CN105937302B - A kind of application of curved wall template system in concreting - Google Patents

A kind of application of curved wall template system in concreting Download PDF

Info

Publication number
CN105937302B
CN105937302B CN201610413203.2A CN201610413203A CN105937302B CN 105937302 B CN105937302 B CN 105937302B CN 201610413203 A CN201610413203 A CN 201610413203A CN 105937302 B CN105937302 B CN 105937302B
Authority
CN
China
Prior art keywords
back cord
flitch
channel
section steel
curved wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610413203.2A
Other languages
Chinese (zh)
Other versions
CN105937302A (en
Inventor
赵英猛
郝继笑
曹计栓
时春震
张义飞
苏阳
郭东方
王经国
张军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Third Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201610413203.2A priority Critical patent/CN105937302B/en
Publication of CN105937302A publication Critical patent/CN105937302A/en
Application granted granted Critical
Publication of CN105937302B publication Critical patent/CN105937302B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/062Forms for curved walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of curved wall template system and its application in concreting, template system to be made up of modular unit, and modular unit includes:Overlay film multi-layer sheet;Flitch time back cord;The sizing main back cord of channel-section steel, the main back cord of sizing channel-section steel are the arcuate structure being adapted to curved wall;Flitch connects reinforcing bar, and flitch connection reinforcing bar passes through the flitch time back cord;Flitch connection reinforcing bar is connected in series by vertical reinforcement, the vertical reinforcement;Horizontal reinforcement, one end of the horizontal reinforcement are connected reinforcement welding connection with flitch, and the other end is welded to connect with the sizing main back cord of channel-section steel;Connection component, the connection component are used to connect adjacent modular unit;Suspension ring, the suspension ring are welded on the main back cord of the channel-section steel.Formwork edge joint position spillage, faulting of slab ends and wall radian are molded the problem of inaccurate during the present invention can effectively solve the problem that arc or special-shaped wall construction, and compared with conventional template system, presentation quality is good after concreting, and shaping radian is accurate.

Description

A kind of application of curved wall template system in concreting
Technical field
The invention belongs to the form work engineering technical field in construction, more particularly to a kind of curved wall template system System, and application of the template system in concreting.
Background technology
With the fast development of economy, technology, the complicated building of Mechanical Builds is more and more, and arc or special-shaped wall are being built It is increasing to build proportion in construction.Conventional arched or special-shaped wall form are mostly to dissipate to spell plank sheathing, but dissipate spelling plank sheathing and exist Many defect and deficiency in arc or special-shaped wall construction be present.
For traditional scattered spelling plank sheathing in arc or special-shaped wall construction, wall shaping radian is inaccurate, influences wall matter Amount.The problem of formwork edge joint position spillage faulting of slab ends also be present in addition, dissipating and spelling in plank sheathing construction.
The content of the invention
The first object of the present invention is to provide a kind of curved wall template system.The second object of the present invention is to provide one kind Application of the curved wall template system in concreting.
In order to realize above-mentioned first purpose, the present invention provides a kind of curved wall template system, and the template system is by mould Slab element is formed, and modular unit includes:
Overlay film multi-layer sheet, the overlay film multi-layer sheet are rectangular configuration;Overlay film multi-layer sheet includes top margin, base, first side And second side;
Flitch time back cord, the flitch time back cord are fixedly connected with the multiple-plate one side of the overlay film, adjacent flitch It is arranged in parallel between secondary back cord, and flitch time back cord is parallel with the multiple-plate side of overlay film;Close on overlay film multi-layer sheet The flitch time outwardly first side of back cord of one side forms female mouth, closes on the flitch time back cord of overlay film multi-layer sheet second side It is inwardly recessed second side and forms rim of the mouth;
The sizing main back cord of channel-section steel, the main back cord of the sizing channel-section steel are the arcuate structure being adapted to curved wall;
Flitch connects reinforcing bar, and the flitch connection reinforcing bar is the arcuate structure being adapted to curved wall, and flitch connects reinforcing bar Through the flitch time back cord;And flitch connection reinforcing bar, the connection of adjacent flitch are arranged at intervals on the flitch time back cord It is parallel to each other between reinforcing bar;
Flitch connection reinforcing bar is connected in series by vertical reinforcement, the vertical reinforcement;
Horizontal reinforcement, one end of the horizontal reinforcement are connected reinforcement welding connection, the other end and sizing channel-section steel master with flitch Back cord is welded to connect;
Connection component, the connection component are used to connect adjacent modular unit;
Suspension ring, the suspension ring are welded on the main back cord of the channel-section steel.
Curved wall template system according to claim 1, it is characterised in that the connection component includes:Base, The tube chamber welds with base is in the end of the sizing main back cord of channel-section steel;Sleeve, the sleeve weld is on the base;Screw arbor with nut at both-ends, institute State Screw arbor with nut at both-ends and pass through the sleeve;Nut, the nut are connected to the end of the Screw arbor with nut at both-ends.
Curved wall template system as described above of the invention, further, the joint location of flitch time back cord utilizes overlay film Multi-layer sheet and nail are attached fixation.
Curved wall template system as described above of the invention, further, the sizing main back cord of channel-section steel utilize double flute steel Notch is relative to be welded.
In order to realize above-mentioned second purpose, the present invention provides a kind of curved wall template system answering in concreting With comprising the following steps:
Step 1:In-depth is carried out according to curved wall size, radian characteristic in structure chart to curved wall template system to set Meter, and provide in-depth figure to processing factory and carry out the main back cord processing of channel-section steel of shaping;
Step 2:The sizing main back cord of channel-section steel is arranged in assembled operating platform;
Step 3:Flitch time back cord is arranged according to one of spacing of 150mm~300mm perpendicular to the main back cord of sizing channel-section steel, wood After side's connection reinforcing bar is according to wall bending curvature, through flitch time back cord, flitch time back cord connection is integral, and vertical reinforcement is pressed Steel bar arrangement is connected perpendicular to flitch according to 1000mm~1500mm spacing, reinforcing bar intersection location is connected with flitch and is welded and fixed, water Flat reinforcing bar is placed perpendicular to overlay film multi-layer sheet, and horizontal reinforcement one end is welded on the main back cord of channel-section steel, and the other end is welded on flitch company Connect on reinforcing bar, integral flitch time back cord will be connected and fixed with the main back cord of channel-section steel, form template framework;
Step 4:Overlay film multi-layer sheet is fixed on flitch time back cord by nail;
Step 5:Overlay film multi-layer sheet protrusion flitch time back cord edge 45mm~55mm in rim of the mouth position, in female mouth position flitch Secondary back cord protrusion overlay film multi-layer sheet first side 10mm~20mm;
Step 6:Weld base on the outside of the main back cord of channel-section steel, welded sleeve on base;
Step 7:Split bolt hole is set on the modular unit after the completion of assembly, and fixed slot is avoided in split bolt hole site The main back cord of steel;
Step 8:Modular unit after the completion of assembly is hoisted to walling body position to be poured, tower crane steel wire penetrating suspension ring;
Step 9:It is fixed after modular unit handling is in place by double steel pipe back cord and Screw arbor with nut at both-ends, chevron card, nut;
Step 10:Rim of the mouth is chimeric with female mouth between adjacent forms unit, is attached by Screw arbor with nut at both-ends, nut.
Application of the curved wall template system in concreting as described above of the invention, it is preferable that in step 2 In, the sizing main back cord of channel-section steel is arranged in assembled operating platform, wherein one of centre-to-centre spacing of bottom according to 450mm~550mm together Structure finished surface distance is 150mm~250mm, the track pitch superstructure floor plate bottom 150mm~250mm of the top one.
Application of the curved wall template system in concreting as described above of the invention, it is preferable that double steel pipe is carried on the back It is stupefied perpendicular to sizing channel-section steel main back cord arrangement, chevron card screens is in double steel pipe, using Screw arbor with nut at both-ends, nut by curved wall two Chevron card is fixedly connected with double steel pipe back cord corresponding to side.
The beneficial effects of the invention are as follows:
In the present invention, flitch time back cord and overlay film multi-layer sheet are by the ingehious design of structure, and that need not increase, other are special In the case of part, the structure of rim of the mouth and female mouth is formd, when modular unit splices, it is wrong to avoid formwork edge joint position spillage The problem of platform, wall good forming effect.
Because flitch time back cord is according to the radian arrangement of the sizing main back cord of channel-section steel, finally make the formation of overlay film multi-layer sheet and wall The consistent cambered surface of radian.And flitch connection reinforcing bar, horizontal reinforcement, vertical reinforcement form a fixed system, by the flitch time back of the body It is stupefied to be connected to the sizing main back cord of channel-section steel, due to the stability of structure, so the multiple-plate cambered surface structure of overlay film will not in installation or Deformed in concreting process, ensure that curved wall molding effect.
Easy construction of the present invention, modular unit can integral hoisting, reduce taking tower crane and hang time, construction period can be shortened, carried The turnover utilization rate of the materials such as high template, saves human and material resources, financial resources, energy-conserving and environment-protective.
Brief description of the drawings
By the detailed description made in conjunction with the following drawings, above-mentioned and/or other aspects of the invention and advantage will become Becoming apparent from and be easier to understand, these accompanying drawings are simply schematical, are not intended to limit the present invention, wherein:
Fig. 1 is curved wall modular unit schematic three dimensional views of the present invention;
Fig. 2 is the stupefied time back cord connection diagram with flitch of fixed slot steel back in the present invention;
Fig. 3 is flitch time back cord joint connection diagram in the present invention;
Fig. 4 splices floor map for two adjacent modular units in the present invention;
Fig. 5 installs diagrammatic cross-section for curved wall template system in the present invention;
Fig. 6-1 and 6-2 is flitch time back cord in the present invention and the sizing main back cord connecting node schematic diagram of channel-section steel;
Fig. 7 is lift hook position schematic diagram in the present invention;
Fig. 8 is suspension hook scheme of installation in the present invention.
In accompanying drawing, the list of parts representated by each label is as follows:
1st, flitch connection reinforcing bar, 2, horizontal reinforcement, 3, suspension ring, 4, flitch time back cord, 5, the sizing main back cord of channel-section steel, 6, flitch Connecting node, 7, sleeve, 8, nut, 9, overlay film multi-layer sheet, 10, base, 11, wall, 12, rim of the mouth, 13, female mouth, 14, double steel pipe Back cord, 15, chevron card, 16, Screw arbor with nut at both-ends, 17, nail, 18, vertical reinforcement.
Embodiment
Hereinafter, the curved wall template system of the present invention and its answering in concreting are described with reference to the accompanying drawings Embodiment.
The embodiment recorded herein is specific embodiment of the invention, for illustrating the design of the present invention, It is explanatory and exemplary, should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except what is recorded herein Outside embodiment, those skilled in the art can also be based on the application claims and specification disclosure of that using aobvious and The other technical schemes being clear to, these technical schemes include any obvious using making for the embodiment to recording herein The technical scheme of substitutions and modifications.
The accompanying drawing of this specification is schematic diagram, aids in illustrating the design of the present invention, it is schematically indicated the shape of each several part And its correlation.It note that for the ease of clearly showing the structure of each part of the embodiment of the present invention, between each accompanying drawing Do not drawn according to identical ratio.Identical reference marker is used to represent identical part.
Fig. 1 is curved wall modular unit schematic three dimensional views of the present invention, and modular unit includes:
Overlay film multi-layer sheet 9, the overlay film multi-layer sheet 9 are rectangular configuration;Overlay film multi-layer sheet includes top margin, base, the first side Side and second side;
Flitch time back cord 4, the flitch time back cord 4 are fixedly connected with the one side of the overlay film multi-layer sheet 9, adjacent wood It is arranged in parallel between degree back cord 4, and flitch time back cord 4 is parallel with the side of overlay film multi-layer sheet 9;Close on overlay film multilayer The flitch time 4 outwardly first side of back cord of the first side of plate 9 forms female mouth 13, closes on the second side of overlay film multi-layer sheet 9 Flitch time back cord 4 is inwardly recessed second side and forms rim of the mouth 12.Flitch time back cord and overlay film multi-layer sheet are set by the ingenious of structure Meter, in the case where that need not increase other particular components, forms the structure of rim of the mouth and female mouth, when modular unit splices, keeps away The problem of having exempted from formwork edge joint position spillage faulting of slab ends, wall good forming effect.
In a kind of specific embodiment, the joint location of flitch time back cord 4 is connected using overlay film multi-layer sheet and nail 17 Connect fixation.Fig. 3 shows flitch connecting node 6.
The sizing main back cord 5 of channel-section steel, the main back cord 5 of the sizing channel-section steel are the arcuate structure being adapted to curved wall 11;One In kind specific embodiment, the sizing main back cord of channel-section steel is welded using double flute steel tank mouth is relative.Fig. 2 shows sizing channel-section steel Back cord and flitch time back cord annexation.Because flitch time back cord 4 is according to the radian arrangement of the sizing main back cord 5 of channel-section steel, finally make Overlay film multi-layer sheet 9 forms the cambered surface consistent with wall radian, and curved wall good forming effect, size, radian are accurate, construction quality It is easy to control.
With reference to shown in Fig. 6-1 and 6-2, illustrate the annexation of flitch dowel, vertical reinforcement and horizontal reinforcement.Flitch connects Reinforcing bar 1 is connect, the flitch connection reinforcing bar 1 is the arcuate structure being adapted to curved wall 11, and flitch connection reinforcing bar 1 passes through the wood Degree back cord 4;And flitch connection reinforcing bar 1 is arranged at intervals on the flitch time back cord 4, adjacent flitch connection reinforcing bar 1 it Between be parallel to each other;
Flitch connection reinforcing bar 1 is connected in series by vertical reinforcement 18, the vertical reinforcement 18;
Horizontal reinforcement 2, one end of the horizontal reinforcement 2 are connected reinforcing bar 1 with flitch and are welded to connect, the other end and sizing channel-section steel Main back cord 5 is welded to connect;Flitch connection reinforcing bar, horizontal reinforcement, vertical reinforcement form a fixed system, and flitch time back cord is connected The sizing main back cord of channel-section steel is connected to, due to the stability of structure, so the multiple-plate cambered surface structure of overlay film will not be in installation or coagulation Deformed in native casting process, ensure that curved wall molding effect.
Connection component, the connection component are used to connect adjacent modular unit.
In a kind of specific embodiment, as shown in Figures 4 and 5, the connection component includes:Base 10, the base 10 weld It is connected on the end of the sizing main back cord 5 of channel-section steel;Sleeve 7, the sleeve 7 are welded on the base 10;Screw arbor with nut at both-ends 16, it is described right Screw rod 16 is drawn to pass through the sleeve 7;Nut 8, the nut 8 are connected to the end of the Screw arbor with nut at both-ends 16.
In a kind of specific embodiment, shown in such as Fig. 7 and with 8, modular unit also includes suspension ring 3, and the suspension ring 3 are welded on Shape on the main back cord 5 of channel-section steel.
The embodiment of the present invention also provides a kind of application of curved wall template system in concreting, including following step Suddenly:
Step 1:In-depth is carried out according to curved wall size, radian characteristic in structure chart to curved wall template system to set Meter, and provide in-depth figure to processing factory and carry out the main back cord processing of channel-section steel of shaping;
Step 2:The sizing main back cord of channel-section steel is arranged in assembled operating platform;In a kind of specific embodiment, shape channel-section steel master Back cord is arranged in assembled operating platform, wherein one of centre-to-centre spacing structure finished surface distance of bottom according to 450mm~550mm together For 150mm~250mm, the track pitch superstructure floor plate bottom 150mm~250mm of the top one.
Step 3:Flitch time back cord is arranged according to one of spacing of 150mm~300mm perpendicular to the main back cord of sizing channel-section steel, wood After side's connection reinforcing bar is according to wall bending curvature, through flitch time back cord, flitch time back cord connection is integral, and vertical reinforcement is pressed Steel bar arrangement is connected perpendicular to flitch according to 1000mm~1500mm spacing, reinforcing bar intersection location is connected with flitch and is welded and fixed, water Flat reinforcing bar is placed perpendicular to overlay film multi-layer sheet, and horizontal reinforcement one end is welded on the main back cord of channel-section steel, and the other end is welded on flitch company Connect on reinforcing bar, integral flitch time back cord will be connected and fixed with the main back cord of channel-section steel, form template framework;
Step 4:Overlay film multi-layer sheet is fixed on flitch time back cord by nail;
Step 5:Overlay film multi-layer sheet protrusion flitch time back cord edge 45mm~55mm in rim of the mouth position, in female mouth position flitch Secondary back cord protrusion overlay film multi-layer sheet first side 10mm~20mm;
Step 6:Weld base on the outside of the main back cord of channel-section steel, welded sleeve on base;
Step 7:Split bolt hole is set on the modular unit after the completion of assembly, and fixed slot is avoided in split bolt hole site The main back cord of steel;
Step 8:Modular unit after the completion of assembly is hoisted to walling body position to be poured, tower crane steel wire penetrating suspension ring;
Step 9:Entered after modular unit handling is in place by double steel pipe back cord 14 and Screw arbor with nut at both-ends 16, chevron card 15, nut 8 Row is fixed;In a kind of specific embodiment, double steel pipe back cord 14 is arranged perpendicular to the sizing main back cord 5 of channel-section steel, the screens of chevron card 15 On double steel pipe back cord 14, using Screw arbor with nut at both-ends 16, nut 8 by chevron card 15 corresponding to curved wall both sides and double steel pipe back cord 14 are fixedly connected.
Step 10:Rim of the mouth is chimeric with female mouth between adjacent forms unit, is attached by Screw arbor with nut at both-ends, nut.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and further feature combination, and those skilled in the art are also Other combinations between each technical characteristic can be carried out according to the purpose of invention, are defined by the purpose for realizing the present invention.

Claims (6)

1. a kind of application of curved wall template system in concreting, the template system are made up of modular unit, mould Slab element includes:
Overlay film multi-layer sheet, the overlay film multi-layer sheet are rectangular configuration;Overlay film multi-layer sheet includes top margin, base, first side and the Dual side-edge;
Flitch time back cord, the flitch time back cord are fixedly connected with the multiple-plate one side of the overlay film, the adjacent flitch time back of the body It is arranged in parallel between stupefied, and flitch time back cord is parallel with the multiple-plate side of overlay film;Close on the side of overlay film multi-layer sheet first The flitch time outwardly first side of back cord on side forms female mouth, and the flitch time back cord for closing on overlay film multi-layer sheet second side is inside Recessed second side forms rim of the mouth;
The sizing main back cord of channel-section steel, the main back cord of the sizing channel-section steel are the arcuate structure being adapted to curved wall;
Flitch connects reinforcing bar, and the flitch connection reinforcing bar is the arcuate structure being adapted to curved wall, and flitch connection reinforcing bar passes through The flitch time back cord;And flitch connection reinforcing bar is arranged at intervals on the flitch time back cord, adjacent flitch connection reinforcing bar Between be parallel to each other;
Flitch connection reinforcing bar is connected in series by vertical reinforcement, the vertical reinforcement;
Horizontal reinforcement, one end of the horizontal reinforcement are connected reinforcement welding connection, the other end and the sizing main back cord of channel-section steel with flitch It is welded to connect;
Connection component, the connection component are used to connect adjacent modular unit;
Suspension ring, the suspension ring are welded on the main back cord of the channel-section steel;
Application of the shape wall form system in concreting comprises the following steps:
Step 1:Deepen Design is carried out to curved wall template system according to curved wall size, radian characteristic in structure chart, and There is provided in-depth figure to processing factory and carry out the main back cord processing of channel-section steel of shaping;
Step 2:The sizing main back cord of channel-section steel is arranged in assembled operating platform;
Step 3:Flitch time back cord is arranged according to one of spacing of 150mm~300mm perpendicular to the main back cord of sizing channel-section steel, flitch connects It is through flitch time back cord, flitch time back cord connection is integral after reinforcing bar is connect according to wall bending curvature, vertical reinforcement according to 1000mm~1500mm spacing connects steel bar arrangement perpendicular to flitch, and reinforcing bar intersection location is connected with flitch and is welded and fixed, horizontal Reinforcing bar is placed perpendicular to overlay film multi-layer sheet, and horizontal reinforcement one end is welded on the main back cord of channel-section steel, and the other end is welded on flitch connection On reinforcing bar, integral flitch time back cord will be connected and fixed with the main back cord of channel-section steel, form template framework;
Step 4:Overlay film multi-layer sheet is fixed on flitch time back cord by nail;
Step 5:Overlay film multi-layer sheet protrusion flitch time back cord edge 45mm~55mm in rim of the mouth position, the flitch time back of the body in female mouth position Stupefied protrusion overlay film multi-layer sheet first side 10mm~20mm;
Step 6:Weld base on the outside of the main back cord of channel-section steel, welded sleeve on base;
Step 7:Split bolt hole is set on the modular unit after the completion of assembly, and the channel-section steel master that shapes is avoided in split bolt hole site Back cord;
Step 8:Modular unit after the completion of assembly is hoisted to walling body position to be poured, tower crane steel wire penetrating suspension ring;
Step 9:It is fixed after modular unit handling is in place by double steel pipe back cord and Screw arbor with nut at both-ends, chevron card, nut;
Step 10:Rim of the mouth is chimeric with female mouth between adjacent forms unit, is attached by Screw arbor with nut at both-ends, nut.
2. application of the curved wall template system according to claim 1 in concreting, it is characterised in that described Connection component includes:Base, the tube chamber welds with base is in the end of the sizing main back cord of channel-section steel;Sleeve, the sleeve weld is described On base;Screw arbor with nut at both-ends, the Screw arbor with nut at both-ends pass through the sleeve;Nut, the nut are connected to the end of the Screw arbor with nut at both-ends Portion.
3. application of the curved wall template system according to claim 1 or 2 in concreting, it is characterised in that The joint location of flitch time back cord is attached fixation using overlay film multi-layer sheet and nail.
4. application of the curved wall template system according to claim 3 in concreting, it is characterised in that described The sizing main back cord of channel-section steel is welded using double flute steel tank mouth is relative.
5. application of the curved wall template system according to claim 4 in concreting, it is characterised in that in step In rapid 2, the sizing main back cord of channel-section steel is arranged in assembled operating platform, wherein one of center of bottom according to 450mm~550mm together It is 150mm~250mm, the track pitch superstructure floor plate bottom 150mm~250mm of the top one away from structure finished surface distance.
6. application of the curved wall template system according to claim any one of 1-5 in concreting, its feature It is, double steel pipe back cord utilizes Screw arbor with nut at both-ends, spiral shell perpendicular to the main back cord arrangement of sizing channel-section steel, chevron card screens in double steel pipe Chevron card corresponding to curved wall both sides is fixedly connected by mother with double steel pipe back cord.
CN201610413203.2A 2016-06-14 2016-06-14 A kind of application of curved wall template system in concreting Active CN105937302B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610413203.2A CN105937302B (en) 2016-06-14 2016-06-14 A kind of application of curved wall template system in concreting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610413203.2A CN105937302B (en) 2016-06-14 2016-06-14 A kind of application of curved wall template system in concreting

Publications (2)

Publication Number Publication Date
CN105937302A CN105937302A (en) 2016-09-14
CN105937302B true CN105937302B (en) 2017-11-14

Family

ID=57152665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610413203.2A Active CN105937302B (en) 2016-06-14 2016-06-14 A kind of application of curved wall template system in concreting

Country Status (1)

Country Link
CN (1) CN105937302B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639319A (en) * 2017-01-16 2017-05-10 中冶建工集团有限公司 Rotten root prevention construction method for shear walls, columns and other concrete vertical structures
CN107461027A (en) * 2017-09-21 2017-12-12 付志红 A kind of wall form reinforcement system
CN108049629A (en) * 2018-02-07 2018-05-18 中天建设集团有限公司 A kind of new big section square column formwork system and method
CN108442689A (en) * 2018-03-23 2018-08-24 中国十七冶集团有限公司 One kind exempting from plaster curved surface concrete walls shaped steel back cord gang form and construction method
CN109386127A (en) * 2018-11-01 2019-02-26 昌宜(天津)模板租赁有限公司 A kind of aluminum alloy formwork system for building
CN110397270A (en) * 2019-06-13 2019-11-01 中国建筑第四工程局有限公司 Beam forms and its installation and method for supporting outside a kind of big sectional dimension arc
CN110630009B (en) * 2019-09-17 2021-07-02 中国化学工程第六建设有限公司 Arc concrete structure formwork reinforcing construction method
CN113482325A (en) * 2021-06-01 2021-10-08 上海宝冶集团有限公司 Method for manufacturing arc formwork system of bare concrete diaphragm wall
CN113944318B (en) * 2021-11-03 2023-04-11 上海建工五建集团有限公司 Steel template reinforcing device, arc-shaped combined shaping steel template and using method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2516358B2 (en) * 1987-03-17 1996-07-24 岡部株式会社 Form support for arch concrete construction
FR2747145B1 (en) * 1996-04-05 1998-05-22 Eurobress Sarl Soc FORMWORK DEVICE WITH ADJUSTABLE CURVE RADIUS
CN202559722U (en) * 2012-04-17 2012-11-28 中天建设集团有限公司 Novel variable camber template device
CN203755654U (en) * 2014-02-17 2014-08-06 苏州第五建筑集团有限公司 Arc wall form
CN205840311U (en) * 2016-06-14 2016-12-28 中建一局集团第三建筑有限公司 A kind of curved wall template system

Also Published As

Publication number Publication date
CN105937302A (en) 2016-09-14

Similar Documents

Publication Publication Date Title
CN105937302B (en) A kind of application of curved wall template system in concreting
CN205840311U (en) A kind of curved wall template system
CN105952148B (en) Easy-dismount aluminum alloy pattern plate support system and construction method in narrow movement joint
CN207499455U (en) A kind of shaping tool fixture for the anti-bank construction of secondary structure masonry
CN206873730U (en) A kind of steel bar truss floor structure
CN206646342U (en) Assembled overhead monorail traffic track beam
CN104153579B (en) A kind of formwork for placing structure of non-standard layers structure and construction method
CN106245821A (en) A kind of lightweight steel construction lightweight concrete prefabrication and assembly construction body of wall and construction method thereof
CN206873673U (en) A kind of assembling type steel structure out-hung panel node
CN210316020U (en) Section steel concrete composite structure
CN206396966U (en) A kind of assembled laminated floor slab plate seam node component
CN102704671B (en) Frame combination mold
CN104929294A (en) Concrete composite plate with built-in cross hollow square steel pipes
CN106284981B (en) The mold method of two side templates in a kind of shear force wall deformation slit
CN207944710U (en) The narrow expansion joint Split form reinforcement system of shear wall structure
CN205134664U (en) A upper and lower double -deck concrete slab structure for girder steel
CN107700531B (en) A kind of erection method of chamfering set shaped steel formwork
CN208280454U (en) Double steel plate Combination beam of steel and concrete
CN207582946U (en) Plate typified form drops in a kind of assembled toilet structure
CN206678143U (en) Hold mode structure and concrete towers frame mould
CN213926977U (en) Prefabricated bottom plate with hidden beam and folded plate type laminated slab comprising prefabricated bottom plate
CN208267235U (en) A kind of double steel plate Combination beam of steel and concrete
CN203795708U (en) Prefabricated reinforced concrete element
CN204059943U (en) A kind of formwork for placing structure of non-standard layers structure
CN208486165U (en) A kind of concrete circular stub and girder steel consolidate connecting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant