CN109050381A - Pipe gallery is constructed the transportation resources of medium-and-large-sized pipeline - Google Patents

Pipe gallery is constructed the transportation resources of medium-and-large-sized pipeline Download PDF

Info

Publication number
CN109050381A
CN109050381A CN201810888548.2A CN201810888548A CN109050381A CN 109050381 A CN109050381 A CN 109050381A CN 201810888548 A CN201810888548 A CN 201810888548A CN 109050381 A CN109050381 A CN 109050381A
Authority
CN
China
Prior art keywords
pipeline
vehicle frame
transport
wheel
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810888548.2A
Other languages
Chinese (zh)
Other versions
CN109050381B (en
Inventor
曾文洋
吴红来
刘明周
易孝斌
廖红玉
朱向生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd filed Critical WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201810888548.2A priority Critical patent/CN109050381B/en
Publication of CN109050381A publication Critical patent/CN109050381A/en
Application granted granted Critical
Publication of CN109050381B publication Critical patent/CN109050381B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P3/00Vehicles adapted to transport, to carry or to comprise special loads or objects

Abstract

It constructs the transportation resources of medium-and-large-sized pipeline the present invention relates to a kind of pipe gallery, before transport, first make transport vehicle, wherein, the front and back end of vehicle frame is equipped with store mounting point, top two sides are equipped with limited block, two sides of the bottom are equipped with wheel, the wheel of side is steamboat and is supported on cabin bottom surface, the wheel of the other side is bull wheel and is supported on gutter bottom surface, guarantees to flush at the top of vehicle frame;When transport, hoist engine is set in the front and back of transport vehicle and connect the wirerope of front and back hoist engine with the store mounting point of vehicle frame front and back end respectively, large-scale pipeline is hung at the top of the vehicle frame between the limited block of two sides, it is moved forward and backward using elevator machine travel transport vehicle, after transport vehicle reaches designated place, large-scale pipeline is hung to pipeline buttress.This method compensates for the difference of height of gutter generation, is not in larger shaking, work efficiency is high, at low cost.

Description

Pipe gallery is constructed the transportation resources of medium-and-large-sized pipeline
Technical field
The invention belongs to the realm of building construction, and in particular to a kind of pipe gallery is constructed the transportation resources of medium-and-large-sized pipeline.
Background technique
In urban construction, pipe gallery enters that corridor pipeline is more, and section is divided into multiple cabins, wherein urban water supply, The large-scale pipelines such as draining are individually arranged in cabin.In pipe gallery construction, the transport of large-scale pipeline has two: 1) Cabin spaces are narrow, cannot be introduced into heavy mechanical equipment;2) pipe gallery belongs to the underground space, there are infiltration hidden danger, therefore cabin Gutter can be arranged in interior, and due to cabin narrow space itself, the ground where gutter must be used, Cai Nengbao The normal transport of large-scale pipeline is demonstrate,proved, current construction method is to be filled gutter, keeps ground holding horizontal, but this method Time-consuming work consuming consumptive material, construction are complicated.
Summary of the invention
It constructs the transportation resources of medium-and-large-sized pipeline the object of the present invention is to provide a kind of pipe gallery, this method compensates for row The difference of height that ditch generates, is not in larger shaking, work efficiency is high, at low cost.
The technical scheme adopted by the invention is that:
A kind of pipe gallery is constructed the transportation resources of medium-and-large-sized pipeline, before transport, first makes transport vehicle, wherein vehicle frame Front and back end is equipped with store mounting point, top two sides are equipped with limited block, two sides of the bottom are equipped with wheel, and the wheel of side is steamboat and is supported on Cabin bottom surface, the other side wheel be bull wheel and be supported on gutter bottom surface, guarantee to flush at the top of vehicle frame;When transport, transporting The wirerope of front and back hoist engine is simultaneously connect with the store mounting point of vehicle frame front and back end by the front and back setting hoist engine of vehicle respectively, will be big Type pipeline, which is hung, between the limited block of two sides, to be moved forward and backward, transport vehicle is arrived using elevator machine travel transport vehicle at the top of the vehicle frame Up to after designated place, large-scale pipeline is hung to pipeline buttress.
Further, limited block is arcwall face or inclined-plane close to the one side of large-scale pipeline.
Further, store mounting point is located at the bottom center of vehicle frame front and back end.
Further, vehicle frame includes the frame and diagonal brace of tetragonal body.
Further, vehicle frame is spliced by channel steel.
The beneficial effects of the present invention are:
This method utilizes the difference of height of bull wheel and steamboat, compensates for the difference of height of gutter generation, ensure that at the top of vehicle frame Flush, meanwhile, it is mobile in front and back traction transport vehicle using hoist engine, due to bidirectional stress, so being not in larger rolling It is dynamic, it ensure that the quality of transport;Equipment size needed for this method is small, and convenient for tossing about, and operating procedure is simple, therefore, work It is high-efficient;Transport vehicle production in this method is simple, can be used in turn again again, at low cost.
Detailed description of the invention
Fig. 1 is operation schematic diagram when transport vehicle picks out well through piping in the embodiment of the present invention.
Fig. 2 is operation schematic diagram when transport vehicle reaches near pipeline buttress in the embodiment of the present invention.
Schematic diagram when Fig. 3 is transport vehicle placement large-scale pipeline in the embodiment of the present invention.
In figure: 1- large-scale pipeline;2- limited block;3- vehicle frame;4- bull wheel;5- store mounting point;6- steamboat;7- pipeline picks out well; 8- pipeline buttress.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
As shown in Figure 1 to Figure 3, a kind of pipe gallery is constructed the transportation resources of medium-and-large-sized pipeline, before transport, first production transport Vehicle, wherein the front and back end of vehicle frame 3 is equipped with store mounting point 5, top two sides are equipped with limited block 2, two sides of the bottom are equipped with wheel, side Wheel is steamboat 6 and is supported on cabin bottom surface, the wheel of the other side is bull wheel 4 and is supported on gutter bottom surface, guarantees that vehicle frame 3 pushes up Portion flushes;When transport, hoist engine is set and by the wirerope of front and back hoist engine respectively and before vehicle frame 3 in the front and back of transport vehicle The store mounting point 5 of rear end connects, and large-scale pipeline 1 is hung between the limited block 2 of 3 top two sides of vehicle frame, elevator machine travel is utilized Transport vehicle moves forward and backward, and after transport vehicle reaches designated place, large-scale pipeline 1 is hung to pipeline buttress 8.This method utilizes The difference of height of bull wheel 4 and steamboat 6 compensates for the difference of height of gutter generation, ensure that flushing for 3 top of vehicle frame, meanwhile, it utilizes Hoist engine is mobile in front and back traction transport vehicle, due to bidirectional stress, so being not in larger shaking, ensure that the matter of transport Amount;Equipment size needed for this method is small, and convenient for tossing about, and operating procedure is simple, and therefore, work efficiency is high;In this method Transport vehicle production is simple, can be used in turn again again, at low cost.
As depicted in figs. 1 and 2, in the present embodiment, limited block 2 is arcwall face or inclined-plane close to the one side of large-scale pipeline 1. This design, so that limited block 2 need not be excessively moved to the outside, the less overall dimensions of transport vehicle.
As depicted in figs. 1 and 2, in the present embodiment, store mounting point 5 is located at the bottom center of 3 front and back end of vehicle frame.Store mounting point 3 That is stress point is located at the bottom center of 3 front and back end of vehicle frame by stress point, it is therefore prevented that discontinuity is tumbled, and stability is improved.
As shown in Figure 1 to Figure 3, in the present embodiment, vehicle frame 3 includes the frame and diagonal brace of tetragonal body.Vehicle frame 3 is spelled by channel steel It connects into (in the present embodiment, using 14# channel steel).
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (5)

  1. The transportation resources of medium-and-large-sized pipeline 1. a kind of pipe gallery is constructed, it is characterised in that: before transport, transport vehicle is first made, In, the front and back end of vehicle frame is equipped with store mounting point, top two sides are equipped with limited block, two sides of the bottom are equipped with wheel, and the wheel of side is small The wheel of cabin bottom surface, the other side is taken turns and be supported on as bull wheel and is supported on gutter bottom surface, guarantees to flush at the top of vehicle frame;Transport When, hoist engine is set in the front and back of transport vehicle and by the wirerope of the front and back hoist engine store mounting point with vehicle frame front and back end respectively Large-scale pipeline is hung and between the limited block of two sides, is moved forward and backward using elevator machine travel transport vehicle at the top of the vehicle frame by connection, After transport vehicle reaches designated place, large-scale pipeline is hung to pipeline buttress.
  2. The transportation resources of medium-and-large-sized pipeline 2. pipe gallery as described in claim 1 is constructed, it is characterised in that: limited block is close The one side of large-scale pipeline is arcwall face or inclined-plane.
  3. The transportation resources of medium-and-large-sized pipeline 3. pipe gallery as described in claim 1 is constructed, it is characterised in that: store mounting point is located at The bottom center of vehicle frame front and back end.
  4. The transportation resources of medium-and-large-sized pipeline 4. pipe gallery as described in claim 1 is constructed, it is characterised in that: vehicle frame includes four The frame and diagonal brace of cube.
  5. The transportation resources of medium-and-large-sized pipeline 5. pipe gallery as claimed in claim 4 is constructed, it is characterised in that: vehicle frame is by channel steel It is spliced.
CN201810888548.2A 2018-08-06 2018-08-06 Transportation method of large pipeline in comprehensive pipe gallery construction Active CN109050381B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810888548.2A CN109050381B (en) 2018-08-06 2018-08-06 Transportation method of large pipeline in comprehensive pipe gallery construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810888548.2A CN109050381B (en) 2018-08-06 2018-08-06 Transportation method of large pipeline in comprehensive pipe gallery construction

Publications (2)

Publication Number Publication Date
CN109050381A true CN109050381A (en) 2018-12-21
CN109050381B CN109050381B (en) 2020-12-11

Family

ID=64832049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810888548.2A Active CN109050381B (en) 2018-08-06 2018-08-06 Transportation method of large pipeline in comprehensive pipe gallery construction

Country Status (1)

Country Link
CN (1) CN109050381B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105179807A (en) * 2015-10-23 2015-12-23 中国水利水电第八工程局有限公司 Moving device used for large steel pipe to penetrate through roadbed sleeve
JP2016124357A (en) * 2014-12-26 2016-07-11 植野 弘志 Inverted type four-wheel base carriage
CN107940097A (en) * 2017-11-21 2018-04-20 中国冶集团有限公司 City piping lane pipe installation method
CN207579497U (en) * 2017-11-29 2018-07-06 邵文波 A kind of inner tube-free wheel rim that height can be adjusted according to surface evenness
CN207683568U (en) * 2017-12-27 2018-08-03 湖北龙齐升阳科技有限公司 Convenient for stopping mixed mud building block transfer car(buggy) on the slope

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016124357A (en) * 2014-12-26 2016-07-11 植野 弘志 Inverted type four-wheel base carriage
CN105179807A (en) * 2015-10-23 2015-12-23 中国水利水电第八工程局有限公司 Moving device used for large steel pipe to penetrate through roadbed sleeve
CN107940097A (en) * 2017-11-21 2018-04-20 中国冶集团有限公司 City piping lane pipe installation method
CN207579497U (en) * 2017-11-29 2018-07-06 邵文波 A kind of inner tube-free wheel rim that height can be adjusted according to surface evenness
CN207683568U (en) * 2017-12-27 2018-08-03 湖北龙齐升阳科技有限公司 Convenient for stopping mixed mud building block transfer car(buggy) on the slope

Also Published As

Publication number Publication date
CN109050381B (en) 2020-12-11

Similar Documents

Publication Publication Date Title
CN103669216A (en) Steel box girder scattered-splicing sliding device and installation method
CN202124824U (en) Floating drilling platform for bridge construction
CN205024717U (en) Construction equipment of city utility tunnel immersed tube section
CN108755644B (en) Transfer platform for cable traction in intertidal zone login and installation method thereof
CN108222069B (en) Underwater immersed tube, device for erecting underwater immersed tube and construction method
CN107255188B (en) A kind of lifting pipeline method suitable at pipe gallery intersection node
CN105178330A (en) Underground structure post-cast strip support replacement method
CN205895274U (en) A section of jurisdiction travelling bogie that is used for shield constituent body to start
CN109295980A (en) Stake method jacket underwater grouting pipeline system and grout sealing method after one kind
CN109050381A (en) Pipe gallery is constructed the transportation resources of medium-and-large-sized pipeline
CN102817616A (en) Construction device and construction method for tunneling soft rock
CN210343347U (en) Assembled pipe jacking back wall
CN209739059U (en) Multipurpose mine bucket truck
CN204608810U (en) For the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering
CN209066440U (en) Stake method jacket underwater grouting pipeline system after one kind
CN205975675U (en) Utility tunnel system
CN206438538U (en) Immersed tube tunnel construction system
CN205100255U (en) Anti system of floating of prefabricated pump station
WO2016155659A1 (en) I-type sheet pile for tunnel construction
CN209508954U (en) A kind of Construction of Civil Engineering small pile
CN206256467U (en) A kind of underway
CN202557542U (en) Arc trolley used for horizontally transporting penstock in hole
CN207191677U (en) A kind of hollow partition board conveying arrangement
CN207331747U (en) A kind of multi-arch type tunnel plate-beam-wall-pile load transport system structure
JP2575940B2 (en) Conduit construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant