CN201574401U - Underground continuous wall - Google Patents
Underground continuous wall Download PDFInfo
- Publication number
- CN201574401U CN201574401U CN2009202825732U CN200920282573U CN201574401U CN 201574401 U CN201574401 U CN 201574401U CN 2009202825732 U CN2009202825732 U CN 2009202825732U CN 200920282573 U CN200920282573 U CN 200920282573U CN 201574401 U CN201574401 U CN 201574401U
- Authority
- CN
- China
- Prior art keywords
- continuous wall
- underground continuous
- wall
- wall body
- diaphragm wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model provides an underground continuous wall. The technical scheme adopted by the underground continuous wall is as follows: the underground continuous wall comprises an underground continuous wall body; a root stud for supporting is arranged at one side of the underground continuous wall body. The root stud is arranged at the outer side of the underground continuous wall body and at the inner side of the underground continuous wall body. The benefits of the underground continuous wall are as follows: the root stud and the underground continuous wall are constructed at the same time; the overall stability is good; the anti-bending capacity is good; the bearing capacity at horizontal direction is increased through bondability of the earth body on the root stud; the underground continuous wall provides possibility of reduced horizontal supporting or non horizontal supporting, thereby having better economical efficiency, simple process, rapid construction and good safety and reliability.
Description
One, technical field
The utility model relates to a kind of structure of diaphragm wall.
Two, background technology
The diaphragm wall excavation technology originates from Europe.It is to use the method for mud and tremie concrete to grow up according to well-digging and oil drilling, nineteen fifty has at first been adopted the slurry coat method construction of diaphragm wall at Milan, ITA, this technology of 50-60 age in 20th century obtains promoting at the western developed country and the former Soviet Union, becomes otherwise effective technique in the construction of underground construction and deep foundation.At present, construction method of underground continuous wall is the diaphragm wall of constructing earlier, successively excavates then, and construction successively is interior to be supported, and treats interior support maintenance after the Intensity Design value, one deck earthwork under could excavating.This method engineering time is longer, and does not make full use of foundation ditch surrounding soil intensity.
Three, summary of the invention
The utility model provides the layout method of a kind of key formula continuous underground wall structure.
Technical solution adopted in the utility model is: a kind of diaphragm wall, comprise the diaphragm wall body of wall, and be provided with passive key in described diaphragm wall body of wall one side.
Described key is arranged on the external side of underground continuous wall.
Described key is arranged on diaphragm wall body of wall inboard.
The beneficial effects of the utility model are, root key and diaphragm wall are constructed simultaneously, resistance to overturning is good, bending resistance is strong, utilize the soil body that the bond stress of root key has been increased the horizontal direction supporting capacity, provide possibility for reducing horizontal support or not establishing horizontal support, thereby had better economy, technology is simple, quick construction, safe and reliable.
Four, description of drawings
The wall body structure schematic diagram of Fig. 1 diaphragm wall
1 diaphragm wall body of wall, 2 medial root keys, 3 lateral root keys among the figure
Five, the specific embodiment
Of the present invention key formula continuous underground wall structure is made up of diaphragm wall body of wall 1 and root key, and it is medial root key 2 or to be arranged on the diaphragm wall outside be lateral root key 3 that the root key can be arranged on the diaphragm wall inboard, when being arranged at the inboard, should progressively knock out with excavation.When the outside allows, should be arranged on the outside, needn't knock out with excavation.Medial root key 2 can level run through, as supporting in the diaphragm wall.The root key degree of depth and spacing need to determine by calculating according to engineering properties, geology and ambient conditions.
Claims (3)
1. a diaphragm wall comprises the diaphragm wall body of wall, it is characterized in that, is provided with passive key in described diaphragm wall body of wall one side.
2. a kind of diaphragm wall as claimed in claim 1 is characterized in that, described key is arranged on the external side of underground continuous wall.
3. a kind of diaphragm wall as claimed in claim 1 is characterized in that, described key is arranged on diaphragm wall body of wall inboard.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202825732U CN201574401U (en) | 2009-12-28 | 2009-12-28 | Underground continuous wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202825732U CN201574401U (en) | 2009-12-28 | 2009-12-28 | Underground continuous wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201574401U true CN201574401U (en) | 2010-09-08 |
Family
ID=42694278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202825732U Expired - Fee Related CN201574401U (en) | 2009-12-28 | 2009-12-28 | Underground continuous wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201574401U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102505699A (en) * | 2011-10-12 | 2012-06-20 | 同济大学建筑设计研究院(集团)有限公司 | Advanced plain concrete wall system for controlling deformation of deep foundation pit, and design method thereof |
CN103374925A (en) * | 2012-04-23 | 2013-10-30 | 同济大学 | Underground diaphragm wall with unilateral expanding and supporting part |
CN107237343A (en) * | 2017-08-10 | 2017-10-10 | 西南科技大学 | A kind of many wall type nodular diaphragm walls as bridge foundation for soft soil foundation |
-
2009
- 2009-12-28 CN CN2009202825732U patent/CN201574401U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102505699A (en) * | 2011-10-12 | 2012-06-20 | 同济大学建筑设计研究院(集团)有限公司 | Advanced plain concrete wall system for controlling deformation of deep foundation pit, and design method thereof |
CN103374925A (en) * | 2012-04-23 | 2013-10-30 | 同济大学 | Underground diaphragm wall with unilateral expanding and supporting part |
CN107237343A (en) * | 2017-08-10 | 2017-10-10 | 西南科技大学 | A kind of many wall type nodular diaphragm walls as bridge foundation for soft soil foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204370469U (en) | A kind of drilled pile long leg jacket offshore wind turbine foundation | |
CN103306682B (en) | Long-span and high-side-wall underground space building and excavation support method thereof | |
CN204738302U (en) | Multi -storey frame formula double row pile supporting construction | |
CN204370458U (en) | A kind of open-cut foundation ditch dewatering installation | |
CN103924602A (en) | Deep soft soil foundation pit construction method | |
CN202227351U (en) | Supporting structure breaking through limitation to application depth of steel sheet piles in deep foundation pit | |
CN201574401U (en) | Underground continuous wall | |
CN103741705B (en) | Two-layer barrel cover suction type bucket stake composite foundation and construction method | |
CN102888848A (en) | Supporting structure for controlling stability of foundation ditch | |
CN202865850U (en) | Near-end shield tunnel foundation pit excavation supporting structure | |
CN102767174A (en) | Dynamic and static water-discharging vibration method | |
CN204780938U (en) | Novel recoverable anchor formula double row pile supporting construction that draws | |
CN104948207B (en) | For improving the device of swell-shrink characteristic soil property large cross-section tunnel steel arch-shelf load-carrying properties | |
CN204849777U (en) | Tilting board double row pile supporting construction that bears down on one | |
CN201502065U (en) | Anchor rod joint excavation compound basis | |
CN103306248A (en) | High dam spillway foundation drainage system and excavation method | |
CN207295773U (en) | A kind of underground trough-shaped body anti-floating construction | |
CN202745033U (en) | Movable and fixed drain pipe well | |
CN202830938U (en) | Supporting structure for controlling foundation trench stability | |
CN204780939U (en) | Masts type double row pile struts system | |
CN203321523U (en) | Large-span high-side-wall underground space building | |
CN204676569U (en) | The Anchor Care of the larger Dangerous Rock Body of a kind of rock side slope combines process structure | |
CN204715364U (en) | A kind of foundation pit support device | |
CN203514325U (en) | Foundation pit stair support system with gravity type cement cob wall in combination with single rank of piles | |
CN203603162U (en) | Construction elevator load basic system based on foundation pit edge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100908 Termination date: 20131228 |