WO2021218202A1 - Anchor bed structure of ship and machining method therefor - Google Patents

Anchor bed structure of ship and machining method therefor Download PDF

Info

Publication number
WO2021218202A1
WO2021218202A1 PCT/CN2020/139280 CN2020139280W WO2021218202A1 WO 2021218202 A1 WO2021218202 A1 WO 2021218202A1 CN 2020139280 W CN2020139280 W CN 2020139280W WO 2021218202 A1 WO2021218202 A1 WO 2021218202A1
Authority
WO
WIPO (PCT)
Prior art keywords
anchor
plate
line
platform
bracket
Prior art date
Application number
PCT/CN2020/139280
Other languages
French (fr)
Chinese (zh)
Inventor
谢锋雷
徐智
刘坤兵
沈强昇
Original Assignee
江苏扬子鑫福造船有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 江苏扬子鑫福造船有限公司 filed Critical 江苏扬子鑫福造船有限公司
Publication of WO2021218202A1 publication Critical patent/WO2021218202A1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/04Fastening or guiding equipment for chains, ropes, hawsers, or the like
    • B63B21/14Hawse-holes; Hawse-pipes; Hawse-hole closures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/20Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/40Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by joining methods
    • B63B73/43Welding, e.g. laser welding

Definitions

  • the invention relates to the field of ship construction, in particular to a ship anchor platform structure and a processing method thereof.
  • the load capacity of ships is getting larger and larger, and the corresponding ship size and specifications of various parts are also increasing, and the corresponding manufacturing process and installation difficulty are also gradually increasing.
  • shipyards use the deck as the tire to turn over and build, and the anchor can be assembled and welded on the segment.
  • the anchor spans two segments and the normal bulk construction is carried out in the general assembly of the segment, which greatly reduces the anchor platform. High-altitude operations and advance construction, shorten the slipway cycle.
  • the anchor is on the outer surface of the hull shell, and the hull is a three-dimensional curved surface, the construction of the anchor can only be carried out after the segmented internal components and the hull shell are assembled. It is cumbersome and requires multiple positioning. If the positioning is not accurate, it will easily lead to rework and scrapping of the outer panel.
  • the purpose of the present invention is to provide a structure of a ship anchor platform with accurate positioning and reduced construction period and a processing method thereof.
  • a ship anchor platform structure comprising an anchor chain tube, an anchor platform package plate, an anchor platform panel, a bracket plate and an anchor lip.
  • On the lower end of the chain cylinder there is an anchor chain hole in the center of the anchor platform panel.
  • the outer wall of the lower end of the chain cylinder is uniformly installed with 8 bracket groups, and the bracket group is composed of an inner bracket and an outer bracket.
  • the inner bracket and the outer bracket are in the same plane and coplanar with the axis of the anchor chain cylinder; the inner bracket is welded to the anchor chain cylinder and the outer plate, and the outer bracket is connected to the anchor plate and the anchor
  • the platform board is welded, and an anchor lip is welded and installed on the bottom surface of the anchor platform board.
  • a gap is provided between the inner and outer brackets, the inner brackets of the three groups of brackets under the outer wall of the chain cylinder are provided with arc-shaped notches, and the inner brackets with the arc-shaped notches and the corresponding outer brackets The pieces form a curved hole.
  • anchor chain cylinder is composed of two semi-cylinders assembled and welded.
  • the bottom surface of the anchor lip is a circular arc surface.
  • a method for processing a ship anchor structure which is characterized in that it includes the following steps:
  • anchor chain cylinder The production of anchor chain cylinder: the processing workshop cuts two semi-cylindrical bodies in the numerical control, sprays powder on the outside of the two semi-cylindrical bodies to mark the position of the quarter line of each semi-cylindrical body, and uses these eight positions After marking the bulging points, process them; after the two semi-cylindrical bodies are welded and assembled into an anchor chain cylinder, check the positions of the eight equal points again and correct the markings with the bulging points as the eight points;
  • the production of the anchor platform the anchor platform package plate and the anchor platform panel are numerically cut, and the eight equal division marks of the anchor chain cylinder are marked on the anchor platform package plate and the anchor platform panel. After the inspection is qualified, make a permanent gun line for the powder spraying mark; match the powder spraying line at the eight-division position of the anchor platform cladding plate with the positioning line on the anchor platform panel, and the lower line of the anchor platform cladding plate The type is based on the contour line of the anchor plate.
  • the upper mouth of the anchor plate is determined by the marking template of the outer plate to determine the opening of the plate, and the upper mouth is fixed with external support. After the anchor plate is positioned, the anchor plate and the anchor plate are fixed.
  • the anchor plate package plate is welded and fixed and the outer bracket plate is installed.
  • the outer bracket plate should be positioned according to the corresponding position line on the anchor plate panel and combined with the installation angle template. First, spot weld 8 outer bracket plates on the inner wall of the anchor plate panel.
  • the positioning line of the outer bracket is marked on the front of the anchor platform panel to mark the position of the blunt point, as the aligning line of the segmented anchor platform; mark 4 equal points on the anchor lip cast steel, and use the anchor lip Position the quartet points of the anchor plate with the corresponding position line on the anchor panel; use the heating device to preheat the metal at the butt weld of the anchor lip, and the preheating temperature of the steel casting will reach 100 °C-150 °C, and then weld and weld After completion, use thermal insulation materials to keep warm and slow cooling; to polish the welding seams of the anchor chain tube, the anchor plate, the anchor plate, the outer bracket and the anchor lip;
  • This positioning line should extend at least 200mm from the outer contour line of the anchor platform; this line is used as the alignment line for subsequent installation of the anchor platform;
  • the chain cylinder is poured from the bow deck through the main deck from top to bottom until it extends out of the outer plate.
  • Check whether the intersecting line of the chain cylinder and the outer plate is consistent with the original line drawn on the template; according to the chain cylinder layout drawing and anchor lip drawing Determine the length of the anchor chain cylinder extending from the outer plate with the cross-line model of the outer plate of the anchor platform package plate, and ensure that the center line of the anchor chain cylinder extends 1550mm from the outer plate.
  • the distance that the cylinder extends from the outer plate on each section is marked to ensure the installation angle of the anchor platform; the angle of the anchor chain cylinder is measured after the cylinder is positioned, and the margin of the cylinder is welded or cut after qualified; the anchor chain cylinder is connected to the bow Weld the floor deck, main deck and outer plate separately, and weld the inner bracket to the chain cylinder according to the anchor lip drawing and the positioning line on the chain cylinder/outer plate;
  • the anchor plate is positioned under the condition of ensuring the center of the chain tube and the length of the eight section positions.
  • the eight section position lines of the anchor plate shall be aligned with the corresponding line of the outer plate.
  • the beneficial effects of the present invention are: the anchor structure is strengthened by the bracket grouping, which can effectively prevent deformation, and through multiple positioning and corrections during the construction process, the installation of each component of the anchor is ensured Accuracy, low installation difficulty, easy construction, and shorten the construction period.
  • Figure 1 is a schematic diagram of the installation structure of the chain cylinder
  • Figure 2 is a schematic diagram of the structure of the anchor plate
  • Figure 3 is a schematic diagram of the structure of the 0°-180° cross-section bracket
  • Figure 4 is a schematic diagram of the 45°-225° cross-section bracket
  • Figure 5 is a schematic diagram of the 90°-270° cross-section bracket
  • Figure 6 is a schematic structural diagram of a 135°-315° cross-section bracket
  • Figure 7 is a schematic diagram of the scribing on the surface of the outer panel.
  • Anchor chain cylinder 1 Anchor plate 2
  • Anchor plate 3 Anchor lip 4
  • Fore deck 5 Main deck 6
  • Outer plate 7 Inner bracket 8
  • Outer bracket 9 Arc-shaped notch 10.
  • Anchor chain hole 11 Anchor chain hole 11.
  • a ship anchoring platform structure is composed of an anchor chain cylinder 1, an anchor platform cladding plate 2, an anchor platform panel 3, 8 pairs of brackets and an anchor lip 4.
  • the anchor chain cylinder 1 is welded by two semi-cylinders
  • the anchor chain tube 1 passes through the bow deck 5, the main deck 6 and the outer plate 7 in turn, and is welded to the above three plates.
  • the upper end of the anchor chain tube 1 is flush with the bow deck 5, and the anchor chain tube
  • the lower end surface of 1 protrudes from the outer panel 7.
  • the anchor plate 3 is welded and installed on the lower end surface of the anchor chain cylinder 1.
  • the anchor plate 3 is provided with an anchor chain hole 11 corresponding to the inner hole of the anchor chain cylinder 1, and an anchor pack is installed between the anchor plate 3 and the outer plate 7.
  • the bottom surface contour of the anchor plate 2 and the anchor plate 2 corresponds to the outer contour of the anchor plate 3 and is welded, and the top surface of the anchor plate 2 is welded to the outer plate 7.
  • the outer wall of the lower end of the anchor chain cylinder 1 is uniformly installed with 8 bracket groups.
  • the bracket group is composed of an inner bracket 8 and an outer bracket 9.
  • the inner bracket 8 and The outer bracket 9 is in the same plane and coplanar with the axis of the chain cylinder 1; the inner bracket 8 is welded to the chain cylinder 1 and the outer plate 7, and the outer bracket 9 is welded to the anchor plate 2 and the anchor plate 3.
  • the inner bracket at 225°, 270°, and 315° on the chain cylinder 1 is provided with arc-shaped notches 10, and the inner bracket with arc-shaped notches 10 8 and the corresponding outer bracket 9 form an arc-shaped hole.
  • the anchor lip 4 is welded and installed on the bottom surface of the anchor platform panel 3, and the bottom surface of the anchor lip 4 is a circular arc circle to avoid scratching the anchor when the anchor lip contacts the anchor.
  • the construction method of the ship anchor structure is:
  • the processing workshop cuts two semi-cylindrical bodies on the CNC, and uses the powder spraying program in the cutting command to mark the parts of the anchor chain cylinder 1 at 90°-270°, 135°- 315°, 180°-0°, 225°-45° four sections, 90°, 135°, 180°, 225°, 270°, 315°, 0°, 45° eight points with powder spray line Spray it on the part, and mark the positions of these eight points with horn points for processing;
  • the cylinder body of the anchor chain cylinder 1 is abutting between two semi-cylindrical bodies.
  • the butt joint position must be smooth to avoid protrusions or depressions. If there is a difference in plate thickness , The difference should be placed on the outside of the chain cylinder 1 to ensure that the inside of the chain cylinder 1 is flat;
  • the anchor plate 2 and the anchor plate 3 are CNC blanked, and the outer bracket 9 installation line is marked by the powder spraying, the assembly line of the processing sample box, and the bracket installation line is made permanent after the package plate is processed and inspected.
  • the blunderbuss are then sent to be installed in sections.
  • the center coordinates of the anchor chain tube on the on-site opening template are mapped out.
  • the plate hole line is drawn from the outside to the inside of the outer plate.
  • the positioning line of the eight inner brackets 8 installed on the anchor chain cylinder 1 is drawn. This positioning line should extend at least 200mm from the outer contour line of the anchor platform. This line is used as a follow-up Installed butt wire.

Abstract

An anchor bed structure of a ship. A hawse pipe (1) penetrates a main deck (6) and a shell plate (7) and is connected to the main deck and the shell plate in a welded manner; an anchor bed panel (3) is mounted on the lower end face of the hawse pipe (1) in a welded manner; a hawse (11) is provided at the center of the anchor bed panel (3); eight bracket groups are evenly distributed and mounted on an outer wall of the lower end of the hawse pipe (1); each bracket group is composed of an inner bracket (8) and an outer bracket (9), the inner bracket (8) and the outer bracket (9) being coplanar and being coplanar with the axis of the hawse pipe (1); the inner bracket (8) is welded to the hawse pipe (1) and the shell plate (7); the outer bracket (9) is welded to an anchor bed wrapper plate (2) and the anchor bed panel (3); and an anchor bell mouth (4) is mounted on the bottom face of the anchor bed panel (3) in a welded manner. A machining method for the anchor bed structure of a ship comprises the steps of: a, manufacturing the hawse pipe (1); b, manufacturing an anchor bed; c, positioning the hawse pipe (1) and mounting the inner bracket (8); and d, mounting the anchor bed wrapper plate (2). The anchor bed structure and the machining method are accurate in terms of positioning, and facilitate a reduction in the construction period.

Description

一种船舶锚台结构及其加工方法Ship anchor structure and processing method thereof 技术领域Technical field
本发明涉及船舶建造领域,具体涉及船舶锚台结构及其加工方法。The invention relates to the field of ship construction, in particular to a ship anchor platform structure and a processing method thereof.
背景技术Background technique
现在船舶载重量越来越大,相应船舶尺寸及各部件规格也增加,对应制作工序和安装难度也逐步增加。目前船厂都是采用分段以甲板为胎翻身建造,锚台可以在分段上装焊结束,如锚台跨两个分段就在分段总组时正态散装施工,这样大大降低了锚台的高空作业及提前施工,缩短船台周期。但因锚台在船体外板的外表面上,而船体外板又是三维曲面,只能是分段内部构件和船体外板装配结束后才能进行锚台的施工,而锚台施工的工序较为繁琐,需要多次定位,如果定位不准确极易导致返工以及外板的报废。Nowadays, the load capacity of ships is getting larger and larger, and the corresponding ship size and specifications of various parts are also increasing, and the corresponding manufacturing process and installation difficulty are also gradually increasing. At present, shipyards use the deck as the tire to turn over and build, and the anchor can be assembled and welded on the segment. For example, the anchor spans two segments and the normal bulk construction is carried out in the general assembly of the segment, which greatly reduces the anchor platform. High-altitude operations and advance construction, shorten the slipway cycle. However, because the anchor is on the outer surface of the hull shell, and the hull is a three-dimensional curved surface, the construction of the anchor can only be carried out after the segmented internal components and the hull shell are assembled. It is cumbersome and requires multiple positioning. If the positioning is not accurate, it will easily lead to rework and scrapping of the outer panel.
发明内容Summary of the invention
为解决现有技术中锚链筒在分段阶段建造时工艺复杂容易返工的缺陷,本发明的目的在于提供一种定位精准、减少建造周期的船舶锚台的结构及其加工方法。In order to solve the defects of complicated process and easy rework in the prior art that the chain cylinder is constructed in the segmented stage, the purpose of the present invention is to provide a structure of a ship anchor platform with accurate positioning and reduced construction period and a processing method thereof.
为达到以上目的,本发明采取的技术方案为:In order to achieve the above objectives, the technical solutions adopted by the present invention are as follows:
一种船舶锚台结构,包括锚链筒、锚台包板、锚台面板、肘板和锚唇,所述锚链筒穿过主甲板和外板并与其焊接连接,锚台面板焊接安装于锚链筒下端面,锚台面板中心设有锚链孔,所述锚链筒下端的外壁均布安装有8个肘板组,所述肘板组由内肘板和外肘板组成,所述内肘板和所述外肘板同平面且与所述锚链筒的轴线共面;所述内肘板与锚链筒以及外板焊接,所述外肘板与锚台包板以及锚台面板焊接,所述锚台面板底面上焊接安装有锚唇。A ship anchor platform structure, comprising an anchor chain tube, an anchor platform package plate, an anchor platform panel, a bracket plate and an anchor lip. On the lower end of the chain cylinder, there is an anchor chain hole in the center of the anchor platform panel. The outer wall of the lower end of the chain cylinder is uniformly installed with 8 bracket groups, and the bracket group is composed of an inner bracket and an outer bracket. The inner bracket and the outer bracket are in the same plane and coplanar with the axis of the anchor chain cylinder; the inner bracket is welded to the anchor chain cylinder and the outer plate, and the outer bracket is connected to the anchor plate and the anchor The platform board is welded, and an anchor lip is welded and installed on the bottom surface of the anchor platform board.
进一步地,所述内外肘板间设有间隙,所述锚链筒外壁下方的三组肘板的内肘板设有弧形缺口,所述带弧形缺口的内肘板与对应外肘板件形成弧形孔。Further, a gap is provided between the inner and outer brackets, the inner brackets of the three groups of brackets under the outer wall of the chain cylinder are provided with arc-shaped notches, and the inner brackets with the arc-shaped notches and the corresponding outer brackets The pieces form a curved hole.
进一步地,所述锚链筒有两个半圆筒拼装焊接组成。Further, the anchor chain cylinder is composed of two semi-cylinders assembled and welded.
再进一步地,所述锚唇的底面为圆弧面。Still further, the bottom surface of the anchor lip is a circular arc surface.
一种船舶锚台结构的加工方法,其特在于,包括以下步骤:A method for processing a ship anchor structure, which is characterized in that it includes the following steps:
(1)锚链筒的制作:加工车间在数控下料两个半圆筒体,在两个半圆筒体的外部喷粉标记各半圆筒体的四等分线位置,并将这八个位置用洋铳点做标记后加工;两个半圆筒体焊接组装为锚链筒体后,再次核对八个等分点的位置并修正用 洋铳点做八个点的位置的标记;(1) The production of anchor chain cylinder: the processing workshop cuts two semi-cylindrical bodies in the numerical control, sprays powder on the outside of the two semi-cylindrical bodies to mark the position of the quarter line of each semi-cylindrical body, and uses these eight positions After marking the bulging points, process them; after the two semi-cylindrical bodies are welded and assembled into an anchor chain cylinder, check the positions of the eight equal points again and correct the markings with the bulging points as the eight points;
(2)锚台的制作:锚台包板及锚台面板数控下料,并在锚台包板以及锚台面板上对应锚链筒的八等分标记做对应的八等分喷粉标记;检验合格后做对喷粉标记处做永久性洋铳线;将锚台包板上八等分位置的喷粉线与锚台面板上的定位线一一对应,锚台包板的下口线型以锚台面板轮廓线为准,锚台包板的上口根据外板划线样板来确定包板的开口,并用外部支撑对上口进行固定,锚台包板定位后将锚台面板与锚台包板焊接固定并安装外肘板,外肘板应按照锚台面板上的相应位置线,并结合安装角度样板进行定位,先将8块外肘板点焊在锚台面板内壁上,同时,将外肘板的定位线在锚台面板正面打出洋铳点的标记位置,作为分段定位锚台的对合线;在锚唇铸钢件上标记4等分点,并利用锚唇的四等分点与锚台面板上的对应位置线进行定位;利用加热装置对锚唇的对焊缝处金属预热,铸钢件预热温度达到100℃‐150℃,然后进行焊接,焊接完成后用保温材料保温缓冷;对锚链筒、锚台包板、锚台面板、外肘板及锚唇的焊接缝做磨光处理;(2) The production of the anchor platform: the anchor platform package plate and the anchor platform panel are numerically cut, and the eight equal division marks of the anchor chain cylinder are marked on the anchor platform package plate and the anchor platform panel. After the inspection is qualified, make a permanent gun line for the powder spraying mark; match the powder spraying line at the eight-division position of the anchor platform cladding plate with the positioning line on the anchor platform panel, and the lower line of the anchor platform cladding plate The type is based on the contour line of the anchor plate. The upper mouth of the anchor plate is determined by the marking template of the outer plate to determine the opening of the plate, and the upper mouth is fixed with external support. After the anchor plate is positioned, the anchor plate and the anchor plate are fixed. The anchor plate package plate is welded and fixed and the outer bracket plate is installed. The outer bracket plate should be positioned according to the corresponding position line on the anchor plate panel and combined with the installation angle template. First, spot weld 8 outer bracket plates on the inner wall of the anchor plate panel. At the same time, the positioning line of the outer bracket is marked on the front of the anchor platform panel to mark the position of the blunt point, as the aligning line of the segmented anchor platform; mark 4 equal points on the anchor lip cast steel, and use the anchor lip Position the quartet points of the anchor plate with the corresponding position line on the anchor panel; use the heating device to preheat the metal at the butt weld of the anchor lip, and the preheating temperature of the steel casting will reach 100 ℃-150 ℃, and then weld and weld After completion, use thermal insulation materials to keep warm and slow cooling; to polish the welding seams of the anchor chain tube, the anchor plate, the anchor plate, the outer bracket and the anchor lip;
(3)锚链筒定位及内肘板的安装:在分段的艏楼甲板、主甲板以及外板上,分别按照锚链筒中心坐标,确定锚链筒体的中心,并勘划锚链管中心线、长短轴线,做永久性标记,然后在各孔中心位置开孔;外板开孔是在划线的基础上周边向中心缩进50mm,并把外板开孔线由外侧引到外板内侧;同时,划出锚链筒安装的8块内肘板的定位线,此定位线应至少延伸出锚台外轮廓线200mm;此线作为后续锚台安装的对合线;将锚链筒由上往下从艏楼甲板经主甲板灌入,直至伸出外板,核对锚链筒和外板的相贯线与原根据样板划线是否一致;根据链筒布置图,锚唇图纸和锚台包板外板相贯线划线样板确定锚链筒伸出外板长度,并确保锚链筒中心线延伸出外板1550mm,根据锚链筒上八个洋铳点的标记位置将这八个剖面上筒体伸出外板的距离划线,以此保证锚台的安装角度;锚链筒筒体定位后测量其角度,合格后焊接或者切割筒体的余量;将锚链筒与艏楼甲板、主甲板以及外板分别焊接,并按照锚唇图纸和锚链筒/外板上的定位线在锚链筒上焊接内肘板;(3) The positioning of the chain cylinder and the installation of the inner bracket: on the segmented forward deck, main deck and outer slab, determine the center of the chain cylinder according to the center coordinates of the chain cylinder, and map the chain Permanently mark the center line and the long and short axis of the pipe, and then make a hole at the center of each hole; the outer plate opening is based on the scoring and the periphery is retracted 50mm to the center, and the outer plate opening line is drawn from the outside to the center. The inner side of the outer plate; at the same time, draw the positioning line of the 8 inner brackets for the anchor chain cylinder installation. This positioning line should extend at least 200mm from the outer contour line of the anchor platform; this line is used as the alignment line for subsequent installation of the anchor platform; The chain cylinder is poured from the bow deck through the main deck from top to bottom until it extends out of the outer plate. Check whether the intersecting line of the chain cylinder and the outer plate is consistent with the original line drawn on the template; according to the chain cylinder layout drawing and anchor lip drawing Determine the length of the anchor chain cylinder extending from the outer plate with the cross-line model of the outer plate of the anchor platform package plate, and ensure that the center line of the anchor chain cylinder extends 1550mm from the outer plate. The distance that the cylinder extends from the outer plate on each section is marked to ensure the installation angle of the anchor platform; the angle of the anchor chain cylinder is measured after the cylinder is positioned, and the margin of the cylinder is welded or cut after qualified; the anchor chain cylinder is connected to the bow Weld the floor deck, main deck and outer plate separately, and weld the inner bracket to the chain cylinder according to the anchor lip drawing and the positioning line on the chain cylinder/outer plate;
(4)锚台包板的安装:在保证锚链筒中心及八个剖面位置长度条件下定位锚台包板,锚台包板上八个剖面位置线须与外板上相应的对合线重合,锚台定位好后对锚台包板上八个剖面位置的安装角度进行复样,确定角度无误后修改锚台包 板余量,锚台包板安装定位好后将其与外板焊接固定,同时将锚链筒的下端面与锚台面板焊接固定。(4) The installation of the anchor plate package: the anchor plate is positioned under the condition of ensuring the center of the chain tube and the length of the eight section positions. The eight section position lines of the anchor plate shall be aligned with the corresponding line of the outer plate. Coinciding, after the anchoring platform is positioned, copy the installation angles of the eight cross-sectional positions of the anchoring platform, and modify the margin of the anchoring platform after confirming that the angle is correct. After the anchoring platform is installed and positioned, weld it to the outer plate Fix, while welding and fixing the lower end surface of the anchor chain barrel with the anchor platform panel.
采取以上技术方案后,本发明的有益效果为:锚台结构通过肘板组队其结构做加强,能够有效防止变形,在施工过程中通过多次的定位和修正,确保锚台各部件的安装精度,安装难度小,便于施工,缩短建造周期。After adopting the above technical solution, the beneficial effects of the present invention are: the anchor structure is strengthened by the bracket grouping, which can effectively prevent deformation, and through multiple positioning and corrections during the construction process, the installation of each component of the anchor is ensured Accuracy, low installation difficulty, easy construction, and shorten the construction period.
附图说明Description of the drawings
图1为锚链筒安装结构示意图;Figure 1 is a schematic diagram of the installation structure of the chain cylinder;
图2为锚台面板的结构示意图;Figure 2 is a schematic diagram of the structure of the anchor plate;
图3为0°‐180°截面肘板的结构示意图;Figure 3 is a schematic diagram of the structure of the 0°-180° cross-section bracket;
图4为45°‐225°截面肘板的结构示意图;Figure 4 is a schematic diagram of the 45°-225° cross-section bracket;
图5为90°‐270°截面肘板的结构示意图;Figure 5 is a schematic diagram of the 90°-270° cross-section bracket;
图6为135°‐315°截面肘板的结构示意图;Figure 6 is a schematic structural diagram of a 135°-315° cross-section bracket;
图7为外板表面划线示意图。Figure 7 is a schematic diagram of the scribing on the surface of the outer panel.
图中:锚链筒1,锚台包板2,锚台面板3,锚唇4,艏楼甲板5,主甲板6和,外板7,内肘板8,外肘板9,弧形缺口10,锚链孔11。In the picture: Anchor chain cylinder 1, Anchor plate 2, Anchor plate 3, Anchor lip 4, Fore deck 5, Main deck 6, Outer plate 7, Inner bracket 8, Outer bracket 9, Arc-shaped notch 10. Anchor chain hole 11.
具体实施方式Detailed ways
以下结合附图对本发明的具体实施方式做进一步详述:The specific embodiments of the present invention will be described in further detail below with reference to the accompanying drawings:
如图1所示,一种船舶锚台结构,由锚链筒1、锚台包板2、锚台面板3、8对肘板和锚唇4组成,锚链筒1由两个半圆筒焊接组成,锚链筒1依次穿过艏楼甲板5、主甲板6和外板7并与上述三块板之间焊接连接,锚链筒1的上端面与艏楼甲板5平齐,锚链筒1的下端面伸出外板7。锚台面板3焊接安装于锚链筒1下端面,锚台面板3中心开有与锚链筒1内孔对应大小的锚链孔11,锚台面板3与外板7之间安装锚台包板2,锚台包板2底面轮廓与锚台面板3的外轮廓对应并焊接,锚台包板2的顶面与外板7焊接。如图3‐6所示,锚链筒1下端的外壁均布安装有8个肘板组,肘板组由内肘板8和外肘板9组成,各肘板组的内肘板8和外肘板9同平面且与锚链筒1的轴线共面;内肘板8与锚链筒1以及外板7焊接,外肘板9与锚台包板2以及锚台面板3焊接。内肘板8与外肘板9间留有间隙,在锚链筒1上225°,270°,315°三处的内肘板设有弧形缺口10,带弧形缺口10的内肘板8与对应外肘板9间形成弧形孔。锚唇4焊接安装在锚台 面板3底面上,锚唇4的底面一圈为圆弧圈,避免锚唇与锚接触时刮伤锚。As shown in Figure 1, a ship anchoring platform structure is composed of an anchor chain cylinder 1, an anchor platform cladding plate 2, an anchor platform panel 3, 8 pairs of brackets and an anchor lip 4. The anchor chain cylinder 1 is welded by two semi-cylinders The anchor chain tube 1 passes through the bow deck 5, the main deck 6 and the outer plate 7 in turn, and is welded to the above three plates. The upper end of the anchor chain tube 1 is flush with the bow deck 5, and the anchor chain tube The lower end surface of 1 protrudes from the outer panel 7. The anchor plate 3 is welded and installed on the lower end surface of the anchor chain cylinder 1. The anchor plate 3 is provided with an anchor chain hole 11 corresponding to the inner hole of the anchor chain cylinder 1, and an anchor pack is installed between the anchor plate 3 and the outer plate 7. The bottom surface contour of the anchor plate 2 and the anchor plate 2 corresponds to the outer contour of the anchor plate 3 and is welded, and the top surface of the anchor plate 2 is welded to the outer plate 7. As shown in Figure 3-6, the outer wall of the lower end of the anchor chain cylinder 1 is uniformly installed with 8 bracket groups. The bracket group is composed of an inner bracket 8 and an outer bracket 9. The inner bracket 8 and The outer bracket 9 is in the same plane and coplanar with the axis of the chain cylinder 1; the inner bracket 8 is welded to the chain cylinder 1 and the outer plate 7, and the outer bracket 9 is welded to the anchor plate 2 and the anchor plate 3. There is a gap between the inner bracket 8 and the outer bracket 9. The inner bracket at 225°, 270°, and 315° on the chain cylinder 1 is provided with arc-shaped notches 10, and the inner bracket with arc-shaped notches 10 8 and the corresponding outer bracket 9 form an arc-shaped hole. The anchor lip 4 is welded and installed on the bottom surface of the anchor platform panel 3, and the bottom surface of the anchor lip 4 is a circular arc circle to avoid scratching the anchor when the anchor lip contacts the anchor.
该船舶锚台结构的施工方法为:The construction method of the ship anchor structure is:
一、锚链筒的制作:1. The production of anchor chain barrel:
(1)加工车间在数控下料两个半圆筒体,在两个半圆筒体的外部利用切割指令里的喷粉程序将锚链筒1筒体零件上标注90°‐270°、135°‐315°、180°‐0°、225°‐45°四个剖面,90°、135°、180°、225°、270°、315°、0°、45°八个点的位置用喷粉线喷到零件上,并将这八个点的位置用洋铳点做标记后加工;(1) The processing workshop cuts two semi-cylindrical bodies on the CNC, and uses the powder spraying program in the cutting command to mark the parts of the anchor chain cylinder 1 at 90°-270°, 135°- 315°, 180°-0°, 225°-45° four sections, 90°, 135°, 180°, 225°, 270°, 315°, 0°, 45° eight points with powder spray line Spray it on the part, and mark the positions of these eight points with horn points for processing;
(2)锚链筒1筒体为两个半圆筒体对接,在加工内半径为550mm的半圆后对接时对接缝位置需光顺,避免出现凸起或凹陷的情况,若存在板厚差,应将差值放在锚链筒1外侧,保证锚链筒1内侧平整;(2) The cylinder body of the anchor chain cylinder 1 is abutting between two semi-cylindrical bodies. When a semicircle with an inner radius of 550mm is processed, the butt joint position must be smooth to avoid protrusions or depressions. If there is a difference in plate thickness , The difference should be placed on the outside of the chain cylinder 1 to ensure that the inside of the chain cylinder 1 is flat;
(3)锚链筒1组合完毕后,再次核对90°‐270°、135°‐315°、180°‐0°、225°‐45°四个剖面,90°、135°、180°、225°、270°、315°、0°、45°八个点的位置的正确性并修正用洋铳点做八个点的位置的标记。(3) After the anchor chain cylinder 1 is assembled, check again the four sections of 90°-270°, 135°-315°, 180°-0°, 225°-45°, 90°, 135°, 180°, 225 The correctness of the positions of the eight points of °, 270°, 315°, 0°, and 45° and correction of the mark of the position of the eight points with the foreign gun point.
二、锚台的制作:2. The production of anchor platform:
(1)锚台包板2及外肘板9的定位、安装:(1) Positioning and installation of anchor plate 2 and outer bracket 9:
1)锚台包板2及锚台面板3数控下料,喷粉标注外肘板9安装线、加工样箱对合线,包板加工及检验合格后,对肘板安装线做永久性洋铳线再送分段安装。1) The anchor plate 2 and the anchor plate 3 are CNC blanked, and the outer bracket 9 installation line is marked by the powder spraying, the assembly line of the processing sample box, and the bracket installation line is made permanent after the package plate is processed and inspected. The blunderbuss are then sent to be installed in sections.
2)锚台包板2定位前首先根据锚台面板的木样板校验面板上8个外肘板9位置喷粉线的准确性;检验完毕后以90°、270°,0°,180°位置为基准,将锚台包板2上八个剖面位置(0、45°、90°、135°、180°、225°、270°、315°)的喷粉线与锚台面板3上的定位线一一对应,锚台包板2的下口线型以锚台面板3轮廓线为准,锚台包板2上口根据样台提供的剖面数据图及外板划线样板来确定锚台包板的开口,并用支撑对上口进行固定,将锚台面板3与锚台包板2焊接固定。2) Before anchoring board 2 is positioned, first check the accuracy of the powder spraying line at the 8 outer bracket 9 positions on the anchor board according to the wood sample of the anchor board; after the inspection is completed, 90°, 270°, 0°, 180° The position is the reference, and the powder spraying line at the eight profile positions (0, 45°, 90°, 135°, 180°, 225°, 270°, 315°) on the anchor plate 2 and the anchor plate 3 The positioning lines correspond one-to-one. The line type of the lower opening of the anchor plate 2 is based on the contour line of the anchor plate 3, and the upper opening of the anchor plate 2 determines the anchor according to the profile data provided by the sample platform and the outer plate marking template. The opening of the platform package plate, and the upper opening is fixed with a support, and the anchor platform panel 3 and the anchor platform package plate 2 are welded and fixed.
3)锚台包板2初步定位后安装外肘板9,外肘板9按照面板上的相应位置线,并结合样台提供的安装角度样板来进行定位,先将(0°、45°、90°、135°、180°、225°、270°,315°)8块外肘板9点焊在锚台面板3上,如与锚台包板2上肘板的相应位置线不符则以锚台包板2划线为准,调整外肘板9位置,报 验合格后焊接固定;同时,将外肘板9的定位线在锚台包板2的正面打出洋铳点的标记位置,作为分段定位锚台的对合线。3) Install the outer bracket 9 after the initial positioning of the anchor plate 2 90°, 135°, 180°, 225°, 270°, 315°) 8 external brackets 9 are spot welded on the anchor plate 3, if they do not match the corresponding position line of the bracket on the anchor plate 2 The anchor plate 2 is subject to the marking, adjust the position of the outer bracket 9 and weld and fix it after passing the inspection; at the same time, the positioning line of the outer bracket 9 is marked on the front of the anchor plate 2. Used as the aligning line of the segmented anchoring platform.
(2)锚唇4的定位、安装:(2) Positioning and installation of anchor lip 4:
1)对锚唇4铸钢件的外形进行报检验收,检查锚唇4与锚台面板3接触平面及焊接破口是否满足要求。精度要求参照GB6414‐1999,CT13来执行,其中主要检验的尺寸为:①下口外形尺寸±10mm;②下口水平度±5mm;③工作面误差±5mm。1) Carry out inspection and acceptance on the shape of the anchor lip 4 cast steel, and check whether the contact plane of the anchor lip 4 and the anchor plate 3 and the welding fracture meet the requirements. The accuracy requirements are implemented with reference to GB6414-1999, CT13, and the main inspection dimensions are: ① the outer dimension of the lower mouth ± 10mm; ② the level of the lower mouth ± 5mm; ③ the working surface error ± 5mm.
2)按照样台提供的锚台面板3划线样板将90°、270°、45°、225°、0°、180°、135°、315°四个剖面位置线划到锚台面板3上。2) According to the anchor plate 3 marking template provided by the sample station, mark the four cross-sectional position lines of 90°, 270°, 45°, 225°, 0°, 180°, 135°, 315° on the anchor plate 3 .
3)根据锚链筒布置图,锚唇图纸,先按锚唇铸钢件上的90°、270°、0°、180°四个位置标记与面板上的对应位置线进行定位,定位时注意该锚唇4有左右之分。3) According to the anchor chain barrel layout drawing and anchor lip drawing, first locate the four position marks on the anchor lip casting steel at 90°, 270°, 0°, and 180° and the corresponding position line on the panel. Pay attention when positioning The anchor lip 4 is divided into left and right.
4)对锚唇5焊缝处金属及相邻钢板预热,铸钢件预热温度达到100度~150度,通过包裹加热垫的方式加热,温度达到后进行焊接固定,焊接完成后然后使用保温材料保温缓冷。4) Preheat the metal and adjacent steel plates at the weld of anchor lip 5, the preheating temperature of the steel casting reaches 100 degrees to 150 degrees, and it is heated by wrapping the heating pad. After the temperature is reached, it is welded and fixed, and then used after the welding is completed. Insulation material keeps warm and cools slowly.
5)对锚链筒1、锚台包板2、锚台面板3、外肘板9及锚唇4的焊接缝做磨光处理。5) Polish the welding seams of the anchor chain cylinder 1, the anchor plate 2, the anchor plate 3, the outer bracket 9 and the anchor lip 4.
三、锚链筒1的定位安装及内肘板8的安装3. Positioning and installation of anchor chain cylinder 1 and installation of inner bracket 8
1)在艏楼甲板5上,按照样台提供的锚链筒艏楼甲板5开孔样板上的锚链筒中心坐标确定筒体的中心,并勘划锚链管中心线、长短轴线,做永久性标记,然后在孔中心位置开一个与设计值适当大小的小孔。1) On the bow deck 5, determine the center of the cylinder according to the center coordinates of the anchor chain tube on the bow deck 5 opening template provided by the sample platform, and map the center line, long and short axis of the chain tube, and do Permanently mark, and then open a small hole in the center of the hole with a size appropriate to the design value.
2)根据样台提供的主甲板6划线样板,在主甲板6理论开孔中心坐标确定筒体的中心,然后在孔中心位置开一个与设计值适当大小的小孔。2) According to the main deck 6 marking template provided by the sample platform, determine the center of the cylinder on the theoretical opening center coordinates of the main deck 6, and then open a small hole with the design value at the center of the hole.
3)根据样台提供的锚链筒外板7现场开孔样板上锚链筒中心坐标,勘划外板开孔线,在划线的基础上周边向中心缩进50mm开孔,并把外板开孔线由外侧引到外板内侧,同时,划出锚链筒1安装的8块内肘板8的定位线,此定位线应至少延伸出锚台外轮廓线200mm,此线作为后续安装的对合线。3) According to the anchor chain tube outer plate 7 provided by the sample platform, the center coordinates of the anchor chain tube on the on-site opening template are mapped out. The plate hole line is drawn from the outside to the inside of the outer plate. At the same time, the positioning line of the eight inner brackets 8 installed on the anchor chain cylinder 1 is drawn. This positioning line should extend at least 200mm from the outer contour line of the anchor platform. This line is used as a follow-up Installed butt wire.
4)将锚链筒1由上往下从艏楼甲板5经主甲板6灌入,直至伸出外板7,核对锚链筒和外板的相贯线与原根据样板划线是否一致,确认后将锚链筒1与艏楼 甲板5、主甲板6和外板7分别焊接固定。4) Pour the chain cylinder 1 from the fore deck 5 through the main deck 6 from top to bottom until it protrudes out of the outer plate 7. Check whether the intersecting line of the chain cylinder and the outer plate is consistent with the original marking according to the template, confirm Then, the anchor chain cylinder 1 is welded to the bow deck 5, the main deck 6 and the outer plate 7 respectively.
5)根据链筒布置图,锚唇图纸和锚台包板外板相贯线划线样板确定锚链筒伸出外板长度,并确保锚链筒中心线延伸出外板1550mm(外板理论面距离),根据锚链筒上八个洋铳点的标记位置将这八个剖面上筒体伸出外板的下列距离划线(筒体内侧距外板外表面):90°=1151mm、270°=1424mm、225°=1481mm、45°=1115mm、180°=1433mm、0°=1175mm、135°=1303mm、315°=1728mm,以此保证锚台的安装角度,以上数据保证正公差,为保证拉锚后锚尖与外板的间隙,对锚链筒加放了50mm余量,车间在修割时应根据理论尺寸同比加放安装余量以保证锚台的安装角度(见附图7)。5) Determine the length of the chain cylinder extending from the outer plate according to the chain cylinder layout drawing, the anchor lip drawing and the cross-line model of the outer plate of the anchor plate package plate, and ensure that the centerline of the chain cylinder extends 1550mm from the outer plate (theoretical surface distance of the outer plate) ), according to the marking positions of the eight bludgeon points on the anchor chain cylinder, mark the following distances of the cylinder body extending from the outer plate on the eight sections (the inner side of the cylinder body is away from the outer surface of the outer plate): 90°=1151mm, 270°= 1424mm, 225°=1481mm, 45°=1115mm, 180°=1433mm, 0°=1175mm, 135°=1303mm, 315°=1728mm, so as to ensure the installation angle of the anchor platform. The above data guarantees the positive tolerance, in order to ensure the tension The gap between the anchor tip and the outer plate after the anchor has a 50mm margin added to the chain cylinder. The workshop should add an installation margin according to the theoretical size to ensure the installation angle of the anchor platform (see Figure 7).
6)锚链筒1定位后测量其角度,报验合格后方可焊接/切割筒体的余量,角度偏差<0.2°。6) Measure the angle of the anchor chain cylinder 1 after positioning, and only after the inspection is qualified, can the margin of the cylinder body be welded/cut, and the angle deviation is less than 0.2°.
7)按照锚唇图纸和锚链筒/外板上的定位线焊接安装锚链筒的内肘板8,完工偏差<10mm。7) Install the inner bracket 8 of the anchor chain barrel by welding and installing the inner bracket 8 of the anchor chain barrel according to the anchor lip drawing and the positioning line on the anchor chain barrel/outer plate, and the completion deviation is less than 10mm.
四、锚台包板的安装:Fourth, the installation of the anchor plate package:
(1)在保证锚链筒1中心及八个剖面位置长度条件下定位锚台包板2,锚台包板2上八个剖面位置线须与外板7上相应的对合线重合。(1) Under the condition of ensuring the center of the chain cylinder 1 and the length of the eight cross-sectional positions, locate the anchor plate 2 and the eight cross-sectional position lines on the anchor plate 2 must coincide with the corresponding alignment lines on the outer plate 7.
(2)锚台包板2定位好后根据外卡样板对锚台包板上八个剖面位置的安装角度进行复样,确定角度无误后修改锚台包板2余量,为保证拉锚后锚尖与外板的间隙。(2) After anchoring the anchor plate 2 is positioned, copy the installation angles of the eight sections of the anchor plate according to the external card template, and modify the margin of the anchor plate 2 after confirming the angle to ensure that the anchor is pulled. The gap between the anchor tip and the outer plate.
(3)将锚台包板2与外板7焊接固定,同时将锚链,1的下端面与锚台面板3焊接固定。(3) Welding and fixing the anchor plate 2 and the outer plate 7, and at the same time welding and fixing the lower end surface of the anchor chain, 1 and the anchor plate 3.

Claims (5)

  1. 一种船舶锚台结构,包括锚链筒、锚台包板、锚台面板、肘板和锚唇,所述锚链筒穿过主甲板和外板并与其焊接连接,锚台面板焊接安装于锚链筒下端面,锚台面板中心设有锚链孔,其特征在于,所述锚链筒下端的外壁均布安装有8个肘板组,所述肘板组由内肘板和外肘板组成,所述内肘板和所述外肘板同平面且与所述锚链筒的轴线共面;所述内肘板与锚链筒以及外板焊接,所述外肘板与锚台包板以及锚台面板焊接,所述锚台面板底面上焊接安装有锚唇。A ship anchor platform structure, comprising an anchor chain tube, an anchor platform package plate, an anchor platform panel, a bracket plate and an anchor lip. The anchor chain hole is provided on the lower end of the anchor chain cylinder and the center of the anchor platform panel. It is characterized in that the outer wall of the lower end of the anchor chain cylinder is uniformly installed with 8 bracket groups, and the bracket group consists of an inner bracket and an outer bracket. The inner bracket and the outer bracket are coplanar and coplanar with the axis of the anchor chain barrel; the inner bracket is welded to the anchor chain barrel and the outer plate, and the outer bracket is connected to the anchor platform The package plate and the anchor plate are welded, and an anchor lip is welded and installed on the bottom surface of the anchor plate.
  2. 根据权利要求1所述的一种船舶锚台结构,其特征在于,所述内外肘板间设有间隙,所述锚链筒外壁下方的三组肘板的内肘板设有弧形缺口,所述带弧形缺口的内肘板与对应外肘板件形成弧形孔。The ship anchor structure according to claim 1, wherein a gap is provided between the inner and outer brackets, and the inner brackets of the three sets of brackets below the outer wall of the anchor chain tube are provided with arc-shaped notches, The inner bracket with the arc-shaped notch and the corresponding outer bracket form an arc-shaped hole.
  3. 根据权利要求1所述的一种船舶锚台结构,其特征在于,所述锚链筒有两个半圆筒拼装焊接组成。The ship anchor platform structure according to claim 1, wherein the anchor chain cylinder is composed of two semi-cylinders assembled and welded.
  4. 根据权利要求1所述的一种船舶锚台结构,其特征在于,所述锚唇的底面为圆弧面。The ship anchor platform structure according to claim 1, wherein the bottom surface of the anchor lip is a circular arc surface.
  5. 权利要求1所述的一种船舶锚台结构的加工方法,其特在于,包括以下步骤:The method for processing a ship's anchorage structure according to claim 1, characterized in that it comprises the following steps:
    (1)锚链筒的制作:加工车间在数控下料两个半圆筒体,在两个半圆筒体的外部喷粉标记各半圆筒体的四等分线位置,并将这八个位置用洋铳点做标记后加工;两个半圆筒体焊接组装为锚链筒体后,再次核对八个等分点的位置并修正用洋铳点做八个点的位置的标记;(1) The production of anchor chain cylinder: the processing workshop cuts two semi-cylindrical bodies in the numerical control, sprays powder on the outside of the two semi-cylindrical bodies to mark the position of the quarter line of each semi-cylindrical body, and uses these eight positions After marking the bulging points, process them; after the two semi-cylindrical bodies are welded and assembled into an anchor chain cylinder, check the positions of the eight equal points again and correct the markings with the bulging points as the eight points;
    (2)锚台的制作:锚台包板及锚台面板数控下料,并在锚台包板以及锚台面板上对应锚链筒的八等分标记做对应的八等分喷粉标记;检验合格后做对喷粉标记处做永久性洋铳线;将锚台包板上八等分位置的喷粉线与锚台面板上的定位线一一对应,锚台包板的下口线型以锚台面板轮廓线为准,锚台包板的上口根据外板划线样板来确定包板的开口,并用外部支撑对上口进行固定,锚台包板定位后将锚台面板与锚台包板焊接固定并安装外肘板,外肘板应按照锚台面板上的相应位置线,并结合安装角度样板进行定位,先将8块外肘板点焊在锚台面板内壁上,同时,将外肘板的定位线在锚台面板正面打出洋铳点的标记位置,作为分段定位锚台的对合线;在锚唇铸钢件上标记4等分点,并利用锚唇的四等分点与锚 台面板上的对应位置线进行定位;利用加热装置对锚唇的对焊缝处金属预热,铸钢件预热温度达到100℃‐150℃,然后进行焊接,焊接完成后用保温材料保温缓冷;对锚链筒、锚台包板、锚台面板、外肘板及锚唇的焊接缝做磨光处理;(2) The production of the anchor platform: the anchor platform package plate and the anchor platform panel are numerically cut, and the eight equal division marks of the anchor chain cylinder are marked on the anchor platform package plate and the anchor platform panel. After the inspection is qualified, make a permanent gun line for the powder spraying mark; match the powder spraying line at the eight-division position of the anchor platform cladding plate with the positioning line on the anchor platform panel, and the lower line of the anchor platform cladding plate The type is based on the contour line of the anchor plate. The upper mouth of the anchor plate is determined by the marking template of the outer plate to determine the opening of the plate, and the upper mouth is fixed with external support. After the anchor plate is positioned, the anchor plate and the anchor plate are fixed. The anchor plate package plate is welded and fixed and the outer bracket plate is installed. The outer bracket plate should be positioned according to the corresponding position line on the anchor plate panel and combined with the installation angle template. First, spot weld 8 outer bracket plates on the inner wall of the anchor plate panel. At the same time, the positioning line of the outer bracket is marked on the front of the anchor platform panel to mark the position of the blunt point, as the aligning line of the segmented anchor platform; mark 4 equal points on the anchor lip cast steel, and use the anchor lip Position the quartet points of the anchor plate with the corresponding position line on the anchor panel; use the heating device to preheat the metal at the butt weld of the anchor lip, and the preheating temperature of the steel casting will reach 100 ℃-150 ℃, and then weld and weld After completion, use thermal insulation materials to keep warm and slow cooling; to polish the welding seams of the anchor chain tube, the anchor plate, the anchor plate, the outer bracket and the anchor lip;
    (3)锚链筒定位及内肘板的安装:在分段的艏楼甲板、主甲板以及外板上,分别按照锚链筒中心坐标,确定锚链筒体的中心,并勘划锚链管中心线、长短轴线,做永久性标记,然后在各孔中心位置开孔;外板开孔是在划线的基础上周边向中心缩进50mm,并把外板开孔线由外侧引到外板内侧;同时,划出锚链筒安装的8块内肘板的定位线,此定位线应至少延伸出锚台外轮廓线200mm;此线作为后续锚台安装的对合线;将锚链筒由上往下从艏楼甲板经主甲板灌入,直至伸出外板,核对锚链筒和外板的相贯线与原根据样板划线是否一致;根据链筒布置图,锚唇图纸和锚台包板外板相贯线划线样板确定锚链筒伸出外板长度,并确保锚链筒中心线延伸出外板1550mm,根据锚链筒上八个洋铳点的标记位置将这八个剖面上筒体伸出外板的距离划线,以此保证锚台的安装角度;锚链筒筒体定位后测量其角度,合格后焊接或者切割筒体的余量;将锚链筒与艏楼甲板、主甲板以及外板分别焊接,并按照锚唇图纸和锚链筒/外板上的定位线在锚链筒上焊接内肘板;(3) The positioning of the chain cylinder and the installation of the inner bracket: on the segmented forward deck, main deck and outer slab, determine the center of the chain cylinder according to the center coordinates of the chain cylinder, and map the chain Permanently mark the center line and the long and short axis of the pipe, and then make a hole at the center of each hole; the outer plate opening is based on the scoring and the periphery is retracted 50mm to the center, and the outer plate opening line is drawn from the outside to the center. The inner side of the outer plate; at the same time, draw the positioning line of the 8 inner brackets for the anchor chain cylinder installation. This positioning line should extend at least 200mm from the outer contour line of the anchor platform; this line is used as the alignment line for subsequent installation of the anchor platform; The chain cylinder is poured from the bow deck through the main deck from top to bottom until it extends out of the outer plate. Check whether the intersecting line of the chain cylinder and the outer plate is consistent with the original line drawn on the template; according to the chain cylinder layout drawing and anchor lip drawing Determine the length of the anchor chain cylinder extending from the outer plate with the cross-line model of the outer plate of the anchor platform package plate, and ensure that the center line of the anchor chain cylinder extends 1550mm from the outer plate. The distance that the cylinder extends from the outer plate on each section is marked to ensure the installation angle of the anchor platform; the angle of the anchor chain cylinder is measured after the cylinder is positioned, and the margin of the cylinder is welded or cut after qualified; the anchor chain cylinder is connected to the bow Weld the floor deck, main deck and outer plate separately, and weld the inner bracket to the chain cylinder according to the anchor lip drawing and the positioning line on the chain cylinder/outer plate;
    (4)锚台包板的安装:在保证锚链筒中心及八个剖面位置长度条件下定位锚台包板,锚台包板上八个剖面位置线须与外板上相应的对合线重合,锚台定位好后对锚台包板上八个剖面位置的安装角度进行复样,确定角度无误后修改锚台包板余量,锚台包板安装定位好后将其与外板焊接固定,同时将锚链筒的下端面与锚台面板焊接固定。(4) The installation of the anchor plate package: the anchor plate is positioned under the condition of ensuring the center of the chain tube and the length of the eight section positions. The eight section position lines of the anchor plate shall be aligned with the corresponding line of the outer plate. Coinciding, after the anchoring platform is positioned, copy the installation angles of the eight cross-sectional positions of the anchoring platform, and modify the margin of the anchoring platform after confirming that the angle is correct. After the anchoring platform is installed and positioned, weld it to the outer plate Fix, while welding and fixing the lower end surface of the anchor chain barrel with the anchor platform panel.
PCT/CN2020/139280 2020-04-28 2020-12-25 Anchor bed structure of ship and machining method therefor WO2021218202A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010348633.7 2020-04-28
CN202010348633.7A CN111532379B (en) 2020-04-28 2020-04-28 Ship anchor platform structure and processing method thereof

Publications (1)

Publication Number Publication Date
WO2021218202A1 true WO2021218202A1 (en) 2021-11-04

Family

ID=71967562

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/139280 WO2021218202A1 (en) 2020-04-28 2020-12-25 Anchor bed structure of ship and machining method therefor

Country Status (2)

Country Link
CN (1) CN111532379B (en)
WO (1) WO2021218202A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113998072A (en) * 2021-11-30 2022-02-01 沪东中华造船(集团)有限公司 Manufacturing and mounting method of standard anchor platform
CN114043171A (en) * 2021-11-12 2022-02-15 中铁山桥集团有限公司 Method for manufacturing steel anchor box of curve cable tower
CN114379728A (en) * 2021-12-17 2022-04-22 沪东中华造船(集团)有限公司 Method for positioning upper bottom subsection and side subsection of heavy lift vessel
CN115230906A (en) * 2022-08-10 2022-10-25 沪东中华造船(集团)有限公司 Method for mounting first anchor hawse pipe
CN115556898A (en) * 2022-10-25 2023-01-03 沪东中华造船(集团)有限公司 Rapid carrying and linear control method for titanium alloy air guide sleeve for shipbuilding on inclined slipway

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111532379B (en) * 2020-04-28 2023-12-15 江苏扬子鑫福造船有限公司 Ship anchor platform structure and processing method thereof
CN112249262B (en) * 2020-10-28 2021-12-17 上海外高桥造船有限公司 Quick positioning method for ship anchor platform
CN112407189A (en) * 2020-11-26 2021-02-26 江南造船(集团)有限责任公司 Precision construction process for bow hawse pipe and anchor block of ultra-large ship
CN112810771B (en) * 2021-01-28 2022-09-16 广州文冲船厂有限责任公司 Assembly method of anchor platform for ship
CN113682446A (en) * 2021-09-02 2021-11-23 沪东中华造船(集团)有限公司 Anchor system installation precision control method for ship construction
CN113697036A (en) * 2021-09-30 2021-11-26 广船国际有限公司 Ship with anchor block
CN113799925A (en) * 2021-10-29 2021-12-17 广州文冲船厂有限责任公司 Anchor chock structure and ship body

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102991653A (en) * 2012-12-22 2013-03-27 厦门船舶重工股份有限公司 Improved structure of anchor station
CN203020525U (en) * 2012-12-22 2013-06-26 厦门船舶重工股份有限公司 Improved structure of anchor chock
KR20140036689A (en) * 2012-09-18 2014-03-26 에스티엑스조선해양 주식회사 Ladder for welding a hawse pipe of ship
CN104973220A (en) * 2015-07-17 2015-10-14 江苏科技大学 Designing method for side anchor mouth with functional area separating structure
CN109094723A (en) * 2018-09-28 2018-12-28 中船黄埔文冲船舶有限公司 A kind of hawse-pipe and anchor station fabrication and installation method
CN109204687A (en) * 2018-08-15 2019-01-15 招商局重工(江苏)有限公司 A kind of installation method of chain pipe anchor station anchor lip
CN109501960A (en) * 2018-12-29 2019-03-22 芜湖造船厂有限公司 A kind of pre-assembled structure of anchor station and its assembly method
CN111532379A (en) * 2020-04-28 2020-08-14 江苏扬子鑫福造船有限公司 Ship anchor platform structure and machining method thereof
CN212332880U (en) * 2020-04-28 2021-01-12 江苏扬子鑫福造船有限公司 Ship anchor platform structure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000257059A (en) * 1999-03-05 2000-09-19 Shimizu Corp Construction method of anchor pedestal and anchor head part
CN104071300B (en) * 2014-07-11 2016-08-31 广州文冲船厂有限责任公司 The installation method that anchor station anchor lip ground is integral prefabricated
CN105366003A (en) * 2015-10-26 2016-03-02 江苏科技大学 Anchor mouth and profile generation method thereof
CN105644714A (en) * 2015-12-21 2016-06-08 广船国际有限公司 Manufacturing and installing method of anchor bed assembly

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140036689A (en) * 2012-09-18 2014-03-26 에스티엑스조선해양 주식회사 Ladder for welding a hawse pipe of ship
CN102991653A (en) * 2012-12-22 2013-03-27 厦门船舶重工股份有限公司 Improved structure of anchor station
CN203020525U (en) * 2012-12-22 2013-06-26 厦门船舶重工股份有限公司 Improved structure of anchor chock
CN104973220A (en) * 2015-07-17 2015-10-14 江苏科技大学 Designing method for side anchor mouth with functional area separating structure
CN109204687A (en) * 2018-08-15 2019-01-15 招商局重工(江苏)有限公司 A kind of installation method of chain pipe anchor station anchor lip
CN109094723A (en) * 2018-09-28 2018-12-28 中船黄埔文冲船舶有限公司 A kind of hawse-pipe and anchor station fabrication and installation method
CN109501960A (en) * 2018-12-29 2019-03-22 芜湖造船厂有限公司 A kind of pre-assembled structure of anchor station and its assembly method
CN111532379A (en) * 2020-04-28 2020-08-14 江苏扬子鑫福造船有限公司 Ship anchor platform structure and machining method thereof
CN212332880U (en) * 2020-04-28 2021-01-12 江苏扬子鑫福造船有限公司 Ship anchor platform structure

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114043171A (en) * 2021-11-12 2022-02-15 中铁山桥集团有限公司 Method for manufacturing steel anchor box of curve cable tower
CN114043171B (en) * 2021-11-12 2024-03-01 中铁山桥集团有限公司 Manufacturing method of curve cable tower steel anchor box
CN113998072A (en) * 2021-11-30 2022-02-01 沪东中华造船(集团)有限公司 Manufacturing and mounting method of standard anchor platform
CN113998072B (en) * 2021-11-30 2023-11-07 沪东中华造船(集团)有限公司 Manufacturing and installing method of standard anchor platform
CN114379728A (en) * 2021-12-17 2022-04-22 沪东中华造船(集团)有限公司 Method for positioning upper bottom subsection and side subsection of heavy lift vessel
CN114379728B (en) * 2021-12-17 2024-03-26 沪东中华造船(集团)有限公司 Positioning method for bottom section and side section on heavy crane ship
CN115230906A (en) * 2022-08-10 2022-10-25 沪东中华造船(集团)有限公司 Method for mounting first anchor hawse pipe
CN115556898A (en) * 2022-10-25 2023-01-03 沪东中华造船(集团)有限公司 Rapid carrying and linear control method for titanium alloy air guide sleeve for shipbuilding on inclined slipway

Also Published As

Publication number Publication date
CN111532379B (en) 2023-12-15
CN111532379A (en) 2020-08-14

Similar Documents

Publication Publication Date Title
WO2021218202A1 (en) Anchor bed structure of ship and machining method therefor
CN103273281B (en) A kind of construction technology of thin-wall barrel
CN102407921B (en) Mounting method for sectional inversely hung rudder arm
CN103273252B (en) Shaping accessory and welding method before a kind of weldering of large-sized steel cylinder
CN107876943A (en) A kind of building technology of wind-power tower
CN102416554B (en) Technology for making pile legs of wind power installation ship
CN107401175B (en) A kind of method of construction of the upper guide pipe support of six pile leaders frame
CN102489947B (en) Bottom chord tube manufacturing process of girder of steel tube concrete truss beam bridge
CN102874379B (en) Manufacture method of offshore riprap leveling ship
CN108687489B (en) manufacturing method of large hopper
CN109204687B (en) Method for installing anchor lips of anchor chain pipe anchor table
US20150368744A1 (en) Method and apparatus for injecting water restraint layer of laser shock processing blade
CN106184686B (en) Ship stern pipe mounting process
CN107825077B (en) It is a kind of to rise self-propulsion type platform leg building technology certainly
CN112570998A (en) Manufacturing process method of air cooling pipeline of thermal generator set
CN212332880U (en) Ship anchor platform structure
CN104191176B (en) The preparation method of cryogenic flow weighing container
CN113714748A (en) Manufacturing method of large wind tunnel contraction section
CN106975675A (en) The wind-powered electricity generation steel-pipe pile shell rolling technique of system and the application system is monitored and controlled in a kind of light sensation of veneer reeling machine
CN105945407A (en) Method for welding and winding cylinder by large high-strength steel
CN103949783B (en) The welding method of extra large work crane cylinder neckline
CN113148058A (en) Process for installing and positioning double-rudder sleeve and tail casting in segmented construction stage
CN105171347B (en) The field installation process of experimental cabin
CN116275909A (en) Manufacturing method of heavy round square variable diameter node
CN115095731B (en) High-speed galloping expansion joint and manufacturing and assembling method thereof

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20934030

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20934030

Country of ref document: EP

Kind code of ref document: A1