CN106558862A - Assembled cable duct bank mounting structure - Google Patents

Assembled cable duct bank mounting structure Download PDF

Info

Publication number
CN106558862A
CN106558862A CN201610851745.8A CN201610851745A CN106558862A CN 106558862 A CN106558862 A CN 106558862A CN 201610851745 A CN201610851745 A CN 201610851745A CN 106558862 A CN106558862 A CN 106558862A
Authority
CN
China
Prior art keywords
cable
protection pipe
cable protection
duct bank
mounting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610851745.8A
Other languages
Chinese (zh)
Inventor
杨雪锋
刘轶伦
张天忠
王力
罗正帮
梁东跃
计策
周晨
陈凯
刘西民
陈彦焰
张�浩
葛娜
胡辉
葛宜俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Anqing Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Anqing Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Anhui Electric Power Co Ltd, Anhui Huadian Engineering Consulting and Design Co Ltd, Anqing Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Anhui Electric Power Co Ltd
Priority to CN201610851745.8A priority Critical patent/CN106558862A/en
Publication of CN106558862A publication Critical patent/CN106558862A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/06Installations of electric cables or lines in or on the ground or water in underground tubes or conduits; Tubes or conduits therefor

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The present invention relates to a kind of factorial praluction, end product quality is high, the assembled cable duct bank mounting structure that speed of production is fast.Including the cable protection pipe of the hollow structure passed through with current supply cable, section outside the cable protection pipe is integrally in rectangular configuration, outwardly spacing tenon is provided with least side of cable protection pipe, it is corresponding, the groove being embedded in for spacing tenon is provided with the opposite side of spacing tenon that cable protection pipe is located, the cable duct bank mounting structure is formed by stacking by multi-layer cable comb, each layer cable duct bank is equipped with multiple, the spacing channel-section steel for limiting that cable protection pipe is moved along the radial is provided with the both sides of the cable protection pipe of the bottom, the lower end of the cable protection pipe of lowermost layer is provided with pillow, road pillow is located at and is equipped with the ground of blotter.Assemble type calandria can adopt mechanized construction, and project progress is fast.Without the need for formwork, casting concrete, more concrete need not be conserved, greatly save the engineering time.

Description

Assembled cable duct bank mounting structure
Technical field
The invention belongs to ultra-high-tension power transmission line technical field, more particularly to a kind of assembled cable duct bank mounting structure.
Background technology
Power circuit underfloor cabling generally uses insulated power cable.System of laying have direct-burried, cable duct bank, cable duct, Underground synthesis(Or cable is special)The several ways such as piping lane, wherein direct-burried, cable duct bank are often aided with work well and are laid.Underground It is comprehensive(Or cable is special)Piping lane investment is huge, using less.Direct-buried cable is easily damaged by external force and thermal source is affected, while will also The corrosion of pre- acid-proof, aqueous slkali, is unfavorable for the safe operation of power circuit.Cable duct bank is little with its low cost, occupation of land, and cable The advantages of safeguard measure is improved, is widely used in cable run construction.
Cable duct bank generally uses cast in situs mode and builds at present, although which has flexible operation, constructs simple etc. excellent Point, but there is also the shortcomings of operation side is big, the cycle is long.On-site concrete stirring simultaneously also easily produces broken to surrounding environment It is bad.
The content of the invention
It is an object of the invention to provide a kind of factorial praluction, the assembled cable row that end product quality is high, speed of production is fast Pipe mounting structure.Using factory floor and equipment advantage, comb concrete etc. is lifted on the premise of cost is not significantly improved Level, further lifts the reliability of cable run.
To achieve these goals, the technical solution used in the present invention is:
Assembled cable duct bank mounting structure, including the cable protection pipe of the hollow structure passed through with current supply cable, the cable is protected Section outside pillar is integrally in rectangular configuration, is provided with outwardly spacing tenon at least side of cable protection pipe, right Answer, the groove being embedded in for spacing tenon is provided with the opposite side of spacing tenon that cable protection pipe is located, the cable duct bank is pacified Assembling structure is formed by stacking by multi-layer cable comb, each layer cable duct bank be equipped with it is multiple, the two of the cable protection pipe of the bottom While being provided with the spacing channel-section steel for limiting that cable protection pipe is moved along the radial, the lower end of the cable protection pipe of lowermost layer is provided with pillow, Road pillow is located at and is equipped with the ground of blotter.
Each angle of described each cable protection pipe is equipped with arc notch, and the cable of adjacent four rectangular array distributions is protected Arc notch between pillar forms a reserved fiber channel.
Width gradually increases described spacing tenon from top to bottom, in isosceles trapezoidal structure.
Described fiber channel is circle.
Beneficial effects of the present invention:Assemble type calandria can adopt mechanized construction, and project progress is fast.Cable duct bank foundation ditch is opened After the completion of digging, you can laying rubble and road pillow, formula comb to be assembled are transported to scene and are laid using mechanical hoisting.Comb installation After carry out foundation ditch backfill, compacting terminate can completion, without the need for formwork, casting concrete, more without conserve to concrete, greatly It is big to save the engineering time.The cable duct bank can improve circuit reality using single distributed system of laying by corridor anxiety section Apply feasibility.
Description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the profile of individual cable protection pipe of the present invention.
Specific embodiment
With reference to embodiment, the present invention will be further described.
Embodiment
Assembled cable duct bank mounting structure as depicted in figs. 1 and 2, including the hollow structure passed through with current supply cable Cable protection pipe 1, the section outside the cable protection pipe are integrally in rectangular configuration, at least side of cable protection pipe be provided with to The spacing tenon 2 of outer protrusion, it is corresponding, it is provided with embedded for spacing tenon in the opposite side of spacing tenon that cable protection pipe is located Groove 3, the cable duct bank mounting structure is formed by stacking by multi-layer cable comb, each layer cable duct bank be equipped with it is multiple, most The both sides of the cable protection pipe of bottom are provided with the spacing channel-section steel 4 for limiting that cable protection pipe is moved along the radial, the cable of lowermost layer The lower end of protection pipe is provided with pillow 5, and road pillow is located at and is equipped with the ground of blotter 6.Described each cable protection pipe it is each Angle is equipped with arc notch 7, and the arc notch between the cable protection pipe of adjacent four rectangular array distributions forms one and reserves Fiber channel.Width gradually increases described spacing tenon from top to bottom, in isosceles trapezoidal structure.Described fiber channel is circle Shape.
Wherein road pillow also includes the annex such as spacing channel-section steel and connector.Spacing channel-section steel has guarantees that bottom comb does not occur a left side The function of right sliding.To ensure that road pillow is generally aligned in the same plane as far as possible, spacing channel-section steel and assemble type calandria all should or so be staggered installation of. Levels comb guarantees will not mutually sliding by itself prefabricated spacing tenon, and then ensures that cable is logical when laying Freely.
For convenience of transporting and constructing, assemble type calandria length is no more than 11m, the comb length assembled using a dead lift No more than 7m.Filled using rubber washer between comb in front and back, in parcel water proof rubber cloth, rubberized fabric parcel scope should for outer layer 300mm each not less than comb seam or so, should not be less than two-layer.
Should suitably increase the embedded bar in comb when comb upper load is larger, improve concrete grade, and suitably Reduce the distance between road pillow.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel it should be appreciated that the present invention is not restricted to the described embodiments, the simply explanation described in above-described embodiment and specification this The principle of invention, without departing from the spirit and scope of the present invention, the simple change of those ordinary skill in the art All it is within protection scope of the present invention with replacing.

Claims (4)

1. assembled cable duct bank mounting structure, it is characterised in that:Protect including the cable of the hollow structure passed through with current supply cable Pillar, the section outside the cable protection pipe are integrally in rectangular configuration, are provided with outwardly at least side of cable protection pipe Spacing tenon, it is corresponding, the groove being embedded in for spacing tenon is provided with the opposite side of spacing tenon that cable protection pipe is located, The cable duct bank mounting structure is formed by stacking by multi-layer cable comb, each layer cable duct bank be equipped with it is multiple, in the electricity of the bottom The both sides of cable protection pipe are provided with the spacing channel-section steel for limiting that cable protection pipe is moved along the radial, under the cable protection pipe of lowermost layer End is provided with pillow, and road pillow is located at and is equipped with the ground of blotter.
2. assembled cable duct bank mounting structure according to claim 1, it is characterised in that:Described each cable protection pipe Each angle be equipped with arc notch, it is pre- that arc notch between the cable protection pipe of adjacent four rectangular array distributions forms one Stay fiber channel.
3. assembled cable duct bank mounting structure according to claim 1 and 2, it is characterised in that:Described spacing tenon Width gradually increases from top to bottom, in isosceles trapezoidal structure.
4. assembled cable duct bank mounting structure according to claim 2, it is characterised in that:Described fiber channel is circle Shape.
CN201610851745.8A 2016-09-26 2016-09-26 Assembled cable duct bank mounting structure Pending CN106558862A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610851745.8A CN106558862A (en) 2016-09-26 2016-09-26 Assembled cable duct bank mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610851745.8A CN106558862A (en) 2016-09-26 2016-09-26 Assembled cable duct bank mounting structure

Publications (1)

Publication Number Publication Date
CN106558862A true CN106558862A (en) 2017-04-05

Family

ID=58418238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610851745.8A Pending CN106558862A (en) 2016-09-26 2016-09-26 Assembled cable duct bank mounting structure

Country Status (1)

Country Link
CN (1) CN106558862A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107370097A (en) * 2017-08-18 2017-11-21 山东农业大学 A kind of prefabricated assembled FRP tendons pervious concrete cable duct bank
CN109457727A (en) * 2018-07-25 2019-03-12 国网浙江嘉善县供电有限公司 The assembly combination of prefabricated distribution civil engineering cable shaft
CN110979978A (en) * 2019-10-15 2020-04-10 江苏通亚工程材料有限公司 Bundling type anti-falling device for power pipe transportation
CN112054462A (en) * 2020-08-31 2020-12-08 杭州鸿晟电力设计咨询有限公司 Cable bridge and cable bridge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US681158A (en) * 1901-07-06 1901-08-20 Charles A Wanner Conduit.
US3693664A (en) * 1970-10-15 1972-09-26 Hancock Brick & Tile Co Modular cellular conduit assembly
CN201352698Y (en) * 2009-01-15 2009-11-25 刘�英 Assemble type calandria support
CN206076873U (en) * 2016-10-19 2017-04-05 江苏日龙塑料制品有限公司 A kind of combination type threading porous rasterization pipeline
CN206099263U (en) * 2016-09-26 2017-04-12 安徽华电工程咨询设计有限公司 Assembled cable duct bank mounting structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US681158A (en) * 1901-07-06 1901-08-20 Charles A Wanner Conduit.
US3693664A (en) * 1970-10-15 1972-09-26 Hancock Brick & Tile Co Modular cellular conduit assembly
CN201352698Y (en) * 2009-01-15 2009-11-25 刘�英 Assemble type calandria support
CN206099263U (en) * 2016-09-26 2017-04-12 安徽华电工程咨询设计有限公司 Assembled cable duct bank mounting structure
CN206076873U (en) * 2016-10-19 2017-04-05 江苏日龙塑料制品有限公司 A kind of combination type threading porous rasterization pipeline

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107370097A (en) * 2017-08-18 2017-11-21 山东农业大学 A kind of prefabricated assembled FRP tendons pervious concrete cable duct bank
CN109457727A (en) * 2018-07-25 2019-03-12 国网浙江嘉善县供电有限公司 The assembly combination of prefabricated distribution civil engineering cable shaft
CN110979978A (en) * 2019-10-15 2020-04-10 江苏通亚工程材料有限公司 Bundling type anti-falling device for power pipe transportation
CN112054462A (en) * 2020-08-31 2020-12-08 杭州鸿晟电力设计咨询有限公司 Cable bridge and cable bridge
CN112054462B (en) * 2020-08-31 2022-03-18 杭州鸿晟电力设计咨询有限公司 Cable bridge and cable bridge

Similar Documents

Publication Publication Date Title
CN106558862A (en) Assembled cable duct bank mounting structure
CN101886374B (en) Groove bottom-reinforced fully lined debris flow drainage groove and construction method thereof
CN204370431U (en) A kind of occlusion long-short pile space enclosing structure
CN110820763A (en) Truss type cast-in-situ bored pile supporting method for mucky soil deep foundation pit
CN107663865A (en) A kind of cable-stayed type immersed tube tunnel structure and method
CN203161244U (en) Existing subway underground excavation running tunnel protection structure
CN104518473A (en) Suspension protection structure and method of cable box culvert pipeline
CN206591509U (en) Protecting wall and the precast concrete pile for building protecting wall
CN206099263U (en) Assembled cable duct bank mounting structure
CN103643681B (en) A kind of Metro station excavation is inverse makes supporting and protection structure and construction method thereof
CN204825993U (en) Underground continuous wall stagnant water, lap guard stream joint design
CN105256811A (en) Sheet pile supporting structure with water stopping function and construction method
CN203420262U (en) Medium and high speed cable crane system for high and steep dam abutment concrete dam of narrow river valley
CN204370417U (en) A kind of for base pit engineering external corner or the road place of going along with sb. to guard him to drawing cable bolting structure
CN205012352U (en) Sheet pile supporting construction with stagnant water function
CN207339216U (en) A kind of power cable comb laying structure
CN204112363U (en) Barricade, blocking dam, river levee, the drainage groove of a kind of brick body and formation thereof
CN205911724U (en) Interval strong and weak magnetron line arrangement structure in tram engineering ground
CN104294859A (en) Stability judgment method of foundation pit basal-heave resistant system
CN207405657U (en) A kind of cable-stayed type immersed tube tunnel structure
CN206135375U (en) Arrangement structure that passes by on one's way of GIL pipeline
CN205000290U (en) Bottom of reservior pitch thoughtlessly congeals panel and storehouse slope concrete panel connection structure
CN204690730U (en) Diaphragm wall skeleton
CN203145025U (en) Soft soil deep foundation pit supporting cat anchor structure
CN208309637U (en) A kind of assembled monolithic concrete structure pipe gallery standard paragraphs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170405