CN204662246U - steep slope bridge pier structure - Google Patents

steep slope bridge pier structure Download PDF

Info

Publication number
CN204662246U
CN204662246U CN201420784331.4U CN201420784331U CN204662246U CN 204662246 U CN204662246 U CN 204662246U CN 201420784331 U CN201420784331 U CN 201420784331U CN 204662246 U CN204662246 U CN 204662246U
Authority
CN
China
Prior art keywords
bridge pier
pier
soil
slope
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420784331.4U
Other languages
Chinese (zh)
Inventor
姚裕春
徐骏
曾永红
张耀
李井元
龚建辉
吴沛沛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201420784331.4U priority Critical patent/CN204662246U/en
Application granted granted Critical
Publication of CN204662246U publication Critical patent/CN204662246U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Steep Slope Bridge pier structure, to avoid occurring high steep excavation slope when steep slope section arranges Bridge Pier, and improves the horizontal force resistant ability to function of Bridge Pier.It comprises: pile foundation, and being arranged in the Rock And Soil of abrupt slope, bassets in its top; Bridge Pier, is consolidated in pile foundation top; Pier reinforcing body, outside is connected for overall with Bridge Pier, inner side and abrupt slope Rock And Soil close contact or overlap joint; Anchor cable, outer end is connected with Bridge Pier or pier reinforcing body, and inner end anchors in the Rock And Soil of abrupt slope.

Description

Steep Slope Bridge pier structure
Technical field
The utility model relates to geotechnical engineering, particularly a kind of steep slope section Bridge Pier structure.
Background technology
Highway construction is built in mountain area, and the proportion of bridge and tunnel engineering is comparatively large, therefore the phenomenon of bridge on abrupt slope is very general.Bridge Pier due to the ability of its horizontal force resistant effect poor, therefore Bridge Pier is embedded in slope ground body under normal circumstances, when being positioned on abrupt slope, excavation abrupt slope is needed all to be embedded in slope ground body to meet Bridge Pier, thus make to have occurred a lot of Bridge Pier foundation ditch high slope, in some cases, Bridge Pier foundation ditch Reinforcing High Slope is very expensive very difficult with reinforcing.For this reason, a kind of Steep Slope Bridge pier structure of urgent needs solves problems.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of Steep Slope Bridge pier structure, to avoid occurring high steep excavation slope when steep slope section arranges Bridge Pier, and improves the horizontal force resistant ability to function of Bridge Pier.
The utility model solves the technical scheme that its technical problem adopts:
Steep Slope Bridge pier structure of the present utility model, is characterized in that it comprises: pile foundation, and being arranged in the Rock And Soil of abrupt slope, bassets in its top; Bridge Pier, is consolidated in pile foundation top; Pier reinforcing body, outside is connected for overall with Bridge Pier, inner side and abrupt slope Rock And Soil close contact or overlap joint; Anchor cable, outer end is connected with Bridge Pier or pier reinforcing body, and inner end anchors in the Rock And Soil of abrupt slope.
The beneficial effects of the utility model are, can effectively avoid occurring high steep excavation slope when steep slope section arranges Bridge Pier, and improve the horizontal force resistant ability to function of Bridge Pier; This structure has easy construction, economy, the feature such as applied widely, has wide popularizing application prospect.
Accompanying drawing explanation
This manual comprises as next width accompanying drawing:
Fig. 1 is the structural representation of the utility model Steep Slope Bridge pier structure.
Component name shown in figure and corresponding mark: pile foundation 1, Bridge Pier 2, pier reinforcing body 3, anchor cable 4, abrupt slope Rock And Soil A.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
With reference to Fig. 1, Steep Slope Bridge pier structure of the present utility model comprises: pile foundation 1, and being arranged in the Rock And Soil A of abrupt slope, bassets in its top; Bridge Pier 2, is consolidated in pile foundation 1 top; Pier reinforcing body 3, outside is connected for overall with Bridge Pier 2, inner side and abrupt slope Rock And Soil A close contact or overlap joint; Anchor cable 4, outer end is connected with Bridge Pier 2 or pier reinforcing body 3, and inner end anchors in the Rock And Soil A of abrupt slope.
The utility model utilizes pile foundation 1 to elevate above the soil, and avoids Bridge Pier 2 excavation of foundation pit to form high gradient slope.Bridge Pier 2 is connected to form overall structure pile foundation 1, pier reinforcing body 3 is as the connecting media of Bridge Pier 2 and abrupt slope Rock And Soil A, horizontal resist forces is conducive to pass to Bridge Pier 2, thus increasing the horizontal force resistant ability to function of Bridge Pier 2, anchor cable 4 provides horizontal resist forces for Bridge Pier 2.This structure has easy construction, economy, the feature such as applied widely, has wide popularizing application prospect.
With reference to Fig. 1, the height that described pile foundation 1 is basseted forms slope height with Bridge Pier 2 excavation of foundation pit and suitably adjusts, and the height basseted in usual pile foundation 1 top is less than 10m.Described pier reinforcing body 3 adopts steel concrete and Bridge Pier 2 monobloc cast, and embed inside it in Rock And Soil A stabilized zone of abrupt slope, its insert depth is generally not less than 30cm.
With reference to Fig. 1, described anchor cable 4 anchors in stable abrupt slope Rock And Soil A, and it is constructed prior to Bridge Pier 2 and pier reinforcing body 3, before pier reinforcing body 3 is built, carry out stressed stretch-draw, and builds with it and connect into entirety.When abrupt slope Rock And Soil A is the better rock mass of stability, anchor cable 4 can adopt anchor pole form, and its length is generally not less than 10m.Anchor cable 4 or anchor pole can adopt single hole or porous reinforcement form, and determine according to the contact area of pier reinforcing body 3 with abrupt slope Rock And Soil A, contact area should adopt porous arrangement form greatly.
The above principle more of the present utility model that just explain through diagrams, be not the utility model to be confined to shown in and in described concrete structure and the scope of application, therefore every corresponding modify of being likely utilized and equivalent, all belong to the scope of the claims that the utility model is applied for.

Claims (3)

1. Steep Slope Bridge pier structure, is characterized in that it comprises: pile foundation (1), and being arranged in abrupt slope Rock And Soil (A), bassets in its top; Bridge Pier (2), is consolidated in pile foundation (1) top; Pier reinforcing body (3), outside is connected for overall with Bridge Pier (2), inner side and abrupt slope Rock And Soil (A) close contact or overlap joint; Anchor cable (4), outer end is connected with Bridge Pier (2) or pier reinforcing body (3), and inner end anchors in abrupt slope Rock And Soil (A).
2. Steep Slope Bridge pier structure as claimed in claim 1, is characterized in that: the height basseted in described pile foundation (1) top is less than 10m.
3. Steep Slope Bridge pier structure as claimed in claim 1, it is characterized in that: described pier reinforcing body (3) adopts steel concrete and Bridge Pier (2) monobloc cast, embed inside it in abrupt slope Rock And Soil (A) stabilized zone, its insert depth is not less than 30cm.
CN201420784331.4U 2014-12-11 2014-12-11 steep slope bridge pier structure Active CN204662246U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420784331.4U CN204662246U (en) 2014-12-11 2014-12-11 steep slope bridge pier structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420784331.4U CN204662246U (en) 2014-12-11 2014-12-11 steep slope bridge pier structure

Publications (1)

Publication Number Publication Date
CN204662246U true CN204662246U (en) 2015-09-23

Family

ID=54132647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420784331.4U Active CN204662246U (en) 2014-12-11 2014-12-11 steep slope bridge pier structure

Country Status (1)

Country Link
CN (1) CN204662246U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107988894A (en) * 2017-08-31 2018-05-04 中铁二院工程集团有限责任公司 The concrete buttress structure for preventing high gradient slope bridge pier from deviating
CN108797634A (en) * 2018-06-20 2018-11-13 福建永强岩土股份有限公司 A kind of novel offshore wind turbine commbined foundations and its construction method pitched for basement rock
CN109056530A (en) * 2018-09-25 2018-12-21 中铁二院工程集团有限责任公司 A kind of king-post base configuration being suitable for bridge tower on steep side slope

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107988894A (en) * 2017-08-31 2018-05-04 中铁二院工程集团有限责任公司 The concrete buttress structure for preventing high gradient slope bridge pier from deviating
CN107988894B (en) * 2017-08-31 2023-07-18 中铁二院工程集团有限责任公司 Concrete buttress structure for preventing high-steep slope pier from shifting
CN108797634A (en) * 2018-06-20 2018-11-13 福建永强岩土股份有限公司 A kind of novel offshore wind turbine commbined foundations and its construction method pitched for basement rock
CN108797634B (en) * 2018-06-20 2021-03-05 福建永强岩土股份有限公司 Offshore wind turbine combined foundation aiming at bedrock inclination and construction method thereof
CN109056530A (en) * 2018-09-25 2018-12-21 中铁二院工程集团有限责任公司 A kind of king-post base configuration being suitable for bridge tower on steep side slope

Similar Documents

Publication Publication Date Title
CN205314116U (en) Continuous type of combined type drilling cling compound structure
CN202689031U (en) Deep foundation pit retaining and protecting retaining wall
CN105298516A (en) Combined supporting structure of steel pipe pile steel-bar-embedded tunnel composite lining used for soft foundation
CN102953372A (en) Steel pipe pile and construction method thereof
CN204662246U (en) steep slope bridge pier structure
CN205225280U (en) A combined supporting structure that is used for steel -pipe pile bar planting tunnel composite lining of soft base
CN204753621U (en) Power transmission sequence iron tower is with compound basis
CN205223767U (en) Loose sand bed slope ground embankment structure
CN207582459U (en) A kind of prefabricated steel-pipe pile of variable cross-section
CN204000840U (en) Concrete floral tube slip casting uplift pile
CN201679094U (en) Abutment-tunnel conjunctive structure
CN102900094A (en) Transmission tower plate-type three-rope foundation structure
CN102900093A (en) Plate-type double-cable foundation structure of transmission tower
CN202969370U (en) Novel steel pipe pile
CN203361150U (en) Composite anti-floating anchor pile
CN201502065U (en) Anchor rod joint excavation compound basis
CN204325837U (en) Basement rock covers the high roadbed reclamation lateral restraint reinforcing construction of soft foundation
CN207672604U (en) A kind of pellet type retaining wall structure
CN103821164B (en) Mountain area cheuch backfill tunnel construction
CN202881967U (en) Transmission tower plate type three-cable base structure
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN202830994U (en) Protective structure for bedding slope bridge abutments
CN201865118U (en) Grouting spiral anchor base
CN201874006U (en) Intubating grouting base of transmission line iron tower
CN204000846U (en) Floral tube slip casting uplift pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant