CN203796321U - Balanced drain system in tunnel - Google Patents

Balanced drain system in tunnel Download PDF

Info

Publication number
CN203796321U
CN203796321U CN201420193557.7U CN201420193557U CN203796321U CN 203796321 U CN203796321 U CN 203796321U CN 201420193557 U CN201420193557 U CN 201420193557U CN 203796321 U CN203796321 U CN 203796321U
Authority
CN
China
Prior art keywords
tunnel
drain
tunnels
lateral sulcus
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420193557.7U
Other languages
Chinese (zh)
Inventor
张剑
孙炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201420193557.7U priority Critical patent/CN203796321U/en
Application granted granted Critical
Publication of CN203796321U publication Critical patent/CN203796321U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to a balanced drain system in tunnels. The water displacements of side drain ditches on two sides of the tunnel as well as those of two bidirectional tunnels are different, and the drain effect is influenced when the water displacements are balanced. The side drain ditches are respectively dug on two sides of the bottom of the tunnel, and are communicated through a plurality of inclined underground drain pipes between the side drain ditches; an inclined contact channel is arranged between the two bidirectional tunnels; a side contact channel ditch is dug on one side of the bottom of the contact channel; the underground drain pipe between the tunnels is buried at the bottom of the contact channel; the side drain ditches which have the nearer distance in the two bidirectional tunnels are communicated through the underground drain pipe between the tunnels. The underground drain pipe is buried at the bottom of the tunnel, water in the side ditch with large water displacement is introduced into a side ditch with small water displacement, meanwhile, the underground drain pipe is buried at the bottom of the contact channel to balance drain of the two tunnels and ensure smooth drain of the tunnels; the balanced drain system has the advantages of being simple in investment, saving investment, being safe and reliable and the like.

Description

Balanced drainage system in a kind of tunnel
Technical field
the utility model belongs to tunnel traffic field of engineering technology, is specifically related to balanced drainage system in a kind of tunnel.
Background technology
The traffic engineering such as China railways, highway has been built a large amount of construction of tunnel, the area of growing at some underground water, and after tunnel builds up operation, water yield is very large, need to carry out permanent draining by ditch in tunnel.Generally adopt the mode that gutter is set in both sides to carry out permanent draining, current fair line road longitudinal gradient direction, by the high-end low side that flows to, finally flows out outside tunnel.Owing to limited by tunnel cross-section, conventionally ditch, both sides cross dimensions is identical, if it is more balanced or be less than ditch drainability that both sides, tunnel enter the underground water in ditch, can not affect use, but often because factor impacts such as the paths of underflow, enter the water yield difference in ditch, both sides, especially some long tunnels, construction period is provided with the service galleries such as inclined shaft in a side, water outlet in tunnel can only flow in a lateral sulcus, therefore, cause the medial sulcus one side water yield in tunnel large, a side water yield is very little.And for two parallel tunnels, the phenomenon that in a tunnel, in large another tunnel of the water yield, the water yield is little is common especially.When wherein ditch water yield is excessive while exceeding its drainability, the flow of water must be overflowed and be caused disease, and other ditch does not play a role.
Summary of the invention
The purpose of this utility model is to provide balanced drainage system in a kind of tunnel, by hidden pipe is set between ditch, makes each ditch mutual balanced displacement of energy in the situation that the water yield is different, ensures that tunnel drainage is unimpeded.
The technical scheme that the utility model adopts is:
Balanced drainage system in a kind of tunnel, respectively digs and puts a draining lateral sulcus in the inner side of the both sides of tunnel bottom, two cable trenchs, it is characterized in that:
Between the draining lateral sulcus of both sides, be communicated with by closed drain between some oblique draining lateral sulcus, between draining lateral sulcus, the direction of burying underground of closed drain is along circuit longitudinal gradient direction of fall from high to low;
Between two-way two tunnels, be provided with oblique service channel, service channel bottom one side is dug and is put a service channel lateral sulcus, service channel lateral sulcus bottom is embedded with closed drain between tunnel, in two-way two tunnels, the drain-side ditch of close together is communicated with by closed drain between tunnel, between tunnel closed drain bury underground direction be circuit longitudinal gradient direction of fall from high to low.
The utlity model has following advantage:
The utility model is by burying closed drain underground at tunnel bottom, water in the lateral sulcus large water yield is introduced in the lateral sulcus that the water yield is little, simultaneously, by burying closed drain underground in service channel bottom, the draining in balanced two tunnels, hidden pipe quantity is determined according to displacement flexible in size, make Nei Getiao ditch, tunnel in the situation that the water yield is very large, all can bring into play drainage, to ensure that tunnel drainage is unimpeded, can not cause harm influence safety, have construction simple, reduce investment outlay, the plurality of advantages such as safe and reliable.
Brief description of the drawings
Fig. 1 is the utility model sectional drawing.
Fig. 2 is the utility model plan view.
In figure, 1-cable trench, 2-draining lateral sulcus, 3-service channel, 4-service channel lateral sulcus, closed drain between 5-tunnel, closed drain between 6-draining lateral sulcus.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the utility model is described in detail.
Balanced drainage system in the related a kind of tunnel of the utility model is the form of structure of both sides lateral sulcus in the same seat of a kind of equilibrium tunnel and parallel two tunnel ditch drainabilities.Not changing on the basis of tunnel cross-section size and structural configuration, make full use of current conditions, existing utility is performed to maximum effect.
In a tunnel, respectively dig and put a draining lateral sulcus 2 in the inner side of the both sides of tunnel bottom, two cable trenchs 1, between the draining lateral sulcus 2 of both sides, be communicated with by closed drain 6 between some oblique draining lateral sulcus, between draining lateral sulcus, the direction of burying underground of closed drain 6 is along circuit longitudinal gradient direction of fall from high to low, to ensure that between draining lateral sulcus, closed drain 6 has minimum drainage grade, water (flow) direction is that the lateral sulcus that the water yield is large flows to the lateral sulcus that the water yield is little, therefore, closed drain 6 right-to-left or from left to right as required between draining lateral sulcus.Between draining lateral sulcus, closed drain 6 is PVC hard plastic tube, can be according to actual amount of water situation quantification.
For two parallel tunnels, between two-way two tunnels, be provided with oblique service channel 3, service channel 3 bottom one sides are dug and are put a service channel lateral sulcus 4, service channel lateral sulcus 4 bottoms are embedded with closed drain 5 between tunnel, in two-way two tunnels, the draining lateral sulcus 2 of close together is communicated with by closed drain between tunnel 5, between tunnel closed drain 5 bury underground direction be circuit longitudinal gradient direction of fall from high to low, water (flow) direction is that tunnel flow that the water yield is large is to the little tunnel of the water yield.Closed drain 5PVC hard plastic tube between tunnel, can be according to actual amount of water situation quantification.
It is cited that content of the present utility model is not limited to embodiment, and the conversion of any equivalence that those of ordinary skill in the art take technical solutions of the utility model by reading the utility model manual, is claim of the present utility model and contains.

Claims (1)

1. a balanced drainage system in tunnel, in the both sides of tunnel bottom, the inner side of two cable trenchs (1) respectively digs and put a draining lateral sulcus (2), is characterized in that:
Between the draining lateral sulcus (2) of both sides, be communicated with by closed drain (6) between some oblique draining lateral sulcus, the direction of burying underground of closed drain between draining lateral sulcus (6) is along circuit longitudinal gradient direction of fall from high to low;
Between two-way two tunnels, be provided with oblique service channel (3), service channel (3) bottom one side is dug and is put a service channel lateral sulcus (4), service channel lateral sulcus (4) bottom is embedded with closed drain between tunnel (5), in two-way two tunnels, the draining lateral sulcus (2) of close together is communicated with by closed drain (5) between tunnel, closed drain between tunnel (5) bury underground direction be circuit longitudinal gradient direction of fall from high to low.
CN201420193557.7U 2014-04-21 2014-04-21 Balanced drain system in tunnel Expired - Lifetime CN203796321U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420193557.7U CN203796321U (en) 2014-04-21 2014-04-21 Balanced drain system in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420193557.7U CN203796321U (en) 2014-04-21 2014-04-21 Balanced drain system in tunnel

Publications (1)

Publication Number Publication Date
CN203796321U true CN203796321U (en) 2014-08-27

Family

ID=51378541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420193557.7U Expired - Lifetime CN203796321U (en) 2014-04-21 2014-04-21 Balanced drain system in tunnel

Country Status (1)

Country Link
CN (1) CN203796321U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104696011A (en) * 2015-04-01 2015-06-10 广东安元矿业勘察设计有限公司 Improved method of underground flat drainage system of coal mine middle section
CN108150219A (en) * 2018-01-23 2018-06-12 中铁二院工程集团有限责任公司 The ground water drainage system and its construction method of a kind of separate type double-hole tunnel
CN110952992A (en) * 2019-11-29 2020-04-03 中铁第四勘察设计院集团有限公司 Superimposed line tunnel
CN111236962A (en) * 2020-03-09 2020-06-05 四川省公路规划勘察设计研究院有限公司 Double-hole intercommunication type tunnel drainage system
CN111472838A (en) * 2020-03-16 2020-07-31 中铁西南科学研究院有限公司 Cooperative drainage system and drainage method for ditches in railway single-track tunnel
CN115075875A (en) * 2022-07-21 2022-09-20 广州地铁设计研究院股份有限公司 Interval drainage pump station of track traffic

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104696011A (en) * 2015-04-01 2015-06-10 广东安元矿业勘察设计有限公司 Improved method of underground flat drainage system of coal mine middle section
CN108150219A (en) * 2018-01-23 2018-06-12 中铁二院工程集团有限责任公司 The ground water drainage system and its construction method of a kind of separate type double-hole tunnel
CN110952992A (en) * 2019-11-29 2020-04-03 中铁第四勘察设计院集团有限公司 Superimposed line tunnel
CN111236962A (en) * 2020-03-09 2020-06-05 四川省公路规划勘察设计研究院有限公司 Double-hole intercommunication type tunnel drainage system
CN111472838A (en) * 2020-03-16 2020-07-31 中铁西南科学研究院有限公司 Cooperative drainage system and drainage method for ditches in railway single-track tunnel
CN115075875A (en) * 2022-07-21 2022-09-20 广州地铁设计研究院股份有限公司 Interval drainage pump station of track traffic

Similar Documents

Publication Publication Date Title
CN203796321U (en) Balanced drain system in tunnel
CN101798939B (en) Maintainable tunnel drainage system
CN101285397B (en) Submarine tunnel transverse water collecting tank
CN107131001A (en) A kind of and water delivery and the Railway Tunnel of communication function
CN206530363U (en) One kind can the outer drainage system of maintenance type railway tunnel bottom structure
CN208441890U (en) A kind of construction tunnel long range counter-slope drainage system
CN110792473A (en) Three-hole tunnel drainage system for centralized drainage by using service tunnel
CN207934932U (en) One kind being used for rich water or easy crystallization water location tunnel auxiliary type replaceable drainage system
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN203373703U (en) River channel water fetching structure
CN209168539U (en) A kind of Tunneling by mining method drainage model apparatus for demonstrating for teaching
CN203768881U (en) Water seepage draining device for corridors of mountain and dam body
CN204983098U (en) Positive pressure box culvert
CN204456024U (en) For the grounding apparatus of power station water-conveyance tunnel steel lining section
CN211474180U (en) Three-hole tunnel drainage system for centralized drainage by using service tunnel
CN103614986A (en) Free surface flow water inflow method suitable for draining off floodwaters of tailing pond
CN204753534U (en) Roller compacted concrete dam internal drain pipe net build structure
CN212053086U (en) Return-shaped rainwater inverted siphon pipeline structure
CN204327189U (en) Precipitation system in hypotonicity thin silt tunnel
CN203175615U (en) Tunnel rain sewage drainage system
CN204282384U (en) A kind of high water head solution cavity passes through the process structure of seepage control of dam curtain
CN103774624A (en) Concentration guiding drainage device of corridor drain hole
CN203939523U (en) A kind of leakage-resistant device for treatment technology for tunnel seepage water treatment
CN204898536U (en) Recess formula box culvert
CN202325677U (en) Drainage structure at position of tunnel deformation seam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140827