CN203420262U - Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley - Google Patents
Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley Download PDFInfo
- Publication number
- CN203420262U CN203420262U CN201320291298.7U CN201320291298U CN203420262U CN 203420262 U CN203420262 U CN 203420262U CN 201320291298 U CN201320291298 U CN 201320291298U CN 203420262 U CN203420262 U CN 203420262U
- Authority
- CN
- China
- Prior art keywords
- dam
- cable
- high speed
- cable crane
- dam abutment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model discloses a medium and high speed cable crane system for a high and steep dam abutment concrete dam of a narrow river valley. The medium and high speed cable crane system comprises a river-across cable used for operating a crane, a cable crane fixing end arranged on the dam abutment of one side and used for fixing one end of the river-across cable, a cable crane moving end arranged on the dam abutment of the other side, and a main machine room where main machine traction equipment is installed. The cable crane fixing end is fixed to the outer side of a short adit formed in the upper portion of the dam abutment in an excavating mode. The main machine room is arranged under the ground through a guide vertical shaft below the cable crane fixing end. The main machine traction equipment is connected with a guide system fixed to the cable crane fixing end through the guide vertical shaft and is used for operating the cable crane. The medium and high speed cable crane system is simple in overall arrangement, influences the stability of the whole high and steep dam abutment little and influences environment little. The technical problems of stability, excavation, support, environmental protection and the like of a high slope are solved, and the engineering quantity and the engineering investment are greatly reduced.
Description
Technical field
The utility model relates to the layout pattern of high speed cable machine system, specifically, it is a kind of high mountain gorge section that is suitable for, should not excavate on a large scale or excavate formation extra-high, bring the high layout pattern of the high speed cable machine system of dam abutment concrete dam suddenly of Narrow Valleys of the technical problems such as stability of high slope and engineering quantity are larger.
Background technology
In the built hydroelectric project in home and abroad, high speed cable machine generally adopts parallel-moving type or radiant type arrangement at present.According to high speed trailer system mechanical property and service requirement, radiant cable crane machine room is generally arranged on the ground under fixed end, needs to have between barrage and dam abutment excavation slope the layout place of one fixed width, to meet main equipment room arrangement requirement.And to being arranged in the barrage of section, valley high gradient slope, as cable machine division of room becomes ground type, need extensive excavation, and will bring the technical barriers such as high cut slope excavation, supporting and environmental protection, engineering quantity and construction investment are larger.
Utility model content
Technical problem to be solved in the utility model is, providing a kind of connects, main equipment room is arranged in underground by vertical shaft, optimize the layout pattern of fixed end and main equipment room, meeting under the prerequisite of safe operation, solve the technical barriers such as high cut slope excavation, supporting and environmental protection, significantly the layout pattern of the high speed cable machine system on the high steep dam concrete of the Narrow Valleys of cost saving dam.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is: the layout pattern of the high speed cable machine system of the high steep dam abutment concrete dam of a kind of Narrow Valleys, high speed cable machine system comprise operation crane across river cable, be positioned at a side dam abutment for the cable machine fixed end of cable one end, fixed span river, be positioned at the cable machine mobile terminal of opposite side dam abutment and the main frame machine room of installation main frame pulling equipment, described cable machine fixed end is fixed on the short adit outside of dam abutment top excavation, main frame machine room is arranged in underground by being arranged on the guiding vertical shaft of cable machine fixed end below, main frame pulling equipment is connected with the guidance system being fixed on cable machine fixed end by guiding vertical shaft, operation cable crane.
In the dam abutment of described concrete dam, be provided with dam crest curtain grouting gallery, main frame machine room is combined layout with dam crest curtain grouting gallery.
In described short adit, be provided with concrete anchor hole formula fixed end, described cable machine fixed end is arranged on the formula fixed end of concrete anchor hole.
The beneficial effects of the utility model are: compare with home and abroad built hydroelectric project high speed cable machine layout pattern, the utility model integral arrangement is simple, smaller on the steep dam abutment monolithic stability impact of height, smaller to ambient influnence.Solve the technical barriers such as stability of high slope, excavation, supporting and environmental protection, significantly reduced engineering quantity and cost saving.
Accompanying drawing explanation
Fig. 1 is the high schematic diagram of the layout pattern of the high speed cable machine system of dam abutment concrete dam suddenly of Narrow Valleys of the present utility model.
Fig. 2 is the partial enlarged drawing of Fig. 1.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
The operating principle of high speed cable machine system of the present utility model is identical with prior art, can be with reference to prior art, so no longer narration.The utility model and the difference of prior art are that the layout pattern of high speed cable machine system is different, are described in detail below:
As Fig. 1, shown in 2, the layout pattern of the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys of the present utility model, high speed cable machine system comprise operation crane across river cable 1, be positioned at a side dam abutment 9 for the cable machine fixed end 2 of cable one end, fixed span river, be positioned at the cable machine mobile terminal 12 of opposite side dam abutment and the main frame machine room 3 of installation main frame pulling equipment, described cable machine fixed end 2 is fixed on short adit 10 outsides of dam abutment top excavation, main frame machine room 3 is arranged in underground by being arranged on the guiding vertical shaft 5 of cable machine fixed end 2 belows, main frame pulling equipment is connected with the guidance system 6 being fixed on cable machine fixed end by guiding vertical shaft 5, operation cable crane.
In the dam abutment of described concrete dam 9, be provided with dam crest curtain grouting gallery 7, main frame machine room 3 is arranged with 7 combinations of dam crest curtain grouting gallery.
In described short adit 10, be provided with concrete anchor formula fixed end 4, described cable machine fixed end 2 is arranged on concrete anchor formula fixed end 4.
Below in conjunction with specific embodiment, describe:
Some hydropower station barrage is compaction type concrete gravity dam, and two sides mountain shape is grand, and mountain top, left bank elevation extends to 2450m, and right bank is 2150m.Two sides landform is grown without large-scale coombe, and two sides, river valley symmetry is fair, and the left bank gradient is generally the basement rock abrupt slope of 50~75 °, slope Gao Keda 1000m.Right bank is the one side hillside of 40~50 °, slope Gao Keda 400m.Because this upstream, power station is arranged in deep mountain valleys, by current home and abroad common practice, cable machine arrangement can only be selected in parallel-moving type or radiant type.Consider that landform, geology, hinge arrangement condition and construction need, radiant cable crane is arranged routinely, for meeting fixed end and main frame division of room, need to excavate on a large scale two sides massif, except bringing high cut slope excavation stablize and add the technical barriers such as strong supporting, also need significantly to increase construction investment.
Adopt the layout pattern of high speed cable machine system of the present utility model, cable machine host machine room is combined with dam crest curtain grouting gallery, underground type main frame machine room is helped in design, and the guiding vertical shaft by nearly 50m is connected with anchor hole formula fixed end, shape cable-former system.
Cable machine lifting capacity 30t, spoke side track length 78m, span 307m, sag ratio 5%.Left bank goes out rope point height 1532m, suspension hook H-Max 150m, crab traversing speed 7.5m/s, fully loaded decrease speed 3.0m/s, fully loaded lifting velocity 2.2m/s.
Adopt arrangement form of the present utility model, avoided Left Hill Mass to excavate, dissolved stability of high slope and added the technical barriers such as strong supporting, significantly saved construction investment.Secondary tower (spoke side) is arranged in right bank, and left bank is fixed end, utilizes left bank grouting adit to dig rear layout main equipment room, makes full use of two sides orographic condition, and the scheme that reduces excavated volume is feasible, meets this engineering construction needs.
In above-mentioned hydroelectric station design process, incorporation engineering landform and geological conditions, initiative proposition connects by vertical shaft, in conjunction with dam abutment curtain grouting gallery, arrange main frame machine room, by division of room underground, solved the technical barriers such as high cut slope excavation, supporting and environmental protection, significantly reduced engineering quantity and cost saving, can be the high steep dam abutment hydroelectric project cable machine layout in section, follow-up valley and adopt and use for reference.
Above-described embodiment is only for illustrating technological thought of the present utility model and feature, its object is to make those skilled in the art can understand content of the present utility model and implement according to this, can not only with the present embodiment, limit the scope of the claims of the present utility model, be equal variation or the modification that spirit that all the utility model disclose is done, still drop in the scope of the claims of the present utility model.
Claims (3)
1. the high speed cable machine system of the high steep dam abutment concrete dam of a Narrow Valleys, high speed cable machine system comprise operation crane across river cable (1), be positioned at a side dam abutment for the cable machine fixed end (2) of cable one end, fixed span river, be positioned at the cable machine mobile terminal (12) of opposite side dam abutment and the main frame machine room (3) of installation main frame pulling equipment, it is characterized in that, described cable machine fixed end (2) is fixed on short adit (10) outside of dam abutment top excavation, main frame machine room (3) is arranged in underground by being arranged on the guiding vertical shaft (5) of cable machine fixed end (2) below, main frame pulling equipment is connected with the guidance system (6) being fixed on cable machine fixed end by guiding vertical shaft (5), operation cable crane.
2. the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys according to claim 1, it is characterized in that, in the dam abutment of described concrete dam, be provided with dam crest curtain grouting gallery (7), main frame machine room (3) is arranged with dam crest curtain grouting gallery (7) combination.
3. the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys according to claim 1, it is characterized in that, in described short adit (10), be provided with concrete anchor hole formula fixed end (4), described cable machine fixed end (2) is arranged on concrete anchor hole formula fixed end (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320291298.7U CN203420262U (en) | 2013-05-24 | 2013-05-24 | Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320291298.7U CN203420262U (en) | 2013-05-24 | 2013-05-24 | Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203420262U true CN203420262U (en) | 2014-02-05 |
Family
ID=50019362
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320291298.7U Expired - Lifetime CN203420262U (en) | 2013-05-24 | 2013-05-24 | Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203420262U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103225293A (en) * | 2013-05-24 | 2013-07-31 | 中国水电顾问集团北京勘测设计研究院 | Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam |
CN104452764A (en) * | 2014-11-24 | 2015-03-25 | 长江勘测规划设计研究有限责任公司 | Hoisting method for concrete production |
CN107988894A (en) * | 2017-08-31 | 2018-05-04 | 中铁二院工程集团有限责任公司 | The concrete buttress structure for preventing high gradient slope bridge pier from deviating |
CN111636384A (en) * | 2020-06-08 | 2020-09-08 | 大连理工大学 | A concrete gravity dam for precipitous river valley topography |
-
2013
- 2013-05-24 CN CN201320291298.7U patent/CN203420262U/en not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103225293A (en) * | 2013-05-24 | 2013-07-31 | 中国水电顾问集团北京勘测设计研究院 | Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam |
CN104452764A (en) * | 2014-11-24 | 2015-03-25 | 长江勘测规划设计研究有限责任公司 | Hoisting method for concrete production |
CN107988894A (en) * | 2017-08-31 | 2018-05-04 | 中铁二院工程集团有限责任公司 | The concrete buttress structure for preventing high gradient slope bridge pier from deviating |
CN107988894B (en) * | 2017-08-31 | 2023-07-18 | 中铁二院工程集团有限责任公司 | Concrete buttress structure for preventing high-steep slope pier from shifting |
CN111636384A (en) * | 2020-06-08 | 2020-09-08 | 大连理工大学 | A concrete gravity dam for precipitous river valley topography |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203420262U (en) | Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley | |
CN103032071B (en) | Shield receiving forward-shift construction method of boulder group open excavation and embedment mutation space | |
CN205024717U (en) | Construction equipment of city utility tunnel immersed tube section | |
CN103603342A (en) | Construction method of ultra-long bored concrete pile with large-diameter casing combination | |
CN107663865A (en) | A kind of cable-stayed type immersed tube tunnel structure and method | |
CN103939137A (en) | Method for filling aeolian sand empty field of western desert mining area shallow coal seam | |
CN103225293B (en) | Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam | |
CN106558862A (en) | Assembled cable duct bank mounting structure | |
CN108868789B (en) | A kind of stratum active support and change method suitable for shield construction tunnel | |
CN204551500U (en) | Novel cofferdam in a kind of super thick soft foundation | |
CN211691670U (en) | Hydropower station underground powerhouse self-flowing drainage system | |
CN202731927U (en) | Tunnel construction device | |
CN202810873U (en) | Pipe curtain connection buckle | |
CN202090352U (en) | Deep foundation pit bracing system with steel pipe piles-self-drilling type pre-stress anchor rods | |
CN203855944U (en) | Outgoing line hole structure for underground powerhouse | |
CN204662246U (en) | steep slope bridge pier structure | |
CN104120696B (en) | Environment-friendly type slope sticking type trashrack structure and construction method thereof | |
CN202323899U (en) | Arrangement structure for underground gate chambers of diversion tunnels | |
CN206099263U (en) | Assembled cable duct bank mounting structure | |
CN207295418U (en) | The concrete buttress structure for preventing high gradient slope bridge pier from deviating | |
CN203022762U (en) | Tunnel structure capable of simultaneously meeting aerial drainage and passage requirements in tunnel diversion period | |
CN202768011U (en) | Lining segment for water pressure control of high-burial depth water-rich stratum tunnel boring machine (TBM)-method inclined shaft | |
CN207405657U (en) | A kind of cable-stayed type immersed tube tunnel structure | |
CN210798971U (en) | Construction structure for realizing maximization of single shield tunneling length in core urban area | |
CN204608736U (en) | A kind of power plant building be arranged in solution cavity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20140205 Effective date of abandoning: 20150325 |
|
RGAV | Abandon patent right to avoid regrant |