CN105937302A - Arc-shaped wall template system and application thereof in concrete pouring - Google Patents

Arc-shaped wall template system and application thereof in concrete pouring Download PDF

Info

Publication number
CN105937302A
CN105937302A CN201610413203.2A CN201610413203A CN105937302A CN 105937302 A CN105937302 A CN 105937302A CN 201610413203 A CN201610413203 A CN 201610413203A CN 105937302 A CN105937302 A CN 105937302A
Authority
CN
China
Prior art keywords
back cord
flitch
channel
section steel
overlay film
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610413203.2A
Other languages
Chinese (zh)
Other versions
CN105937302B (en
Inventor
赵英猛
郝继笑
曹计栓
时春震
张义飞
苏阳
郭东方
王经国
张军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Third Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201610413203.2A priority Critical patent/CN105937302B/en
Publication of CN105937302A publication Critical patent/CN105937302A/en
Application granted granted Critical
Publication of CN105937302B publication Critical patent/CN105937302B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/062Forms for curved walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an arc wall template system and application thereof in concrete pouring, wherein the template system is composed of template units, and the template units comprise: laminating a multilayer board; wood secondary dorsal ridges; shaping a main back ridge of the channel steel, wherein the main back ridge of the channel steel is of an arc-shaped structure matched with the arc-shaped wall body; the batten connecting steel bar penetrates through the secondary back edge of the batten; the vertical steel bars connect the batten connecting steel bars in series; one end of the horizontal steel bar is welded with the batten connecting steel bar, and the other end of the horizontal steel bar is welded with the main back ridge of the shaped channel steel; a connecting assembly for connecting adjacent formwork units; and the lifting ring is welded on the main back edge of the channel steel. The invention can effectively solve the problems of slurry leakage and slab staggering at the splicing positions of the templates and inaccurate shaping of the radian of the wall body in the construction process of the arc-shaped or special-shaped wall body, and compared with the traditional template system, the concrete poured template system has good appearance quality and accurate shaping radian.

Description

A kind of curved wall template system and the application in concreting thereof
Technical field
The invention belongs to the form work engineering technical field in construction, particularly relate to a kind of curved wall template system, and the application that this template system is in concreting.
Background technology
Along with economy, the fast development of technology, the building of Mechanical Builds complexity gets more and more, and arc or abnormity body of wall proportion in construction are increasing.Conventional arched or abnormity wall form mostly are to dissipate spells plank sheathing, but dissipates spelling plank sheathing and there is many defects and deficiency in arc or special-shaped wall body construction.
Traditional scattered spelling plank sheathing when arc or special-shaped wall body construction, body of wall molding radian inaccuracy, affect wall quality.The problem that there is also formwork edge joint position spillage faulting of slab ends in plank sheathing construction is spelled additionally, dissipate.
Summary of the invention
The first object of the present invention is to provide a kind of curved wall template system.The second object of the present invention is to provide the application in concreting of a kind of curved wall template system.
In order to realize above-mentioned first purpose, the present invention provides a kind of curved wall template system, and described template system is made up of modular unit, and modular unit includes:
Overlay film multi-layer sheet, described overlay film multi-layer sheet is rectangular configuration;Overlay film multi-layer sheet includes top margin, base, first side and second side;
Flitch time back cord, described flitch time back cord one side multiple-plate with described overlay film is fixing to be connected, arranged in parallel between adjacent flitch time back cord, and flitch time back cord side multiple-plate with overlay film is parallel;The flitch time outwardly first side of back cord closing on overlay film multi-layer sheet first side forms female mouth, and the flitch time back cord closing on overlay film multi-layer sheet second side is inwardly recessed formation rim of the mouth, second side;
The sizing main back cord of channel-section steel, the described main back cord of sizing channel-section steel is the arcuate structure adaptive with curved wall;
Flitch connects reinforcing bar, and it is the arcuate structure adaptive with curved wall that described flitch connects reinforcing bar, and flitch connects reinforcing bar through described flitch time back cord;And on described flitch time back cord, interval arranges flitch connection reinforcing bar, is parallel to each other between adjacent flitch connection reinforcing bar;
Vertical reinforcement, flitch is connected reinforcing bar and is connected in series by described vertical reinforcement;
Horizontal reinforcement, one end of described horizontal reinforcement is connected reinforcement welding and connects with flitch, and the other end is welded to connect with the sizing main back cord of channel-section steel;
Connecting assembly, described connection assembly is for connecting adjacent modular unit;
Suspension ring, described suspension ring are welded on the main back cord of described channel-section steel.
Curved wall template system according to claim 1, it is characterised in that described connection assembly includes: base, described base is welded on the end of the sizing main back cord of channel-section steel;Sleeve, described sleeve weld is on described base;Screw arbor with nut at both-ends, described Screw arbor with nut at both-ends passes described sleeve;Nut, described nut is connected to the end of described Screw arbor with nut at both-ends.
Present invention curved wall as above template system, further, the joint location of flitch time back cord utilizes overlay film multi-layer sheet and nail to be attached fixing.
Present invention curved wall as above template system, further, the described main back cord of sizing channel-section steel utilizes double flute steel tank mouth to be relatively welded.
In order to realize above-mentioned second purpose, the present invention provides the application in concreting of a kind of curved wall template system, comprises the following steps:
Step 1: curved wall template system carried out Deepen Design according to curved wall size, radian characteristic in structure chart, and in-depth figure offer processing factory is carried out channel-section steel main back cord processing of shaping;
Step 2: the sizing main back cord of channel-section steel is arranged in assembled operating platform;
Step 3: flitch time back cord is perpendicular to, according to one spacing of 150mm~300mm, channel-section steel main back cord arrangement of shaping, after flitch connection reinforcing bar is according to body of wall bending curvature, through flitch time back cord, flitch time back cord is connected into entirety, vertical reinforcement is perpendicular to flitch according to 1000mm~1500mm spacing and connects steel bar arrangement, it is connected reinforcing bar intersection location to be welded and fixed with flitch, horizontal reinforcement is perpendicular to overlay film multi-layer sheet and places, horizontal reinforcement one end is welded on the main back cord of channel-section steel, the other end is welded on flitch and connects on reinforcing bar, the flitch time back cord back cord main with channel-section steel connecting into entirety is fixed, form template framework;
Step 4: overlay film multi-layer sheet is fixed on flitch time back cord by nail;
Step 5: protrude flitch time back cord edge 45mm~55mm at position, rim of the mouth overlay film multi-layer sheet, in female mouth position, flitch time back cord protrudes overlay film multi-layer sheet first side 10mm~20mm;
Step 6: weld base, welded sleeve on base outside the main back cord of channel-section steel;
Step 7: arrange split bolt hole on the modular unit after assembly completes, the main back cord of channel-section steel of shaping is avoided in split bolt hole site;
Step 8: the modular unit after assembly being completed is hoisted to walling body position to be poured, tower crane steel wire penetrating suspension ring;
Step 9: be fixed by double steel pipe back cords and Screw arbor with nut at both-ends, chevron card, nut after modular unit handling is in place;
Step 10: between adjacent forms unit, rim of the mouth is chimeric with female mouth, is attached by Screw arbor with nut at both-ends, nut.
The application in concreting of the present invention curved wall as above template system, preferably, in step 2, the sizing main back cord of channel-section steel is arranged in assembled operating platform together according to 450mm~550mm, wherein one centre-to-centre spacing structure finished surface distance of bottom is 150mm~250mm, 150mm~250mm at the bottom of the track pitch superstructure floor plate of the top one.
The application in concreting of the present invention curved wall as above template system, preferably, double steel pipe back cords are perpendicular to channel-section steel main back cord layout of shaping, chevron card screens, on double steel pipes, utilizes Screw arbor with nut at both-ends, nut to connect fixing to chevron card corresponding for curved wall both sides and double steel pipe back cord.
The invention has the beneficial effects as follows:
In the present invention, flitch time back cord and the overlay film multi-layer sheet ingehious design by structure, in the case of without increasing other particular component, define rim of the mouth and the structure of female mouth, when modular unit splices, it is to avoid the problem of formwork edge joint position spillage faulting of slab ends, body of wall good forming effect.
Owing to flitch time back cord is arranged according to the radian of the sizing main back cord of channel-section steel, overlay film multi-layer sheet is finally made to form the cambered surface consistent with body of wall radian.And flitch connects reinforcing bar, horizontal reinforcement, vertical reinforcement one fixed system of formation, flitch time back cord is connected to the main back cord of channel-section steel of shaping, stability due to structure, so the multiple-plate cambered surface structure of overlay film installing or will not deform in concreting process, it is ensured that curved wall molding effect.
Easy construction of the present invention, modular unit can integral hoisting, reduce taking tower crane and hang time, construction period can be shortened, improve the turnover utilization rate of the materials such as template, save human and material resources, financial resources, energy-conserving and environment-protective.
Accompanying drawing explanation
By the detailed description made in conjunction with the following drawings, above-mentioned and/or other aspects of the present invention and advantage will be apparent from and be easier to understand, and these accompanying drawings the most schematically, are not limiting as the present invention, wherein:
Fig. 1 is curved wall modular unit schematic three dimensional views of the present invention;
Fig. 2 is shape in the present invention channel-section steel back cord and flitch time back cord connection diagram;
Fig. 3 is flitch time back cord joint connection diagram in the present invention;
Fig. 4 is two adjacent modular unit splicing floor map in the present invention;
Fig. 5 is that in the present invention, curved wall template system installs generalized section;
Fig. 6-1 and 6-2 is that in the present invention, flitch time back cord is connected node schematic diagram with the sizing main back cord of channel-section steel;
Fig. 7 is lift hook position schematic diagram in the present invention;
Fig. 8 is suspension hook scheme of installation in the present invention.
In accompanying drawing, the list of parts representated by each label is as follows:
1, flitch connects reinforcing bar, and 2, horizontal reinforcement, 3, suspension ring, 4, flitch time back cord, 5, the sizing main back cord of channel-section steel, 6, flitch connect node, 7, sleeve, 8, nut, 9, overlay film multi-layer sheet, 10, base, 11, body of wall, 12, rim of the mouth, 13, female mouth, 14, double steel pipe back cord, 15, chevron card, 16, Screw arbor with nut at both-ends, 17, nail, 18, vertical reinforcement.
Detailed description of the invention
Hereinafter, the curved wall template system of the present invention and the embodiment of the application in concreting thereof are described with reference to the accompanying drawings.
The embodiment recorded at this is the specific detailed description of the invention of the present invention, for the design of the present invention is described, is all explanatory and exemplary, should not be construed as the restriction to embodiment of the present invention and the scope of the invention.In addition to the embodiment recorded at this, those skilled in the art can also use other technical scheme obvious based on the application claims and description disclosure of that, and these technical schemes include using the technical scheme making any obvious substitutions and modifications to the embodiment recorded at this.
The accompanying drawing of this specification is schematic diagram, aids in illustrating the design of the present invention, it is schematically indicated the shape of each several part and mutual relation thereof.Note that the structure of each parts for the ease of clearly showing the embodiment of the present invention, do not draw according to identical ratio between each accompanying drawing.Identical reference marker is used for representing identical part.
Fig. 1 is curved wall modular unit schematic three dimensional views of the present invention, and modular unit includes:
Overlay film multi-layer sheet 9, described overlay film multi-layer sheet 9 is rectangular configuration;Overlay film multi-layer sheet includes top margin, base, first side and second side;
Flitch time back cord 4, described flitch time back cord 4 is fixing with the one side of described overlay film multi-layer sheet 9 to be connected, arranged in parallel between adjacent flitch time back cord 4, and flitch time back cord 4 is parallel with the side of overlay film multi-layer sheet 9;The flitch time outwardly first side of back cord 4 closing on overlay film multi-layer sheet 9 first side forms female mouth 13, and the flitch time back cord 4 closing on overlay film multi-layer sheet 9 second side is inwardly recessed formation rim of the mouth, second side 12.Flitch time back cord and the overlay film multi-layer sheet ingehious design by structure, in the case of without increasing other particular component, define rim of the mouth and the structure of female mouth, when modular unit splices, it is to avoid the problem of formwork edge joint position spillage faulting of slab ends, body of wall good forming effect.
In a kind of specific embodiment, the joint location of flitch time back cord 4 utilizes overlay film multi-layer sheet and nail 17 to be attached fixing.Fig. 3 shows that flitch connects node 6.
The sizing main back cord of channel-section steel 5, the described main back cord of sizing channel-section steel 5 is and the arcuate structure of curved wall 11 adaptation;In a kind of specific embodiment, the described main back cord of sizing channel-section steel utilizes double flute steel tank mouth to be relatively welded.Fig. 2 shows sizing channel-section steel back cord and flitch time back cord annexation.Owing to flitch time back cord 4 is arranged according to the radian of the sizing main back cord of channel-section steel 5, finally making overlay film multi-layer sheet 9 form the cambered surface consistent with body of wall radian, curved wall good forming effect, size, radian are accurate, and construction quality is easy to control.
Shown in Fig. 6-1 and 6-2, the annexation of flitch dowel, vertical reinforcement and horizontal reinforcement is described.Flitch connects reinforcing bar 1, and described flitch connects reinforcing bar 1 and is and the arcuate structure of curved wall 11 adaptation, and flitch connects reinforcing bar 1 through described flitch time back cord 4;And on described flitch time back cord 4, interval arranges flitch connection reinforcing bar 1, is parallel to each other between adjacent flitch connection reinforcing bar 1;
Vertical reinforcement 18, flitch is connected reinforcing bar 1 and is connected in series by described vertical reinforcement 18;
Horizontal reinforcement 2, one end of described horizontal reinforcement 2 is connected reinforcing bar 1 and is welded to connect with flitch, and the other end is welded to connect with the sizing main back cord of channel-section steel 5;Flitch connects reinforcing bar, horizontal reinforcement, vertical reinforcement one fixed system of formation, flitch time back cord is connected to the main back cord of channel-section steel of shaping, due to the stability of structure, so the multiple-plate cambered surface structure of overlay film installing or will not deform in concreting process, it is ensured that curved wall molding effect.
Connecting assembly, described connection assembly is for connecting adjacent modular unit.
In a kind of specific embodiment, as shown in Figures 4 and 5, described connection assembly includes: base 10, and described base 10 is welded on the end of the sizing main back cord of channel-section steel 5;Sleeve 7, described sleeve 7 is welded on described base 10;Screw arbor with nut at both-ends 16, described Screw arbor with nut at both-ends 16 is through described sleeve 7;Nut 8, described nut 8 is connected to the end of described Screw arbor with nut at both-ends 16.
In a kind of specific embodiment, such as Fig. 7 with shown in 8, modular unit also includes that suspension ring 3, described suspension ring 3 are welded on the sizing main back cord of channel-section steel 5.
The embodiment of the present invention also provides for the application in concreting of a kind of curved wall template system, comprises the following steps:
Step 1: curved wall template system carried out Deepen Design according to curved wall size, radian characteristic in structure chart, and in-depth figure offer processing factory is carried out channel-section steel main back cord processing of shaping;
Step 2: the sizing main back cord of channel-section steel is arranged in assembled operating platform;In a kind of specific embodiment, the sizing main back cord of channel-section steel is arranged in assembled operating platform together according to 450mm~550mm, wherein one centre-to-centre spacing structure finished surface distance of bottom is 150mm~250mm, 150mm~250mm at the bottom of the track pitch superstructure floor plate of the top one.
Step 3: flitch time back cord is perpendicular to, according to one spacing of 150mm~300mm, channel-section steel main back cord arrangement of shaping, after flitch connection reinforcing bar is according to body of wall bending curvature, through flitch time back cord, flitch time back cord is connected into entirety, vertical reinforcement is perpendicular to flitch according to 1000mm~1500mm spacing and connects steel bar arrangement, it is connected reinforcing bar intersection location to be welded and fixed with flitch, horizontal reinforcement is perpendicular to overlay film multi-layer sheet and places, horizontal reinforcement one end is welded on the main back cord of channel-section steel, the other end is welded on flitch and connects on reinforcing bar, the flitch time back cord back cord main with channel-section steel connecting into entirety is fixed, form template framework;
Step 4: overlay film multi-layer sheet is fixed on flitch time back cord by nail;
Step 5: protrude flitch time back cord edge 45mm~55mm at position, rim of the mouth overlay film multi-layer sheet, in female mouth position, flitch time back cord protrudes overlay film multi-layer sheet first side 10mm~20mm;
Step 6: weld base, welded sleeve on base outside the main back cord of channel-section steel;
Step 7: arrange split bolt hole on the modular unit after assembly completes, the main back cord of channel-section steel of shaping is avoided in split bolt hole site;
Step 8: the modular unit after assembly being completed is hoisted to walling body position to be poured, tower crane steel wire penetrating suspension ring;
Step 9: be fixed by double steel pipe back cords 14 and Screw arbor with nut at both-ends 16, chevron card 15, nut 8 after modular unit handling is in place;In a kind of specific embodiment, double steel pipe back cords 14 are perpendicular to the sizing main back cord of channel-section steel 5 and arrange, chevron card 15 screens, on double steel pipe back cords 14, utilizes Screw arbor with nut at both-ends 16, nut 8 by chevron card 15 corresponding for curved wall both sides and the fixing connection of double steel pipe back cord 14.
Step 10: between adjacent forms unit, rim of the mouth is chimeric with female mouth, is attached by Screw arbor with nut at both-ends, nut.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed with further feature combination, those skilled in the art also can carry out between each technical characteristic according to the purpose of invention other combine, be as the criterion realizing the purpose of the present invention.

Claims (7)

1. a curved wall template system, described template system is made up of modular unit, it is characterised in that modular unit includes:
Overlay film multi-layer sheet, described overlay film multi-layer sheet is rectangular configuration;Overlay film multi-layer sheet includes top margin, base, first side and second side;
Flitch time back cord, described flitch time back cord one side multiple-plate with described overlay film is fixing to be connected, arranged in parallel between adjacent flitch time back cord, and flitch time back cord side multiple-plate with overlay film is parallel;The flitch time outwardly first side of back cord closing on overlay film multi-layer sheet first side forms female mouth, and the flitch time back cord closing on overlay film multi-layer sheet second side is inwardly recessed formation rim of the mouth, second side;
The sizing main back cord of channel-section steel, the described main back cord of sizing channel-section steel is the arcuate structure adaptive with curved wall;
Flitch connects reinforcing bar, and it is the arcuate structure adaptive with curved wall that described flitch connects reinforcing bar, and flitch connects reinforcing bar through described flitch time back cord;And on described flitch time back cord, interval arranges flitch connection reinforcing bar, is parallel to each other between adjacent flitch connection reinforcing bar;
Vertical reinforcement, flitch is connected reinforcing bar and is connected in series by described vertical reinforcement;
Horizontal reinforcement, one end of described horizontal reinforcement is connected reinforcement welding and connects with flitch, and the other end is welded to connect with the sizing main back cord of channel-section steel;
Connecting assembly, described connection assembly is for connecting adjacent modular unit;
Suspension ring, described suspension ring are welded on the main back cord of described channel-section steel.
Curved wall template system the most according to claim 1, it is characterised in that described connection assembly includes: base, described base is welded on the end of the sizing main back cord of channel-section steel;Sleeve, described sleeve weld is on described base;Screw arbor with nut at both-ends, described Screw arbor with nut at both-ends passes described sleeve;Nut, described nut is connected to the end of described Screw arbor with nut at both-ends.
Curved wall template system the most according to claim 1 and 2, it is characterised in that the joint location of flitch time back cord utilizes overlay film multi-layer sheet and nail to be attached fixing.
Curved wall template system the most according to claim 3, it is characterised in that the described main back cord of sizing channel-section steel utilizes double flute steel tank mouth to be relatively welded.
5. the application in concreting of the curved wall template system described in any one of claim 1-4, comprises the following steps:
Step 1: curved wall template system carried out Deepen Design according to curved wall size, radian characteristic in structure chart, and in-depth figure offer processing factory is carried out channel-section steel main back cord processing of shaping;
Step 2: the sizing main back cord of channel-section steel is arranged in assembled operating platform;
Step 3: flitch time back cord is perpendicular to, according to one spacing of 150mm~300mm, channel-section steel main back cord arrangement of shaping, after flitch connection reinforcing bar is according to body of wall bending curvature, through flitch time back cord, flitch time back cord is connected into entirety, vertical reinforcement is perpendicular to flitch according to 1000mm~1500mm spacing and connects steel bar arrangement, it is connected reinforcing bar intersection location to be welded and fixed with flitch, horizontal reinforcement is perpendicular to overlay film multi-layer sheet and places, horizontal reinforcement one end is welded on the main back cord of channel-section steel, the other end is welded on flitch and connects on reinforcing bar, the flitch time back cord back cord main with channel-section steel connecting into entirety is fixed, form template framework;
Step 4: overlay film multi-layer sheet is fixed on flitch time back cord by nail;
Step 5: protrude flitch time back cord edge 45mm~55mm at position, rim of the mouth overlay film multi-layer sheet, in female mouth position, flitch time back cord protrudes overlay film multi-layer sheet first side 10mm~20mm;
Step 6: weld base, welded sleeve on base outside the main back cord of channel-section steel;
Step 7: arrange split bolt hole on the modular unit after assembly completes, the main back cord of channel-section steel of shaping is avoided in split bolt hole site;
Step 8: the modular unit after assembly being completed is hoisted to walling body position to be poured, tower crane steel wire penetrating suspension ring;
Step 9: be fixed by double steel pipe back cords and Screw arbor with nut at both-ends, chevron card, nut after modular unit handling is in place;
Step 10: between adjacent forms unit, rim of the mouth is chimeric with female mouth, is attached by Screw arbor with nut at both-ends, nut.
The curved wall template system the most according to claim 5 application in concreting, it is characterized in that, in step 2, the sizing main back cord of channel-section steel is arranged in assembled operating platform together according to 450mm~550mm, wherein one centre-to-centre spacing structure finished surface distance of bottom is 150mm~250mm, 150mm~250mm at the bottom of the track pitch superstructure floor plate of the top one.
7. according to the application in concreting of the curved wall template system described in claim 5 or 6, it is characterized in that, double steel pipe back cords are perpendicular to channel-section steel main back cord layout of shaping, chevron card screens, on double steel pipes, utilizes Screw arbor with nut at both-ends, nut to connect fixing to chevron card corresponding for curved wall both sides and double steel pipe back cord.
CN201610413203.2A 2016-06-14 2016-06-14 Application of arc-shaped wall template system in concrete pouring Active CN105937302B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610413203.2A CN105937302B (en) 2016-06-14 2016-06-14 Application of arc-shaped wall template system in concrete pouring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610413203.2A CN105937302B (en) 2016-06-14 2016-06-14 Application of arc-shaped wall template system in concrete pouring

Publications (2)

Publication Number Publication Date
CN105937302A true CN105937302A (en) 2016-09-14
CN105937302B CN105937302B (en) 2017-11-14

Family

ID=57152665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610413203.2A Active CN105937302B (en) 2016-06-14 2016-06-14 Application of arc-shaped wall template system in concrete pouring

Country Status (1)

Country Link
CN (1) CN105937302B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639319A (en) * 2017-01-16 2017-05-10 中冶建工集团有限公司 Rotten root prevention construction method for shear walls, columns and other concrete vertical structures
CN107461027A (en) * 2017-09-21 2017-12-12 付志红 A kind of wall form reinforcement system
CN108049629A (en) * 2018-02-07 2018-05-18 中天建设集团有限公司 A kind of new big section square column formwork system and method
CN108442689A (en) * 2018-03-23 2018-08-24 中国十七冶集团有限公司 One kind exempting from plaster curved surface concrete walls shaped steel back cord gang form and construction method
CN109386127A (en) * 2018-11-01 2019-02-26 昌宜(天津)模板租赁有限公司 A kind of aluminum alloy formwork system for building
CN110397270A (en) * 2019-06-13 2019-11-01 中国建筑第四工程局有限公司 Beam forms and its installation and method for supporting outside a kind of big sectional dimension arc
CN110630009A (en) * 2019-09-17 2019-12-31 中国化学工程第六建设有限公司 Arc concrete structure formwork reinforcing construction method
CN113482325A (en) * 2021-06-01 2021-10-08 上海宝冶集团有限公司 Method for manufacturing arc formwork system of bare concrete diaphragm wall
CN113944318A (en) * 2021-11-03 2022-01-18 上海建工五建集团有限公司 Steel template reinforcing device, arc-shaped combined shaping steel template and using method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63226460A (en) * 1987-03-17 1988-09-21 岡部株式会社 Mold frame timbering for executing arch concrete
EP0799950A1 (en) * 1996-04-05 1997-10-08 Eurobress Formwork system with adjustable curvature
CN202559722U (en) * 2012-04-17 2012-11-28 中天建设集团有限公司 Novel variable camber template device
CN203755654U (en) * 2014-02-17 2014-08-06 苏州第五建筑集团有限公司 Arc wall form
CN205840311U (en) * 2016-06-14 2016-12-28 中建一局集团第三建筑有限公司 Arc wall template system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63226460A (en) * 1987-03-17 1988-09-21 岡部株式会社 Mold frame timbering for executing arch concrete
EP0799950A1 (en) * 1996-04-05 1997-10-08 Eurobress Formwork system with adjustable curvature
CN202559722U (en) * 2012-04-17 2012-11-28 中天建设集团有限公司 Novel variable camber template device
CN203755654U (en) * 2014-02-17 2014-08-06 苏州第五建筑集团有限公司 Arc wall form
CN205840311U (en) * 2016-06-14 2016-12-28 中建一局集团第三建筑有限公司 Arc wall template system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639319A (en) * 2017-01-16 2017-05-10 中冶建工集团有限公司 Rotten root prevention construction method for shear walls, columns and other concrete vertical structures
CN107461027A (en) * 2017-09-21 2017-12-12 付志红 A kind of wall form reinforcement system
CN108049629A (en) * 2018-02-07 2018-05-18 中天建设集团有限公司 A kind of new big section square column formwork system and method
CN108442689A (en) * 2018-03-23 2018-08-24 中国十七冶集团有限公司 One kind exempting from plaster curved surface concrete walls shaped steel back cord gang form and construction method
CN109386127A (en) * 2018-11-01 2019-02-26 昌宜(天津)模板租赁有限公司 A kind of aluminum alloy formwork system for building
CN110397270A (en) * 2019-06-13 2019-11-01 中国建筑第四工程局有限公司 Beam forms and its installation and method for supporting outside a kind of big sectional dimension arc
CN110630009A (en) * 2019-09-17 2019-12-31 中国化学工程第六建设有限公司 Arc concrete structure formwork reinforcing construction method
CN113482325A (en) * 2021-06-01 2021-10-08 上海宝冶集团有限公司 Method for manufacturing arc formwork system of bare concrete diaphragm wall
CN113944318A (en) * 2021-11-03 2022-01-18 上海建工五建集团有限公司 Steel template reinforcing device, arc-shaped combined shaping steel template and using method thereof

Also Published As

Publication number Publication date
CN105937302B (en) 2017-11-14

Similar Documents

Publication Publication Date Title
CN105937302A (en) Arc-shaped wall template system and application thereof in concrete pouring
CN205840311U (en) Arc wall template system
CN207499455U (en) A kind of shaping tool fixture for the anti-bank construction of secondary structure masonry
CN106284787B (en) Assembled superimposed sheet is installed and localization method
CN210483014U (en) Arc concrete wall form
CN104131704A (en) Steel pipe column concrete lateral pouring method and steel pipe column structure used in method
CN106906984A (en) A kind of prefabricated assembled steel reinforced concrete framework elevator shaft structure and its construction method
CN206873673U (en) A kind of assembling type steel structure out-hung panel node
CN104153579B (en) A kind of formwork for placing structure of non-standard layers structure and construction method
CN203947498U (en) Poured band of outer wall of basement wall Side Template
CN205894668U (en) Superimposed sheet is pour and is used mould
CN109667376A (en) Novel superposed superstructure and its construction method suitable for steel construction H profile steel beam
CN103912095A (en) Precast reinforced concrete member
CN103276840B (en) Nuclear power plant composite floor slab module and construction method thereof
CN108412099A (en) Bar connecting formula concrete prefabricated board and connection method are buried after through thickness
CN209703805U (en) A kind of novel superposed superstructure suitable for steel construction H profile steel beam
CN107700531B (en) A kind of erection method of chamfering set shaped steel formwork
CN207944710U (en) The narrow expansion joint Split form reinforcement system of shear wall structure
CN207672745U (en) A kind of node structure of precast prestressed assembled composite beam-prefabricated post
CN207484795U (en) A kind of highly integrated unidirectional overlapping floorboard
CN207048314U (en) A kind of shaping type stair wooden model board component
CN213926977U (en) Prefabricated bottom plate with hidden beam and folded plate type laminated slab comprising prefabricated bottom plate
CN204691033U (en) A kind of superposed beam prefabricated units for integral precast groined type building cover structure
CN110955929B (en) Method and device for generating model of horizontal seam connecting component of wallboard
CN203867176U (en) Circular reinforced concrete cylindrical silo wall template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant