CN209508954U - A kind of Construction of Civil Engineering small pile - Google Patents

A kind of Construction of Civil Engineering small pile Download PDF

Info

Publication number
CN209508954U
CN209508954U CN201822238071.1U CN201822238071U CN209508954U CN 209508954 U CN209508954 U CN 209508954U CN 201822238071 U CN201822238071 U CN 201822238071U CN 209508954 U CN209508954 U CN 209508954U
Authority
CN
China
Prior art keywords
pile body
construction
hollow pile
counter sink
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822238071.1U
Other languages
Chinese (zh)
Inventor
罗爱忠
陈昌禄
张效忠
李利峰
李密
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou University of Engineering Science
Original Assignee
Guizhou University of Engineering Science
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou University of Engineering Science filed Critical Guizhou University of Engineering Science
Priority to CN201822238071.1U priority Critical patent/CN209508954U/en
Application granted granted Critical
Publication of CN209508954U publication Critical patent/CN209508954U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of Construction of Civil Engineering small piles, including pedestal, hollow pile body is equipped with above the pedestal, the hollow pile body and pedestal surrounding is transition cambered surface, the counter sink there are three positive triangle distribution of shapes is set inside the hollow pile body, three counter sinks are additionally provided with connection conduit each other, filling steel reinforcement cage is respectively provided with inside the counter sink, steel reinforcement cage is also filled between the counter sink and hollow pile body, cushioned material layer is equipped between the hollow pile body surrounding and transition cambered surface, several vertical through holes are equipped at the pedestal edge position, positioning pin column is inserted into inside the vertical through holes.The small pile convenient transportation, and structural strength is higher after Construction Arrangement, improves the service life of small pile at the problem of can effectively reducing existing small pile transverse breakage.

Description

A kind of Construction of Civil Engineering small pile
Technical field
The utility model relates to Construction of Civil Engineering equipment technical fields, apply more specifically, being related to a kind of civil engineering Work small pile.
Background technique
Civil engineering is to build the general designation of the science and technology of all kinds of job facilities, it both referred to applied material, equipment and The technical activities such as the exploration, design, construction, maintenance, the maintenance that are carried out also refer to the object of engineering construction, that is, build on the ground or In underground, land or water, be directly or indirectly human lives, production, military affairs, Scientific Research Service various job facilities, such as room Room, road, railway, pipeline, tunnel, bridge, canal, dykes and dams, harbour, power station, airport, ocean platform, water supply and drainage and Protection works etc., civil engineering refer in addition to building construction, to create, reconstructing or extending the building of all kinds of engineerings, construct Every technical work such as the prospecting, planning, design, construction, installation and the maintenance that are carried out such as object and related auxiliary facility and its complete At engineering entity, when small pile used in middle-size and small-size civil engineering and soft soil foundation small pile, that is, building used Engineering small pile, small pile in the prior art are mostly deal pile or hollow elongated shape concrete solid, the former uses the longevity Life and intensity are lower, and the latter is heavier, it has not been convenient to transport, and the rigid of a hole hollow pile is relatively low, use process In easily there is transverse breakage and cause hollow pile of civil engineering works can not normal use.
Utility model content
The purpose of the utility model is to provide a kind of Construction of Civil Engineering small pile, the small pile convenient transportation, and And structural strength is higher after Construction Arrangement, the problem of can effectively reducing existing small pile transverse breakage, improves making for small pile Use the service life.
To achieve the goals above, the technical solution adopted in the utility model is as follows:
A kind of Construction of Civil Engineering small pile, including pedestal, the pedestal top are equipped with hollow pile body, the sky Heart pile body and pedestal surrounding are transition cambered surface, and the counter sink there are three positive triangle distribution of shapes is set inside the hollow pile body, Three counter sinks are additionally provided with connection conduit each other, and filling steel reinforcement cage is respectively provided with inside the counter sink, described Counter sink and hollow pile body between also fill steel reinforcement cage, between the hollow pile body surrounding and transition cambered surface be equipped with fender The bed of material is equipped with several vertical through holes at the pedestal edge position, is inserted into positioning pin inside the vertical through holes Column.
Further, steel reinforcement cage density is greater than steel reinforcement cage density inside counter sink between the counter sink and hollow pile body.
Further, penetration concrete liquid inside the steel reinforcement cage.
Further, the padded coaming layer height is greater than hollow pile body and transition cambered surface height.
Compared with the prior art, the beneficial effects of the utility model are as follows:
The newel being distributed in the utility model by three equilateral triangles, improves the transverse strength of small pile, avoids existing There is the problem of small pile transverse breakage;By the penetration concrete liquid in steel reinforcement cage, after solidification, hollow pile knows from experience expansion outward, The expansion displacement squeezes cushioned material layer, fully supports cushioned material layer, further increases hollow strength of pile body;Transition cambered surface can To increase the contact area of the small pile and soil layer, increase frictional resistance, and then reinforce the bearing capacity of the small pile;Fortune Because not having penetration concrete before defeated, the structure small pile is lighter, and convenient transportation is mobile.
Detailed description of the invention
Fig. 1 is the utility model overall structure top view;
Fig. 2 is the utility model overall structure side view;
In figure: 1, cushioned material layer;2, it is connected to conduit;3, counter sink;4, steel reinforcement cage;5, transition cambered surface;6, vertical through holes; 7, pedestal.
Specific embodiment
In order to which the technical means, creative features, achievable purpose and effectiveness for realizing utility model are easy to understand, below In conjunction with being specifically illustrating, the utility model is further described.
As depicted in figs. 1 and 2, a kind of Construction of Civil Engineering small pile, including pedestal 7 are equipped with hollow pile above pedestal 7 Body, hollow pile body and 7 surrounding of pedestal are transition cambered surface 5, and the counter sink there are three positive triangle distribution of shapes is set inside hollow pile body 3, three counter sinks 3 are additionally provided with connection conduit 2 each other, and filling steel reinforcement cage 4, counter sink 3 and sky are respectively provided with inside counter sink 3 Also steel reinforcement cage 4 is filled between heart pile body, and cushioned material layer 1,7 surrounding of pedestal are equipped between hollow pile body surrounding and transition cambered surface 5 It is equipped with several vertical through holes 6 at marginal position, positioning pin column is inserted into inside vertical through holes 6, between counter sink 3 and hollow pile body 4 density of steel reinforcement cage is greater than 3 inside steel reinforcement cage of counter sink, 4 density, 4 inside penetration concrete liquid of steel reinforcement cage, 1 height of cushioned material layer Greater than 5 height of hollow pile body and transition cambered surface.
Actual installation is in use, staff first passes through transport device for multiple small pile haul road Construction of Civil Engineering Then the small pile is arranged at specified construction location, then the penetration concrete inside counter sink 3 and hollow pile body in scene Liquid, after waiting solidification to be filled, then to being inserted into the positioning elements such as positioning pin column inside vertical through holes 6, wherein cushioned material layer 1 can Using rubber or plastics, the position of vertical through holes 6 and quantity are determined according to specific operating condition.
The advantages of basic principles and main features and the utility model of the utility model have been shown and described above.This The technical staff of industry is retouched in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments That states only illustrates the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model It will also have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.This is practical new Type is claimed range and is defined by the appending claims and its equivalent thereof.

Claims (4)

1. a kind of Construction of Civil Engineering small pile, it is characterised in that: including pedestal, hollow pile is equipped with above the pedestal Body, the hollow pile body and pedestal surrounding are transition cambered surface, set that there are three positive triangle shapes point inside the hollow pile body The counter sink of cloth, three counter sinks are additionally provided with connection conduit each other, filling are respectively provided with inside the counter sink Steel reinforcement cage, also fills steel reinforcement cage between the counter sink and hollow pile body, the hollow pile body surrounding and transition cambered surface it Between be equipped with cushioned material layer, several vertical through holes are equipped at the pedestal edge position, in the vertical through holes Portion is inserted into positioning pin column.
2. a kind of Construction of Civil Engineering small pile according to claim 1, it is characterised in that: the counter sink and sky Steel reinforcement cage density is greater than steel reinforcement cage density inside counter sink between heart pile body.
3. a kind of Construction of Civil Engineering small pile according to claim 1, it is characterised in that: inside the steel reinforcement cage Penetration concrete liquid.
4. a kind of Construction of Civil Engineering small pile according to claim 1, it is characterised in that: the cushioned material layer Height is greater than hollow pile body and transition cambered surface height.
CN201822238071.1U 2018-12-28 2018-12-28 A kind of Construction of Civil Engineering small pile Expired - Fee Related CN209508954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822238071.1U CN209508954U (en) 2018-12-28 2018-12-28 A kind of Construction of Civil Engineering small pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822238071.1U CN209508954U (en) 2018-12-28 2018-12-28 A kind of Construction of Civil Engineering small pile

Publications (1)

Publication Number Publication Date
CN209508954U true CN209508954U (en) 2019-10-18

Family

ID=68198122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822238071.1U Expired - Fee Related CN209508954U (en) 2018-12-28 2018-12-28 A kind of Construction of Civil Engineering small pile

Country Status (1)

Country Link
CN (1) CN209508954U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519642A (en) * 2020-04-22 2020-08-11 广东裕基建筑工程有限公司 Pile foundation structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519642A (en) * 2020-04-22 2020-08-11 广东裕基建筑工程有限公司 Pile foundation structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN202124824U (en) Floating drilling platform for bridge construction
CN102828525A (en) Foundation structure of power transmission line tower
CN202577349U (en) Large immersed tube tunnel dry dock floor structure
CN101906786A (en) Method for judging piping seepage damage of foundation pit containing confined water of soft soil layer
CN208685703U (en) A kind of prefabricated armored concrete water intaking header structure
CN206887926U (en) A kind of novel high-strength geotechnical grid
CN201232194Y (en) Anti-deformation power transmission tower
CN209508954U (en) A kind of Construction of Civil Engineering small pile
CN102322078A (en) Method for calculating and processing inrushing destruction of excavation and depressurization coupling effect of foundation pit with confined water
CN207525758U (en) A kind of reinforced Structure About Soldier Pile
CN205934753U (en) A become sloping slide device for pushing up advance prefabricated frame
CN109487793A (en) Inner support of pile foundation pit permanent support structure is perfused in a kind of solid matter under complex environment
CN209779666U (en) Bridge foundation space protection structure on rock cone slope
CN206941562U (en) A kind of geotechnical grid for strengthening being fixedly connected
CN203922510U (en) A kind of simple and easy cable machine that is arranged in slope
CN204510181U (en) A kind of phytal zone drilling platform
CN211898167U (en) Reservoir dam seepage prevention structure based on concrete panel
CN206736743U (en) Lay the easy structure of mountable steel bridge
CN205259216U (en) Adopt steel truss to add concrete structure of back cover under water of muscle
CN207405657U (en) A kind of cable-stayed type immersed tube tunnel structure
CN207794132U (en) A kind of anti-floating, which is resisted strenuously, lifts the prefabricated pipe gallery of strength concrete
CN205223769U (en) Structure is restoreed fast to mountain area slope road bed
CN204492890U (en) Warpage preventing draining blind pipe
CN204080831U (en) The antislide pile that a kind of flexibility is reinforced
CN109372013A (en) EPS (expandable polystyrene) mixed soil construction technology and method for backfilling comprehensive pipe gallery on soft foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191018

Termination date: 20201228

CF01 Termination of patent right due to non-payment of annual fee