CN207339216U - A kind of power cable comb laying structure - Google Patents
A kind of power cable comb laying structure Download PDFInfo
- Publication number
- CN207339216U CN207339216U CN201721391475.3U CN201721391475U CN207339216U CN 207339216 U CN207339216 U CN 207339216U CN 201721391475 U CN201721391475 U CN 201721391475U CN 207339216 U CN207339216 U CN 207339216U
- Authority
- CN
- China
- Prior art keywords
- cable
- laying structure
- concrete layer
- heat dissipation
- power cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
Description
Claims (6)
- A kind of 1. power cable comb laying structure, it is characterised in that including cable tubing, pipe pillow, blinding layer, heat dissipation duct, Ground wire, earthing pole and concrete layer, the blinding layer are arranged on comb laying structure bottom, and the cable tubing is set in In the pipe pillow and it is positioned over above blinding layer, the ground wire is laid along cable tubing bottom, the earthing pole and ground connection Wire bonding connects, and the pipe pillow periphery concrete layer encapsulating is tamped, and is set inside the left and right sides of the concrete layer some Heat dissipation duct.
- A kind of 2. power cable comb laying structure as claimed in claim 1, it is characterised in that:The cable tubing is single Wall bellows, thickness of pipe wall 5mm.
- A kind of 3. power cable comb laying structure as claimed in claim 2, it is characterised in that:The interior of duct that radiate Footpath is not more than the 1/4 of cable pipe internal diameter.
- A kind of 4. power cable comb laying structure as claimed in claim 1, it is characterised in that:At the top of the concrete layer Back fill course is also set up, the thickness pavement of backfill is not less than 0.6m, and driveway is not less than 0.7m.
- A kind of 5. power cable comb laying structure as claimed in claim 1, it is characterised in that:The ground wire uses 50x5 zinc-coated flat steel sheets.
- A kind of 6. power cable comb laying structure as claimed in claim 1, it is characterised in that:The earthing pole uses L50x5 Zinc-coated angle steels, length 1.5m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721391475.3U CN207339216U (en) | 2017-10-26 | 2017-10-26 | A kind of power cable comb laying structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721391475.3U CN207339216U (en) | 2017-10-26 | 2017-10-26 | A kind of power cable comb laying structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207339216U true CN207339216U (en) | 2018-05-08 |
Family
ID=62362740
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721391475.3U Expired - Fee Related CN207339216U (en) | 2017-10-26 | 2017-10-26 | A kind of power cable comb laying structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207339216U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111817199A (en) * | 2020-06-23 | 2020-10-23 | 中国五冶集团有限公司 | Construction method for changing electric U-shaped groove into calandria |
CN111984909A (en) * | 2020-08-11 | 2020-11-24 | 合肥电力规划设计院 | Method for rapidly calculating civil engineering quantity in power distribution network cable engineering |
-
2017
- 2017-10-26 CN CN201721391475.3U patent/CN207339216U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111817199A (en) * | 2020-06-23 | 2020-10-23 | 中国五冶集团有限公司 | Construction method for changing electric U-shaped groove into calandria |
CN111984909A (en) * | 2020-08-11 | 2020-11-24 | 合肥电力规划设计院 | Method for rapidly calculating civil engineering quantity in power distribution network cable engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203702166U (en) | Segment lining ring structure applicable to rectangular tunnel | |
CN103557014B (en) | A kind of tunnel segment structure and its assembling method suitable for Rectangular Tunnel | |
CN207339216U (en) | A kind of power cable comb laying structure | |
CN201599040U (en) | Prefabricated segments for shield tunneling | |
CN104514218A (en) | Energy pile and system thereof | |
CN106558862A (en) | Assembled cable duct bank mounting structure | |
CN202678908U (en) | High-toughness power cable protection tube | |
CN102704388A (en) | Anti-seismic and anti-flood semi-integral abutment seamless bridge and construction method thereof | |
CN202194159U (en) | Square pipe gallery bracket and square pipe gallery | |
CN201696055U (en) | Multi-span flat arch tunnel structure | |
CN211571784U (en) | Assembled underground pipe gallery | |
CN209293067U (en) | Integrated pipe shelter bridge structure | |
CN206099263U (en) | Assembled cable duct bank mounting structure | |
CN206635812U (en) | A kind of U-shaped Combined type concrete prefabricated box culvert | |
CN204266666U (en) | A kind of street lamp | |
CN211948676U (en) | Major diameter municipal administration steel pipe underground installation structure | |
CN204886076U (en) | Simple and easy indoor cable tray | |
CN204435209U (en) | A kind of semi-rigid joint Integral Abutment Bridge of concrete pile supporting | |
CN204570718U (en) | A kind of raft foundation with fluid pipeline path | |
CN207775648U (en) | A kind of precast concrete block road | |
CN113629647A (en) | Large-span ultrahigh-voltage power pipe trench suspension device and method in subway station foundation pit | |
CN207646606U (en) | A kind of bridge cable protective device for municipal science of bridge building | |
CN203184551U (en) | Steel wire woven mesh | |
CN207047681U (en) | Bridge assembly | |
CN105088916A (en) | Road pipeline crossing node protection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Xu Inventor after: Jiang Shuai Inventor after: Li Jinyi Inventor after: Liu Lingyun Inventor after: Zhou Daoqing Inventor after: Lu Guirong Inventor after: Zhang Fei Inventor after: Gong Zhipeng Inventor before: Liu Xu Inventor before: Jiang Shuai Inventor before: Li Jinyi |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180508 Termination date: 20201026 |