CN206887926U - A kind of novel high-strength geotechnical grid - Google Patents
A kind of novel high-strength geotechnical grid Download PDFInfo
- Publication number
- CN206887926U CN206887926U CN201720761197.XU CN201720761197U CN206887926U CN 206887926 U CN206887926 U CN 206887926U CN 201720761197 U CN201720761197 U CN 201720761197U CN 206887926 U CN206887926 U CN 206887926U
- Authority
- CN
- China
- Prior art keywords
- cell compartment
- geotechnical grid
- novel high
- weld seam
- strength
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
It the utility model is related to civil engineering material technical field, there is provided a kind of novel high-strength geotechnical grid, such a geotechnical grid are three dimensional hexagonal grid type.Including three-dimensional six side cell compartments and the honeycomb type grid being interconnected together by the cell compartment, the cell compartment is spreading weld, the spreading weld cell compartment expansion is connected as hexagon honeycomb type, water permeable device and non-slip texture are additionally provided with the cell compartment, honeycomb type cell compartment effectively firm soil body after slope protection works implementation, the tensile capacity of spreading weld cell compartment significantly improves so that bank protection overall structure is more stable and firm, also dramatically increases the performance of such a honeycomb type cell compartment.
Description
Technical field
It the utility model is related to civil engineering material technical field, especially novel high-strength geotechnical grid.
Background technology
Geotechnical grid is that a kind of geotechnical grid sheet material is had into 3 D stereo network structure simultaneously by the one kind connected and composed
And suitable for the civil engineering material of soil curing, after geotechnical grid is provided with slope and is banketed, run into rainwash
When, the soil body can be fixed in geotechnical grid, thin sand and soil will not be allowed to slide down, avoid the risk on landslide, while geotechnique
Cell compartment can play a part of strengthening road bearing strength, can effectively prevent road sinks, enhance the stability of road, but
It is that geotechnical grid still has problems and can cause negative consequence to construction quality.Existing geotechnical grid shortcoming is as follows:(1)
Although although many geotechnical grid referred to as honeycomb types, and non-critical honeycomb at present, due to the geotechnique of prior art
Cell compartment welds out a sealing wire, such as Chinese patent application using ultrasonic bonding on geotechnical grid piece
It is near-rhombic after the interconnection of geotechnical grid piece is reinflated shown in geotechnical grid in CN106592567A, contrasts hexagon,
The firm performance of quadrangle is greatly reduced, and the tensile strength between cell compartment is limited, influences the firm of the soil body after construction.For another example China is special
A kind of profit application double-deck geotechnical grids with drain function of CN106638555A, bilayer have the geotechnical grid of drain function,
Using the compactness that filler can be influenceed because of double layer hollow structure in being carried on basis, so as to influence base fixed;In slope protection works
Middle use, laterally laying can be reduced because of double-deck labyrinth current on slope to seepage velocity under slope, cause slope table protection geotechnique
Cell compartment stress increases, and sheet material fracture easily occurs and washes away dike slopes;Longitudinal direction laying causes geotechnical grid weld seam to be in stress point below cell compartment, easily
Snap the correct method for paving for not meeting geotechnical grid in slope protection works.(2) former cell compartment sheet surface is non-porous, can be because in engineering
Cell compartment occlusion relatively hinders the water body infiltration between cell compartment, meeting slopes caused by rainfall is accumulated in cell compartment especially in slope protection works
Gravity is excessive and causes to come down, and forms slope table runoff because slope table infiltration ability is relatively low, coombe occurs;As cell compartment includes
Water is larger to there is frost heave in the winter time, and cell compartment and slopes are damaged;
The content of the invention
The utility model solve technical problem be to provide a kind of novel high-strength geotechnical grid, make honeycomb type geotechnique's lattice
Room effectively firm soil, tensile capacity of cell compartment after engineering construction significantly improve, and tension is strong between width welding also causes cell compartment
Degree increase, extend the service life of geotechnical grid.
To achieve the above object, the utility model employs following technical scheme:
A kind of novel high-strength work cell compartment, including geotechnical grid piece and honeycomb is interconnected together by the geotechnical grid piece
Type grid, the cell compartment are provided with weld seam, and the weld seam forms a line of the geotechnical grid, and the cell compartment expands into
Hexagon honeycomb type.
Preferably, the width of the weld seam is a, and the distance of adjacent weld seam is e, the relational expression of satisfaction for 1.5cm≤a≤
0.5b。
Preferably, the weld seam is be arranged in parallel by more than two welding edges.
Preferably, it is provided with water permeable device in the cell compartment.
Preferably, the water permeable device is permeable circular hole.
Preferably, the cell compartment thickness is d, and the relational expression that d meets is d >=1.5mm.
A kind of novel high-strength geotechnical grid of the present utility model, is provided with weld seam, the weld seam on geotechnical grid piece
The a line of hexagon is constituted, is hexagonal honeycomb after connection expansion, because the stabilized structure of hexagon so that cell compartment energy
The ability of enough stability maintenance soil significantly becomes strong, and single-point stress when contrasting the wall scroll welding of prior art becomes wider weld seam
Stress so that the tensile capacity of cell compartment significantly improves.Advantage on geotechnical grid piece:1st, hexagon honeycomb structure be in nature most
Energy-conservation, strong mechanical structure, have given play to the bigger soil stabilization ability of cell compartment;2nd, adjacent cell compartment sheet material because set weld seam,
Cell compartment is changed into two points stress from single-point stress in slope protection works, and the tensile capacity between cell compartment significantly improves.
Brief description of the drawings
Fig. 1 is the deployed condition structural representation of high-strength novel geotechnical grid of the present utility model;
Fig. 2 is the undeployed configuration structural representation of high-strength novel geotechnical grid of the present utility model;
Fig. 3 is geotechnical grid and the high-strength novel geotechnical grid stress of the present utility model signal of prior art
Figure;
Fig. 4 is the deployed condition structural representation of the geotechnical grid in Chinese patent application CN106592567A;
Description of reference numerals:1- geotechnical grid pieces;2- honeycomb type geotechnical grids;11- weld seams;11a- sealing wires one;11b-
Sealing wire two;12 permeable holes.
Embodiment
The utility model provides a kind of novel high-strength geotechnical grid, as shown in figure 1, in one of the embodiments,
The minimum unit of honeycomb type geotechnical grid is approximate hexagon, and the geotechnological lattice of overall honeycomb type are connected to become by geotechnological form piece
Room, in the present embodiment, weld seam is provided with geotechnical grid piece, weld seam includes the 11a of the sealing wire one and 11b of sealing wire two, sealing wire
One 11a and the 11b of sealing wire two be arranged in parallel, and it is wide that the distance between the wherein 11a of welding edge one and the 11b of welding edge two are defined as weld seam
Degree, the width of weld seam 11 be c, as shown in Fig. 2 the distance between adjacent weld seam be e, the relational expression of their satisfactions be 1.5cm≤c≤
0.5e, after the expansion of honeycomb type geotechnical grid piece, width weld seam becomes one of side of minimum unit, so whole expansion
It is afterwards hexagonal honeycomb, hexagon honeycomb structure is highly stable mechanical structure so that whole system is more stable, no
Easy glide, protect the soil body.Fig. 3 is the geotechnical grid deployed condition structure chart of prior art, with geotechnical grid of the present utility model
Compare, the geotechnical grid deployed condition of prior art is four sides, and the utility model is opened up due to being provided with width weld seam in cell compartment
It is approximate hexagon after opening.Furthermore as shown in figure 3,3a is the geotechnical grid stress schematic diagram of prior art, 3b is this reality
With new geotechnical grid stress schematic diagram, adjacent cell compartment sheet material is spot welded through more than two welding, in slope protection works
Cell compartment is changed into two points stress from single-point stress, and the tensile capacity between cell compartment significantly improves.Width weld seam increase of the present utility model
The joint face of adjacent two cell compartment, bonding strength increase.Lower section cell compartment pulls downwards the top being attached thereto in slope protection works
Cell compartment, stress point increase to width weld seam of the present utility model, tensile capacity significantly improves from the very bead weld of prior art.
In actual applications, in order to further strengthen the intensity of geotechnical grid, the weld seam 11 in the present embodiment is by the 11a of sealing wire one and weldering
The 11b of wiring two, they constitute a line of hexagon, on this edge can according to Practical Project need be further added by welding edge
Or the quantity of pad.
As shown in figure 1, the water permeable device set on geotechnical grid piece is permeable hole, as shown in Fig. 2 of the prior art
Geotechnical grid piece surface is non-porous, and relatively inaccessible environment can be formed in engineering and then hinders the water body infiltration between cell compartment, eventually
Cause to occur surface coombe and winter geotechnical grid interior moisture content is larger occurs frost heave in the winter time, destroy geotechnical grid piece, enter
And the domatic destruction protected.The utility model is provided with permeable hole on geotechnical grid piece, can flow out the moisture in cell compartment
Go, effectively mitigate the weight of slopes;Above-mentioned permeable hole, also becomes the anchor hole of vegetation root system, mostly in lattice in ecological revetment
Filling planting is native in room and broadcasts sowing grass seeds, and root system meeting cross winding clenches into circular opening after vegetation grows, bank protection
Ability strengthens.
As a further improvement, non-slip texture is provided with geotechnical grid piece, non-slip texture is three-dimensional in the present embodiment
Reticulation patterns, there are following both sides beneficial effects:1st, increase three-dimensional netted decorative pattern on former sheet material to play sheet material
Reinforcement effects, intensity increase;2nd, the coefficient of friction of sheet material can be increased, the control ability lifting of filler in plaid matching room.
It can increase sealing wire or solder joint, the above in a line of the hexagon of the present utility model being made up of sealing wire
The explanation of embodiment is only intended to help and understands method and its core concept of the present utility model.It should be pointed out that for this technology
For the those of ordinary skill in field, on the premise of the utility model principle is not departed from, the utility model can also be carried out
Some improvement and modification, these are improved and modification is also fallen into the protection domain of the utility model claims.
Claims (6)
- A kind of 1. novel high-strength geotechnical grid, it is characterised in that:Including geotechnical grid piece (1) and by the geotechnical grid piece (1) honeycomb type grid (2) is interconnected together, the cell compartment is provided with weld seam (11), and the weld seam forms the geotechnological lattice The a line of room, the cell compartment (1) expand into hexagon honeycomb type.
- 2. novel high-strength geotechnical grid according to claim 1, it is characterised in that:The width of the weld seam (11) is c, The distance of adjacent weld seam is e, and the relational expression of satisfaction is 1.5cm≤c≤0.5e.
- 3. novel high-strength geotechnical grid according to claim 2, it is characterised in that:The weld seam (11) is by more than two Welding edge be arranged in parallel.
- 4. the novel high-strength geotechnical grid according to any one of claims 1 to 3, it is characterised in that:In the cell compartment It is provided with water permeable device.
- 5. novel high-strength geotechnical grid according to claim 4, it is characterised in that:The water permeable device is permeable circular hole (12)。
- 6. novel high-strength geotechnical grid according to claim 5, it is characterised in that:The cell compartment thickness is d, and d is full The relational expression of foot is d >=1.5mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720761197.XU CN206887926U (en) | 2017-06-28 | 2017-06-28 | A kind of novel high-strength geotechnical grid |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720761197.XU CN206887926U (en) | 2017-06-28 | 2017-06-28 | A kind of novel high-strength geotechnical grid |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206887926U true CN206887926U (en) | 2018-01-16 |
Family
ID=61297998
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720761197.XU Active CN206887926U (en) | 2017-06-28 | 2017-06-28 | A kind of novel high-strength geotechnical grid |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206887926U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110777768A (en) * | 2019-11-14 | 2020-02-11 | 安徽捷思新材料科技有限公司 | Hexagonal geocell and preparation method thereof |
CN111139845A (en) * | 2020-01-17 | 2020-05-12 | 哈尔滨盛洋塑胶材料有限公司 | Hexagonal honeycomb slope protection net |
CN111173011A (en) * | 2020-02-27 | 2020-05-19 | 河南交通职业技术学院 | Basalt fiber protection structure and protection folded plate for sandy soil roadbed slope |
CN113981997A (en) * | 2021-11-11 | 2022-01-28 | 成都路宝工程材料有限公司 | Slope geocell and fixing method |
-
2017
- 2017-06-28 CN CN201720761197.XU patent/CN206887926U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110777768A (en) * | 2019-11-14 | 2020-02-11 | 安徽捷思新材料科技有限公司 | Hexagonal geocell and preparation method thereof |
CN111139845A (en) * | 2020-01-17 | 2020-05-12 | 哈尔滨盛洋塑胶材料有限公司 | Hexagonal honeycomb slope protection net |
CN111173011A (en) * | 2020-02-27 | 2020-05-19 | 河南交通职业技术学院 | Basalt fiber protection structure and protection folded plate for sandy soil roadbed slope |
CN111173011B (en) * | 2020-02-27 | 2021-12-14 | 河南交通职业技术学院 | Basalt fiber protection structure and protection folded plate for sandy soil roadbed slope |
CN113981997A (en) * | 2021-11-11 | 2022-01-28 | 成都路宝工程材料有限公司 | Slope geocell and fixing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206887926U (en) | A kind of novel high-strength geotechnical grid | |
CN106193066B (en) | A kind of Loess landslide administering method based on restoration of the ecosystem | |
CN102369326A (en) | Windproof and sand-blocking dam with net cage sand barriers constructed by machine and constructing method thereof | |
CN210827501U (en) | Greening structure of stock ground rock slope | |
CN203498721U (en) | Three-dimensional drainage roadbed structure preventing damage by water of road in cold region | |
CN205591066U (en) | Fine grained soil is received sloping embankment and is filled structure | |
CN209493953U (en) | Slope protection structure with pollution barriers function | |
CN107419628A (en) | A kind of construction method of the rapid build road on reclaimed ground | |
CN204119877U (en) | A kind of Slope greening device | |
CN212270826U (en) | Check guest net cage | |
CN210031903U (en) | Retaining wall structure based on mortar rubble | |
JP6533907B1 (en) | Composite sheet and bag made of the composite sheet | |
CN110396983B (en) | Frame beam ecological slope protection structure with drainage and greening functions | |
CN111119205A (en) | Gabion shoulder pad | |
CN206916795U (en) | A kind of anti-ponding structure of basement bottom board | |
RU2152479C1 (en) | Device for protection of slopes and road base | |
CN208056098U (en) | A kind of flexible retaining wall | |
CN209508954U (en) | A kind of Construction of Civil Engineering small pile | |
JP3781631B2 (en) | Planting ground | |
CN205171454U (en) | Ecological bank protection | |
CN211922654U (en) | Gabion shoulder pad | |
CN204690762U (en) | The protecting and greening structure of a kind of geotechnological guipure and land waste side slope | |
CN211571753U (en) | Cutting slope protector with buffering energy dissipation function | |
RU136815U1 (en) | WINTER ROAD CONSTRUCTION | |
CN203007959U (en) | Net cage pad type revetment structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |