CN203420262U - Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley - Google Patents

Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley Download PDF

Info

Publication number
CN203420262U
CN203420262U CN201320291298.7U CN201320291298U CN203420262U CN 203420262 U CN203420262 U CN 203420262U CN 201320291298 U CN201320291298 U CN 201320291298U CN 203420262 U CN203420262 U CN 203420262U
Authority
CN
China
Prior art keywords
dam
cable
high speed
cable crane
dam abutment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320291298.7U
Other languages
Chinese (zh)
Inventor
薛宝臣
范建章
白宇
卢勃
高永辉
刘新钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina Beijing Engineering Corp
Original Assignee
Hydrochina Beijing Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Beijing Engineering Corp filed Critical Hydrochina Beijing Engineering Corp
Priority to CN201320291298.7U priority Critical patent/CN203420262U/en
Application granted granted Critical
Publication of CN203420262U publication Critical patent/CN203420262U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a medium and high speed cable crane system for a high and steep dam abutment concrete dam of a narrow river valley. The medium and high speed cable crane system comprises a river-across cable used for operating a crane, a cable crane fixing end arranged on the dam abutment of one side and used for fixing one end of the river-across cable, a cable crane moving end arranged on the dam abutment of the other side, and a main machine room where main machine traction equipment is installed. The cable crane fixing end is fixed to the outer side of a short adit formed in the upper portion of the dam abutment in an excavating mode. The main machine room is arranged under the ground through a guide vertical shaft below the cable crane fixing end. The main machine traction equipment is connected with a guide system fixed to the cable crane fixing end through the guide vertical shaft and is used for operating the cable crane. The medium and high speed cable crane system is simple in overall arrangement, influences the stability of the whole high and steep dam abutment little and influences environment little. The technical problems of stability, excavation, support, environmental protection and the like of a high slope are solved, and the engineering quantity and the engineering investment are greatly reduced.

Description

The high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys
Technical field
The utility model relates to the layout pattern of high speed cable machine system, specifically, it is a kind of high mountain gorge section that is suitable for, should not excavate on a large scale or excavate formation extra-high, bring the high layout pattern of the high speed cable machine system of dam abutment concrete dam suddenly of Narrow Valleys of the technical problems such as stability of high slope and engineering quantity are larger.
Background technology
In the built hydroelectric project in home and abroad, high speed cable machine generally adopts parallel-moving type or radiant type arrangement at present.According to high speed trailer system mechanical property and service requirement, radiant cable crane machine room is generally arranged on the ground under fixed end, needs to have between barrage and dam abutment excavation slope the layout place of one fixed width, to meet main equipment room arrangement requirement.And to being arranged in the barrage of section, valley high gradient slope, as cable machine division of room becomes ground type, need extensive excavation, and will bring the technical barriers such as high cut slope excavation, supporting and environmental protection, engineering quantity and construction investment are larger.
Utility model content
Technical problem to be solved in the utility model is, providing a kind of connects, main equipment room is arranged in underground by vertical shaft, optimize the layout pattern of fixed end and main equipment room, meeting under the prerequisite of safe operation, solve the technical barriers such as high cut slope excavation, supporting and environmental protection, significantly the layout pattern of the high speed cable machine system on the high steep dam concrete of the Narrow Valleys of cost saving dam.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is: the layout pattern of the high speed cable machine system of the high steep dam abutment concrete dam of a kind of Narrow Valleys, high speed cable machine system comprise operation crane across river cable, be positioned at a side dam abutment for the cable machine fixed end of cable one end, fixed span river, be positioned at the cable machine mobile terminal of opposite side dam abutment and the main frame machine room of installation main frame pulling equipment, described cable machine fixed end is fixed on the short adit outside of dam abutment top excavation, main frame machine room is arranged in underground by being arranged on the guiding vertical shaft of cable machine fixed end below, main frame pulling equipment is connected with the guidance system being fixed on cable machine fixed end by guiding vertical shaft, operation cable crane.
In the dam abutment of described concrete dam, be provided with dam crest curtain grouting gallery, main frame machine room is combined layout with dam crest curtain grouting gallery.
In described short adit, be provided with concrete anchor hole formula fixed end, described cable machine fixed end is arranged on the formula fixed end of concrete anchor hole.
The beneficial effects of the utility model are: compare with home and abroad built hydroelectric project high speed cable machine layout pattern, the utility model integral arrangement is simple, smaller on the steep dam abutment monolithic stability impact of height, smaller to ambient influnence.Solve the technical barriers such as stability of high slope, excavation, supporting and environmental protection, significantly reduced engineering quantity and cost saving.
Accompanying drawing explanation
Fig. 1 is the high schematic diagram of the layout pattern of the high speed cable machine system of dam abutment concrete dam suddenly of Narrow Valleys of the present utility model.
Fig. 2 is the partial enlarged drawing of Fig. 1.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
The operating principle of high speed cable machine system of the present utility model is identical with prior art, can be with reference to prior art, so no longer narration.The utility model and the difference of prior art are that the layout pattern of high speed cable machine system is different, are described in detail below:
As Fig. 1, shown in 2, the layout pattern of the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys of the present utility model, high speed cable machine system comprise operation crane across river cable 1, be positioned at a side dam abutment 9 for the cable machine fixed end 2 of cable one end, fixed span river, be positioned at the cable machine mobile terminal 12 of opposite side dam abutment and the main frame machine room 3 of installation main frame pulling equipment, described cable machine fixed end 2 is fixed on short adit 10 outsides of dam abutment top excavation, main frame machine room 3 is arranged in underground by being arranged on the guiding vertical shaft 5 of cable machine fixed end 2 belows, main frame pulling equipment is connected with the guidance system 6 being fixed on cable machine fixed end by guiding vertical shaft 5, operation cable crane.
In the dam abutment of described concrete dam 9, be provided with dam crest curtain grouting gallery 7, main frame machine room 3 is arranged with 7 combinations of dam crest curtain grouting gallery.
In described short adit 10, be provided with concrete anchor formula fixed end 4, described cable machine fixed end 2 is arranged on concrete anchor formula fixed end 4.
Below in conjunction with specific embodiment, describe:
Some hydropower station barrage is compaction type concrete gravity dam, and two sides mountain shape is grand, and mountain top, left bank elevation extends to 2450m, and right bank is 2150m.Two sides landform is grown without large-scale coombe, and two sides, river valley symmetry is fair, and the left bank gradient is generally the basement rock abrupt slope of 50~75 °, slope Gao Keda 1000m.Right bank is the one side hillside of 40~50 °, slope Gao Keda 400m.Because this upstream, power station is arranged in deep mountain valleys, by current home and abroad common practice, cable machine arrangement can only be selected in parallel-moving type or radiant type.Consider that landform, geology, hinge arrangement condition and construction need, radiant cable crane is arranged routinely, for meeting fixed end and main frame division of room, need to excavate on a large scale two sides massif, except bringing high cut slope excavation stablize and add the technical barriers such as strong supporting, also need significantly to increase construction investment.
Adopt the layout pattern of high speed cable machine system of the present utility model, cable machine host machine room is combined with dam crest curtain grouting gallery, underground type main frame machine room is helped in design, and the guiding vertical shaft by nearly 50m is connected with anchor hole formula fixed end, shape cable-former system.
Cable machine lifting capacity 30t, spoke side track length 78m, span 307m, sag ratio 5%.Left bank goes out rope point height 1532m, suspension hook H-Max 150m, crab traversing speed 7.5m/s, fully loaded decrease speed 3.0m/s, fully loaded lifting velocity 2.2m/s.
Adopt arrangement form of the present utility model, avoided Left Hill Mass to excavate, dissolved stability of high slope and added the technical barriers such as strong supporting, significantly saved construction investment.Secondary tower (spoke side) is arranged in right bank, and left bank is fixed end, utilizes left bank grouting adit to dig rear layout main equipment room, makes full use of two sides orographic condition, and the scheme that reduces excavated volume is feasible, meets this engineering construction needs.
In above-mentioned hydroelectric station design process, incorporation engineering landform and geological conditions, initiative proposition connects by vertical shaft, in conjunction with dam abutment curtain grouting gallery, arrange main frame machine room, by division of room underground, solved the technical barriers such as high cut slope excavation, supporting and environmental protection, significantly reduced engineering quantity and cost saving, can be the high steep dam abutment hydroelectric project cable machine layout in section, follow-up valley and adopt and use for reference.
Above-described embodiment is only for illustrating technological thought of the present utility model and feature, its object is to make those skilled in the art can understand content of the present utility model and implement according to this, can not only with the present embodiment, limit the scope of the claims of the present utility model, be equal variation or the modification that spirit that all the utility model disclose is done, still drop in the scope of the claims of the present utility model.

Claims (3)

1. the high speed cable machine system of the high steep dam abutment concrete dam of a Narrow Valleys, high speed cable machine system comprise operation crane across river cable (1), be positioned at a side dam abutment for the cable machine fixed end (2) of cable one end, fixed span river, be positioned at the cable machine mobile terminal (12) of opposite side dam abutment and the main frame machine room (3) of installation main frame pulling equipment, it is characterized in that, described cable machine fixed end (2) is fixed on short adit (10) outside of dam abutment top excavation, main frame machine room (3) is arranged in underground by being arranged on the guiding vertical shaft (5) of cable machine fixed end (2) below, main frame pulling equipment is connected with the guidance system (6) being fixed on cable machine fixed end by guiding vertical shaft (5), operation cable crane.
2. the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys according to claim 1, it is characterized in that, in the dam abutment of described concrete dam, be provided with dam crest curtain grouting gallery (7), main frame machine room (3) is arranged with dam crest curtain grouting gallery (7) combination.
3. the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys according to claim 1, it is characterized in that, in described short adit (10), be provided with concrete anchor hole formula fixed end (4), described cable machine fixed end (2) is arranged on concrete anchor hole formula fixed end (4).
CN201320291298.7U 2013-05-24 2013-05-24 Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley Expired - Lifetime CN203420262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320291298.7U CN203420262U (en) 2013-05-24 2013-05-24 Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320291298.7U CN203420262U (en) 2013-05-24 2013-05-24 Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley

Publications (1)

Publication Number Publication Date
CN203420262U true CN203420262U (en) 2014-02-05

Family

ID=50019362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320291298.7U Expired - Lifetime CN203420262U (en) 2013-05-24 2013-05-24 Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley

Country Status (1)

Country Link
CN (1) CN203420262U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225293A (en) * 2013-05-24 2013-07-31 中国水电顾问集团北京勘测设计研究院 Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam
CN104452764A (en) * 2014-11-24 2015-03-25 长江勘测规划设计研究有限责任公司 Hoisting method for concrete production
CN107988894A (en) * 2017-08-31 2018-05-04 中铁二院工程集团有限责任公司 The concrete buttress structure for preventing high gradient slope bridge pier from deviating
CN111636384A (en) * 2020-06-08 2020-09-08 大连理工大学 A concrete gravity dam for precipitous river valley topography

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225293A (en) * 2013-05-24 2013-07-31 中国水电顾问集团北京勘测设计研究院 Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam
CN104452764A (en) * 2014-11-24 2015-03-25 长江勘测规划设计研究有限责任公司 Hoisting method for concrete production
CN107988894A (en) * 2017-08-31 2018-05-04 中铁二院工程集团有限责任公司 The concrete buttress structure for preventing high gradient slope bridge pier from deviating
CN107988894B (en) * 2017-08-31 2023-07-18 中铁二院工程集团有限责任公司 Concrete buttress structure for preventing high-steep slope pier from shifting
CN111636384A (en) * 2020-06-08 2020-09-08 大连理工大学 A concrete gravity dam for precipitous river valley topography

Similar Documents

Publication Publication Date Title
CN203420262U (en) Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley
CN103032071B (en) Shield receiving forward-shift construction method of boulder group open excavation and embedment mutation space
CN205024717U (en) Construction equipment of city utility tunnel immersed tube section
CN103603342A (en) Construction method of ultra-long bored concrete pile with large-diameter casing combination
CN107663865A (en) A kind of cable-stayed type immersed tube tunnel structure and method
CN103939137A (en) Method for filling aeolian sand empty field of western desert mining area shallow coal seam
CN103225293B (en) Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam
CN106558862A (en) Assembled cable duct bank mounting structure
CN108868789B (en) A kind of stratum active support and change method suitable for shield construction tunnel
CN204551500U (en) Novel cofferdam in a kind of super thick soft foundation
CN211691670U (en) Hydropower station underground powerhouse self-flowing drainage system
CN202731927U (en) Tunnel construction device
CN202810873U (en) Pipe curtain connection buckle
CN202090352U (en) Deep foundation pit bracing system with steel pipe piles-self-drilling type pre-stress anchor rods
CN203855944U (en) Outgoing line hole structure for underground powerhouse
CN204662246U (en) steep slope bridge pier structure
CN104120696B (en) Environment-friendly type slope sticking type trashrack structure and construction method thereof
CN202323899U (en) Arrangement structure for underground gate chambers of diversion tunnels
CN206099263U (en) Assembled cable duct bank mounting structure
CN207295418U (en) The concrete buttress structure for preventing high gradient slope bridge pier from deviating
CN203022762U (en) Tunnel structure capable of simultaneously meeting aerial drainage and passage requirements in tunnel diversion period
CN202768011U (en) Lining segment for water pressure control of high-burial depth water-rich stratum tunnel boring machine (TBM)-method inclined shaft
CN207405657U (en) A kind of cable-stayed type immersed tube tunnel structure
CN210798971U (en) Construction structure for realizing maximization of single shield tunneling length in core urban area
CN204608736U (en) A kind of power plant building be arranged in solution cavity

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140205

Effective date of abandoning: 20150325

RGAV Abandon patent right to avoid regrant