CN103225293B - Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam - Google Patents

Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam Download PDF

Info

Publication number
CN103225293B
CN103225293B CN201310198622.5A CN201310198622A CN103225293B CN 103225293 B CN103225293 B CN 103225293B CN 201310198622 A CN201310198622 A CN 201310198622A CN 103225293 B CN103225293 B CN 103225293B
Authority
CN
China
Prior art keywords
dam
cable
cable crane
dam abutment
fixed end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310198622.5A
Other languages
Chinese (zh)
Other versions
CN103225293A (en
Inventor
薛宝臣
范建章
白宇
卢勃
高永辉
刘新钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina Beijing Engineering Corp
Original Assignee
Hydrochina Beijing Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Beijing Engineering Corp filed Critical Hydrochina Beijing Engineering Corp
Priority to CN201310198622.5A priority Critical patent/CN103225293B/en
Publication of CN103225293A publication Critical patent/CN103225293A/en
Application granted granted Critical
Publication of CN103225293B publication Critical patent/CN103225293B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses an arrangement structure for a medium/high-speed cable crane system in a narrow valley high-steep dam abutment concrete dam. The medium/high-speed cable crane system comprises a river-cross cable for operating a crane, a cable crane fixing end which is positioned on the dam abutment on one side and is used for fixing one end of the river-cross cable, a cable crane moving end positioned on the dam abutment on the other side, and a host machine room equipped with host traction equipment, wherein the cable crane fixing end is fixed on the outer side of a short flat hole which is formed in the upper part of the dam abutment in an excavating manner; the host machine room is arranged under the ground through a guide silo which is arranged below the cable crane fixing end; and the host traction equipment is connected with a guide system fixed at the cable crane fixing end through the guide silo, so that the cable crane is operated. The overall arrangement is simple, the influence on the overall stability of a high-steep dam abutment is small, and the influence on the environment is small. The technical problems of high slope stabilization, excavation, support, environment friendliness and the like are solved, the engineering quantity is greatly reduced, and the engineering investment is saved.

Description

The arrangement of the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys
Technical field
The present invention relates to the arrangement of high speed cable machine system, specifically, that one is suitable for high mountain gorge section, should not excavate or excavate formation extra-high on a large scale, the arrangement of the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys of the technical problem such as bring stability of high slope and engineering quantity is larger.
Background technology
In the built hydroelectric project in current home and abroad, high speed cable machine generally adopts parallel-moving type or radiant type arrangement.According to high speed traction system mechanical characteristics and service requirement, radiant cable crane machine room is generally arranged on the ground immediately below fixed end, needs the layout place having one fixed width between barrage and abutment excavation side slope, to meet main equipment room arrangement requirement.And to being arranged in the barrage of section, valley high gradient slope, as cable machine division of room becomes ground type, then need extensive excavation, the technical barriers such as high cut slope excavation, supporting and environmental protection will be brought, engineering quantity and construction investment larger.
Summary of the invention
Technical problem to be solved by this invention is, there is provided a kind of to connect by vertical shaft, main equipment room is arranged in underground, optimize the arrangement of fixed end and main equipment room, under the prerequisite meeting safe operation, solve the technical barriers such as high cut slope excavation, supporting and environmental protection, significantly the arrangement of the high speed cable machine system on the high steep dam concrete dam of the Narrow Valleys of cost saving.
In order to solve the problems of the technologies described above, the technical solution used in the present invention is: the arrangement of the high speed cable machine system of the high steep dam abutment concrete dam of a kind of Narrow Valleys, high speed cable machine system comprise run crane across river cable, be positioned at the cable machine fixed end of side dam abutment for cable one end, fixed span river, be positioned at the cable machine mobile terminal of opposite side dam abutment and the main frame machine room of main frame pulling equipment is installed, described cable machine fixed end is fixed on outside the short adit of dam abutment top excavation, main frame machine room is arranged in underground by the guiding vertical shaft be arranged on below cable machine fixed end, main frame pulling equipment is connected with the guidance system be fixed on cable machine fixed end by guiding vertical shaft, run cable crane.
Be provided with dam crest curtain grouting gallery in the dam abutment of described concrete dam, main frame machine room is combined with dam crest curtain grouting gallery and arranges.
Be provided with concrete anchor hole formula fixed end in described short adit, described cable machine fixed end is arranged on the formula fixed end of concrete anchor hole.
The invention has the beneficial effects as follows: compared with the built hydroelectric project high speed cable machine arrangement of home and abroad, integral arrangement of the present invention is simple, smaller on the impact of height steep dam abutment monolithic stability, smaller to ambient influnence.Solve the technical barriers such as stability of high slope, excavation, supporting and environmental protection, significantly reduce engineering quantity and cost saving.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the arrangement of the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys of the present invention.
Fig. 2 is the partial enlarged drawing of Fig. 1.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail:
The operating principle of high speed cable machine system of the present invention is identical with prior art, can with reference to prior art, so no longer describe.The present invention and the difference of prior art are that the arrangement of high speed cable machine system is different, are described in detail below:
As Fig. 1, shown in 2, the arrangement of the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys of the present invention, high speed cable machine system comprise run crane across river cable 1, be positioned at the cable machine fixed end 2 of side dam abutment 9 for cable one end, fixed span river, be positioned at the cable machine mobile terminal 12 of opposite side dam abutment and the main frame machine room 3 of main frame pulling equipment is installed, described cable machine fixed end 2 is fixed on outside the short adit 10 of dam abutment top excavation, main frame machine room 3 is arranged in underground by the guiding vertical shaft 5 be arranged on below cable machine fixed end 2, main frame pulling equipment is connected with the guidance system 6 be fixed on cable machine fixed end by guiding vertical shaft 5, run cable crane.
Be provided with dam crest curtain grouting gallery 7 in the dam abutment 9 of described concrete dam, main frame machine room 3 is combined with dam crest curtain grouting gallery 7 and arranges.
Be provided with concrete anchor formula fixed end 4 in described short adit 10, described cable machine fixed end 2 is arranged on concrete anchor formula fixed end 4.
Be described below in conjunction with specific embodiment:
Some hydropower station barrage is compaction type concrete gravity dam, and two sides mountain shape is grand, and mountain top, left bank elevation extends to 2450m, and right bank is 2150m.Two sides landform is grown without large-scale coombe, and two sides, river valley symmetry is fair, and the left bank gradient is generally the basement rock abrupt slope of 50 ~ 75 °, slope Gao Keda 1000m.Right bank is the one side hillside of 40 ~ 50 °, slope Gao Keda 400m.Because this upstream, power station is arranged in deep mountain valleys, by current home and abroad common practice, cable machine arrangement can only be selected in parallel-moving type or radiant type.Consider that landform, geology, project playout condition and construction need, radiant cable crane is arranged routinely, for meeting fixed end and main frame division of room, need to excavate on a large scale two sides massif, except bringing the technical barriers such as the stable and strengthening supporting of high cut slope excavation, also need significantly to increase construction investment.
Adopt the arrangement of high speed cable machine system of the present invention, combined by cable machine host machine room with dam crest curtain grouting gallery, underground type main frame machine room is helped in design, is connected with anchor hole formula fixed end by the guiding vertical shaft of nearly 50m, shape cable-former system.
Cable machine lifting capacity 30t, spoke side track length 78m, span 307m, sag ratio 5%.Left bank goes out rope point height 1532m, suspension hook H-Max 150m, crab traversing speed 7.5m/s, fully loaded decrease speed 3.0m/s, fully loaded lifting velocity 2.2m/s.
Adopt arrangement form of the present invention, avoid and Left Hill Mass is excavated, dissolved the technical barrier such as stability of high slope and strengthening supporting, significantly saved construction investment.Secondary tower (spoke side) is arranged in right bank, and left bank is fixed end, utilizes left bank grouting adit to dig rear layout main equipment room, makes full use of two sides orographic condition, reduce the concept feasible of excavated volume, meet this engineering construction needs.
In above-mentioned hydroelectric station design process, incorporation engineering landform and geological conditions, initiative proposition is connected by vertical shaft, main frame machine room is arranged in conjunction with dam abutment curtain grouting gallery, by division of room in underground, solve the technical barriers such as high cut slope excavation, supporting and environmental protection, significantly reduce engineering quantity and cost saving, can be the high steep dam abutment hydroelectric project cable machine in section, follow-up valley arrange adopt and use for reference.
Above-described embodiment is only for illustration of technological thought of the present invention and feature, its object is to enable those skilled in the art understand content of the present invention and implement according to this, only can not limit the scope of the claims of the present invention with the present embodiment, namely the equal change done of all disclosed spirit or modification, still drop in the scope of the claims of the present invention.

Claims (3)

1. the arrangement of the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys, high speed cable machine system comprise run crane across river cable (1), be positioned at the cable machine fixed end (2) of side dam abutment for cable one end, fixed span river, be positioned at the cable machine mobile terminal (12) of opposite side dam abutment and the main frame machine room (3) of main frame pulling equipment is installed, it is characterized in that, described cable machine fixed end (2) is fixed on short adit (10) outside of dam abutment top excavation, main frame machine room (3) is arranged in underground by the guiding vertical shaft (5) being arranged on cable machine fixed end (2) below, main frame pulling equipment is connected with the guidance system (6) be fixed on cable machine fixed end by guiding vertical shaft (5), run cable crane.
2. the arrangement of the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys according to claim 1, it is characterized in that, be provided with dam crest curtain grouting gallery (7) in the dam abutment of described concrete dam, main frame machine room (3) and dam crest curtain grouting gallery (7) combine to be arranged.
3. the arrangement of the high speed cable machine system of the high steep dam abutment concrete dam of Narrow Valleys according to claim 1, it is characterized in that, be provided with concrete anchor hole formula fixed end (4) in described short adit (10), described cable machine fixed end (2) is arranged on concrete anchor hole formula fixed end (4).
CN201310198622.5A 2013-05-24 2013-05-24 Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam Active CN103225293B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310198622.5A CN103225293B (en) 2013-05-24 2013-05-24 Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310198622.5A CN103225293B (en) 2013-05-24 2013-05-24 Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam

Publications (2)

Publication Number Publication Date
CN103225293A CN103225293A (en) 2013-07-31
CN103225293B true CN103225293B (en) 2015-03-25

Family

ID=48835918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310198622.5A Active CN103225293B (en) 2013-05-24 2013-05-24 Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam

Country Status (1)

Country Link
CN (1) CN103225293B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106044579B (en) * 2016-08-01 2017-11-24 长江勘测规划设计研究有限责任公司 Cable machine walking dolly auxiliary traction carrying rope crosses river structure and method
CN113152386B (en) * 2021-02-04 2023-03-21 南昌工学院 Cable crane grading damming system of wet-process stockpiling tailing pond

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1160157A (en) * 1997-08-12 1999-03-02 Ohbayashi Corp Control method of parallel running type cable crane
JP2003192270A (en) * 2001-12-26 2003-07-09 Ishikawajima Harima Heavy Ind Co Ltd Cable crane
CN201525708U (en) * 2009-07-28 2010-07-14 中国水电顾问集团华东勘测设计研究院 Arrangement structure of cross cable machine
CN201473220U (en) * 2009-07-28 2010-05-19 中国水电顾问集团华东勘测设计研究院 Multipoint large-distance radiant cable crane arranging structure
CN203420262U (en) * 2013-05-24 2014-02-05 中国水电顾问集团北京勘测设计研究院 Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley

Also Published As

Publication number Publication date
CN103225293A (en) 2013-07-31

Similar Documents

Publication Publication Date Title
CN203420262U (en) Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley
CN103603342A (en) Construction method of ultra-long bored concrete pile with large-diameter casing combination
CN103939137B (en) The drift-sand barnyard placement method of western desertification mining area shallow buried coal seam
CN107663865A (en) A kind of cable-stayed type immersed tube tunnel structure and method
CN105041204A (en) Movable upward raise boring machine
CN103225293B (en) Arrangement form for medium/high-speed cable crane system in narrow valley high-steep dam abutment concrete dam
CN203441529U (en) Shaft multiple section parallel interception device
CN106558862A (en) Assembled cable duct bank mounting structure
CN103397904B (en) Downhole transportation method for shuttle cabin of ultra-large type shield tunneling machine
CN202731927U (en) Tunnel construction device
CN202090352U (en) Deep foundation pit bracing system with steel pipe piles-self-drilling type pre-stress anchor rods
CN204608810U (en) For the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering
CN207295418U (en) The concrete buttress structure for preventing high gradient slope bridge pier from deviating
CN103670449B (en) Coal bunker partial sealing support technology
CN202323899U (en) Arrangement structure for underground gate chambers of diversion tunnels
CN206099263U (en) Assembled cable duct bank mounting structure
CN202768011U (en) Lining segment for water pressure control of high-burial depth water-rich stratum tunnel boring machine (TBM)-method inclined shaft
CN207405657U (en) A kind of cable-stayed type immersed tube tunnel structure
CN203022762U (en) Tunnel structure capable of simultaneously meeting aerial drainage and passage requirements in tunnel diversion period
CN206705432U (en) The safe jacking system of Construction of Silo cage with anticreep track
CN207297019U (en) Tunnel portal is oriented to wall beam frame structure in length and breadth
CN203239354U (en) Arranging structure utilizing large-tunnel construction space comprehensively
CN205062823U (en) Side slope structure that stabilizes
CN205205885U (en) Steel stand verticality deviation processing unit
CN202882759U (en) Running gear for full-casing full-rotary drill

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant