed:Installed on the inner bottom plating 2 of bottom section 1 and carry code, it is to avoid in building berth
Installed when loop wheel machine is linked up with and carry code;
Step 2, segmentation Quick carrying positioning support is installed:In the topside sectional making stage, positioning is installed in topside segmentation 3
Support base 7 and support pipe 8, install in the sectional making stage in advance, segmentation Quick carrying positioning can quick loose hook, shorten and be segmented
Building berth lifts the time;
Step 3, segmentation Quick carrying positioning is strengthened installing:The corrugated bulkhead sectional making stage, in corrugated bulkhead segmentation 4
Guarantor's type stiffening device 9 is set, and guarantor's type stiffening device can reduce the quantity that code is carried in the segmentation of stainless steel corrugated bulkhead, split fix
After can quickly fix, reduce the lifting time;
Step 4, is transported to building berth and is simulated carrying and pre-modified after segmentation application:Tanker segmental hoisting front simulation is calculated
Close up a mouthful data between adjacent sectional, and mowing is carried out to closing up mouth segmentation cooperation surplus, it is to avoid ability surplus is repaiied when loop wheel machine is linked up with
Cut, it is to avoid high-altitude application, and reduce occupancy loop wheel machine;Specifically, can be simulated by software and calculated or manual calculation adjacent sectional
Between close up a mouthful data, both modes are not limited to certainly;
Step 5, Anti-inclining steel wire rope is installed before segment carrying lifting:Lifting is carried in corrugated bulkhead segmentation 4, topside segmentation 3
Before, the suitable for reading and topside in laterally disposed corrugated bulkhead segmentation 4 is segmented 3 installation steel wire rope 10 suitable for reading respectively;Site layout project
When should try one's best ensure back and forth or left and right steel wire rope on the same line;Specifically, each corrugated bulkhead segmentation 4 includes transverse groove
The segmentation of type bulkhead, longitudinal corrugated bulkhead segmentation.
Step 6, segmental hoisting is in place:As shown in figure 4, the order of the specific segmental hoisting of molten stainless steel freighter and being fixed as:
First lifting groove type wall segmentation 4 transverse bulkhead sectional M21C, next lifting groove type wall segmentation 4 longitudinal bulkhead segmentation M01C and
M02C, then the M21S and M21P of topside segmentation 3 are lifted, then the transverse bulkhead M22C of groove type wall segmentation 4 is lifted, then lift groove type wall point
The longitudinal bulkhead M03C of section 4, then the M22S and M22P of topside segmentation 3 are lifted, complete whole groove type wall segmentations and the side of a ship according to this order
The lifting of side segmentation.And combine the carrying code installed on inner bottom plating 2, the groove by the way of steel wire rope 10 and cucurbit 11 to lifting
Type bulkhead segmentation 4 or topside segmentation 3 carry out drawing and set, and make each segmentation quick in place and fixed;Corrugated bulkhead is prevented to be segmented, topside divides
Section is toppled over, and is substituted tradition drawing and is set the reinforcement mode such as pipe, can effectively reduce weld job;And ensure cell wall vertical case under steel
Cord uniform force;
Step 7, split fix precision measure:Lifting split fix in place is accurately measured, is adjusted;
Step 8, the loose car constraint of segmentation Quick carrying positioning:Segmental hoisting order and segmental structure feature according to Fig. 5, system
Conclude a contract or treaty beam weldering weldering knot position and quantity, fixed code plate installation site and quantity and determine auxiliary mould position, scene is fast
The fixed welding of speed, installation;
Step 9, crane pine hook.
Building berth operation is moved forward to sectional making car by the present invention by the principle of " operation reach, work high above the ground lower are completed "
Interior completion, is advanced to work high above the ground lower and completes, improves operating efficiency, reduces loop wheel machine holding time.Stainless steel of the present invention
Tanker be segmented Quick carrying localization method, reduce lifting carry code install, shorten the building berth segmental hoisting time (be reduced to 1 day/
Segmentation), while installing various carrying codes before application is segmented, reduce follow-up work high above the ground.
Above-described embodiment 1 is basic embodiment of the invention, and the following examples are improved on the basis of embodiment 1
Or the embodiment for further limiting.
Specifically, step 1 is segmented in fast carrying code installation, in the bottom section production phase, is carried code and is arranged on inner bottom plating
On, bottom section lifting is carried and forms complete inner bottom plating, while completing to carry the arrangement of code.
Further, as shown in Figure 1 and Figure 2, the carrying code includes locating piece 5, spacing code 6, draws code, wherein, it is described fixed
Position block 5 can make corrugated bulkhead be segmented quick positioning along corrugated bulkhead segment carrying location arrangements;The spacing code 6 is along segmentation
Close up mouth arrangement, corrugated bulkhead is segmented quickly in place;It is described to draw code carrying the free end both sides of segmentation according to segmented shape
Arrangement, the free end of positioning segmentation is carried for limiting.
It is preferred that the drawing two-sided continuous welded and installed of code, locating piece end spot welding installation;The locating piece can be with
Drawing code is also served as, when locating piece also serves as drawing code, the two-sided continuous welded and installed of locating piece can further reduce the quantity for drawing code.
Further, as shown in Fig. 2 step 2 segmentation Quick carrying positioning is supported in installing, according to segmental hoisting order,
3 weight center of gravity positions are segmented in topside and positioning support base 7 and support pipe 8 are set, it is preferred that the base plate of support base must assemble water
It is flat, press outside plate line style with outside plate contact position and repair;Preferably, support base and support pipe are symmetrically arranged.
Further, as shown in figure 3, during step 3 segmentation Quick carrying positioning is strengthened installing, it is upper that corrugated bulkhead is segmented
Mouth, lower mouth set guarantor's type stiffening device 9, and guarantor's type stiffening device 9 includes channel member 91, is welded on the two ends of channel member 91 not
Rust bloom 92,93, two piece of stainless steel 92,93 outer ends are fixedly mounted in the mouth of corrugated bulkhead, for guarantor's type of corrugated bulkhead
Booster action.It is preferred that as shown in figure 1, during Anti-inclining steel wire rope is installed before the lifting of step 5 segment carrying, steel wire rope 10 is installed
It is segmented on guarantor's type stiffening device 9 of 4 settings suitable for reading in corrugated bulkhead, can further reduces and be carried in the segmentation of stainless steel corrugated bulkhead
The quantity of code, can quickly fix after split fix, reduce the lifting time.
Further, as shown in figure 4, the previous segmental hoisting of tanker lifts latter segmentation again in place and after crane pine hook;
Further, as shown in figure 5, the lifting of the segmentation of tanker first and the loose car constraint order of Quick carrying positioning are:
Step a, horizontal corrugated bulkhead segmentation 1 is lifted in place, and the loose car constraint of Quick carrying positioning;
Step b, longitudinal corrugated bulkhead segmentation 1 is lifted into the left side of horizontal corrugated bulkhead segmentation 1, and Quick carrying
The loose car constraint of positioning;
Step c, longitudinal corrugated bulkhead segmentation 2 43 is lifted into the right side of horizontal corrugated bulkhead segmentation 1, and Quick carrying
The loose car constraint of positioning;
Step d, respectively lifts in place the topside that horizontal corrugated bulkhead is segmented a two ends, and Quick carrying positioning pine respectively
Car is constrained.
The lifting of each segmentation below is carried can be according to the order in embodiment 1 and shown in Fig. 4 arrows, until completing most
The latter lifting of segmentation is carried.
Embodiment described above only expresses several embodiments of the invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention
Shield scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (10)
1. a kind of molten stainless steel freighter is segmented Quick carrying localization method, it is characterised in that comprise the following steps:
Step 1, segmentation Quick carrying code is installed:Installed on the inner bottom plating of bottom section and carry code;
Step 2, segmentation Quick carrying positioning support is installed:In the topside sectional making stage, positioning support is installed in topside segmentation
Seat and support pipe;
Step 3, segmentation Quick carrying positioning is strengthened installing:In the corrugated bulkhead sectional making stage, set in corrugated bulkhead segmentation
Guarantor's type stiffening device;
Step 4, is transported to building berth and is simulated carrying and pre-modified after segmentation application:Tanker segmental hoisting front simulation calculates adjacent
Close up a mouthful data between segmentation, and mowing is carried out to closing up mouth segmentation cooperation surplus;
Step 5, Anti-inclining steel wire rope is installed before segment carrying lifting:Before corrugated bulkhead segmentation, the lifting of topside segment carrying, respectively
The installation steel wire rope suitable for reading of the suitable for reading and topside segmentation being segmented in laterally disposed corrugated bulkhead;
Step 6, segmental hoisting is in place:According to segmental hoisting order, the segmentation of lifting corrugated bulkhead and topside are segmented, and combine interior bottom
The carrying code installed on plate, is drawn the corrugated bulkhead segmentation or topside segmentation that lift by the way of steel wire rope with cucurbit
If making each segmentation quick in place and fixed;
Step 7, split fix precision measure:Lifting split fix in place is accurately measured, is adjusted;
Step 8, the loose car constraint of segmentation Quick carrying positioning:According to segmental hoisting order and segmental structure feature, constraint weldering is formulated
Weldering knot position and quantity, fixed code plate installation site and quantity and determination auxiliary mould position, the quick fixed weldering in scene
Connect, install;
Step 9, crane pine hook.
2. a kind of molten stainless steel freighter according to claim 1 is segmented Quick carrying localization method, it is characterised in that step
During the fast carrying code of 1 segmentation is installed, in the bottom section production phase, carry code and be arranged on inner bottom plating, bottom section lifting carrying
Complete inner bottom plating is formed, while completing to carry the arrangement of code.
3. a kind of molten stainless steel freighter according to claim 2 is segmented Quick carrying localization method, it is characterised in that described
Carrying code includes locating piece, spacing code, draws code, wherein, the locating piece is along corrugated bulkhead segment carrying location arrangements;The limit
Bit code is arranged along segment folding mouthful;It is described to draw code carrying the free end both sides arrangement of segmentation according to segmented shape.
4. a kind of molten stainless steel freighter according to claim 3 is segmented Quick carrying localization method, it is characterised in that described
The two-sided continuous welded and installed of code is drawn, locating piece end spot welding is installed;The locating piece can also serve as drawing code, when locating piece is simultaneous
When doing drawing code, the two-sided continuous welded and installed of locating piece.
5. a kind of molten stainless steel freighter according to claim 1 is segmented Quick carrying localization method, it is characterised in that step
During 2 segmentation Quick carrying positioning supports are installed, according to segmental hoisting order, positioning branch is set in topside segmentation weight center of gravity position
Support seat and support pipe.
6. a kind of molten stainless steel freighter according to claim 1 is segmented Quick carrying localization method, it is characterised in that step
During 3 segmentation Quick carrying positioning are strengthened installing, the mouth suitable for reading, lower of corrugated bulkhead segmentation sets guarantor's type stiffening device, guarantor's type
Stiffening device includes channel member, is welded on the piece of stainless steel at channel member two ends, and two piece of stainless steel outer ends are fixedly mounted on groove profile
In the mouth of bulkhead.
7. a kind of molten stainless steel freighter according to claim 6 is segmented Quick carrying localization method, it is characterised in that step
Installed before the lifting of 5 segment carryings in Anti-inclining steel wire rope, guarantor's type that steel wire rope is arranged on corrugated bulkhead segmentation setting suitable for reading is strengthened
On device.
8. a kind of molten stainless steel freighter according to claim 1 is segmented Quick carrying localization method, it is characterised in that step
Building berth is transported to after 4 segmentation applications to be simulated in carrying and pre-modified, simulated by software and calculated or manual calculation adjacent sectional
Between close up a mouthful data.
9. a kind of molten stainless steel freighter according to claim 1 is segmented Quick carrying localization method, it is characterised in that each
Corrugated bulkhead segmentation includes the segmentation of transverse groove type bulkhead, longitudinal corrugated bulkhead segmentation.
10. a kind of molten stainless steel freighter according to claim 9 is segmented Quick carrying localization method, it is characterised in that liquid
The previous segmental hoisting of freighter lifts latter segmentation, the lifting of the segmentation of tanker first and Quick carrying again in place and after crane pine hook
Positioning loose car constraint order is:
Step a, horizontal corrugated bulkhead segmentation one is lifted in place, and the loose car constraint of Quick carrying positioning;
Step b, longitudinal corrugated bulkhead segmentation one is lifted into the left side of horizontal corrugated bulkhead segmentation one, and the loose car of Quick carrying positioning
Constraint;
Step c, longitudinal corrugated bulkhead segmentation two is lifted into the right side of horizontal corrugated bulkhead segmentation one, and the loose car of Quick carrying positioning
Constraint;
Step d, respectively lifts in place the topside that horizontal corrugated bulkhead is segmented a two ends, and Quick carrying positioning Song Cheyue respectively
Beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710158866.9A CN106882326B (en) | 2017-03-17 | 2017-03-17 | A kind of molten stainless steel freighter is segmented Quick carrying localization method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710158866.9A CN106882326B (en) | 2017-03-17 | 2017-03-17 | A kind of molten stainless steel freighter is segmented Quick carrying localization method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106882326A true CN106882326A (en) | 2017-06-23 |
CN106882326B CN106882326B (en) | 2018-03-02 |
Family
ID=59182093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710158866.9A Expired - Fee Related CN106882326B (en) | 2017-03-17 | 2017-03-17 | A kind of molten stainless steel freighter is segmented Quick carrying localization method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106882326B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108032960A (en) * | 2017-12-28 | 2018-05-15 | 广东新船重工有限公司 | A kind of two phase stainless steel tanker corrugated bulkhead guarantor's type device |
CN109533192A (en) * | 2018-10-23 | 2019-03-29 | 上海江南长兴造船有限责任公司 | A kind of carrying pine hook constrained procedure for super-container vessel compartment block |
CN109625171A (en) * | 2018-10-31 | 2019-04-16 | 沪东中华造船(集团)有限公司 | A kind of total group of two phase stainless steel chemical tanker bottom section and subsequent hanging method |
CN110877690A (en) * | 2019-11-15 | 2020-03-13 | 沪东中华造船(集团)有限公司 | Shaft rudder system segmented carrying and positioning control method of double-oar and double-rudder ship |
CN112208724A (en) * | 2020-10-23 | 2021-01-12 | 中船黄埔文冲船舶有限公司 | Deformation-preventing hoisting method for ship open section |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04266584A (en) * | 1991-02-22 | 1992-09-22 | Ishikawajima Harima Heavy Ind Co Ltd | Transverse member assembly method for ship shell block |
CN202657205U (en) * | 2012-04-26 | 2013-01-09 | 天津新河船舶重工有限责任公司 | Reversed U-shaped seat frame for quickly positioning broadside section and side tank section of ship body |
CN102923276A (en) * | 2012-10-11 | 2013-02-13 | 江苏熔盛重工有限公司 | Quick support tool used for section assembly and block carrying of ship |
KR20130050187A (en) * | 2011-11-07 | 2013-05-15 | 현대중공업 주식회사 | Method for fixing offshore platform using transporter |
CN104875847A (en) * | 2015-05-28 | 2015-09-02 | 沪东中华造船(集团)有限公司 | Method for quickly carrying middle transverse bulkhead of container ship |
CN204775829U (en) * | 2015-05-28 | 2015-11-18 | 沪东中华造船(集团)有限公司 | A protect apart from roof beam for container ship transverse bulkhead carries on fast |
-
2017
- 2017-03-17 CN CN201710158866.9A patent/CN106882326B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04266584A (en) * | 1991-02-22 | 1992-09-22 | Ishikawajima Harima Heavy Ind Co Ltd | Transverse member assembly method for ship shell block |
KR20130050187A (en) * | 2011-11-07 | 2013-05-15 | 현대중공업 주식회사 | Method for fixing offshore platform using transporter |
CN202657205U (en) * | 2012-04-26 | 2013-01-09 | 天津新河船舶重工有限责任公司 | Reversed U-shaped seat frame for quickly positioning broadside section and side tank section of ship body |
CN102923276A (en) * | 2012-10-11 | 2013-02-13 | 江苏熔盛重工有限公司 | Quick support tool used for section assembly and block carrying of ship |
CN104875847A (en) * | 2015-05-28 | 2015-09-02 | 沪东中华造船(集团)有限公司 | Method for quickly carrying middle transverse bulkhead of container ship |
CN204775829U (en) * | 2015-05-28 | 2015-11-18 | 沪东中华造船(集团)有限公司 | A protect apart from roof beam for container ship transverse bulkhead carries on fast |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108032960A (en) * | 2017-12-28 | 2018-05-15 | 广东新船重工有限公司 | A kind of two phase stainless steel tanker corrugated bulkhead guarantor's type device |
CN109533192A (en) * | 2018-10-23 | 2019-03-29 | 上海江南长兴造船有限责任公司 | A kind of carrying pine hook constrained procedure for super-container vessel compartment block |
CN109625171A (en) * | 2018-10-31 | 2019-04-16 | 沪东中华造船(集团)有限公司 | A kind of total group of two phase stainless steel chemical tanker bottom section and subsequent hanging method |
CN109625171B (en) * | 2018-10-31 | 2021-01-22 | 沪东中华造船(集团)有限公司 | Double-phase stainless steel chemical ship bottom part subsection assembling and subsequent hoisting method |
CN110877690A (en) * | 2019-11-15 | 2020-03-13 | 沪东中华造船(集团)有限公司 | Shaft rudder system segmented carrying and positioning control method of double-oar and double-rudder ship |
CN112208724A (en) * | 2020-10-23 | 2021-01-12 | 中船黄埔文冲船舶有限公司 | Deformation-preventing hoisting method for ship open section |
Also Published As
Publication number | Publication date |
---|---|
CN106882326B (en) | 2018-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106882326B (en) | A kind of molten stainless steel freighter is segmented Quick carrying localization method | |
CN106395628B (en) | A kind of method of the aerial group pair of heavy tower equipment segmental hoisting | |
CN108928432B (en) | A kind of installation method in ultra large crude carrier energy-conservation conduit segmentation stage | |
CN109319045B (en) | Construction method of duplex stainless steel chemical tanker bulkhead intermediate product | |
CN103410322B (en) | The parallel Truss Steel corridor construction method of large span | |
CN102019998B (en) | Erection embarking method of upper and lower water side cabins | |
WO2018090875A1 (en) | Self-sailing integrated vessel for carrying and mounting submerged tubes of underwater tunnel | |
CN204775829U (en) | A protect apart from roof beam for container ship transverse bulkhead carries on fast | |
CN109334858A (en) | A kind of method that ship superstructure is built | |
CN109625170A (en) | A kind of method of flat car linkage ships that transport block | |
CN203864927U (en) | Guiding and locating device | |
CN105781205B (en) | A kind of guider in place of the aerial group pair of heavy tower equipment segmental hoisting | |
CN105421341B (en) | A kind of large diameter pile foundation fabrication of reinforcing cage method | |
CN104691704B (en) | A kind of method of construction of inland navigation craft | |
CN102371457A (en) | Auxiliary device for assembly and welding of ship flat bulb steel | |
CN109811725B (en) | Non-water-cut-off quick maintenance method for water delivery channel | |
CN107881914B (en) | Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method | |
CN108086166B (en) | Hybrid beam continuous rigid frame bridge steel box-girder installation method | |
CN214729536U (en) | Construction platform for overwater trestle | |
CN202657205U (en) | Reversed U-shaped seat frame for quickly positioning broadside section and side tank section of ship body | |
CN208897265U (en) | A kind of novel rudder paddle mounting tool | |
CN207420574U (en) | A kind of shield is missed the stop steelframe | |
CN206915570U (en) | A kind of multi-purpose cargo ship section bar lifting device | |
CN103738466B (en) | 400 tons of lifting pipe laying vessel stinger method for makings | |
CN215663923U (en) | Single-shell LNG ship saddle guider |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180302 Termination date: 20210317 |
|
CF01 | Termination of patent right due to non-payment of annual fee |