CN109056530A - A kind of king-post base configuration being suitable for bridge tower on steep side slope - Google Patents

A kind of king-post base configuration being suitable for bridge tower on steep side slope Download PDF

Info

Publication number
CN109056530A
CN109056530A CN201811118501.4A CN201811118501A CN109056530A CN 109056530 A CN109056530 A CN 109056530A CN 201811118501 A CN201811118501 A CN 201811118501A CN 109056530 A CN109056530 A CN 109056530A
Authority
CN
China
Prior art keywords
king
post
bridge tower
side slope
steep side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811118501.4A
Other languages
Chinese (zh)
Inventor
游励晖
胡玉珠
蒋良文
刘伟
陈克坚
许志艳
艾智能
李俊龙
韩国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201811118501.4A priority Critical patent/CN109056530A/en
Publication of CN109056530A publication Critical patent/CN109056530A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of king-post base configurations for being suitable for bridge tower on steep side slope, and including the single-pile foundation being connected to below left king-post and right king-post, each single-pile foundation is reinforced concrete structure.The bridge tower king-post basis that the present invention designs, it is very suitable for steep side slope bridge tower, it uses only column single pile to replace a clump of piles, and cancel cushion cap construction, king-post base profile size is reduced, basic slope excavating planar dimension is reduced, considerably reduces native stone excavated volume, the excavation workload of steep side slope is also reduced, construction safety risk is reduced.

Description

A kind of king-post base configuration being suitable for bridge tower on steep side slope
Technical field
The present invention relates to technical field of bridge engineering, in particular to a kind of king-post basis for being suitable for bridge tower on steep side slope Construction.
Background technique
Bridge tower is the important component of suspension bridge, and bridge tower is not only subjected to outside the active force of main push-towing rope transmitting, is also subjected to The load actions such as itself dead load, wind load, temperature, earthquake.Bridge tower internal force is transferred to ground, such as Fig. 1 by the king-post basis of bridge tower Shown, the king-post basis of mountain area bridge tower generally uses multi-column pier foundation, in order to the interior of king-post (including left king-post 1 and right king-post 2) Power is uniformly transferred to each foundation pile 4, and setting cushion cap 3 is needed between king-post and foundation pile 4.
Need to guarantee certain stake spacing when king-post basis uses multi-column pier foundation, between foundation pile 4, " railway bridges and culverts ground and Foundation design code " (TB10093-2017) regulation: the center of (digging) hole perfusion friction pile is bored away from no less than 2.5 times design stakes Diameter bores the center of (digging) hole perfusion stanchion away from no less than 2 times design stake diameters.Construction of Pylon of Long Span Suspension Bridge stress is huge, 4 numbers of foundation pile More, therefore, the planar dimension of cushion cap 3 is accordingly more much bigger than king-post size.For mountain area steep side slope, bridge tower king-post uses group When pile foundation, 3 slope excavating planar dimension of cushion cap is huge, and native stone earthwork is huge, serious to former slope failure, also increases Construction cost and security risk.
Summary of the invention
When it is an object of the invention to overcome the steep side slope in the presence of the prior art using multi-column pier foundation, there is native stone Earthwork is huge, serious to former slope failure, the big deficiency of construction risk, provides and a kind of is suitable for bridge tower on steep side slope King-post base configuration.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of king-post base configuration being suitable for bridge tower on steep side slope, including be connected under left king-post and right king-post The single-pile foundation of side, each single-pile foundation is reinforced concrete structure.
The bridge tower king-post basis that the present invention designs, is very suitable for steep side slope bridge tower, only column single pile is used to replace group Stake, and cancel cushion cap construction, king-post base profile size is reduced, basic slope excavating planar dimension is reduced, greatly subtracts Native stone excavated volume is lacked, has also reduced slope excavating workload, reduce construction safety risk.
Preferably, it is separately connected the apical side height of two single-pile foundations below the left king-post and right king-post not Together, and the size of two single-pile foundations and size are different.
Due to that can be separately designed according to the difference of the parameters such as height, the gradient of two sides side slope using single-pile foundation The single-pile foundation of different sizes, different installation sites out, this flexible and changeable property of single-pile foundation, especially suitable for steep side slope Bridge tower, further ensures the reliability on basis, and reduces slope excavating risk.
Preferably, the single-pile foundation includes the basic top entity section being connected with king-post, the base being connected with ground Plinth bottom entity section and basis middle part hollow section positioned there between, basic internal are arranged hollow section, can reduce concrete The amount of pouring, save construction cost.
Preferably, the single-pile foundation is rectangular section, and the length and/or width dimensions of the rectangular section are 14m- 20m.Different from the circular cross-section that multi-column pier foundation and single-pile foundation generally use, present invention employs rectangular section, not only section Composite bending modulus is big, and facilitates excavation.Further, the sectional dimension of common single-pile foundation is within 4m, and the present invention is by rectangle The sectional dimension in section is extended to 14m-20m, to significantly increase bearing capacity.Although the section of single-pile foundation of the invention Size is larger, but the overall dimensions relative to multi-column pier foundation, and the size of single-pile foundation is still smaller, so as to greatly subtract Lack native stone excavated volume, also reduces slope excavating risk.
The invention also discloses one kind to be suitable for bridge tower on steep side slope comprising left king-post and right king-post and any A kind of king-post base configuration
Compared with prior art, beneficial effects of the present invention:
The bridge tower king-post basis for inventing design, is very suitable for steep side slope bridge tower, only column single pile is used to replace a clump of piles, And cancel cushion cap construction, king-post base profile size is reduced, basic slope excavating planar dimension is reduced, considerably reduces Native stone excavated volume, also reduces slope excavating workload, reduces construction safety risk.
Due to that can be separately designed according to the difference of the parameters such as height, the gradient of two sides side slope using single-pile foundation The single-pile foundation of different sizes, different installation sites out, this flexible and changeable property of single-pile foundation, especially suitable for steep side slope Bridge tower, further ensures the reliability on basis, and reduces slope excavating risk.
Present invention employs rectangular sections, and not only section composite bending modulus is big, and facilitate excavation.Further, the present invention will The sectional dimension of rectangular section is extended to 14m-20m, to significantly increase bearing capacity.
Detailed description of the invention:
Fig. 1 is the schematic diagram that king-post uses multi-column pier foundation in the prior art.
It is marked in Fig. 1: the left king-post of 1-, the right king-post of 2-, 3- cushion cap, 4- foundation pile.
Fig. 2 is a kind of schematic diagram of king-post base configuration for being suitable for bridge tower on steep side slope of the present invention.
Fig. 3 is the left view of Fig. 2.
Fig. 4 is the right view of Fig. 2.
Fig. 5 is the structural schematic diagram of single-pile foundation of the present invention.
Fig. 6 is the cross-sectional view of A-A section in Fig. 5.
Fig. 7 is the cross-sectional view of B-B section in Fig. 5.
Fig. 8 is stress balance figure of the single-pile foundation of the present invention in vertical direction.
Fig. 9 is single-pile foundation of the present invention stress balance figure in the horizontal direction.
It is marked in Fig. 2-Fig. 9: the left king-post of 1-, the right king-post of 2-, 3- single-pile foundation, the basis 31- top entity section, the basis 32- Middle part hollow section, 33- foundation bottom entity section.
Specific embodiment
Below with reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood It is all that this is belonged to based on the technology that the content of present invention is realized for the scope of the above subject matter of the present invention is limited to the following embodiments The range of invention.
As shown in figs 2-4, a kind of king-post base configuration being suitable for bridge tower on steep side slope, including respectively in left king-post 1 and right king-post 2 below an only column single-pile foundation 3 being arranged, the single-pile foundation 3 is reinforced concrete structure.
The single-pile foundation 3 is rectangular section, and the length and/or width of the rectangular section are 14m-20m.And in order to suitable The size of the natural parameters such as the gradient for answering two sides massif different, two single-pile foundations 3 in left and right can be different, and apical side height and bottom surface are high Degree can also be different, and H is the difference in height of the apical side height of the two in figure.
As shown in Figure 5-Figure 7, the single-pile foundation 3 includes the basic top entity section 31 being connected with king-post, with ground The foundation bottom entity section 33 being connected and basis middle part hollow section 32 positioned there between.
As shown in figure 8, the vertical internal force balance in king-post basis meets following formula:
N+G=∑ σ+∑ τ
Wherein, N is the vertical internal force on the basis of king-post acts on, the self weight based on G, and ∑ σ is that branch is resisted in basic bottom The resultant force of load σ, the resultant force of the resistance frictional resistance τ of four side grounds based on ∑ τ.
As shown in figure 9, laterally or longitudinally Bending Moment balance meets following formula on king-post basis:
M=Mq
Wherein, M is that the moment of flexure of the moment of flexure and shearing generation on king-post exposure basis is total, MqFor the lateral resistance q of ground The resist torque of generation.
Above embodiments are only to illustrate the present invention and not limit the technical scheme described by the invention, although this explanation The present invention has been described in detail referring to above-mentioned each embodiment for book, but the present invention is not limited to above-mentioned specific implementation Mode, therefore any couple of present invention modifies or equivalent replacement;And the technical side of all spirit and scope for not departing from invention Case and its improvement, are intended to be within the scope of the claims of the invention.

Claims (7)

1. a kind of king-post base configuration for being suitable for bridge tower on steep side slope, which is characterized in that including being connected to left king-post (1) single-pile foundation (3) and below right king-post (2), each single-pile foundation (3) is reinforced concrete structure.
2. a kind of king-post base configuration for being suitable for bridge tower on steep side slope according to claim 1, which is characterized in that point It is different with the apical side height of two single-pile foundations (3) below right king-post (2) that the left king-post (1) is not connected.
3. a kind of king-post base configuration for being suitable for bridge tower on steep side slope according to claim 1, which is characterized in that point The left king-post (1) is not connected and the size of two single-pile foundations (3) below right king-post (2) is different with size.
4. a kind of king-post base configuration for being suitable for bridge tower on steep side slope according to claim 1, which is characterized in that every A single-pile foundation (3) includes the basic top entity section (31) being connected with king-post, the basic bottom being connected with ground Portion's entity section (33) and basis middle part hollow section (32) positioned there between.
5. a kind of king-post base configuration for being suitable for bridge tower on steep side slope according to claim 1, which is characterized in that every A single-pile foundation (3) is rectangular section.
6. a kind of king-post base configuration for being suitable for bridge tower on steep side slope according to claim 5, which is characterized in that institute The length and/or width dimensions for stating rectangular section are 14m-20m.
7. one kind is suitable for bridge tower on steep side slope, which is characterized in that including left king-post (1) and right king-post (2), and it is such as above-mentioned A kind of any king-post base configuration of claim 1-6.
CN201811118501.4A 2018-09-25 2018-09-25 A kind of king-post base configuration being suitable for bridge tower on steep side slope Pending CN109056530A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811118501.4A CN109056530A (en) 2018-09-25 2018-09-25 A kind of king-post base configuration being suitable for bridge tower on steep side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811118501.4A CN109056530A (en) 2018-09-25 2018-09-25 A kind of king-post base configuration being suitable for bridge tower on steep side slope

Publications (1)

Publication Number Publication Date
CN109056530A true CN109056530A (en) 2018-12-21

Family

ID=64765903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811118501.4A Pending CN109056530A (en) 2018-09-25 2018-09-25 A kind of king-post base configuration being suitable for bridge tower on steep side slope

Country Status (1)

Country Link
CN (1) CN109056530A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356054A (en) * 2021-06-26 2021-09-07 山东省公路桥梁建设有限公司 Cable tower and construction method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100802038B1 (en) * 2007-02-27 2008-02-12 (주)내경엔지니어링 Rahmen type abutment structure
KR200445795Y1 (en) * 2009-04-21 2009-09-01 김기훈 Single Column Drilled Pier Foundation having Concrete Block for Surface Reinforcement
CN102733407A (en) * 2011-04-01 2012-10-17 上海同济启明星科技发展有限公司 Two-ring grouted single pile foundation
CN203160110U (en) * 2013-03-14 2013-08-28 上海市政工程设计研究总院(集团)有限公司 Near-mountain and near-water bridge structure
CN104047222A (en) * 2013-03-14 2014-09-17 上海市政工程设计研究总院(集团)有限公司 Bridge structure near mountain and by river and construction method of bridge
CN204401644U (en) * 2014-12-17 2015-06-17 中国电力工程顾问集团西北电力设计院有限公司 A kind of hollow digging foundation
CN204662246U (en) * 2014-12-11 2015-09-23 中铁二院工程集团有限责任公司 steep slope bridge pier structure
CN105155421A (en) * 2015-09-02 2015-12-16 中铁港航局集团有限公司 Construction method for single-pile single-stud fully-buried round bearing platform in shallow water of riverway
CN106759446A (en) * 2017-02-27 2017-05-31 中国电力工程顾问集团西北电力设计院有限公司 A kind of hollow digging foundation of root keyed for transmission line of electricity
CN107642041A (en) * 2017-08-17 2018-01-30 华东交通大学 The hollow clump of piles anchorage of super-large diameter
CN107974942A (en) * 2017-11-30 2018-05-01 中铁二十局集团有限公司 A kind of abrupt slope side rigid frame-continuous girder end bay construction method
CN208884359U (en) * 2018-09-25 2019-05-21 中铁二院工程集团有限责任公司 A kind of king-post base configuration being suitable for bridge tower on steep side slope

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100802038B1 (en) * 2007-02-27 2008-02-12 (주)내경엔지니어링 Rahmen type abutment structure
KR200445795Y1 (en) * 2009-04-21 2009-09-01 김기훈 Single Column Drilled Pier Foundation having Concrete Block for Surface Reinforcement
CN102733407A (en) * 2011-04-01 2012-10-17 上海同济启明星科技发展有限公司 Two-ring grouted single pile foundation
CN203160110U (en) * 2013-03-14 2013-08-28 上海市政工程设计研究总院(集团)有限公司 Near-mountain and near-water bridge structure
CN104047222A (en) * 2013-03-14 2014-09-17 上海市政工程设计研究总院(集团)有限公司 Bridge structure near mountain and by river and construction method of bridge
CN204662246U (en) * 2014-12-11 2015-09-23 中铁二院工程集团有限责任公司 steep slope bridge pier structure
CN204401644U (en) * 2014-12-17 2015-06-17 中国电力工程顾问集团西北电力设计院有限公司 A kind of hollow digging foundation
CN105155421A (en) * 2015-09-02 2015-12-16 中铁港航局集团有限公司 Construction method for single-pile single-stud fully-buried round bearing platform in shallow water of riverway
CN106759446A (en) * 2017-02-27 2017-05-31 中国电力工程顾问集团西北电力设计院有限公司 A kind of hollow digging foundation of root keyed for transmission line of electricity
CN107642041A (en) * 2017-08-17 2018-01-30 华东交通大学 The hollow clump of piles anchorage of super-large diameter
CN107974942A (en) * 2017-11-30 2018-05-01 中铁二十局集团有限公司 A kind of abrupt slope side rigid frame-continuous girder end bay construction method
CN208884359U (en) * 2018-09-25 2019-05-21 中铁二院工程集团有限责任公司 A kind of king-post base configuration being suitable for bridge tower on steep side slope

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周建春, 魏琴, 寿楠椿: "群桩―地基土―桥梁结构的相互作用分析", 华南理工大学学报(自然科学版), no. 05 *
胡永春;: "大直径空心桩基础的发展及在桃源沅水大桥中的应用", 黑龙江交通科技, no. 03, pages 82 *
陈志坚, 冯兆祥, 陈松, 张勤: "江阴大桥摩擦失效嵌岩群桩传力机理的实测研究", 岩石力学与工程学报, no. 06 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356054A (en) * 2021-06-26 2021-09-07 山东省公路桥梁建设有限公司 Cable tower and construction method thereof
CN113356054B (en) * 2021-06-26 2023-02-14 山东省公路桥梁建设集团有限公司 Cable tower and construction method thereof

Similar Documents

Publication Publication Date Title
CN103485363B (en) Three-dimensional continuous frame formula reinforced concrete structure retaining wall
CN104389317B (en) The only pile foundation construction of large-span arch bridge ultra-large type tilting
CN108342982A (en) A kind of hybrid combining girder stayed-cable bridge cable crane track cable beam-ends is from anchor structure
CN102061742B (en) Shockproof reinforced concrete pseudo-classic building structural system
CN106087742A (en) A kind of suspension bridge pier-stage type prestressing force anchorage
JP3765000B2 (en) Ground improvement foundation method for soft ground.
Choudhary et al. Influence of soil density on performance of geocell-reinforced vertical anchor in sand
CN201272968Y (en) Combined anchorage system
CN208884359U (en) A kind of king-post base configuration being suitable for bridge tower on steep side slope
CN204690805U (en) A kind of shield tunnel continuous beam type float Structure
CN204738304U (en) An anchor rope framed bent friction pile combination fender structure
CN109056530A (en) A kind of king-post base configuration being suitable for bridge tower on steep side slope
CN213267973U (en) Pile foundation reinforced structure constructed by adopting composite piles
CN203475289U (en) Pile type continuous rigid frame bridge
CN109235465A (en) Squeeze into the superpower concrete tubular pile breast wall type packaged combination anti-slide pile structure of prestressing force
CN206376981U (en) Lattice tower and the wind power generating set including the lattice tower
CN102535505A (en) Tower crane foundation formed by using external walls of basement and supporting piles of foundation pit
CN209066456U (en) Squeeze into the superpower concrete tubular pile breast wall type packaged combination anti-slide pile structure of prestressing force
CN208309604U (en) Hinged joint opposite supporting type anchors pilework
CN206279437U (en) A kind of non-gestalt Cable-Stayed Bridge Structure
CN203066082U (en) Temporary trestle on edge of anchor rod support type foundation pit
CN114000588A (en) Large-span arched stadium structure system
CN208777327U (en) A kind of deep water anchorage shallow foundation structure
CN210031461U (en) Towerless suspension bridge structure system
CN210151768U (en) Position structure of bridge pile foundation and subway tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination