CN204608810U - For the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering - Google Patents

For the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering Download PDF

Info

Publication number
CN204608810U
CN204608810U CN201520006889.4U CN201520006889U CN204608810U CN 204608810 U CN204608810 U CN 204608810U CN 201520006889 U CN201520006889 U CN 201520006889U CN 204608810 U CN204608810 U CN 204608810U
Authority
CN
China
Prior art keywords
slagging tap
excavation
vertical shaft
engineering
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520006889.4U
Other languages
Chinese (zh)
Inventor
张伟狄
祝青
刘西军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201520006889.4U priority Critical patent/CN204608810U/en
Application granted granted Critical
Publication of CN204608810U publication Critical patent/CN204608810U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of for the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering.The purpose of this utility model is to provide a kind of for the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering, is intended to the problem solving difficult deslagging in high gradient slope construction, the mode of slagging tap is fixed relatively, reduces and other mutual interference of constructing.The technical solution of the utility model is: a kind of for the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering, comprise the drainage tunnel that high gradient slope is close with the some layers of lower planes position be arranged in this side slope, it is characterized in that: at the deslagging vertical shaft of a periphery up/down perforation of described each layer drainage tunnel, this silo bottom is provided with hole of slagging tap; Described deslagging vertical shaft is connected hole with arranging between drainage tunnel, and this connection is propped up slagging tray smooth connection the utility model excavate near the employing oblique angle, side of deslagging vertical shaft in hole and is applicable to hydroelectric project.

Description

For the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering
Technical field
The utility model relates to a kind of for the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering, is applicable to hydroelectric project.
Background technology
In hydroelectric project, often run into high gradient slope, in design, normal employing arranges multilayer drainage tunnel in the side slope of water retaining structure downstream, forms the groundwater table that multilayer slope drainage curtain reduces two sides side slope, thus improves side slope permanent stability.In this type of Excavation of High And Steep Slopes Bracing Process, often there is side slope thin layer excavation, the construction Difficulties that transport routes are difficult to arrange is slagged tap in construction.
Summary of the invention
The technical problems to be solved in the utility model is: for above-mentioned existing problems, there is provided a kind of for the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering, be intended to the problem solving difficult deslagging in high gradient slope construction, the mode of slagging tap fixed relatively, reduces and other mutual interference of constructing.
The technical scheme that the utility model adopts is: a kind of for the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering, comprise the drainage tunnel that high gradient slope is close with the some layers of lower planes position be arranged in this side slope, it is characterized in that: at the deslagging vertical shaft of a periphery up/down perforation of described each layer drainage tunnel, this silo bottom is provided with hole of slagging tap; Described deslagging vertical shaft is connected hole with arranging between drainage tunnel, and the slagging tray smooth connection of excavate near the employing oblique angle, side of deslagging vertical shaft in hole is propped up in this connection.
Described hole of slagging tap is arranged in the bottom of high gradient slope and is excavated to the axial location of deslagging vertical shaft.
The beneficial effect of this patent is: the utility model utilizes the multilayer drainage tunnel arranged in high gradient slope, adopt raise boring machine to bore one and drainage tunnel is carried out the vertical vertical shaft of slagging tap connected, and to be transported by drainage tunnel by the rock ballast of each slope excavation and down to the hole of slagging tap of silo bottom of slagging tap, thus transport slag field to by hole of slagging tap; Solve the problem of slagging tap in high gradient slope construction, and mode of slagging tap relatively is fixed, can be reduced and other interference of constructing.
Accompanying drawing explanation
Fig. 1 is vertical planning drawing of the present utility model.
Fig. 2 is the vertical partial sectional view of shaft portion of slagging tap in the utility model.
Fig. 3 be slag tap in the utility model vertical shaft, connect the floor map of hole, slagging tray.
Fig. 4 be slag tap in the utility model vertical shaft, connect the longitudinal section of hole, slagging tray.
Fig. 5 is the vertical shaft Rapid Excavation constructure scheme figure that slags tap of the present utility model.
Detailed description of the invention
As shown in Figure 1 and Figure 2, the present embodiment comprises the high gradient slope 1 of System drainage curtain, the multilayer drainage tunnel 2 be arranged in high gradient slope, connects the vertical shaft 3 of slagging tap of levels (horizontal direction) drainage tunnel, is arranged on the hole 4 and be arranged on drainage tunnel 2 and hole 5 and slagging tray 6 are propped up in the connection of slagging tap between vertical shaft 3 of slagging tap of silo bottom of slagging tap.
The specific implementation method of the present embodiment is as follows:
The axis of a, vertical shaft 3 of determining to slag tap according to the axial location of each layer drainage tunnel 2 in high gradient slope 1, and hole 4 of slagging tap bottom side slope is excavated to the axial location of vertical shaft 3 of slagging tap, utilize on domatic raise boring machine to carry out slagging tap the Rapid Excavation (as shown in Figure 5) of vertical shaft 3.
B, when after elevation higher than certain layer of drainage tunnel 2 in high gradient slope 1 of the excavation elevation of vertical shaft 3 of slagging tap, connect a hole 5 from drainage tunnel 2 side excavation, and in this hole near employing oblique angle, vertical shaft 3 side excavation of slagging tap as slagging tray 6 (as shown in Figure 3, Figure 4).
C, above-mentioned drainage tunnel 2 is communicated with vertical shaft 3 of slagging tap after, can slope excavation tap cinder construction be carried out.

Claims (2)

1. one kind for the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering, comprise high gradient slope (1) and be arranged on the close drainage tunnel (2) in some layers of lower planes position in this side slope, it is characterized in that: at the deslagging vertical shaft (3) of a periphery up/down perforation of described each layer drainage tunnel (2), this silo bottom is provided with hole of slagging tap (4); Described deslagging vertical shaft (3) is connected hole (5) with arranging between drainage tunnel (2), and slagging tray (6) smooth connection of excavate near the employing oblique angle, side of deslagging vertical shaft (3) in hole is propped up in this connection.
2. according to claim 1 for the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering, it is characterized in that: described in hole (4) of slagging tap be arranged in the bottom of high gradient slope (1) and be excavated to the axial location of deslagging vertical shaft (3).
CN201520006889.4U 2015-01-04 2015-01-04 For the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering Active CN204608810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520006889.4U CN204608810U (en) 2015-01-04 2015-01-04 For the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520006889.4U CN204608810U (en) 2015-01-04 2015-01-04 For the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering

Publications (1)

Publication Number Publication Date
CN204608810U true CN204608810U (en) 2015-09-02

Family

ID=53961371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520006889.4U Active CN204608810U (en) 2015-01-04 2015-01-04 For the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering

Country Status (1)

Country Link
CN (1) CN204608810U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842781A (en) * 2018-08-06 2018-11-20 中国电建集团华东勘测设计研究院有限公司 A kind of Excavation of High And Steep Slopes tap cinder construction method
CN110145325A (en) * 2019-06-04 2019-08-20 中铁十局集团城市轨道交通工程有限公司 A kind of tunneling vertical shaft loading and unloading transportation system and its method
CN111677512A (en) * 2020-05-15 2020-09-18 中国水利水电第七工程局有限公司 Shaft type diversion tunnel excavation method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842781A (en) * 2018-08-06 2018-11-20 中国电建集团华东勘测设计研究院有限公司 A kind of Excavation of High And Steep Slopes tap cinder construction method
CN110145325A (en) * 2019-06-04 2019-08-20 中铁十局集团城市轨道交通工程有限公司 A kind of tunneling vertical shaft loading and unloading transportation system and its method
CN110145325B (en) * 2019-06-04 2020-10-30 中铁十局集团城市轨道交通工程有限公司 Feeding and discharging conveying system and method for underground excavation vertical shaft
CN111677512A (en) * 2020-05-15 2020-09-18 中国水利水电第七工程局有限公司 Shaft type diversion tunnel excavation method

Similar Documents

Publication Publication Date Title
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN102661167B (en) Protected seam bottom plate upward comb-shaped drilled hole gas extraction method
CN103924795A (en) Existing building moving underground space structure and construction method
CN202544925U (en) One-hole dual-purpose tunnel drain hole structure
CN204608810U (en) For the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering
CN206256468U (en) A kind of underway of simple type
CN202560319U (en) Tunnel drainage and pressure reduction structure
CN110486021B (en) Construction method for converting large-section tunnel into two small-section tunnels
CN105370300A (en) Two-layer or multi-layer underground space construction method
CN104314578A (en) Construction method for continuous construction by using shield construction machine and matched station thereof
CN108547639A (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN104975606A (en) Method for handling high-low strides at adjacent parts of reverse building foundation pit and adjacent foundation pit
CN102913249A (en) Inclined shaft transverse-through positive hole single horn lifting construction method
CN204311435U (en) One is revolved and is dug occlusion steel concrete impervious wall
CN204002832U (en) A kind of shield tunnel portal structure
CN207453966U (en) The attached wind booth vertical shaft section in subway station excavates structure of slagging tap
CN203796321U (en) Balanced drain system in tunnel
CN202181907U (en) Tenon-free pipe curtain structure
CN105065040A (en) Top-plate-prefabricated underground space underground excavation building method
CN211008655U (en) Underpass subway supporting structure
CN106593454A (en) Shield side original tunneling construction method and structure combined with subsurface excavated construction of original well and hoisting well
CN204212103U (en) A kind of slag field draining and spoil disposal rock glacier structure
CN203420262U (en) Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley
CN205742151U (en) A kind of continuous underground wall structure of adverse construction method
CN201574401U (en) Underground continuous wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant