CN102416554B - Technology for making pile legs of wind power installation ship - Google Patents
Technology for making pile legs of wind power installation ship Download PDFInfo
- Publication number
- CN102416554B CN102416554B CN 201110294789 CN201110294789A CN102416554B CN 102416554 B CN102416554 B CN 102416554B CN 201110294789 CN201110294789 CN 201110294789 CN 201110294789 A CN201110294789 A CN 201110294789A CN 102416554 B CN102416554 B CN 102416554B
- Authority
- CN
- China
- Prior art keywords
- tube coupling
- pin hole
- plate
- cladding plate
- segmentation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a technology for making pile legs of a wind power installation ship. The technology comprises the following steps of: making single pipe sections; arranging reinforcing angle steels in the pipe sections; making the first to eleventh pipe sections; butting the first to fourth pipe sections to form a first big subsection, butting the fifth to seventh pipe sections to form a second big subsection, and butting the eighth to eleventh pipe sections to form a third big subsection; separately machining subsections of bolt hole coverage plates around the three big subsections; pre-closing the three big subsections; scribing and assembling the bolt hole coverage plates and making marks; scribing a cylinder along the bolt holes of the coverage plates; detaching the bolt hole coverage plates; cutting the bolt holes in the cylinder in an imitation manner; assembling the coverage plates for the second time; welding the coverage plates; welding an internal seawater-proof structure; polishing after welding; and performing quality control (QC) inspection. According to the subsection making and integral closing technology, the manufacturing precision of integral closing is ensured by controlling the manufacturing precision of subsection making.
Description
Technical field
The present invention relates to a kind of wind-powered electricity generation the manufacture craft of ship spud leg is installed.
Background technology
Nowadays, external wind-powered electricity generation development is conceived to the deep-sea wind-powered electricity generation, the about 20-30 rice of operating water depth, and wind-powered electricity generation mounting platform size is big, and platform weight is big, mostly adopts six leg tooth bars, gear pump elevating mechanism.Substantially there is not a wind-powered electricity generation coastal.Domestic do not have a job platform that is applicable to that coastal mudflat wind electric is installed at present, and the motor-driven difficulty of wind-powered electricity generation mounting platform of only bottom-sitting type is influenced greatly by stormy waves, relies on tidewater, and installation accuracy does not satisfy the demand of wind-powered electricity generation installation.
Coastal wind-powered electricity generation is installed the required 4 spud leg hydraulic lifting systems of ship, can solve coastal wind-powered electricity generation installation and influenced by stormy waves, and platform arrives the assigned address that wind-powered electricity generation is installed, and uses hydraulic lifting system that platform is risen, locatees and carry out the wind-powered electricity generation installation exercise.Wind-powered electricity generation is installed and is divided into piling work and two steps of wind tower installation exercise.The work pattern that floating wind-powered electricity generation mounting platform is installed wind power equipment is: platform is motor-driven to utilize mooring system that platform is carried out coarse positioning to assigned address, beginning wind-powered electricity generation installation exercise.Owing to influenced by wave and tidewater lifting, the step of driving piles location is difficult to control, needs good sea situation ability operation.Dock wind-power tower, cabin and fan blade poor efficiency in the lifting step process, be difficult to the accurate in locating butt joint, often repeatedly butt joint just can be finished, and causes installing complete wind tower needs and arrives week age in several days, does not satisfy the demand that wind-powered electricity generation is installed.And the wind-powered electricity generation mounting platform that uses hydraulic lifting system can solve the problem of wave and tidewater, after having equipped motor-driven the putting in place of platform of hydraulic lifting system, use hydraulic lifting system that platform is risen, platform leaves the water surface, not influenced by stormy waves and tidewater, piling and lifting operation can carry out continuously, wind tower of general installation only needed about two days, improved operating efficiency greatly, satisfy the demand that wind-powered electricity generation is installed, so when making spud leg, need control the precision and the accuracy of manufacture of spud leg in segmentation is made of spud leg circularity well.
Summary of the invention
The manufacture craft that provides a kind of easy to operate, time saving and energy saving, safe and reliable wind-powered electricity generation that the ship spud leg is installed is provided in order to overcome above deficiency.
Purpose of the present invention is achieved through the following technical solutions: a kind of wind-powered electricity generation is installed the manufacture craft of ship spud leg, may further comprise the steps:
The making of A, single tube coupling:
(1), roll before thickness, size, diagonal, the flatness of check steel plate, the sample dotting punch is struck in line, the next process of being allowed for access after qualified;
(2), roll before earlier with hydraulic press the veneer reeling machine volume press less than the plate end regions press arc according to the tube coupling radius, leave groove;
(3), tube coupling will make the detection model before rolling, and detects the inside and outside pattern of model, model length should be greater than 1/3 circumference;
(4), tube coupling carry out roller system after the accurate positioning on the roller bed;
(5), pressure head on the roller bed and roller bowlder machined surface and model gap requirement≤2.0mm;
(6), the steel plate of end press-bending radian delivers to veneer reeling machine and carries out tube coupling and roll, the butt joint dislocation of steel plate is controlled in the 2mm, plate seam two ends are used with the steel plate of material stack pile and are fixed as run-on tab, mid portion is at outside tack welding, i.e. 1/3 groove side;
(7), the tube coupling that rolls end is through welding after the assay was approved, tube coupling rolls the longitudinal joint butt joint and adopts Lincoln weld: install run-on tab before the welding, and scrutiny groove linearity, flatness, bevel angle and cleannes, require single tube coupling linearity less than 2mm, flatness is less than 2mm, require combination back angle greater than 50 ° for V or X type groove, the smooth metal luster of the inner smooth surface of groove, adopt SAW to weld automatically after the passed examination, carry out back gouging after requiring one side weld, carefully polish behind the back chipping to satisfy and carry out SAW again after the above-mentioned requirements and weld automatically;
(8), tube coupling cylindrical shell piece welding, preheat temperature is 80-100 ° of C before the welding;
(9), UT detect qualified after, Hui Yuan, diameter tolerance ± 2mm can flow into next procedure after the assay was approved;
The inside of B, tube coupling is installed and is strengthened angle steel:
(1), the inner angle steel theoretical size Φ 3204 that strengthens, actual fabrication is of a size of Φ 3200;
(2), the 16mm flanged plate of the strengthening angle steel jigsaw of going ahead of the rest, the inner 26*300 stiffening ring of dress weldering, and the small gusset of 16mm then, Φ 3200 ± 2mm when requiring the final external diameter 48mm wall thickness of strengthening angle steel, Φ 3210 ± 2mm during the 42mm wall thickness can flow into next procedure after the assay was approved;
C, the assembling of reinforcement angle steel: in order to utilize the inner reversible deformation effect of strengthening angle steel, the reinforcement angle steel of each tube coupling inside can assemble spot welding earlier, treats the dress weldering of ruling again after two tube couplings splice;
D, spud leg are made up of 11 tube couplings, are respectively first tube coupling, second tube coupling, the 3rd tube coupling, the 4th tube coupling, the 5th tube coupling, the 6th tube coupling, the 7th tube coupling, the 8th tube coupling, the 9th tube coupling, the tenth tube coupling and the 11 tube coupling;
F, first tube coupling, second tube coupling, the 3rd tube coupling and the butt joint of the 4th tube coupling are formed first segmentation, second largest segmentation is formed in the 5th tube coupling, the 6th tube coupling and the butt joint of the 7th tube coupling, the third-largest segmentation is formed in the 8th tube coupling, the 9th tube coupling, the tenth tube coupling and the butt joint of the 11 tube coupling;
The independent machined of pin hole cladding plate segmentation around G, three the big segmentations, machined is pressed the part drawing bevel after finishing;
H, three big segmentations are closed up in advance:
(1), at first check each segmentation circularity, longitudinal size deviation, can close up in advance after qualified;
(2), the segmentation joint uses the horse plate of stack pile ad eundem to connect, segmentation position groove is more special, closes up place's cylindrical shell butt joint form,
(3), at first second largest segmentation and the third-largest segmentation are closed up in advance, the place of closing up uses the horse plate to fix;
(4), secondly the segmentation and the first segmentation of above-mentioned steps being closed up formation closed up in advance, and the place of closing up uses the horse plate to fix;
(5), in advance check the circularity of whole spud leg part after closing up, the longitudinal size deviation can be carried out the cladding plate assembling after qualified;
Described pin hole cladding plate among I, the line installation step G is also carried out mark:
(1), on cladding plate, draws 4 vertical datum lines of right-angled intersection and pin hole lateral fiducial line;
(2), first block of cladding plate begins assembling from the bottom, join by above-mentioned marking-out rule little progress luggage, pay special attention to two pin hole longitudinal pitch tolerances about the cladding plate edge joint position, assembling examination requirements pin hole longitudinal pitch tolerance+1mm, 10 hole cumulative errors 5mm, horizontal spacing tolerance+1.5mm, lower deviation is not more than 1mm on four pin holes of same horizontal level, the pin hole centrally aligned spud leg center of circle, about with the center line of front and back should be orthogonal;
J, on cylindrical shell, rule along the cladding plate pin hole:
(1), cleaning eye inner barrel surface, require the surface smooth-going, smooth;
(2), on cylindrical shell, rule along cladding plate pin hole profile, rule must be perpendicular to drum surface, lines must be clear;
K, lay down the pin hole cladding plate:
(1), on the cladding plate that assembles, carry out mark, require must clear and definite every block of cladding plate the position, the termination towards;
(2), lay down the pin hole cladding plate, and put neatly, put by group;
Pin hole on L, the shape cutting cylindrical shell:
(1), cut behind first pin hole after the check size, can continue cutting;
(2), cladding plate closing up about seam each 100mm line and cutting, and spot welding is nearby on the cylindrical shell, the scene closes up the fashionable dress weldering;
M, the assembling of cladding plate secondary:
(1), be assembled to cladding plate on the spud leg successively by ready-made flag sequence after, be up to the standards and weld;
(2), postwelding polishing pin hole inside;
N, the inner anti-seawater structure of dress weldering are advanced the inner anti-seawater structure of spud leg interior welds, report the QC check before the welding, and postwelding polishes smooth;
O, close up and apply for checking and examination in advance, final inspection requires: check whole spud leg diameter of phi 3300 ± 2mm, and ovality 10mm, straightness error is no more than 5mm in any spud leg length of the linearity 12m scope, and the check pin hole report QC to check.
The present invention compared with prior art has the following advantages:
The present invention adopts sectional making, and the technical matters that final integral is closed up by the accuracy of manufacture of control sectional making, guarantees the whole accuracy of manufacture of closing up.Can make the spud leg accuracy of manufacture requirement of finally producing be: whole spud leg diameter of phi 3300 ± 2mm; Ovality 10mm; Straightness error is no more than 5mm in any spud leg length of the linearity 12m scope.
The specific embodiment:
In order to deepen the understanding of the present invention, the invention will be further described below in conjunction with embodiment, and this embodiment only is used to explain the present invention, do not constitute the qualification to protection domain of the present invention.
Wind-powered electricity generation of the present invention is installed a kind of specific embodiment of the manufacture craft of ship spud leg, may further comprise the steps:
The making of A, single tube coupling, the control of volume circle precision, up to standard ± 2mm:
(1), roll before thickness, size, diagonal, the flatness of check steel plate, the sample dotting punch is struck in line, the next process of being allowed for access after qualified;
(2), roll before earlier with hydraulic press the veneer reeling machine volume press less than the plate end regions press arc according to the tube coupling radius, leave groove;
(3), tube coupling will make the detection model before rolling, and detects the inside and outside pattern of model, model length should be greater than 1/3 circumference;
(4), tube coupling carry out roller system after the accurate positioning on the roller bed;
(5), pressure head on the roller bed and roller bowlder machined surface and model gap requirement≤2.0mm;
(6), the steel plate of end press-bending radian delivers to veneer reeling machine and carries out tube coupling and roll, the butt joint dislocation of steel plate is controlled in the 2mm, plate seam two ends are used with the steel plate of material stack pile and are fixed as run-on tab, mid portion is at outside tack welding, i.e. 1/3 groove side;
(7), the tube coupling that rolls end is through welding after the assay was approved, tube coupling rolls the longitudinal joint butt joint and adopts Lincoln weld: install run-on tab before the welding, and scrutiny groove linearity, flatness, bevel angle and cleannes, require single tube coupling linearity less than 2mm, flatness is less than 2mm, require combination back angle greater than 50 ° for V or X type groove, the smooth metal luster of the inner smooth surface of groove, adopt SAW to weld automatically after the passed examination, carry out back gouging after requiring one side weld, carefully polish behind the back chipping to satisfy and carry out SAW again after the above-mentioned requirements and weld automatically;
(8), tube coupling cylindrical shell piece welding, preheat temperature is 80-100 ° of C before the welding;
(9), UT detect qualified after, Hui Yuan, diameter tolerance ± 2mm can flow into next procedure after the assay was approved;
The inside of B, tube coupling is installed and is strengthened angle steel:
(1), the inner angle steel theoretical size Φ 3204 that strengthens, actual fabrication is of a size of Φ 3200;
(2), the 16mm flanged plate of the strengthening angle steel jigsaw of going ahead of the rest, the inner 26*300 stiffening ring of dress weldering, and the small gusset of 16mm then, Φ 3200 ± 2mm when requiring the final external diameter 48mm wall thickness of strengthening angle steel, Φ 3210 ± 2mm during the 42mm wall thickness can flow into next procedure after the assay was approved;
C, the assembling of reinforcement angle steel: in order to utilize the inner reversible deformation effect of strengthening angle steel, the reinforcement angle steel of each tube coupling inside can assemble spot welding earlier, treats the dress weldering of ruling again after two tube couplings splice;
D, spud leg are made up of 11 tube couplings, are respectively first tube coupling, second tube coupling, the 3rd tube coupling, the 4th tube coupling, the 5th tube coupling, the 6th tube coupling, the 7th tube coupling, the 8th tube coupling, the 9th tube coupling, the tenth tube coupling and the 11 tube coupling;
F, first tube coupling, second tube coupling, the 3rd tube coupling and the butt joint of the 4th tube coupling are formed first segmentation, second largest segmentation is formed in the 5th tube coupling, the 6th tube coupling and the butt joint of the 7th tube coupling, the third-largest segmentation is formed in the 8th tube coupling, the 9th tube coupling, the tenth tube coupling and the butt joint of the 11 tube coupling;
The independent machined of pin hole cladding plate segmentation around G, three the big segmentations, machined is pressed the part drawing bevel after finishing;
H, three big segmentations are closed up in advance:
(1), at first check each segmentation circularity, longitudinal size deviation, can close up in advance after qualified;
(2), the segmentation joint uses the horse plate of stack pile ad eundem to connect, segmentation position groove is more special, closes up place's cylindrical shell butt joint form,
(3), at first second largest segmentation and the third-largest segmentation are closed up in advance, the place of closing up uses the horse plate to fix;
(4), secondly the segmentation and the first segmentation of above-mentioned steps being closed up formation closed up in advance, and the place of closing up uses the horse plate to fix;
(5), in advance check the circularity of whole spud leg part after closing up, the longitudinal size deviation can be carried out the cladding plate assembling after qualified;
Described pin hole cladding plate among I, the line installation step G is also carried out mark:
(1), on cladding plate, draws 4 vertical datum lines of right-angled intersection and pin hole lateral fiducial line;
(2), first block of cladding plate begins assembling from the bottom, join by above-mentioned marking-out rule little progress luggage, pay special attention to two pin hole longitudinal pitch tolerances about the cladding plate edge joint position, assembling examination requirements pin hole longitudinal pitch tolerance+1mm, 10 hole cumulative errors 5mm, horizontal spacing tolerance+1.5mm, lower deviation is not more than 1mm on four pin holes of same horizontal level, the pin hole centrally aligned spud leg center of circle, about with the center line of front and back should be orthogonal;
J, on cylindrical shell, rule along the cladding plate pin hole:
(1), cleaning eye inner barrel surface, require the surface smooth-going, smooth;
(2), on cylindrical shell, rule along cladding plate pin hole profile, rule must be perpendicular to drum surface, lines must be clear;
K, lay down the pin hole cladding plate:
(1), on the cladding plate that assembles, carry out mark, require must clear and definite every block of cladding plate the position, the termination towards;
(2), lay down the pin hole cladding plate, and put neatly, put by group;
Pin hole on L, the shape cutting cylindrical shell:
(1), cut behind first pin hole after the check size, can continue cutting;
(2), cladding plate closing up about seam each 100mm line and cutting, and spot welding is nearby on the cylindrical shell, the scene closes up the fashionable dress weldering;
M, the assembling of cladding plate secondary:
(1), be assembled to cladding plate on the spud leg successively by ready-made flag sequence after, be up to the standards and weld;
(2), postwelding polishing pin hole inside;
N, the inner anti-seawater structure of dress weldering are advanced the inner anti-seawater structure of spud leg interior welds, report the QC check before the welding, and postwelding polishes smooth;
O, close up and apply for checking and examination in advance, final inspection requires: check whole spud leg diameter of phi 3300 ± 2mm, and ovality 10mm, straightness error is no more than 5mm in any spud leg length of the linearity 12m scope, and the check pin hole report QC to check.
The diameter of spud leg is 3300mm, material EH36, and cylindrical shell thickness 48mm, therefore for ovality after guaranteeing the spud leg general assembly reaches 10mm, spud leg diameter 3300mm ± 2mm then must guarantee volume circle precision.Because spud leg thickness of slab and groove processing are difficult for, and the secondary operations thermal deformation is big, can cause back the circle difficulty, therefore the volume circle rolls with the four stars roller, and adjusts crush pad.Measure girth control ± 5mm with the interior sheet material percentage elongation of controlling the volume bowlder.The volume circle is checked: adjust support bar, and make circumference and check circularity greater than 1/4 original mold, when circularity is not enough, regulate Philip's head screw, use external force to adjust circularity.The welding longitudinal joint, but capping not guarantees that weld seam does not exceed the steel plate plane, and is UT, guarantees weldquality.Hui Yuan: tack welding location behind the Hui Yuan, and adopt special transportation tool carrying to guarantee not deform in the carrying way, require diameter be controlled at ± 2mm in.The welding capping, fine setting is done in welding cooling back secondary measurement.
Above-mentioned welding 100% usefulness welding cross, SAW welds automatically, and purpose reduces distortion, improves the quality.Simultaneously, for marking four jiaos of position lines and circumference 90 degree, 180 degree, 270 degree bisectors behind the subsequent production jigsaw, guarantee the single cylinder concentricity.
100% adopts the auxiliary butt joint of turning rolls during butt joint, guarantees precision with equipment; To cylindrical shell propping reinforcement degree, solidify the single cylinder precision, its central point can connect during the reinforcement supported design, utilizes laser transit to detect control; Circumferential weld 100% adopts cross to add roller moulding bed welding minimizing seam deformation.
Wind-powered electricity generation is installed crane ship 4 pile legs, the cylindrical shell class formation, and each spud leg length is L=58084mm, the every pile leg of barrel diameter D=3300mm. weight is about 304.5 tons, totally 1218 tons of 4 pile legs.It is the deck of boat of CCSEH36 that spud leg cylindrical shell roller plectane has adopted 48mm, 42mm grade, all to have adopted the 48mm grade be the deck of boat of CCSEH36 to the pin hole cladding plate all around, it is the angle steel of CCSA36 that middle angle steel stiffening ring has adopted the L160*100*14 grade, inner loop has adopted 16mm, 26mm respectively to strengthening dividing plate, grade is CCSAH36 and CCSDH36, and it is the CCSDH36 deck of boat that hanger has adopted the 32mm grade.Inner anti-seawater structure all adopts the deck of boat of 12mmCCSAH36.
The present invention adopts sectional making, and the technical matters that final integral is closed up by the accuracy of manufacture of control sectional making, guarantees the whole accuracy of manufacture of closing up.Can make the spud leg accuracy of manufacture requirement of finally producing be: whole spud leg diameter of phi 3300 ± 2mm; Ovality 10mm; Straightness error is no more than 5mm in any spud leg length of the linearity 12m scope.
Claims (1)
1. a wind-powered electricity generation is installed the manufacture craft of ship spud leg, it is characterized in that: may further comprise the steps:
The making of A, single tube coupling:
(1), roll before thickness, size, diagonal, the flatness of check steel plate, the sample dotting punch is struck in line, the next process of being allowed for access after qualified;
(2), roll before earlier with hydraulic press the veneer reeling machine volume press less than the plate end regions press arc according to the tube coupling radius, leave groove;
(3), tube coupling will make the detection model before rolling, and detects the inside and outside pattern of model, model length should be greater than 1/3 circumference;
(4), tube coupling carry out roller system after the accurate positioning on the roller bed;
(5), pressure head on the roller bed and roller bowlder machined surface and model gap requirement≤2.0mm;
(6), the steel plate of end press-bending radian delivers to veneer reeling machine and carries out tube coupling and roll, the butt joint dislocation of steel plate is controlled in the 2mm, plate seam two ends are used with the steel plate of material stack pile and are fixed as run-on tab, mid portion is at outside tack welding, i.e. 1/3 groove side;
(7), the tube coupling that rolls end is through welding after the assay was approved, tube coupling rolls the longitudinal joint butt joint and adopts Lincoln weld: install run-on tab before the welding, and scrutiny groove linearity, flatness, bevel angle and cleannes, require single tube coupling linearity less than 2mm, flatness is less than 2mm, require combination back angle greater than 50 ° for V or X type groove, the smooth metal luster of the inner smooth surface of groove, adopt SAW to weld automatically after the passed examination, carry out back gouging after requiring one side weld, carefully polish behind the back chipping to satisfy and carry out SAW again after the above-mentioned requirements and weld automatically;
(8), tube coupling cylindrical shell piece welding, preheat temperature is 80-100 ° of C before the welding;
(9), UT detect qualified after, Hui Yuan, diameter tolerance ± 2mm can flow into next procedure after the assay was approved;
The inside of B, tube coupling is installed and is strengthened angle steel:
(1), the inner angle steel theoretical size Φ 3204 that strengthens, actual fabrication is of a size of Φ 3200;
(2), the 16mm flanged plate of the strengthening angle steel jigsaw of going ahead of the rest, the inner 26*300 stiffening ring of dress weldering, and the small gusset of 16mm then, Φ 3200 ± 2mm when requiring the final external diameter 48mm wall thickness of strengthening angle steel, Φ 3210 ± 2mm during the 42mm wall thickness can flow into next procedure after the assay was approved;
C, the assembling of reinforcement angle steel: in order to utilize the inner reversible deformation effect of strengthening angle steel, the reinforcement angle steel of each tube coupling inside can assemble spot welding earlier, treats the dress weldering of ruling again after two tube couplings splice;
D, spud leg are made up of 11 tube couplings, are respectively first tube coupling, second tube coupling, the 3rd tube coupling, the 4th tube coupling, the 5th tube coupling, the 6th tube coupling, the 7th tube coupling, the 8th tube coupling, the 9th tube coupling, the tenth tube coupling and the 11 tube coupling;
F, first tube coupling, second tube coupling, the 3rd tube coupling and the butt joint of the 4th tube coupling are formed first segmentation, second largest segmentation is formed in the 5th tube coupling, the 6th tube coupling and the butt joint of the 7th tube coupling, the third-largest segmentation is formed in the 8th tube coupling, the 9th tube coupling, the tenth tube coupling and the butt joint of the 11 tube coupling;
The independent machined of pin hole cladding plate segmentation around G, three the big segmentations, machined is pressed the part drawing bevel after finishing;
H, three big segmentations are closed up in advance:
(1), at first check each segmentation circularity, longitudinal size deviation, can close up in advance after qualified;
(2), the segmentation joint uses the horse plate of stack pile ad eundem to connect, segmentation position groove is more special, closes up place's cylindrical shell butt joint form,
(3), at first second largest segmentation and the third-largest segmentation are closed up in advance, the place of closing up uses the horse plate to fix;
(4), secondly the segmentation and the first segmentation of above-mentioned steps being closed up formation closed up in advance, and the place of closing up uses the horse plate to fix;
(5), in advance check the circularity of whole spud leg part after closing up, the longitudinal size deviation can be carried out the cladding plate assembling after qualified;
Described pin hole cladding plate among I, the line installation step G is also carried out mark:
(1), on cladding plate, draws 4 vertical datum lines of right-angled intersection and pin hole lateral fiducial line;
(2), first block of cladding plate begins assembling from the bottom, join by above-mentioned marking-out rule little progress luggage, pay special attention to two pin hole longitudinal pitch tolerances about the cladding plate edge joint position, assembling examination requirements pin hole longitudinal pitch tolerance+1mm, 10 hole cumulative errors 5mm, horizontal spacing tolerance+1.5mm, lower deviation is not more than 1mm on four pin holes of same horizontal level, the pin hole centrally aligned spud leg center of circle, about with the center line of front and back should be orthogonal;
J, on cylindrical shell, rule along the cladding plate pin hole:
(1), cleaning eye inner barrel surface, require the surface smooth-going, smooth;
(2), on cylindrical shell, rule along cladding plate pin hole profile, rule must be perpendicular to drum surface, lines must be clear;
K, lay down the pin hole cladding plate:
(1), on the cladding plate that assembles, carry out mark, require must clear and definite every block of cladding plate the position, the termination towards;
(2), lay down the pin hole cladding plate, and put neatly, put by group;
Pin hole on L, the shape cutting cylindrical shell:
(1), cut behind first pin hole after the check size, can continue cutting;
(2), cladding plate closing up about seam each 100mm line and cutting, and spot welding is nearby on the cylindrical shell, the scene closes up the fashionable dress weldering;
M, the assembling of cladding plate secondary:
(1), be assembled to cladding plate on the spud leg successively by ready-made flag sequence after, be up to the standards and weld;
(2), postwelding polishing pin hole inside;
N, the inner anti-seawater structure of dress weldering are advanced the inner anti-seawater structure of spud leg interior welds, report the QC check before the welding, and postwelding polishes smooth;
O, close up and apply for checking and examination in advance, final inspection requires: check whole spud leg diameter of phi 3300 ± 2mm, and ovality 10mm, straightness error is no more than 5mm in any spud leg length of the linearity 12m scope, and the check pin hole report QC to check.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110294789 CN102416554B (en) | 2011-09-28 | 2011-09-28 | Technology for making pile legs of wind power installation ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110294789 CN102416554B (en) | 2011-09-28 | 2011-09-28 | Technology for making pile legs of wind power installation ship |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102416554A CN102416554A (en) | 2012-04-18 |
CN102416554B true CN102416554B (en) | 2013-07-24 |
Family
ID=45941337
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110294789 Active CN102416554B (en) | 2011-09-28 | 2011-09-28 | Technology for making pile legs of wind power installation ship |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102416554B (en) |
Families Citing this family (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102717248A (en) * | 2012-07-05 | 2012-10-10 | 南通中远船务工程有限公司 | Design method for section closure accuracy of octagonal pile leg |
CN102720197B (en) * | 2012-07-05 | 2014-07-02 | 南通中远船务工程有限公司 | Method for hoisting pile legs of self-elevating wind turbine installation vessel in turn-over way |
CN102728980B (en) * | 2012-07-05 | 2014-12-10 | 南通中远船务工程有限公司 | Method for limiting and positioning octagonal spud leg in folding process |
CN102848053B (en) * | 2012-08-03 | 2014-12-24 | 扬帆集团股份有限公司 | Assembly and flame process for trunk bulkhead deck |
CN103406639A (en) * | 2013-08-20 | 2013-11-27 | 南通中新钢构重工有限公司 | Welding process for pile leg stereo sectional erection |
CN103407553A (en) * | 2013-08-20 | 2013-11-27 | 南通中新钢构重工有限公司 | Pile leg of windmill installation vessel |
CN103410163A (en) * | 2013-08-20 | 2013-11-27 | 南通中新钢构重工有限公司 | Manufacturing process of pile leg of windmill installation vessel |
CN103406679A (en) * | 2013-08-20 | 2013-11-27 | 南通中新钢构重工有限公司 | Welding technology of stereoscopic section composed of platform board and lateral plates |
CN103624488B (en) * | 2013-11-15 | 2016-02-10 | 南通润邦重机有限公司 | A kind of self-lifting offshore wind power job platform spud leg manufacturing process |
CN103862133B (en) * | 2014-04-08 | 2016-04-27 | 哈尔滨红光锅炉总厂有限责任公司 | A kind of drum welding method |
CN104759770B (en) * | 2014-10-10 | 2016-08-17 | 南通振华重型装备制造有限公司 | A kind of manufacture method of pile legs of self-elevating drilling platform |
CN104384733B (en) * | 2014-10-23 | 2016-04-20 | 武汉船用机械有限责任公司 | For the weld industry technique that bolt-type hoistable platform spud leg makes |
CN104590505B (en) * | 2014-12-03 | 2016-09-14 | 中船黄埔文冲船舶有限公司 | Straight pin cellular type spud leg construction precision control method |
CN105234575B (en) * | 2015-11-18 | 2017-05-17 | 青岛海西重机有限责任公司 | Manufacturing method for self-elevating type offshore platform cylindrical pile leg |
CN106475741B (en) * | 2016-10-20 | 2018-11-09 | 南通振华重型装备制造有限公司 | A kind of self-elevating drilling platform cantilever beam pushing-pulling-rack building technology |
CN107825083A (en) * | 2017-11-30 | 2018-03-23 | 南通蓝岛海洋工程有限公司 | A kind of wedge bracket structure construction technology |
CN108817607A (en) * | 2018-07-10 | 2018-11-16 | 湖南机电职业技术学院 | Wind-power electricity generation stake welding procedure |
CN109648269B (en) * | 2019-01-02 | 2021-07-09 | 南通泰胜蓝岛海洋工程有限公司 | Construction process of lifting leg pile of marine life platform |
CN110421238B (en) * | 2019-02-11 | 2021-07-30 | 上海振华重工集团(南通)传动机械有限公司 | Welding process for butt welding of high-strength barrel |
CN110102981B (en) * | 2019-05-24 | 2020-12-08 | 上海电力设计院有限公司 | Construction method of wind power tower with reinforcing plate |
CN110480261A (en) * | 2019-07-30 | 2019-11-22 | 南通振华重型装备制造有限公司 | A kind of broken stone leveling ship spud leg building technology |
CN110421320A (en) * | 2019-08-06 | 2019-11-08 | 招商局重工(深圳)有限公司 | A kind of positioning piling bar welding procedure of cutter suction dredger |
CN113634945B (en) * | 2021-10-13 | 2021-12-07 | 江苏海通海洋工程装备有限公司 | Single-barrel vertical installing and welding processing method for offshore wind power composite barrel foundation |
CN114083244B (en) * | 2021-12-07 | 2023-08-22 | 南通振华重型装备制造有限公司 | Jacket grouting pipe manufacturing process |
CN114227156A (en) * | 2021-12-10 | 2022-03-25 | 中国水电四局(酒泉)新能源装备有限公司 | Assembly construction method of wind power foundation steel pipe piles |
CN114161091B (en) * | 2021-12-10 | 2023-06-09 | 上海振华重工启东海洋工程股份有限公司 | Accurate perforating method for pile leg bolt holes |
CN114012372B (en) * | 2022-01-05 | 2022-04-08 | 中交三航(南通)海洋工程有限公司 | Construction method of super-large-diameter single-pile composite cylinder |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101062751A (en) * | 2007-05-31 | 2007-10-31 | 何富荣 | Beach working hoister |
CN101885369A (en) * | 2010-05-31 | 2010-11-17 | 南通中远船务工程有限公司 | Positioning, mounting and segment folding method for self- elevating offshore platform elevating and locking system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004218215A (en) * | 2003-01-10 | 2004-08-05 | Norio Moriya | Foundation pile and tip shoe of foundation pile |
-
2011
- 2011-09-28 CN CN 201110294789 patent/CN102416554B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101062751A (en) * | 2007-05-31 | 2007-10-31 | 何富荣 | Beach working hoister |
CN101885369A (en) * | 2010-05-31 | 2010-11-17 | 南通中远船务工程有限公司 | Positioning, mounting and segment folding method for self- elevating offshore platform elevating and locking system |
Non-Patent Citations (2)
Title |
---|
钻井平台桩腿合拢对接工艺装备;陈子卿;《造船技术》;19830501(第4期);全文 * |
陈子卿.钻井平台桩腿合拢对接工艺装备.《造船技术》.1983,(第4期),全文. |
Also Published As
Publication number | Publication date |
---|---|
CN102416554A (en) | 2012-04-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102416554B (en) | Technology for making pile legs of wind power installation ship | |
CN109648269B (en) | Construction process of lifting leg pile of marine life platform | |
CN103624488B (en) | A kind of self-lifting offshore wind power job platform spud leg manufacturing process | |
CN101870335B (en) | Sectional construction precision control method for cylindrical ultra-deep sea drilling platform | |
CN111532379B (en) | Ship anchor platform structure and processing method thereof | |
CN106149658B (en) | A kind of jack up broken stone pile offshore engineering platform leg and its manufacture craft | |
CN107401175B (en) | A kind of method of construction of the upper guide pipe support of six pile leaders frame | |
CN102874379B (en) | Manufacture method of offshore riprap leveling ship | |
CN110525576B (en) | Ship deck base structure and ship deck base structure installation method | |
CN102489947B (en) | Bottom chord tube manufacturing process of girder of steel tube concrete truss beam bridge | |
CN107825077B (en) | It is a kind of to rise self-propulsion type platform leg building technology certainly | |
CN105414907A (en) | Building technology for pile leg of self-elevating wind power vessel | |
CN103192952A (en) | Vehicular bulbous bow integral-replacing process | |
CN103818540A (en) | Processing method of eccentric full-revolving steering oar device base | |
CN110723263A (en) | Ship rudder blade refitting process | |
CN108396863A (en) | A kind of steel structure member and its manufacture craft | |
CN110254623B (en) | Manufacturing method of submerged body segment | |
CN113320659B (en) | Method for assembling flange and barrel of double-angle steering oar of ship | |
CN102886655A (en) | Manufacturing process of upper and lower ring beams | |
CN104476133A (en) | Manufacturing method of nine-hydraulic-motor driven self-discharging boom base | |
CN114084311A (en) | High-precision installation method for full-slewing device | |
CN101812856B (en) | Production process of steel pile structure of cutter suction dredger | |
CN111604643B (en) | Manufacturing and mounting process of crane upright column for ship and ocean engineering | |
CN106552832A (en) | A kind of manufacturing process of nuclear fuel storage framework bush square tube | |
CN106514151B (en) | It is a kind of to guarantee porous group's latching mechanism part with the process of porosity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |